Repair

Unplanned closures filed this way: 89 in June to August 2026 against 52 a year earlier, up by more than chance would produce; tested on its own, not among the trends page's findings. How a change is tested.

On record
532 notices since May 2025: 422 closures, 10 restrictions and 100 not yet started

In force today

16 closures filed this way are in force today, longest shut first. Filter the explorer to them.

Shut today, counted to today.
CanalWhereSinceDays shut
Weaver Navigation, Trent & Mersey CanalAnderton Boat Lift3 January 2025631
Llangollen CanalLock 6, Grindley Brook Locks to Bridge 31, New Mills Lift Bridge22 December 2025278
Lee NavigationLock 2, Ware Lock21 January 2026248
Rochdale CanalLock 81 Butler Street to Lock 83 Brownsfield31 March 2026179
Caldon CanalFroghall Basin Lock30 July 202658
Llangollen CanalLock 1, Swanley Lock to Lock 1, Baddiley Lock6 August 202651
Macclesfield CanalBosley Lock 1 to Bosley Lock 1211 August 202642
Weaver NavigationMarsh Lock16 July 202638
River SoarLock 55 - Zouch Lock20 August 202637
Monmouthshire & Brecon CanalBridge 47, Solomon's Bridge to Bridge 55, Jockey Bridge25 August 202632
Glasson Branch (Lancaster Canal)Lock No.44 September 202622
River SoarLock 48 - Cossington Lock7 September 202619
Rochdale CanalLock 569 September 202617
Leeds & Liverpool CanalBridge 33, Glovers Swing Bridge24 September 20262
Stainforth & Keadby CanalGodnow Swing Bridge25 September 20261
Stainforth & Keadby CanalKeadby Lock26 September 2026same day

By canal

68 canals have had a closure filed this way. A closure naming two canals counts on both.

Closures filed this way on each canal since May 2025, most first.
CanalClosures
Grand Union Canal64
Rochdale Canal38
Leeds & Liverpool Canal32
Trent & Mersey Canal28
Huddersfield Narrow Canal27
Shropshire Union Canal20
Staffordshire & Worcestershire Cnl18
Kennet & Avon Canal16
Oxford Canal15
Calder & Hebble Navigation13
Peak Forest Canal13
North Stratford Canal12
Show 56 moreShow fewer
CanalClosures
Llangollen Canal11
Monmouthshire & Brecon Canal11
Ashton Canal10
Lee Navigation10
Macclesfield Canal10
Birmingham & Fazeley Canal9
Rufford Branch (L&L Canal)9
Stainforth & Keadby Canal9
Worcester & Birmingham Canal9
Leicester Line (Grand Union Canal)8
Aire & Calder Navigation Main Line7
Caldon Canal7
New Junction Canal7
Stourbridge Canal7
Chesterfield Canal6
Regent's Canal6
Wakefield Branch (Aire & Calder)6
Weaver Navigation6
Glasson Branch (Lancaster Canal)5
Huddersfield Broad Canal5
Old Main Line5
River Soar5
River Stort5
River Trent5
Sheffield & South Yorkshire Nav5
Coventry Canal4
South Stratford Canal4
Erewash Canal3
Gloucester & Sharpness Canal3
Rushall Canal3
Tame Valley Canal3
Walsall Canal3
Bridgwater & Taunton Canal2
Digbeth Branch (Birm'm & Fazeley)2
Market Harborough Arm (GU Cnl)2
Pocklington Canal2
Ripon Canal2
River Ouse2
River Severn Navigation2
Selby Canal2
Sheffield & Tinsley Canal2
Ashby Canal1
Bank Dole Cut1
Daw End Canal1
Dudley No 1 Canal1
Gower Branch (New Main Line)1
Hertford Union Canal1
Lancaster Canal1
Liverpool Link1
Montgomery Canal1
New Mainline1
Northampton Arm (GU Canal)1
Nottingham & Beeston Canal1
Old River Lea1
River Witham1
South Dock1

Every closure on record

Showing 422 closures and 10 restrictions CRT filed as “Repair”.

Period

Rank by

Population

45 closures are in neither group: 43 unplanned with no day in the cruising season since May 2025, and 2 not started yet.

Status

Duration

Cause

Asset affected

Lock part

Unplanned lock failures naming a part

Water problem

Unplanned failures naming one

CRT reason

Region

422
closures
7,834
closure-days since May 2025
3,593
in cruising season
13
no reopening date
What these figures mean
Population
Which closures a figure counts. All closures is everything; Unplanned closure drops the works CRT flags as its winter programme and any day outside the cruising season (the Friday nearest 15 March to the Sunday before the first Monday in November). Scheduled work CRT does not flag as winter works still counts here. CRT Planned closure is the flagged winter programme alone.
Defensible duration
The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
Closure-days
One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals. They are counted from 1 May 2025, when this archive begins: a closure that started earlier adds only its days since then, though its own row shows its whole length. Every figure and chart counts only the days inside the Period chosen above them.
In force
A closure is in a Period, and a day is one a closure affected, if it was in force at any time that day, including the morning it reopened. Closure-days measure how long, so they count whole days and not the reopening day: a closure can be in a Period and add no closure-day to it.

Closures in force each month

closures active during the month
21
27
27
21
13
21
42
48
69
66
63
29
39
30
46
46
32
May 25Jun 25Jul 25Aug 25Sep 25Oct 25Nov 25Dec 25Jan 26Feb 26Mar 26Apr 26May 26Jun 26Jul 26Aug 26Sep 26
  • In force
  • Announced, not yet reached

Canals ranked by the season's closures

share of the period's cruising-season days up to today — a closure somewhere on a long canal is likelier, and does not mean the canal was impassableclosures in force on the period's cruising-season days — a longer canal has more to go wrong on

Where

closure-days by regionclosures by region

A region with more canal has more to go wrong on, so these totals partly measure its size. Regions compared by length of canal are on the Reliability page.

What causes them

closure-days by causeclosures by cause
Show 3 moreShow fewer
Not read yet12
Show 3 moreShow fewer
Not read yet21

What fails

closure-days by assetclosures by asset
Lock5,348328
Other6144
Bridge15711
Show 5 moreShow fewer
Show 5 moreShow fewer
Other4614
Weir111

What fails on a lock

closure-days by part — unplanned lock failures naming a partclosures by part — unplanned lock failures naming a part
Gate1,02663
Paddle25881
Cill21315
Bywash1092
Show 4 moreShow fewer
Show 4 moreShow fewer

How long they last

closures by full length, including any days before May 2025 — the bands are not equal in width
158
100
75
71
16
2
<=1d2-7d8-30d31-90d91-365d>365d
432 results · every closure CRT filed as “Repair”Jump to list

Closures

  1. Albert Street Cutting. Bridgwater & Taunton Canal

    Bridgwater & Taunton CanalWales and South West

    1,337 days

    From 12 November 2021

    Reopened 11 July 2025

    71 of them since this archive began on 1 May 2025

    Where
    Bridge 1, Victoria Rd to Bridge 4, Albert St
    CRT reason
    Repair
    Cause
    Cause not stated
    Asset
    Canal or river

    Please be advised that following planned inspection works through Albert Street Cutting the Trust has taken the decision to close the towpath and navigation with immediate effect in the interest of public safety. We are working with colleagues to ensure that remedial work to…

    CRT's only update, 1 May 2025.

  2. Navigation Closure: Anderton Boat Lift

    Weaver Navigation, Trent & Mersey CanalNorth West

    631 days

    From 3 January 2025

    No reopening date

    Still shut. Joins the Weaver Navigation and the Trent & Mersey Canal: it stops boats passing between them, not along either

    513 of them since this archive began on 1 May 2025

    Where
    Anderton Boat Lift
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Other

    We understand how much the Anderton Boat Lift means to boaters, visitors and the community. We're focussed on finding a solution to get the lift operational again while we look to secure the larger investment for its long-term future. We are still aiming to reopen one caisson in…

    Latest of 7 CRT updates, 12 August 2026. 45 days without another.

  3. Between Lock 6 Grindley Brook Lock and Bridge 31A Whitchurch Bypass Bridge

    Llangollen CanalWest Midlands

    278 days

    From 22 December 2025

    No reopening date

    Still shut

    Where
    Lock 6, Grindley Brook Locks to Bridge 31, New Mills Lift Bridge
    CRT reason
    Repair
    Cause
    Worn out
    Asset
    Embankment

    Work has temporarily stopped on the reconstruction of the canal embankment due to unforeseen wet areas of material at the south (New Mills Lift Bridge) end of the works. The wet areas are preventing the imported granular material from being adequately compacted. The existing…

    Latest of 18 CRT updates, 14 September 2026. 12 days without another.

  4. Navigation Closure - Lee Navigation, Ware Lock

    Lee NavigationLondon and South East

    248 days

    From 21 January 2026

    No reopening date

    Still shut

    Where
    Lock 2, Ware Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    The navigation closure remains in place and will continue until the EA replaces the gates. Further update will be provided as soon as additional information becomes available from the EA regarding the programme for works and any future navigation arrangements. If you would like…

    Latest of 13 CRT updates, 8 September 2026. 18 days without another.

  5. Navigation Closure: Lock 11 West, Huddersfield Narrow Canal

    Huddersfield Narrow CanalNorth West

    212 days

    From 1 January 2025

    Reopened 1 August 2025

    92 of them since this archive began on 1 May 2025

    Where
    Lock 12 West to Lock 10 West
    CRT reason
    Repair
    Cause
    Weather
    Asset
    Embankment

    We are pleased we have completed works to Lock 11W, from the extreme damaged that occurred in January. We will continue to demobilise the area and we will carry landscaping with reinstalling of trees. Please note this lock and all locks on the Huddersfield Narrow Canal will…

    Latest of 6 CRT updates, 30 July 2025.

  6. Marsh Lock

    Weaver NavigationNorth West

    193 days

    Fully shut 193 of CRT's 202 days

    From 12 September 2025

    Reopened 2 April 2026

    Where
    Marsh Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Our teams are currently awaiting the delivery of, and training on, the powered windlass, which will support future operations. Bookings are now open, and customers can reserve a slot online or by contacting our Customer Services team on 03030 404040. From 13 April, bookings will…

    Latest of 11 CRT updates, 27 March 2026.

  7. Lock 58, Tardebigge Top Lock

    Worcester & Birmingham CanalWest Midlands

    191 days

    From 17 February 2025

    Reopened 27 August 2025

    118 of them since this archive began on 1 May 2025

    Where
    Lock 58
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    We're pleased to confirm that, despite the discovery of an additional significant void requiring further work, repairs at Tardebigge Top Lock remain on schedule. The lock is due to reopen on Wednesday 27th August. Please note that upon reopening, Tardebigge Lock Flight will be…

    Latest of 9 CRT updates, 18 August 2025.

  8. Lock 83 to Lock 81, Rochdale Canal

    Rochdale CanalNorth West

    179 days

    From 31 March 2026

    No reopening date

    Still shut

    Where
    Lock 81 Butler Street to Lock 83 Brownsfield
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Culvert

    Since out last update contractors have encountered some unforeseen ground conditions during the excavation works which requires additional engineering assessments to be carried out. Work has now been scheduled to continue on Monday 14 September. Despite this short delay, work on…

    Latest of 16 CRT updates, 9 September 2026. 17 days without another.

  9. Lock 40, Wilmcote Top Lock

    South Stratford CanalWest Midlands

    147 days

    From 24 January 2025

    Reopened 20 June 2025

    50 of them since this archive began on 1 May 2025

    Where
    Lock 40, Wilmcote Top Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    To clarify, there will be no restrictions once navigation opens. We expect navigation to be open by 5 PM today.

    Latest of 7 CRT updates, 20 June 2025.

  10. Lock 5, Kelston Lock

    Kennet & Avon CanalWales and South West

    132 days

    Fully shut 132 of CRT's 182 days

    From 10 September 2025

    Reopened 11 March 2026

    Where
    Lock 5, Kelston Lock
    CRT reason
    Repair
    Cause
    Other cause
    Asset
    Lock

    Further to the notice below, please be advised that Kelston Lock (Lock 5) is now closed pending the replacement of the lock gates. Unfortunately, due to elevated water levels, it is not possible to undertake the necessary works during the winter period. For safety reasons, the…

    Latest of 6 CRT updates, 10 November 2025.

  11. Spouthouse Embankment, Perry Barr, Birmingham

    Tame Valley CanalWest Midlands

    130 days

    From 3 November 2025

    Reopened 13 March 2026

    Where
    Culvert 3, Hampstead to Perry Barr Lock 1, Top Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Embankment

    A navigation and towpath closure are required for significant canal bed replacement works to two areas of the canal over the length of Spouthouse Embankment. The canal will be drained between Gorse Farm Bridge and Tower Hill and works will also include canal wall rebuild and…

    CRT's only update, 8 May 2025.

  12. Bridge 131, Knolles Bridge to Bridge 133, Backford Bridge

    Shropshire Union CanalNorth West

    127 days

    From 17 July 2025

    Reopened 21 November 2025

    Where
    Bridge 133, Backford to Bridge 131, Knolles
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Culvert

    We are pleased to confirm that the refilling and testing, originally scheduled to begin during the week commencing 24th November, will now be brought forward and will start on Thursday this week. Subject to successful testing and no unforeseen issues, we expect to reopen the…

    Latest of 13 CRT updates, 18 November 2025.

  13. Lock 1-4 - Monday passage only 9am to 3pm.

    Rochdale CanalYorkshire and North East

    126 days

    Fully shut 126 of CRT's 128 days

    From 6 April 2025

    Reopened 12 August 2025

    101 of them since this archive began on 1 May 2025

    Where
    Lock 1 to Lock 3/4
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Canal or river

    The investigation works have progressed and we are able to provide a window of passage from Lock 1 to Lock 4 on Mondays only from 9am to 3pm, water levels permitting. The local team will be closely monitoring the water levels and communicating with the engineers carrying out the…

    Latest of 17 CRT updates, 11 August 2025.

  14. Navigation Closure: Lock 7, Glasson Branch, Lancaster Canal

    Glasson Branch (Lancaster Canal)North West

    114 days

    From 3 February 2025

    Reopened 28 May 2025

    27 of them since this archive began on 1 May 2025

    Where
    Lock No.7, Glasson Basin Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    We are pleased to advise navigation is now open at Lock 7 on the Glasson Branch of the Lancaster Canal following a successful repair.

    Latest of 4 CRT updates, 28 May 2025.

  15. Lock 103 Burghfield Lock

    Kennet & Avon CanalWales and South West

    109 days

    From 17 January 2026

    Reopened 6 May 2026

    Where
    Lock 103, Burghfield Lock
    CRT reason
    Repair
    Cause
    Struck by boat or vehicle
    Asset
    Lock

    Further to the notice below, work is planned to start at Burghfield Lock on the 11th May and our contractors estimate that the repair will take 3 weeks. Thank you for your patience and understanding while these essential repairs are carried out. You are welcome to contact us at…

    Latest of 7 CRT updates, 6 May 2026.

  16. Lock 38, Penkridge Lock

    Staffordshire & Worcestershire CnlWest Midlands

    107 days

    From 31 December 2025

    Reopened 17 April 2026

    Where
    Lock 38 Penkridge Lock to Lock 37 Filance Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    We are pleased to report that good progress has been made at Penkridge Lock. The bywash culvert liner has now been installed and is awaiting grouting. Grouting of the liner is planned to take place on Monday and Tuesday, subject to the timely delivery of materials. Following…

    Latest of 14 CRT updates, 10 April 2026.

  17. Culvert 16, between bridges 22 and 23, Strines

    Peak Forest CanalNorth West

    106 days

    Fully shut 106 of CRT's 114 days

    From 27 October 2025

    Reopened 18 February 2026

    Where
    Bridge 22, Turf Lea Lift Bridge to Bridge 23, Stanley Hall Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Culvert

    Due to time lost because of poor weather, this stoppage has been extended. Rewatering of the canal will take place on 12 and 13 February, followed by the removal of dams and the overpumping equipment. We currently expect the canal to reopen to boaters on 17 February, with the…

    Latest of 7 CRT updates, 12 February 2026.

  18. Walsall Lock Flight

    Walsall CanalWest Midlands

    105 days

    From 27 May 2026

    Reopened 9 September 2026

    Where
    Lock 8, Walsall Bottom Lock to Lock 1, Walsall Top Lock
    CRT reason
    Repair
    Cause
    Worn out
    Asset
    Lock

    The repair works are now nearing completion, and we are pleased to advise that Walsall Lock Flight is expected to reopen to navigation on Wednesday 9 September. Before travelling, please check the latest navigation notices and stoppage information, as other restrictions may…

    Latest of 6 CRT updates, 7 September 2026.

  19. Navigation and Towpath Closure: Between Bridge 51, Cowley Bridge and Bosley Lock 12, Macclesfield Canal

    Macclesfield CanalNorth West

    89 days

    From 28 March 2025

    Reopened 25 June 2025

    55 of them since this archive began on 1 May 2025

    Where
    Bridge 51, Cowley Bridge to Bosley Lock 12
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Canal or river

    We are pleased to announce that works at the breach site have been completed. Our teams will be removing the stop planks and padlocks from the locks tomorrow morning and will carry out testing. The canal and towpath will reopen and navigation will resume at 12 midday tomorrow…

    Latest of 5 CRT updates, 24 June 2025.

  20. Quoisley Lock, near Marbury

    Llangollen CanalNorth West

    81 days

    From 5 January 2026

    Reopened 27 March 2026

    Where
    Quoisley Lock,
    CRT reason
    Repair
    Cause
    Worn out
    Asset
    Lock

    We wanted to let you know that the works at Quoisley Lock will require additional time to complete. During the dewatering of the lock, it was identified that the lock gates were in significantly worse condition than expected, making repair unfeasible. New gates are therefore…

    Latest of 2 CRT updates, 2 March 2026.

  21. Spouthouse Embankment, Perry Barr, Birmingham

    Tame Valley CanalWest Midlands

    78 days

    From 23 March 2026

    Reopened 9 June 2026

    Where
    Gorse Farm Bridge, Gorse Farm to Perry Barr Lock 1, Top Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Embankment

    The navigation and towpath remain closed while we work with a third party to resolve the issue. We apologise for any inconvenience and will provide an update by 5 June.

    Latest of 6 CRT updates, 12 May 2026.

  22. Lock 19 Gas Pipe Lock - near Kibworth Harcourt

    Leicester Line (Grand Union Canal)East Midlands

    74 days

    From 12 January 2026

    Reopened 27 March 2026

    Where
    Lock 19 - Gas Pipe Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Work at Gas Pipe Lock has been delayed by severe weather and flooding in early January, which held up the start of the planned stoppage by two weeks. The project includes full replacement of both lock gates, repairs, and lock ladder renewal. Because the original programme…

    Latest of 2 CRT updates, 13 February 2026.

  23. Lock 36 - Gees Lock - Near Whetstone

    Leicester Line (Grand Union Canal)East Midlands

    73 days

    From 19 January 2026

    Reopened 2 April 2026

    Where
    Lock 36 - Gees Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Works at Gees Lock 36 are running behind schedule due to operational challenges, including low water levels affecting access to the site. Progress has also been slowed by limited lifting capacity, as only one crane boat is currently available. Flooding elsewhere on the network…

    Latest of 4 CRT updates, 20 March 2026.

  24. Locks 42, 43 and 44 - Marsworth Flight

    Grand Union CanalLondon and South East

    73 days

    From 6 January 2026

    Reopened 20 March 2026

    Where
    Lock 42 to Lock 44
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Work on the Marsworth Flight has been delayed by severe weather throughout the project. As a result, the team has been unable to complete all required repairs within the original stoppage window. To allow the remaining work to be completed safely and to the required standard, we…

    Latest of 4 CRT updates, 4 March 2026.

  25. Advice - Grand Union Canal, Clitheroe's Lock, Lock 99, Brentford

    Grand Union CanalLondon and South East

    70 days

    Fully shut 70 of CRT's 71 days

    From 27 May 2025

    Reopened 6 August 2025

    Where
    Lock 99, Clitheroes Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Clitheroe's lock remains closed while essential repair work continues. We would like to inform you that concrete is currently being poured as part of the ongoing cill repair works. The concrete will require at least three full days to cure properly. On Monday, 4th of August, we…

    Latest of 13 CRT updates, 1 August 2025.

  26. Lock 87, Ham lock, near Thatcham

    Kennet & Avon CanalWales and South West

    67 days

    From 3 November 2025

    Reopened 9 January 2026

    Where
    Lock 87, Ham Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Unfortunately, we now require additional time on site to complete these works to the required standard. The stoppage will now end on 9th January. We have experienced challenges with effectively damming the lock, which has caused delays in replacing the bottom gates. To ensure…

    Latest of 3 CRT updates, 12 December 2025.

  27. Lock 81 and Top Lock 65, Near Wigan

    Leeds & Liverpool CanalNorth West

    67 days

    From 5 January 2026

    Reopened 13 March 2026

    Where
    Lock 85, Lock 21 to Lock 65, Top Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Please be advised that, in addition to the advertised works at Locks 81 and 65, we will also be carrying out repair works at Lock 75, which require the lock to be dewatered. The stoppage dates and closure location remain unchanged as originally communicated. Both teams have…

    Latest of 2 CRT updates, 16 January 2026.

  28. Lock 12, Brighouse Bottom

    Calder & Hebble NavigationYorkshire and North East

    67 days

    From 5 January 2026

    Reopened 13 March 2026

    Where
    Bridge 2, Elland to Lock 15, Kirklees Low Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for a full lock gate replacement & general repairs

    CRT's only update, 7 May 2025.

  29. Lock 5, Woodside Mills - Near Elland

    Calder & Hebble NavigationYorkshire and North East

    67 days

    From 5 January 2026

    Reopened 13 March 2026

    Where
    Lock 3, Salterhebble Bottom to Lock 5, Woodside Mills
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for a full lock gate replacement & general repairs

    CRT's only update, 7 May 2025.

  30. Lock 36 Otherton, Penkridge

    Staffordshire & Worcestershire CnlWest Midlands

    67 days

    From 5 January 2026

    Reopened 13 March 2026

    Where
    Littleton Colliery Railway Bridge 80A to Bridge 83 Lyne Hill Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    The gates are composite and after further investigations are going to require off-site refurbishment. We require additional time at this stoppage to complete the works to the necessary standard. Starting the works a bit earlier will allow us to complete by the original 13 March…

    Latest of 2 CRT updates, 12 September 2025.

  31. Lock 37, Penkridge

    Staffordshire & Worcestershire CnlWest Midlands

    67 days

    From 5 January 2026

    Reopened 13 March 2026

    Where
    Bridge 84, Filance Bridge to Bridge 85, Princefield Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for top and bottom gate replacements and quoin repairs.

    CRT's only update, 8 May 2025.

  32. Lock 48, Worksop Stret Lock - Near Worksop

    Chesterfield CanalYorkshire and North East

    60 days

    From 12 January 2026

    Reopened 13 March 2026

    Where
    Lock 48, Worksop Stret Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for a full lock gate replacement & general repairs

    CRT's only update, 7 May 2025.

  33. Lock 4, Adderley

    Shropshire Union CanalWest Midlands

    60 days

    From 12 January 2026

    Reopened 13 March 2026

    Where
    Adderley Lock 5 to Adderley Lock 1
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for top and bottom gate replacements and brickwork repairs. We will also be doing lock landing repairs below lock 4.

    CRT's only update, 8 May 2025.

  34. Lock 4

    Glasson Branch (Lancaster Canal)North West

    59 days

    From 5 January 2026

    Reopened 5 March 2026

    Where
    Lock No.4
    CRT reason
    Repair
    Cause
    Worn out
    Asset
    Lock

    We are pleased to confirm that work to replace the paddles at Lock 4 on the Glasson Branch is planned to commence on Monday 02 March, and is expected to take a few days to complete. Navigation remains closed until the work is completed. We will provide an update on or before…

    Latest of 5 CRT updates, 20 February 2026.

  35. Lock 21 East - Closed in preparation for repairs to the stop plank grooves

    Huddersfield Narrow CanalYorkshire and North East

    58 days

    From 22 October 2025

    Reopened 19 December 2025

    Where
    Lock 21 East, Waterside Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Lock 21 East will be locked up due to preparation work that is needed for the repairs to the stop plank grooves, taking place under the Winter Stoppages Works. This is to ensure that the team are working in the conditions needed to undertake the preparation work for the Winter…

    CRT's only update, 21 October 2025.

  36. Froghall Basin Lock

    Caldon CanalWest Midlands

    58 days

    From 30 July 2026

    Due to reopen 23 October 2026

    Still shut

    Where
    Froghall Basin Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Repairs to Froghall Basin Lock have now been scheduled. Works are currently planned to commence during the week commencing 14 September 2026 and are expected to take approximately six weeks, with completion anticipated by 23 October 2026, subject to conditions on site. Please…

    Latest of 2 CRT updates, 18 August 2026. 39 days without another.

  37. Lock 5, Camp Hill

    Grand Union CanalWest Midlands

    53 days

    From 5 January 2026

    Reopened 27 February 2026

    Where
    Lock 6, Camp Hill (Lock 57) to Lock 1, Camp Hill Top Lock (Lock 52)
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Due to additional work identified while on site, this stoppage will be extended and is now planned to complete on 27 February. During the course of the project, our team identified further brickwork repairs that were not included in the original scope. In addition, we found that…

    Latest of 2 CRT updates, 12 February 2026.

  38. Lock 21 - Pywells Lock - near Kibworth Harcourt

    Leicester Line (Grand Union Canal)East Midlands

    53 days

    From 12 January 2026

    Reopened 6 March 2026

    Where
    Lock 21 - Pywells Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We'd like to clarify the nature of the upcoming works at Pywells Lock. The project has always been intended for gate repairs rather than a full gate replacement. The schedule remains unchanged, as other essential works are also planned during this 8-week stoppage. These repairs…

    Latest of 2 CRT updates, 5 December 2025.

  39. Lock 20, Dowley Gap Bottom Lock - Near Bingley

    Leeds & Liverpool CanalYorkshire and North East

    53 days

    From 5 January 2026

    Reopened 27 February 2026

    Where
    Lock 21, Dowley Gap Top Lock to Bridge 206, Dowley Gap Changeline Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Please note the towpath will no longer be closed during these works.

    Latest of 2 CRT updates, 29 June 2025.

  40. Lock 8, Mayroyd - Near Hebden Bridge

    Rochdale CanalYorkshire and North East

    53 days

    From 5 January 2026

    Reopened 27 February 2026

    Where
    Bridge 14, Fallingroyd Tunnel to Lock 8, Mayroyd
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Following a detailed inspection after the canal was dewatered, we have identified that the repairs required are more extensive than originally anticipated. These works will now require specialist contractor involvement. To ensure the repairs are completed safely and to the…

    Latest of 2 CRT updates, 5 February 2026.

  41. Culvert 15A, near Sutton Road Bridge in the Bonehill area of Tamworth

    Coventry CanalWest Midlands

    53 days

    From 19 January 2026

    Reopened 13 March 2026

    Where
    Sutton Road Bridge to A5 Road Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Culvert

    Following an onsite review, we're now confident that the works can be completed within a shorter stoppage window. The revised stoppage dates are 19 January to 13 March.

    Latest of 2 CRT updates, 19 December 2025.

  42. Lock 12, Napton on the Hill

    Oxford CanalWest Midlands

    52 days

    From 26 January 2026

    Reopened 19 March 2026

    Where
    Lock 8, Napton Bottom Lock to Lock 14, Adkins Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We would like to offer our sincere apologies, as we require an extension of up to 6 days to complete the remaining works on site. During the removal and installation of the gates this week, our team identified several unforeseen issues that could not have been detected before…

    Latest of 4 CRT updates, 13 March 2026.

  43. York street lock - Stourport on Severn

    Staffordshire & Worcestershire CnlWest Midlands

    51 days

    From 5 January 2026

    Reopened 25 February 2026

    Where
    York Street Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We're pleased to let you know that the works at York Street Lock have been completed ahead of schedule, and the navigation is now open.

    Latest of 4 CRT updates, 25 February 2026.

  44. Mechanical Failure at Barmby Tidal Barrage - Now Operational

    River OuseYorkshire and North East

    51 days

    From 13 July 2026

    Reopened 2 September 2026

    CRT's title says reopened

    Where
    Barmby Tidal Barrage
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Other

    The Environment Agency have informed us that the mechanical fault has been fixed. Barmby Tidal Barrage is operational. For any information regarding Barmby Barrage, please contact them directly on 0208 474 8798.

    Latest of 2 CRT updates, 2 September 2026.

  45. Lock 1 Baddiley Lock to Lock 1 Swanley lock on the Llangollen Canal

    Llangollen CanalNorth West

    51 days

    From 6 August 2026

    No reopening date

    Still shut

    Where
    Lock 1, Swanley Lock to Lock 1, Baddiley Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Culvert

    Since our last update the fallen tree has now been removed, and our contractors are carrying out excavation works to gain access to the culvert. This will enable the team to undertake detailed inspections and surveys, providing the information required for our design engineers…

    Latest of 6 CRT updates, 18 September 2026. 8 days without another.

  46. Lock 81, Hamstead Lock, near Hamstead Marshall

    Kennet & Avon CanalWales and South West

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Lock 81, Hamstead Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Please note the towpath will no longer be closed during these works.

    Latest of 2 CRT updates, 29 June 2025.

  47. Bridge 62, High Bridge, Mamhilad

    Monmouthshire & Brecon CanalWales and South West

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Bridge 62, High Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Bridge

    Please note the towpath will no longer be closed during these works.

    Latest of 2 CRT updates, 29 June 2025.

  48. Llanfoist Safety Gates (upstream and downstream), Embankment 8A, Llanfoist.

    Monmouthshire & Brecon CanalWales and South West

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Tod's Bridge to Bridge 96, Govilon Turn
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Other

    Due to additional work identified on site, the safety gate replacement will not be completed by the advertised stoppage end date of 19th December. During installation of the new gates, it was discovered that the quoins had shifted. Our team will carry out the necessary remedial…

    Latest of 2 CRT updates, 12 December 2025.

  49. Lock 13, Tilstone

    Shropshire Union CanalNorth West

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Lock 13 Tilstone Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigational closure is required for top and bottom gate repair works and ladder hoop modifications.

    CRT's only update, 6 May 2025.

  50. Locks 22, 26, 27 and 28 West, Diggle

    Huddersfield Narrow CanalNorth West

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Bridge66, Ward Lane Bridge to Bridge 71, Wool Road
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Please be advised that the works at Lock 22W have been completed and the lock is now open. The stoppage now runs from Bridge 66, Ward Lane Bridge, to Bridge 71, Wool Road Bridge, while works continue at Locks 26W, 27W, and 28W.

    Latest of 4 CRT updates, 26 November 2025.

  51. Lock 2, Camp Hill

    Grand Union CanalWest Midlands

    46 days

    From 5 January 2026

    Reopened 20 February 2026

    Where
    Lock 6, Camp Hill (Lock 57) to Lock 1, Camp Hill Top Lock (Lock 52)
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for top and bottom lock gate replacements. We will also be doing lock chamber brickwork repairs.

    CRT's only update, 7 May 2025.

  52. Bank Dole Lock (5) in Knottingley

    Bank Dole CutYorkshire and North East

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Trundles Lane Bridge to Bank Dole Lock (Lock 5)
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for downstream gate replacements & upstream lock gate repairs.

    CRT's only update, 7 May 2025.

  53. Bridge 11, Dratley's Bridge - Near Burton Hastings

    Ashby CanalEast Midlands

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Bridge 11, Dratley's Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Bridge

    Following a review of the works and customer feedback, this stoppage will now commence on 03/11/2025 to align with the start of the Intensive Maintenance Period.

    Latest of 3 CRT updates, 19 September 2025.

  54. Lock 7, Top Lock - Near Long Buckby Wharf

    Grand Union CanalEast Midlands

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Lock 7, Top Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Following a review of the works and customer feedback, this stoppage will now commence on 03/11/2025 to align with the start of the Intensive Maintenance Period.

    Latest of 3 CRT updates, 17 September 2025.

  55. Lock 81 and Miles Platting Bridge, Manchester

    Rochdale CanalNorth West

    46 days

    From 5 January 2026

    Reopened 20 February 2026

    Where
    Lock 66 Tannersfield Highest to Bridge 88, Red Hill Street Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    This navigational closure will encompass 2 pieces of work, the navigation will be closed from bridge 88 through to lock 66. We will be replacing the top & bottom gates of lock 81 along with masonry repairs, ladder & paddle works. We will also be doing leakage repairs to the…

    CRT's only update, 8 May 2025.

  56. Lock 20, Kingswood

    North Stratford CanalWest Midlands

    46 days

    From 5 January 2026

    Reopened 20 February 2026

    Where
    Lock 20
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We're pleased to confirm that the works at Kingswood Lock 20 will be completed ahead of schedule, and navigation will reopen on 20 February. Some works will continue on the lockside after navigation has reopened, but these will not affect boat movements. Thank you for your…

    Latest of 2 CRT updates, 17 February 2026.

  57. Lock 1 - Near Mirfield

    Huddersfield Broad CanalYorkshire and North East

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Bridge 3b, Pipebridge 2 to Lock 1
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for a full lock gate replacement and wash wall repairs.

    CRT's only update, 8 May 2025.

  58. Lock 15 East, Golcar Brook Lock and Lock 18 East, Can Lock - Near Huddersfield

    Huddersfield Narrow CanalYorkshire and North East

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Lock 9 East, Isis Lock to Lock 31 East
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    This closure now encompasses two pieces of work. We will be doing top gate replacement and bottom gate repairs to Lock 15 East and a full lock gate replacement (upstream and downstream) to Lock 18 East along with general repairs.

    Latest of 2 CRT updates, 29 June 2025.

  59. Sykehouse Lock - Near Thorne

    New Junction CanalYorkshire and North East

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Don Aqueduct to New Junction End Culvert
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for bottom and top gate repairs. We will also be working on the upstream cill and doing sluice and ladder repair works.

    CRT's only update, 8 May 2025.

  60. Lock 56 - Kegworth New Lock - Near Kegworth

    River SoarEast Midlands

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Lock 56 - Kegworth New Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for top gate replacement and general lock repairs.

    CRT's only update, 8 May 2025.

  61. Lock 34, Somerton deep lock

    Oxford CanalLondon and South East

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Lock 34, Somerton Deep Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for top lock gate replacement.

    CRT's only update, 11 May 2025.

  62. Lock 7, Worcester

    Worcester & Birmingham CanalWest Midlands

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Lock 7, Bilford
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Please note the towpath will no longer be closed during these works.

    Latest of 2 CRT updates, 29 June 2025.

  63. Bridge 51, Ben Healey Bridge - Littleborough

    Rochdale CanalNorth West

    46 days

    From 26 January 2026

    Reopened 13 March 2026

    Where
    Bridge 51, Ben Healey Bridge to Bridge 52, Brown Bank Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Canal or river

    Following the initial onsite investigation works, it has become clear that the repair required is more extensive than first anticipated. This stoppage will therefore be extended until 13 March to allow the investigation to be completed and for any necessary repairs to be carried…

    Latest of 2 CRT updates, 12 February 2026.

  64. Lock 87, Manchester

    Rochdale CanalNorth West

    44 days

    From 2 February 2026

    Reopened 18 March 2026

    Where
    Lock 84 Dale St to Lock 92 Castlefield
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We would like to make you aware that we are having to extend the closure at Lock 87 due to delays and additional work requirements. Planned crane lift dates had to be moved at short notice because they coincided with the Chinese New Year parade. Whilst on site with the lock…

    Latest of 2 CRT updates, 27 February 2026.

  65. Lock 18

    Ashton CanalNorth West

    44 days

    From 1 October 2025

    Reopened 14 November 2025

    Where
    Lock 18 to Lock 1
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    We're pleased to confirm that the works at Lock 18 on the Ashton Canal have now been completed. We are currently awaiting the contractors to dismantle the scaffolding before navigation can be reopened. A further update will be provided on Friday, 14 November.

    Latest of 5 CRT updates, 13 November 2025.

  66. Star Lock 27, Stone

    Trent & Mersey CanalWest Midlands

    42 days

    From 3 November 2025

    Reopened 15 December 2025

    Where
    Lock 28, Yard Lock to Bridge 93, Stafford Road Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We're pleased to inform you that works on site have been completed ahead of schedule, and the navigation is open.

    Latest of 3 CRT updates, 15 December 2025.

  67. Kegworth New Lock 56

    River SoarEast Midlands

    42 days

    From 2 February 2026

    Reopened 16 March 2026

    Where
    Lock 56 - Kegworth New Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Ongoing flooding on the River Soar continues to prevent works at Kegworth from being carried out safely. As a result, the works cannot be completed by the original end date of Friday 6th March. The navigation closure has therefore been extended until 20th March to allow river…

    Latest of 3 CRT updates, 4 March 2026.

  68. Bottom Barge Lock, Stourport Basin

    Staffordshire & Worcestershire CnlWest Midlands

    42 days

    From 10 July 2026

    Reopened 21 August 2026

    Where
    Bottom Barge Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Please be advised that the planned works at Bottom Barge Lock, Stourport Basin, have now been successfully completed. Our teams are currently demobilising the site and removing equipment from the area. The lock will be fully reopened and available for navigation from 16:00…

    Latest of 8 CRT updates, 20 August 2026.

  69. Lock 2, Colne Bridge Lock - Broken Mechanism, Balance Beam Dropped - Repaired and operational

    Huddersfield Broad CanalYorkshire and North East

    42 days

    From 24 July 2026

    Reopened 4 September 2026

    CRT's title says reopened

    Where
    Lock 2, Colne Bridge Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    The repairs to the balance beam have been successfully completed and Lock 2 is operational.

    Latest of 5 CRT updates, 4 September 2026.

  70. Bosley Flight

    Macclesfield CanalNorth West

    42 days

    Fully shut 42 of CRT's 46 days

    From 11 August 2026

    No reopening date

    Still shut

    Where
    Bosley Lock 1 to Bosley Lock 12
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Due to a paddle failure at Lock 3 over the weekend, we are extending the reopening of the Bosley Lock Flight by an additional day to allow boats currently travelling through this section of the Macclesfield Canal to complete their journey. The Bosley Flight will now remain open…

    Latest of 5 CRT updates, 14 September 2026. 12 days without another.

  71. lock 72, Scothmans

    Rochdale CanalNorth West

    41 days

    From 6 June 2025

    Reopened 17 July 2025

    Where
    Lock 72 Scothmans
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    We're pleased to inform you that all works at Lock 72 on the Rochdale Canal are now complete. Our teams are currently in the process of demobilising equipment and removing dams from the lock. These works will be completed by 1pm, on Thursday 17 July. Please note this area has…

    Latest of 5 CRT updates, 16 July 2025.

  72. Glasson Branch - Lock 1, near Galgate

    Glasson Branch (Lancaster Canal)North West

    39 days

    From 5 January 2026

    Reopened 13 February 2026

    Where
    Lock No.1 to Lock No.6
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigational closure is required for top gate replacements and wood paddle replacement on the bottom gates. We will also be doing some lock wall grouting and paving repairs.

    CRT's only update, 7 May 2025.

  73. Lock 35, Hatton

    Grand Union CanalWest Midlands

    39 days

    From 3 November 2025

    Reopened 12 December 2025

    Where
    Lock 46, Hatton Top Lock to Lock 26, Hatton Bottom Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We're pleased to inform you that works on site are due to complete ahead of schedule. The navigation will be open from 4pm on Friday 12th December.

    Latest of 2 CRT updates, 10 December 2025.

  74. Lock 14 - Near Bridge 23, Holmcoat Road Bridge

    Rochdale CanalYorkshire and North East

    39 days

    From 19 January 2026

    Reopened 27 February 2026

    Where
    Lock 14
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Following a recent review, we're now confident that the works can be completed within a shorter stoppage window. The revised stoppage dates are 19th January to 27th February.

    Latest of 2 CRT updates, 3 November 2025.

  75. Brades Locks, Lock 1 to Lock 3

    Gower Branch (New Main Line)West Midlands

    39 days

    From 15 September 2025

    Reopened 24 October 2025

    Where
    Lock 1 Brades Double to Lock 3, Brades Locks, Gower Branch
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We will be undertaking works at Brades Lock 3, including the replacement of both the top and bottom gates, as well as the installation of a new lock ladder. To carry out these works safely, the navigation will be closed from Lock 1 (Brades Top Lock) through to Lock 3 from 15…

    CRT's only update, 21 July 2025.

  76. Marsh Lock

    Weaver NavigationNorth West

    38 days

    Fully shut 38 of CRT's 72 days

    From 16 July 2026

    No reopening date

    Still shut

    Where
    Marsh Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Since our last update, contractors have completed their inspections and mechanical parts have now been ordered; however, as these parts are being manufactured, delivery is expected to take up to five weeks. Unfortunately, due to a mechanical fault being found, we are currently…

    Latest of 9 CRT updates, 18 September 2026. 8 days without another.

  77. Lock 3, Calcutt

    Grand Union CanalWest Midlands

    37 days

    From 3 November 2025

    Reopened 10 December 2025

    Where
    Lock 1 to Lock 3
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We're pleased to inform you that works on site have been completed ahead of schedule, and the navigation is now open.

    Latest of 2 CRT updates, 10 December 2025.

  78. Zouch Lock 55

    River SoarEast Midlands

    37 days

    From 20 August 2026

    No reopening date

    Still shut

    Where
    Lock 55 - Zouch Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    On Wednesday, our team identified issues with both the lock cill and the mitre. As the location of the lock makes these complex issues to fix, our team will be working with specialist contractors to carry out the necessary works in the shortest possible timeframe. Site set-up is…

    Latest of 4 CRT updates, 18 September 2026. 8 days without another.

  79. Batchworth Mooring - above Batchworth Lock 81

    Grand Union CanalLondon and South East

    34 days

    From 9 January 2026

    Reopened 12 February 2026

    Where
    Lock 81, Batchworth Lock
    CRT reason
    Repair
    Cause
    Worn out
    Asset
    Canal or river

    We are pleased to advise that this stoppage will finish earlier than advertised. The navigation is now scheduled to reopen on 12 February, ahead of the next planned stoppage at Lotmead Lock 80, which begins on 23 February 2026.

    Latest of 4 CRT updates, 12 February 2026.

  80. Lock 32 West to Lock 1 West

    Huddersfield Narrow CanalNorth West

    34 days

    From 10 July 2026

    Reopened 13 August 2026

    Where
    Lock 32 West to Lock 1 West
    CRT reason
    Repair
    Cause
    Weather
    Asset
    Canal or river

    The broken paddle at Lock 11West has been successfully repaired but navigation will remain closed between Lock 1 West and Lock 32 West due to a leak between Lock 12 West and Lock 13 West. Further details about this can be found via the following link: Lock 1 West To Lock 32 West

    Latest of 9 CRT updates, 13 August 2026.

  81. Lock 10, Audlem

    Shropshire Union CanalNorth West

    32 days

    From 26 January 2026

    Reopened 27 February 2026

    Where
    Lock 10 Audlem
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Following a site review of the works, we're now confident that the works can be completed within a shorter stoppage window than originally planned. The revised stoppage dates are 26th January to 27th February, meaning the whole of the Shropshire Union Canal will be open for most…

    Latest of 2 CRT updates, 28 November 2025.

  82. Lock 76, near Dutton

    Trent & Mersey CanalNorth West

    32 days

    From 19 January 2026

    Reopened 20 February 2026

    Where
    Lock 76
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Following a recent review, we're now confident that the works can be completed within a shorter stoppage window. The revised stoppage dates are 19 January 2026 to 20 February 2026.

    Latest of 2 CRT updates, 3 October 2025.

  83. Lock 42, Near Thornton-in-Craven

    Leeds & Liverpool CanalNorth West

    32 days

    From 5 January 2026

    Reopened 6 February 2026

    Where
    Lock 44, Top Lock to Bridge 158, Changeline Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigational closure is required for bottom gate refurbishment and various repair works.

    CRT's only update, 8 May 2025.

  84. Lock 8, Gardam Lock - Near Melbourne

    Pocklington CanalYorkshire and North East

    32 days

    From 8 September 2025

    Reopened 10 October 2025

    Where
    Swingbridge 7 to Lock 8, Gardam Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Unfortunately, this stoppage has been extended by a week. During the dismantling of the gates, components not originally scheduled for replacement were found to be in poor condition. This extension will allow our technicians to carry out a full assessment and formalise a…

    Latest of 3 CRT updates, 3 October 2025.

  85. Lock 10, Barton Turns

    Trent & Mersey CanalWest Midlands

    32 days

    From 3 November 2025

    Reopened 5 December 2025

    Where
    Lock 10, Barton Lock
    CRT reason
    Repair
    Cause
    Worn out
    Asset
    Lock

    Due to a change in methodology for these works, we're pleased to announce that this stoppage is now scheduled to finish at 4:00 PM on Friday, 5th December.

    Latest of 3 CRT updates, 25 November 2025.

  86. Lock 37, Dashwood Lock

    Oxford CanalLondon and South East

    32 days

    From 3 November 2025

    Reopened 5 December 2025

    Where
    Lock 37, Dashwood Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We're pleased to inform you that works on site have been completed ahead of schedule, and the navigation is now open. Please note: Our team is still carrying out some minor remedial work onsite, but this will not affect navigation.

    Latest of 2 CRT updates, 5 December 2025.

  87. Bosley Lock 7

    Macclesfield CanalNorth West

    32 days

    From 10 November 2025

    Reopened 12 December 2025

    Where
    Bosley Lock 1 to Bosley Lock 12
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    We're pleased to inform you that works on site have been completed ahead of schedule, and the navigation will be open from 4pm today.

    Latest of 4 CRT updates, 12 December 2025.

  88. Lock 13, Stewponey Lock

    Staffordshire & Worcestershire CnlWest Midlands

    32 days

    From 5 January 2026

    Reopened 6 February 2026

    Where
    Lock 13 Stewponey Lock to Bridge 32 Stewponey Old Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We are pleased to confirm that works at Lock 13 have been completed and the lock is now open.

    Latest of 2 CRT updates, 6 February 2026.

  89. Bridge 47 to Bridge 55 on the Monmouthshire & Brecon Canal.

    Monmouthshire & Brecon CanalWales and South West

    32 days

    From 25 August 2026

    No reopening date

    Still shut

    Where
    Bridge 47, Solomon's Bridge to Bridge 55, Jockey Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Canal or river

    We would like to advise our customers that we have had to close the stretch of canal between Bridge 47 and Bridge 55 due to a bed valve failure, which has resulted in a small leak within the canal bed. Contractors have carried out temporary repair works; however, the permanent…

    CRT's only update, 25 August 2026. 32 days without another.

  90. Lock 2 Rufford Branch

    Rufford Branch (L&L Canal)North West

    29 days

    From 9 February 2026

    Reopened 10 March 2026

    Where
    Lock No.1, Rufford Branch to Lock 7, Rufford Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We're pleased to let you know that the works at Lock 2 Rufford Branch have been completed ahead of schedule, and the navigation is now open.

    Latest of 2 CRT updates, 10 March 2026.

  91. Lock 83 , Lock 19 near Wigan

    Leeds & Liverpool CanalNorth West

    28 days

    From 19 January 2026

    Reopened 16 February 2026

    Where
    Lock 83, Lock 19
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We are pleased to confirm that the works at Lock 83, Lock 19 have now been completed. Please note that the Wigan Flight remains closed due to the ongoing works at Lock 65.

    Latest of 3 CRT updates, 16 February 2026.

  92. Navigation Closure: Between Bridge 26 and Bridge 27, Bollington, Macclesfield Canal

    Macclesfield CanalNorth West

    26 days

    Fully shut 26 of CRT's 28 days

    From 28 May 2025

    Reopened 25 June 2025

    Where
    Bridge 26, Sugar Lane Bridge to Bridge 27, Kerridge Road Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Canal or river

    We are pleased to announce that our teams have successfully completed the canal bed repairs over the weekend. The canal section is now fully refilled with water, and our team will continue to monitor water levels overnight. The stop planks will be removed tomorrow morning, and…

    Latest of 8 CRT updates, 24 June 2025.

  93. Lock 77, Brunsden, near Kintbury

    Kennet & Avon CanalWales and South West

    25 days

    From 12 January 2026

    Reopened 6 February 2026

    Where
    Lock 77, Brunsden Lock to Lock 76, Wire Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Please note the towpath will no longer be closed during these works.

    Latest of 2 CRT updates, 29 June 2025.

  94. Lock 42, Littlebrough

    Rochdale CanalNorth West

    25 days

    From 5 January 2026

    Reopened 30 January 2026

    Where
    Lock 37, West Summit to Lock 45
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigational closure is required for top and bottom gate refurbishment and various repair works.

    CRT's only update, 8 May 2025.

  95. Bridge 22, Burntacres Bridge

    Rochdale CanalYorkshire and North East

    25 days

    From 2 February 2026

    Reopened 27 February 2026

    Where
    Lock 13 to Lock 14
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Bridge

    Following a recent review, we're now confident that the works can be completed within a shorter stoppage window. The revised stoppage dates are 2nd February to 27th February.

    Latest of 3 CRT updates, 3 November 2025.

  96. Lock 1, Wolverhampton

    Old Main LineWest Midlands

    25 days

    From 24 November 2025

    Reopened 19 December 2025

    Where
    Lock 21, Wolverhampton to Lock 1, Top Lock, Wolverhampton
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Following the emergency works we have done this summer; there are still elements of the planned works left to undertake. During this closure we will be checking the fitting of the gate and replacing the cill, we will also be replacing the brickwork between locks 1 and 2 and…

    Latest of 2 CRT updates, 29 June 2025.

  97. Lock 5, near bridge 3, near Burscough

    Rufford Branch (L&L Canal)North West

    25 days

    From 26 January 2026

    Reopened 20 February 2026

    Where
    Lock No.1, Rufford Branch to Lock 5, German's Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We want to advise that the works at Lock 5, Burscough will remain ongoing until Friday 20 February. The team is making good progress on site; however, the activity is taking slightly longer to complete than originally anticipated. There are no additional works causing delay — we…

    Latest of 2 CRT updates, 17 February 2026.

  98. Lock 63, Sandbach malkins bank, near bridge 151

    Trent & Mersey CanalNorth West

    25 days

    From 3 November 2025

    Reopened 28 November 2025

    Where
    Lk 63, Clear Water Lock - Towpath Side to Bridge 150
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    A navigational closure is required to repair the head and tail gates of both locks.

    CRT's only update, 29 June 2025.

  99. Lock 7, Bevere Lock

    River Severn NavigationWales and South West

    25 days

    From 22 September 2025

    Reopened 17 October 2025

    Where
    Lock 7 Bevere Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Further to the notice below, please be advised that from 17th to 19th September, divers and team members will be working at Bevere Lock in preparation for the main stoppage starting on 22nd September. Navigation will remain open on the above dates but delays may occur while…

    Latest of 2 CRT updates, 3 September 2025.

  100. Iron Lock 11 in Beeston, Cheshire

    Shropshire Union CanalNorth West

    25 days

    From 2 March 2026

    Reopened 27 March 2026

    Where
    Lock 10, Wharton's Lock to Lock 12, Beeston Stone Lock
    CRT reason
    Repair
    Cause
    Worn out
    Asset
    Lock

    Repairs at Beeston Lock 11 have been progressing well, and the planned works on the head gate have now been completed. However, some unexpected conditions on site are affecting the next stage of the programme. The team has been unable to achieve a full seal on one of our dams.…

    Latest of 2 CRT updates, 19 March 2026.

  101. Lock 76 Rochdale Canal

    Rochdale CanalNorth West

    25 days

    From 30 March 2026

    Reopened 24 April 2026

    Where
    Lock 54 to Lock 81 Butler Street
    CRT reason
    Repair
    Cause
    Worn out
    Asset
    Lock

    Our team is now on site and has begun repairs to the lock gate at Lock 76. We expect the work to be completed by Friday, 24th April We will provide a further update on or before Friday, 24th April.

    Latest of 3 CRT updates, 20 April 2026.

  102. Lock 1 to lock 18

    Ashton CanalNorth West

    25 days

    From 2 August 2026

    Reopened 27 August 2026

    Where
    Lock 18 to Lock 1
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation remains closed between Lock 1 and Lock 18 on the Ashton Canal due to a head gate failure at Lock 18. Our team has now taken delivery of the brace for the head gate and has received the necessary permissions from the council. We anticipate that the team will be on site…

    Latest of 5 CRT updates, 25 August 2026.

  103. Rushall Lock Flight

    Rushall CanalWest Midlands

    23 days

    From 28 April 2026

    Reopened 21 May 2026

    Where
    Lock 1, Top Lock Rushall to Rushall Junction Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Canal or river

    Our team remains on site carrying out the canal wall repair works. In order to safely complete these works, it is necessary to maintain a reduced water level in the pound, and as such, navigation remains closed. We are currently aiming to complete the repairs and reopen the…

    Latest of 4 CRT updates, 7 May 2026.

  104. Lock 2, Hack Green

    Shropshire Union CanalNorth West

    22 days

    From 9 February 2026

    Reopened 3 March 2026

    Where
    Lock 2, Hack Green Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Following our previous update, we would like to provide further information regarding the repairs at Lock 2, Hack Green. Our original team scheduled to undertake the balance beam replacement has been delayed while completing other emergency repair works elsewhere in the North…

    Latest of 3 CRT updates, 19 February 2026.

  105. Lock 9, Mile end Regents Canal

    Regent's CanalLondon and South East

    22 days

    From 24 July 2026

    Reopened 15 August 2026

    Where
    Lock 9, Mile End Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Please be advised all repair works are complete at Mile End Lock, and the area is being cleared. The lock will reopen at 9am tomorrow morning.

    Latest of 5 CRT updates, 14 August 2026.

  106. Lock 65 to Lock 85, Wigan Flight

    Leeds & Liverpool CanalNorth West

    22 days

    From 20 August 2026

    Reopened 11 September 2026

    Where
    Lock 85, Lock 21 to Lock 65, Top Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation remains closed between Lock 65 and Lock 85 on the Wigan Flight of the Leeds & Liverpool Canal. Our team are looking to start the repairs to the detached head cill at Lock 69 week commencing Monday 7 September. Repairs are expected to take one week. A further update…

    Latest of 3 CRT updates, 1 September 2026.

  107. Lock 4

    Glasson Branch (Lancaster Canal)North West

    22 days

    From 4 September 2026

    No reopening date

    Still shut

    Where
    Lock No.4
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Since our last update, our team has attended the site at Lock 4 on the Glasson Branch and identified a suitable method of repair. Our team is now awaiting delivery of the materials required to repair the damaged paddle. Once these materials have been received, a date for the…

    Latest of 2 CRT updates, 10 September 2026. 16 days without another.

  108. Lock 11 West

    Huddersfield Narrow CanalNorth West

    21 days

    From 19 September 2025

    Reopened 10 October 2025

    Where
    Lock 11 West
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Our contractors have completed the grouting works at Lock 11 West ahead of schedule and plan for navigation to resume Friday 10 October from 5pm.

    Latest of 2 CRT updates, 8 October 2025.

  109. Lock 1 to Lock 16 Marple Flight

    Peak Forest CanalNorth West

    20 days

    From 9 June 2026

    Reopened 29 June 2026

    Where
    Lock 1 to Lock 16
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    We have now established a method of repair for the damaged balance beam at Lock 10 on the Peak Forest Canal. The team will be on site from 8:00 am on Monday 29 June to carry out the replacement of the balance beam. We currently anticipate that the works will be completed on the…

    Latest of 5 CRT updates, 23 June 2026.

  110. Swingbridge 7 - Closed (Unable to swing)

    Pocklington CanalYorkshire and North East

    19 days

    From 26 June 2025

    Reopened 15 July 2025

    Where
    Swingbridge 7
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Swingbridge 7 is unable to swing due to a fault with the pintle and is currently inoperable. Mechanical & Electrical team have notified us that they will be attending site to start work on Thursday, 3rd July. They anticipate that works will last 2-3 weeks. We will update this…

    Latest of 2 CRT updates, 30 June 2025.

  111. Cossington Lock 48

    River SoarEast Midlands

    19 days

    From 7 September 2026

    Due to reopen 23 October 2026

    Still shut

    Where
    Lock 48 - Cossington Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We're carrying out essential improvements at Cossington Lock 48, including the replacement of the top and bottom lock gates. To complete this work safely, a stoppage will be in place from 7th September to 23rd October 2026. Previous stoppages on the River Soar have been…

    CRT's only update, 30 March 2026. 180 days without another.

  112. Lock 24 West

    Huddersfield Narrow CanalNorth West

    19 days

    Fully shut 19 of CRT's 29 days

    From 28 August 2026

    Restriction from 16 September 2026

    Now a restriction: boats can pass, with limits

    Where
    Lock 24 West
    CRT reason
    Repair
    Cause
    Worn out
    Asset
    Bridge

    Following our previous update, our team is still awaiting delivery of the replacement footbridge and the scaffolding required to carry out the works. Once these have been delivered and the scaffolding erected, we will be able to confirm a date for the repair. In the meantime…

    Latest of 5 CRT updates, 16 September 2026.

  113. Lock 3 Factory, Tipton

    New MainlineWest Midlands

    18 days

    From 3 November 2025

    Reopened 21 November 2025

    Where
    Lock 3, Factory Locks, Tipton
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for top side lock gate replacement.

    CRT's only update, 7 May 2025.

  114. Lock 9 Aston

    Birmingham & Fazeley CanalWest Midlands

    18 days

    From 23 February 2026

    Reopened 13 March 2026

    Where
    Lock 1, Aston Top Lock to Aston Lock 11
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for top side lock gate replacements. We will also be replacing some lock chamber brickwork.

    CRT's only update, 7 May 2025.

  115. Lock 8, Curdworth

    Birmingham & Fazeley CanalWest Midlands

    18 days

    From 5 January 2026

    Reopened 23 January 2026

    Where
    Lock 1, Curdworth Top Lock to Lock 11, Curdworth
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for top side lock gate replacements. We will also be doing forebay sandstone repairs and trash screen repairs.

    CRT's only update, 7 May 2025.

  116. Lock 80

    Grand Union CanalLondon and South East

    18 days

    From 23 February 2026

    Reopened 13 March 2026

    Where
    Lock 80, Lot Mead
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Please note the towpath is now open for the duration of these works.

    Latest of 2 CRT updates, 29 June 2025.

  117. Lock 48, Barrowford

    Leeds & Liverpool CanalNorth West

    18 days

    From 23 February 2026

    Reopened 13 March 2026

    Where
    Lock 51, Bottom Lock to Lock 45, Top Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    This navigational closure will encompass 2 pieces of work, the navigation will be closed from Lock 45 through to lock 51. We will be refurbishing the top gates and paddles of locks 46 and 48, we will also be doing some repointing too.

    CRT's only update, 8 May 2025.

  118. Lock 1 Aston, West Felton

    Montgomery CanalWest Midlands

    18 days

    From 3 November 2025

    Reopened 21 November 2025

    Where
    Lock 1, Aston Locks
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigational closure is required for lock gate replacement.

    CRT's only update, 8 May 2025.

  119. Lock 13, Stourbridge

    Stourbridge CanalWest Midlands

    18 days

    From 23 February 2026

    Reopened 13 March 2026

    Where
    Lock 16, Stourbridge Bottom Lock to Lock 1, Stourbridge Top Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for top gate replacement and lock ladder repair.

    CRT's only update, 8 May 2025.

  120. Lock 46

    Leeds & Liverpool CanalNorth West

    18 days

    From 2 February 2026

    Reopened 20 February 2026

    Where
    Lock 51, Bottom Lock to Lock 45, Top Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    This navigational closure will encompass 2 pieces of work, the navigation will be closed from Lock 45 through to lock 51. We will be refurbishing the top gates and paddles of locks 46 and 48, we will also be doing some repointing too.

    CRT's only update, 8 May 2025.

  121. Lock 7, Actons

    Regent's CanalLondon and South East

    18 days

    From 1 December 2025

    Reopened 19 December 2025

    Where
    Lock 7, Actons Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Please be advised that, due to delays at City Road Lock, this stoppage will now commence on Monday, 1st December. This later start will provide time for travel through the area and onward to winter moorings over the coming weekend.

    Latest of 5 CRT updates, 27 November 2025.

  122. Lock 1, Rufford branch

    Rufford Branch (L&L Canal)North West

    18 days

    From 18 August 2025

    Reopened 5 September 2025

    Where
    Lock 1, Top Lock Swing Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    We are pleased to advise the works to replace the paddles at Lock 1 on the Rufford Branch are now complete. Our contractors will be on site tomorrow to remove the dams and navigation is anticipated to resume tomorrow, Friday 5 September by 4pm.

    Latest of 4 CRT updates, 4 September 2025.

  123. Lock 4, Bosley

    Macclesfield CanalNorth West

    18 days

    From 13 October 2025

    Reopened 31 October 2025

    Where
    Bosley Lock 1 to Bosley Lock 12
    CRT reason
    Repair
    Cause
    Struck by boat or vehicle
    Asset
    Lock

    We're pleased to confirm that works at Bosley Lock 4 are now nearing completion. The navigation will reopen from 10am on Friday 31st October.

    Latest of 2 CRT updates, 30 October 2025.

  124. Lock 10e, Milnsbridge

    Huddersfield Narrow CanalYorkshire and North East

    18 days

    From 1 December 2025

    Reopened 19 December 2025

    Where
    Lock 9 East, Isis Lock to Lock 11 East, Library Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Please note: A clearly signposted diversion route will be available for towpath users throughout the closure period of this stoppage.

    Latest of 2 CRT updates, 10 November 2025.

  125. Sluice 1 - Dukinfield, Tameside

    Peak Forest CanalNorth West

    18 days

    From 9 February 2026

    Reopened 27 February 2026

    Where
    Bridge 1B to Bridge 2, Dog Lane Bridge
    CRT reason
    Repair
    Cause
    Worn out
    Asset
    Sluice

    Following a recent survey of the sluice, we have identified that the paddle has become detached and the existing chamber stop planks have deteriorated. To safely replace these components, a stoppage is required. While the canal is dewatered, we will also use a jet vac tanker to…

    CRT's only update, 9 January 2026.

  126. Lock 1, New Marton, above Welsh Frankton

    Llangollen CanalWest Midlands

    18 days

    From 9 February 2026

    Reopened 27 February 2026

    Where
    Lock 1, New Marton Locks
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    We need to introduce an emergency stoppage at Lock 1, New Marton, above Welsh Frankton, on the Llangollen Canal to allow essential repair works to be carried out. The bottom gate has developed a serious water leak, which is preventing the lock from filling correctly. Repairs are…

    CRT's only update, 27 January 2026.

  127. Foxton Lock Flight

    Leicester Line (Grand Union Canal)East Midlands

    17 days

    From 22 December 2025

    Reopened 8 January 2026

    Where
    Lock 8 to Lock 17
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Unfortunately, today's attempt to repair the red paddle at Lock 17 was not successful. The team was unable to reattach the paddle due to high water levels, which will require additional stop planks and pumping to lower. This work will need specialist support and cannot be…

    Latest of 3 CRT updates, 2 January 2026.

  128. Lock 56

    Rochdale CanalNorth West

    17 days

    From 9 September 2026

    No reopening date

    Still shut

    Where
    Lock 56
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Since our last update repairs to the paddle mechanism at Lock 56 have been delayed whilst the necessary safety assessments are carried out. We anticipate repairs to start on Monday 21 September A further update will be provided on or before Tuesday 22 September.

    Latest of 4 CRT updates, 18 September 2026. 8 days without another.

  129. Lock 13, Itchington Bottom Lock

    Grand Union CanalWest Midlands

    16 days

    From 25 June 2025

    Reopened 11 July 2025

    Where
    Lock 13, Itchington Bottom Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Further to our previous update, please be advised that our team will be commencing work on site tomorrow (Thursday 10th July). We are aiming to complete the necessary works and reopen navigation by Friday 11th July. We will provide a further update on Friday to confirm progress…

    Latest of 3 CRT updates, 9 July 2025.

  130. Lock 59 To Lock 64

    Leeds & Liverpool CanalNorth West

    16 days

    From 11 May 2026

    Reopened 27 May 2026

    Where
    Lock 64, Bottom Lock to Lock 59, Lock 2
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Due to other priority works our reactive team where delayed carrying out the repairs to Lock 60 on the Leeds & Liverpool Canal. The reactive team are currently now on site repairing the damaged tail gate cill. As a result navigation remains closed between Lock 59 and Lock 64…

    Latest of 2 CRT updates, 20 May 2026.

  131. Lock 52 Heathy Lock.

    Kennet & Avon CanalWales and South West

    15 days

    From 30 December 2025

    Reopened 14 January 2026

    Where
    Lock 52, Heathy Close Lock
    CRT reason
    Repair
    Cause
    Worn out
    Asset
    Lock

    Please be advised that repairs to the lock beam will take place as soon as we can safely mobilize to site. We anticipate this being towards the end of this week, or start of the following week once access via work boat is possible. We apologies for any inconvenience caused and…

    Latest of 2 CRT updates, 5 January 2026.

  132. Bridge 55 M&B Canal

    Monmouthshire & Brecon CanalWales and South West

    15 days

    From 9 August 2026

    Reopened 24 August 2026

    Where
    Bridge 47, Solomon's Bridge to Bridge 55, Jockey Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Canal or river

    Unfortunately we have had to close the M&B Canal along this stretch due to a bed valve failure which has caused a small breach within the canal bed. The stretch of canal has isolated the issue and the teams have place holding stop planks at the bridges mentioned. Engineers will…

    CRT's only update, 9 August 2026.

  133. Lock 5, Rufford Branch, German's Lock

    Rufford Branch (L&L Canal)North West

    14 days

    From 21 November 2025

    Reopened 5 December 2025

    Where
    Lock 5, German's Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Please be aware: Following a further review of this stoppage, the navigation will remain closed for the entire duration to ensure all necessary work is completed within the stoppage window. It will not be open over the weekend as previously advertised. We apologise for any…

    Latest of 3 CRT updates, 21 November 2025.

  134. Lock 26, Aston Lock

    Trent & Mersey CanalWest Midlands

    14 days

    From 14 January 2026

    Reopened 28 January 2026

    Where
    Lock 28, Yard Lock to Lock 26, Aston Lock
    CRT reason
    Repair
    Cause
    Worn out
    Asset
    Lock

    We are sorry to announce the addition of these works to our winter works programme, which will allow us to carry out essential repairs to the gates and lock chamber at Lock 26. We are undertaking this now because the condition of the gates has continued to deteriorate, and…

    CRT's only update, 19 December 2025.

  135. Marsh Lane Lock 27

    Kennet & Avon CanalWales and South West

    14 days

    From 16 February 2026

    Reopened 2 March 2026

    Where
    Lock 44, Sir Hugh Stockwell to Lock 26, Devizes Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We're pleased to let you know that the works at Marsh Lane Lock 27 have been completed ahead of schedule, and the navigation is now open.

    Latest of 3 CRT updates, 2 March 2026.

  136. Between Lock 1 and Lock 18

    Ashton CanalNorth West

    14 days

    From 16 April 2026

    Reopened 30 April 2026

    Where
    Lock 18 to Lock 1
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation remains closed between Locks 1 and 18 on the Ashton Canal due to the cill on the tail gates at Lock 10 becoming dislodged. Repairs were initially scheduled to take place, but have been delayed while the team sourced the necessary water pumps to carry out the work. A…

    Latest of 4 CRT updates, 29 April 2026.

  137. Lock 26w

    Huddersfield Narrow CanalNorth West

    14 days

    From 1 May 2026

    Reopened 15 May 2026

    Where
    Lock 26 West
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation remains closed due to a damaged cill at Lock 26W on the Huddersfield Narrow Canal. This damage is preventing the lock from sealing, resulting in the lock being filled and operated safely. The local team have experienced delays in sourcing the necessary parts to carry…

    Latest of 2 CRT updates, 5 May 2026.

  138. Tuel Lane lock passage closed from 29th May 17:00hrs. Reopening from Friday 12th June.

    Rochdale CanalYorkshire and North East

    14 days

    From 29 May 2026

    Reopened 12 June 2026

    Where
    Lock 1 to Lock 3/4
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    I am sorry the previous message stated you need to book passage through Tuel. This is no longer the case. We will reopen the lock on Friday 12 June and passage will be available following this pattern: Mondays and Fridays 0800-1600 no prior booking required Sundays 1000-1500 no…

    Latest of 5 CRT updates, 10 June 2026.

  139. Lock 7 west Huddersfield Narrow Canal

    Huddersfield Narrow CanalNorth West

    13 days

    From 20 June 2026

    Reopened 3 July 2026

    Where
    Lock 7 West
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Due to a failed paddle, the lock is not operational at this time. An update will be provided by16:00 on Monday afternoon.

    CRT's only update, 20 June 2026.

  140. Lock 19 Marsh Lock

    Staffordshire & Worcestershire CnlWest Midlands

    13 days

    From 9 July 2026

    Reopened 22 July 2026

    Where
    Lock 18 Swindon Lock to Lock 20 Botterham Bottom Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    A replacement brace is required and is currently being manufactured. Once available, our team will install the brace and complete the necessary repairs. We currently expect works to be completed and navigation to reopen by Thursday 23 July 2026. We apologise for the…

    Latest of 2 CRT updates, 13 July 2026.

  141. Lock 45

    Rochdale CanalNorth West

    13 days

    From 28 July 2026

    Reopened 10 August 2026

    Where
    Lock 45
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation remains closed at Lock 45 on the Rochdale Canal due to a damaged paddle, which is preventing the lock from filling. We are currently awaiting the availability of the necessary resources before the repair works can begin. Once these are in place, our team will arrange…

    Latest of 3 CRT updates, 5 August 2026.

  142. Lock 44, Greenberfield, near Bridge 157

    Leeds & Liverpool CanalNorth West

    12 days

    From 8 January 2026

    Reopened 20 January 2026

    Where
    Lock 44, Top Lock to Lock 43, Middle Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigational closure is required to replace the ground paddle on the off side of the lock.

    CRT's only update, 29 June 2025.

  143. Lock 47, Dudswell lock

    Grand Union CanalLondon and South East

    11 days

    From 12 January 2026

    Reopened 23 January 2026

    Where
    Lock 47, Dudswell Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Please note the towpath will no longer be closed during these works.

    Latest of 2 CRT updates, 29 June 2025.

  144. Lock 69, Nash Mills

    Grand Union CanalLondon and South East

    11 days

    From 2 February 2026

    Reopened 13 February 2026

    Where
    Lock 69, Nash Mills
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    The works at Lock 68 have been deferred to a later date. However, the works at Lock 69 will proceed as planned, with revised dates.

    Latest of 3 CRT updates, 7 August 2025.

  145. Lock 14, Fradley

    Trent & Mersey CanalWest Midlands

    11 days

    From 8 December 2025

    Reopened 19 December 2025

    Where
    Lock 14, Common Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for top end gate replacement as well as cill and anchor plate repairs.

    CRT's only update, 8 May 2025.

  146. Lock 7, Bosley weir

    Macclesfield CanalNorth West

    11 days

    From 6 October 2025

    Reopened 17 October 2025

    Where
    Bosley Lock 1 to Bosley Lock 12
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Weir

    With a shorter window for the lock gate works at Bosley Lock 7 to allow a window for boat passage – we will undertake improvements to the weir at Lock 7 from 6 October to 17 October while there are other closures in place. We were awaiting listed building consent but now have…

    CRT's only update, 3 October 2025.

  147. Lapworth Lock 9

    North Stratford CanalWest Midlands

    11 days

    From 8 December 2025

    Reopened 19 December 2025

    Where
    Lock 9
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Our reactive response team attended site today to identify the issue and develop a repair plan. The team will return on Thursday and Friday to carry out the necessary works, with the aim of reopening navigation on Monday afternoon.

    Latest of 5 CRT updates, 17 December 2025.

  148. Culvert 16, between locks 2 & 3 Baddiley; near Nantwich

    Llangollen CanalNorth West

    11 days

    From 2 March 2026

    Reopened 13 March 2026

    Where
    Lock 2, Baddiley Lock to Lock 3, Baddiley Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Culvert

    A stoppage is required to allow us to undertake repairs to Culvert 16. The closure will be in place between Locks 2 and 3 at Baddiley so that our teams can carry out the works safely. Thank you for your patience and understanding while we complete these essential repairs.

    CRT's only update, 12 February 2026.

  149. Lock 46 - Littleborough

    Rochdale CanalNorth West

    11 days

    From 9 March 2026

    Reopened 20 March 2026

    Where
    Lock 46
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Essential paddle works are required at Lock 46, and to complete this safely and effectively, a full navigation closure will be in place for the duration of the works. This stoppage is necessary to ensure the continued reliability and safe operation of the lock. We recognise the…

    CRT's only update, 27 February 2026.

  150. Navigation Closure  Request, Huddersfield Narrow Canal, Lock 34E - Snapped Paddle - Repaired, now open

    Huddersfield Narrow CanalYorkshire and North East

    11 days

    From 30 March 2026

    Reopened 10 April 2026

    CRT's title says reopened

    Where
    Lock 34 East
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    The repairs have all been completed and the Stoppage is removed. Boaters due to be moving down the Marsden Flight are being contacted by the team to coordinate the passage through from Lock 42 East to Lock 32 East. Please be aware that the Stoppage at Lock 24 East is still on…

    Latest of 4 CRT updates, 10 April 2026.

  151. Sykehouse Road Bridge

    New Junction CanalYorkshire and North East

    11 days

    From 10 September 2026

    Restriction from 21 September 2026

    Now a restriction: boats can pass, with limits

    Where
    Sykehouse Road Bridge 7
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lift bridge

    Sykehouse Lift Bridge is currently closed to navigation due to a mechanical fault with the pump that operates the bridge. The pump has been removed and sent to a specialist for inspection, and at this stage we cannot rule out that repair or remanufacture could take several…

    Latest of 5 CRT updates, 21 September 2026.

  152. Bridge 33, Macclesfield Canal

    Macclesfield CanalNorth West

    10 days

    From 23 January 2026

    Reopened 2 February 2026

    Where
    Bridge 33, Higherfold Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Canal or river

    The repairs have now been completed. Over the weekend, we'll be removing the stop planks and carrying out checks as the canals are refilled. Once the team has finished these final checks, we're hopeful that navigation will reopen on Monday. A further update will be provided on…

    Latest of 2 CRT updates, 30 January 2026.

  153. Lock 2, Stourbridge

    Stourbridge CanalWest Midlands

    10 days

    From 16 February 2026

    Reopened 26 February 2026

    Where
    Lock 2, Stourbridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We're pleased to let you know that the works at Stourbridge Lock 2 have been completed ahead of schedule, and the navigation is now open.

    Latest of 2 CRT updates, 26 February 2026.

  154. Lock 29W

    Huddersfield Narrow CanalNorth West

    10 days

    From 5 May 2026

    Reopened 15 May 2026

    Where
    Lock 32 West to Lock 24 West
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation is currently closed at Lock 29W on the Huddersfield Narrow Canal, due to a damaged cill which is preventing the lock being operated safely. Our specialist team are planning to attend site to carry out the emergency repairs. An update will be provided on or before…

    CRT's only update, 5 May 2026.

  155. Lock 28 W, Huddersfield Narrow Canal

    Huddersfield Narrow CanalNorth West

    9 days

    From 7 May 2025

    Reopened 16 May 2025

    Where
    Lock 28 West
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    We are pleased to advise navigation is back open at Lock 28W on the Huddersfield Narrow Canal following a successful repair.

    Latest of 2 CRT updates, 16 May 2025.

  156. Lock 2 , Rufford Branch , Burscough

    Rufford Branch (L&L Canal)North West

    9 days

    Fully shut 9 of CRT's 11 days

    From 10 November 2025

    Reopened 21 November 2025

    Where
    Lock 2, 2Nd Lock Rufford Branch
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Unfortunately, this stoppage has been extended until 21st November due to additional work identified on site. This change will affect the stoppage dates for the grouting work at Lock 5, Rufford Branch, which will now run from 21st November to 5th December.

    Latest of 2 CRT updates, 18 November 2025.

  157. Keadby Rail Drawbridge - now operational

    Stainforth & Keadby CanalYorkshire and North East

    9 days

    From 17 November 2025

    Reopened 26 November 2025

    CRT's title says reopened

    Where
    Bridge 83, Keadby Rail Drawbridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lift bridge

    Repairs have been completed and the bridge is now operational.

    Latest of 2 CRT updates, 26 November 2025.

  158. RE-004-017 - Lock 1A, Hampstead Road Lock RE-004-021 - Lock 2, Hawley Lock RE-004-024 - Lock 3, Kentish Town Lock

    Regent's CanalLondon and South East

    8 days

    Fully shut 8 of CRT's 9 days

    From 13 May 2025

    Reopened 22 May 2025

    Where
    Lock 1A, Hampstead Road Lock to Lock 3, Kentish Town Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    We are delighted to report that the Camden locks are now open. The Hampstead Road lock currently available for operational use is Lock 1b.

    Latest of 6 CRT updates, 22 May 2025.

  159. Wolverhampton Lock Flight, Old Main Line

    Old Main LineWest Midlands

    8 days

    From 5 June 2025

    Reopened 13 June 2025

    Where
    Lock 21, Wolverhampton to Lock 1, Top Lock, Wolverhampton
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    We've received an update from the team. A new gate is required to complete the necessary repairs. This gate will be ready for collection from our Bradley workshop on Tuesday. We plan to transport the gate using a tug and hopper, with installation scheduled for Wednesday…

    Latest of 2 CRT updates, 5 June 2025.

  160. Bridge 31, Stone Chimney Bridge

    Lancaster CanalNorth West

    8 days

    From 2 September 2025

    Reopened 10 September 2025

    Where
    Bridge 31, Stone Chimney Bridge
    CRT reason
    Repair
    Cause
    Struck by boat or vehicle
    Asset
    Bridge

    Our engineers have removed the overhanging masonry blocks from the top of the bridge and have installed concrete barriers on bridge to prevent vehicle access, allowing us to re-open our towpath. Navigation remains closed at Bridge 31 whilst our specialist team complete the…

    Latest of 2 CRT updates, 5 September 2025.

  161. Lock 88, Oxford Street

    Rochdale CanalNorth West

    8 days

    From 12 January 2026

    Reopened 20 January 2026

    Where
    Lock 88 Oxford St
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    We are pleased to confirm that the works at Lock 88 have been completed and the navigation is now open.

    Latest of 2 CRT updates, 20 January 2026.

  162. Lock 81, Butler Street To Lock 83, Brownsfield

    Rochdale CanalNorth West

    8 days

    From 5 March 2026

    Reopened 13 March 2026

    Where
    Lock 81 Butler Street to Lock 83 Brownsfield
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation remains closed between Lock 81 and Lock 83 on the Rochdale Canal due to a loose cill at Lock 82. Our local team attended site today to carry out an investigation and are now developing a repair plan for the cill. A further update will be provided on or before Friday…

    Latest of 2 CRT updates, 9 March 2026.

  163. Between Lock 65 and Lock 85

    Leeds & Liverpool CanalNorth West

    8 days

    From 14 April 2026

    Reopened 22 April 2026

    Where
    Lock 85, Lock 21 to Lock 65, Top Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation remains closed between Lock 65 and Lock 85 on the Leeds and Liverpool Canal due to a disconnected paddle at lock 70. The team have a successfully planned a method of repair and are currently waiting on parts to be manufactured. A further update will be provided on or…

    Latest of 3 CRT updates, 17 April 2026.

  164. Upper Lode Lock.

    River Severn NavigationWales and South West

    8 days

    From 13 August 2026

    Reopened 21 August 2026

    Where
    Upper Lode Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Further to the notice below, we are pleased to advise that Upper Lode Lock has been repaired and is now fully operational. Thank you for your patience.

    Latest of 3 CRT updates, 21 August 2026.

  165. Selby Swingbridge - Assisted passage daily 9am to 12 noon - Update: Closure

    Selby CanalYorkshire and North East

    7 days

    Fully shut 7 of CRT's 9 days

    From 12 August 2025

    Reopened 21 August 2025

    Where
    Selby Swingbridge 1
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Unfortunately no further information has been received, so the status of Selby Swingbridge is still closed. On receiving any further information, the notice will be updated.

    Latest of 3 CRT updates, 20 August 2025.

  166. Lock 103, Burghfield Lock

    Kennet & Avon CanalWales and South West

    7 days

    Fully shut 7 of CRT's 9 days

    From 15 October 2025

    Reopened 24 October 2025

    Where
    Lock 103, Burghfield Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    A navigation closure is required to carry out essential repairs to the bottom lock gates, which were recently damaged. A temporary fix was implemented at the time to extend operation through the summer, but this stoppage will allow us to complete a more permanent and robust…

    CRT's only update, 18 September 2025.

  167. Lock 6 - Castle Lock

    Nottingham & Beeston CanalEast Midlands

    7 days

    From 16 February 2026

    Reopened 23 February 2026

    Where
    Lock 6 - Castle Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We're pleased to let you know that the works at Castle Lock 6 have been completed ahead of schedule, and the navigation is now open.

    Latest of 2 CRT updates, 23 February 2026.

  168. Tinsley Lock Flight

    Sheffield & Tinsley CanalYorkshire and North East

    7 days

    From 24 March 2026

    Reopened 31 March 2026

    Where
    Lock 1 Tinsley to Tinsley No.12 Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    The Tinsley flight will be closed to boaters as a dive time will be supporting sluice repairs on Tinsley No.3 Lock. This notice will be updated when the navigation closure is lifted.

    CRT's only update, 18 March 2026.

  169. Kibworth Top Lock 18 to Cranes Lock 22

    Leicester Line (Grand Union Canal)East Midlands

    7 days

    From 22 May 2026

    Reopened 29 May 2026

    Where
    Lock 18 - Kibworth Top Lock to Lock 22 - Cranes Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    The towpath side bottom gate at Kibworth Top Lock 18 has come away from the headpost causing the gate and beam to fail. This repair will need assessing by our Engineers and a repair is being planned for as soon as possible. We will update this notice with further information…

    CRT's only update, 22 May 2026.

  170. Lock 23E, Huddersfield Narrow Canal - Repaired and reopened

    Huddersfield Narrow CanalYorkshire and North East

    7 days

    From 22 May 2026

    Reopened 29 May 2026

    CRT's title says reopened

    Where
    Lock 23 East
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    The dive team have attended this morning and have repaired the paddle. The lock is now operational for boaters to use.

    Latest of 4 CRT updates, 29 May 2026.

  171. Tinsley No.3 Lock to Holmes Lock

    Sheffield & Tinsley Canal, Sheffield & South Yorkshire NavYorkshire and North East

    7 days

    From 14 September 2026

    Restriction from 21 September 2026

    Now a restriction: boats can pass, with limits

    Where
    Tinsley No.3 Lock to Tinsley No.12 Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Passage through the Tinsley Flight on Thursday the 24th of September is now fully booked. We are now also offering passage on Monday the 28th of September and Thursday the 1st of October. Advanced booking is required for these days. Booking requests should be made through…

    Latest of 3 CRT updates, 22 September 2026.

  172. Keadby Rail Drawbridge, Bridge 83

    Stainforth & Keadby CanalYorkshire and North East

    6 days

    From 7 May 2025

    Reopened 13 May 2025

    Where
    Bridge 83, Keadby Rail Drawbridge
    CRT reason
    Repair
    Cause
    Weather
    Asset
    Lift bridge

    Keadby Rail Drawbridge is still closed and the high temperatures are affecting the operating mechanisms. The bridge can operate once the temperature has dropped below 26 degrees and has stayed below for 12 hours. We will wait for an update from Network Rail once this condition…

    Latest of 3 CRT updates, 12 May 2025.

  173. Lock 2, Rufford Branch

    Rufford Branch (L&L Canal)North West

    6 days

    From 4 June 2025

    Reopened 10 June 2025

    Where
    Lock 2, 2Nd Lock Rufford Branch
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation remains closed at Lock 2 on the Rufford Branch of the Leeds & Liverpool Canal due to a blockage in the paddle mechanism. Works are scheduled to begin on Tuesday, when we hope to reopen navigation using one paddle by installing a temporary plate in the paddle chamber.…

    Latest of 2 CRT updates, 6 June 2025.

  174. Lock 5 of the Watford Flight - Leicester Line (Grand Union Canal)

    Leicester Line (Grand Union Canal)East Midlands

    6 days

    From 5 June 2025

    Reopened 11 June 2025

    Where
    Lock 5
    CRT reason
    Repair
    Cause
    Struck by boat or vehicle
    Asset
    Lock

    Multiple Teams from across the Trust have been on site this morning to assess and attempt to repair the damage. Unfortunately, their attempts have been unsuccessful and the Lock remains inoperable. Specialist equipment is required to lift the gate so that some further work can…

    Latest of 2 CRT updates, 6 June 2025.

  175. Aston Lock 10

    Birmingham & Fazeley CanalWest Midlands

    6 days

    From 2 July 2025

    Reopened 8 July 2025

    Where
    Aston Lock 10
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Please be advised our reactive response team is now scheduled to attend tomorrow (Tuesday 8th July) to assess the situation and develop a suitable repair plan for the failed lock beam at Lock 10 on the Aston Flight. In the meantime, navigation remains possible via the…

    Latest of 3 CRT updates, 7 July 2025.

  176. Lock 40, Summit Lock

    Trent & Mersey CanalWest Midlands

    6 days

    From 26 August 2025

    Reopened 1 September 2025

    Where
    Lock 40 Summit Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    We will be carrying out essential repairs to re-fix the loose metal bumper at Lock 40 on Monday 1st September. The site will be set up in the morning, including fencing off the area, dewatering the lock, and installing lifting equipment. Once this is complete, the repair works…

    Latest of 2 CRT updates, 28 August 2025.

  177. Lock 15 to Lock 18

    Ashton CanalNorth West

    6 days

    From 2 October 2025

    Reopened 8 October 2025

    Where
    Bridge 18, Ashton Hill Lane Road Bridge to Lock 15
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    The faulty head paddle at Lock 17 has now been repaired. Navigation through lock 1 to 18 is also temporarily closed due to repairs at Lock 18. You can find more details and updates here.

    Latest of 2 CRT updates, 8 October 2025.

  178. Lock 3W

    Huddersfield Narrow CanalNorth West

    6 days

    From 12 March 2026

    Reopened 18 March 2026

    Where
    Lock 3 West
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Our local team is currently planning the necessary repair works at Lock 3W on the Huddersfield Narrow Canal. These works are expected to be completed by Friday, 20 March. We will provide a further update on Friday, 20 March, or sooner if the situation changes.

    Latest of 3 CRT updates, 16 March 2026.

  179. Navigation Closure - Regent's Canal, Lock 8 Old Ford, Bow

    Regent's CanalLondon and South East

    6 days

    From 12 May 2026

    Reopened 18 May 2026

    Where
    Lock 8, Old Ford Lock
    CRT reason
    Repair
    Cause
    Struck by boat or vehicle
    Asset
    Lock

    A stoppage is required to replace the top gates and balance beams at LK 8 Old Ford, the existing gates had emergency holding repairs made in November 2025, after being severely damaged due to boat strike. Top stop plank installation is required to carry out the gate replacement…

    CRT's only update, 13 March 2026.

  180. Lock 6 - repaired and operational

    Rochdale CanalYorkshire and North East

    6 days

    From 13 June 2026

    Reopened 19 June 2026

    CRT's title says reopened

    Where
    Lock 3/4 to Lock 7
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    The repairs at Lock 6 have been completed and it is operational.

    Latest of 3 CRT updates, 19 June 2026.

  181. Lock 1 Top Lock - Lock 9 Rushall

    Rushall CanalWest Midlands

    6 days

    From 25 June 2026

    Reopened 1 July 2026

    Where
    Lock 1, Top Lock Rushall to Lock 9, Rushall
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Following attendance on site, it has been identified that stop planks are required to facilitate the repair. Once the stop planks are in place, we will be able to access the area safely and commence the necessary repair works to refit the paddle. We apologise for the continued…

    Latest of 2 CRT updates, 26 June 2026.

  182. Lock 45 Rochdale canal

    Rochdale CanalNorth West

    6 days

    From 18 July 2026

    Reopened 24 July 2026

    Where
    Lock 34 to Lock 45
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Due to a failed paddle on lock 45, its not possible to operate the lock for boat passage. Works are currently being plan for repairs. Further update will be provided on monday afternoon

    CRT's only update, 18 July 2026.

  183. Out of Service - Bridge 147, Wink Well Swing bridge, Bourne End

    Grand Union CanalLondon and South East

    6 days

    From 7 August 2026

    Reopened 13 August 2026

    Where
    Bridge 147, W'Well Swingbridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    We are pleased to advise a repair has been completed and the bridge is now operational. Thank you for your patience whilst the work was undertaken.

    Latest of 4 CRT updates, 13 August 2026.

  184. Winkwell Swing Bridge 147

    Grand Union CanalLondon and South East

    5 days

    From 23 May 2025

    Reopened 28 May 2025

    Where
    Bridge 147, W'Well Swingbridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Winkwell Swing Bridge has failed and a repair is not possible until Wednesday 28th May. Unfortunately the Bridge is inoperable until this repair is made

    CRT's only update, 23 May 2025.

  185. Navigation Closure - Lee Navigation, Parndon Mill Lock, Parndon

    River StortLondon and South East

    5 days

    From 16 July 2025

    Reopened 21 July 2025

    Where
    Lock 11, Parndon Mill Lock to Lock 10, Burnt Mill Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    After a successful repair we are delighted to reopen Parndon Mill Lock for navigation.

    Latest of 3 CRT updates, 21 July 2025.

  186. Lock 57

    Rochdale CanalNorth West

    5 days

    From 3 January 2026

    Reopened 8 January 2026

    Where
    Lock 57
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation remains closed at lock 57 on the Rochdale Canal due to a paddle failure. The local team have attended site and are continuing to investigate a solution for a repair. A further update will be provided Tuesday 13 January 2026.

    Latest of 3 CRT updates, 6 January 2026.

  187. Lock 5, Walsall

    Walsall CanalWest Midlands

    5 days

    From 25 March 2026

    Reopened 30 March 2026

    Where
    Lock 5, Walsall
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Please be advised that the repair of the paddle at Lock 5, on the Walsall Canal, is not expected to be complete before the end of next week. We apologise for any inconvenience and will post any further updates on here.

    Latest of 2 CRT updates, 26 March 2026.

  188. Keadby Rail Drawbridge - operational

    Stainforth & Keadby CanalYorkshire and North East

    5 days

    From 10 April 2026

    Reopened 15 April 2026

    CRT's title says reopened

    Where
    Bridge 83, Keadby Rail Drawbridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lift bridge

    We have had confirmation from Network Rail that repairs have been completed and Keadby Rail Drawbridge is back in working order.

    Latest of 2 CRT updates, 15 April 2026.

  189. Wolverhampton Lock Flight

    Old Main LineWest Midlands

    5 days

    From 18 June 2026

    Reopened 23 June 2026

    Where
    Lock 21, Wolverhampton to Lock 1, Top Lock, Wolverhampton
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    We're pleased to advise that the repair will be completed by 12noon today (Tuesday 23 June) The lock flight will reopen with no restrictions.

    Latest of 3 CRT updates, 23 June 2026.

  190. Lock 5, Edward Kilner Lock - Sinkhole has opened up - repairs are needed. - open

    Rochdale CanalYorkshire and North East

    5 days

    From 24 June 2026

    Reopened 29 June 2026

    Where
    Lock 5, Edward Kilner
    CRT reason
    Repair
    Cause
    Ground moved
    Asset
    Lock

    The repairs have been carried out and Lock 5 is now open as the water levels have recovered sufficiently over the weekend.

    Latest of 4 CRT updates, 29 June 2026.

  191. Watford Lock Flight

    Leicester Line (Grand Union Canal)East Midlands

    5 days

    From 23 July 2026

    Reopened 28 July 2026

    Where
    Lock 1 to Lock 7
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    There has been a delay in getting the required equipment on site to complete the repair. As soon as the equipment is available, we will start work. We will update this notice as soon as we have further information.

    Latest of 2 CRT updates, 27 July 2026.

  192. Lock 1 West to Lock 32 West

    Huddersfield Narrow CanalNorth West

    5 days

    From 13 August 2026

    Reopened 18 August 2026

    Where
    Lock 32 West to Lock 1 West
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Culvert

    Please be advised navigation is currently closed between Lock 1 West and Lock 32 West on the Huddersfield Narrow Canal due to a leak flowing into a culvert between Lock 12 West and Lock 13 West in Micklehurst causing low water levels. Our local team are on site investigating the…

    CRT's only update, 13 August 2026.

  193. Bridge 59A, Armitage

    Trent & Mersey CanalWest Midlands

    4 days

    From 8 December 2025

    Reopened 12 December 2025

    Where
    Bridge 59A
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Canal or river

    We have now received the necessary approvals from Network Rail. The works will take place from Monday, 8th December to Friday, 12th December 2025, with our contractor providing additional resources to ensure the work is completed as originally planned.

    Latest of 3 CRT updates, 25 November 2025.

  194. Stoke Bruerne Lock Flight

    Grand Union CanalEast Midlands

    4 days

    From 26 January 2026

    Reopened 30 January 2026

    Where
    Lock 14, Top Lock to Lock 20
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigational closure is required to remove invasive non native fish species.

    CRT's only update, 7 May 2025.

  195. Wheaton Aston Stop Gate near Bridge 21, Shushions Bridge

    Shropshire Union CanalWest Midlands

    4 days

    From 9 March 2026

    Reopened 13 March 2026

    Where
    Bridge 22, Rye Hill Bridge to Bridge 21, Shushions Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Other

    A navigation and towpath closure are required for stop gate replacement.

    CRT's only update, 8 May 2025.

  196. Woodend Lift Bridge 24

    Peak Forest CanalNorth West

    4 days

    From 17 November 2025

    Reopened 21 November 2025

    Where
    Bridge 24, Wood End Lift Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lift bridge

    We are pleased to confirm that the works at Woodend Lift Bridge have been completed and the navigation is now open.

    Latest of 3 CRT updates, 21 November 2025.

  197. Bridge 1, Manchester Road Bridge

    South DockLondon and South East

    4 days

    From 16 February 2026

    Reopened 20 February 2026

    Where
    Bridge 1, Manchester Road Bridge to West India Dock Entrance Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Bridge

    Following an on-site review, we are pleased to confirm that these works can now be completed within a shorter timeframe. The works will take place over two week-long stoppages, scheduled for 16–20 February and 2–6 March.

    Latest of 2 CRT updates, 9 January 2026.

  198. Lock 45 Grand Union

    Grand Union CanalLondon and South East

    4 days

    From 26 June 2025

    Reopened 30 June 2025

    Where
    Lock 45
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Due to an issue with the paddle at lock 45, the lock has been temporarily closed whilst a repair is undertaken

    CRT's only update, 26 June 2025.

  199. Bridgwater & Taunton Canal

    Bridgwater & Taunton CanalWales and South West

    4 days

    From 7 July 2025

    Reopened 11 July 2025

    Where
    Lock 6 Higher Lock to Lock 7 Firepool
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Please be advised that due to a damaged Heel post, Lock 6 (Higher Maunsel lock) will be closed until Friday 11th July. To facilitate this repair, the water level between Lock 6 (Higher Maunsel) and Lock 7 (Firepool lock) will dropped by approximately 12 inches. In the meantime…

    CRT's only update, 7 July 2025.

  200. Victoria Bridge, Gloucester Docks

    Gloucester & Sharpness CanalWales and South West

    4 days

    From 10 July 2025

    Reopened 14 July 2025

    Where
    Victoria Basin Swing Bridge
    CRT reason
    Repair
    Cause
    Weather
    Asset
    Swing bridge

    Due to hot weather, Victoria Swing bridge will be closed until temperatures drop low enough to reopen it. We have already carried out maintenance works on this bridge to reduce the impact of hot weather on this heritage structure and continue to work on a long term solution. We…

    CRT's only update, 10 July 2025.

  201. Lock 15, Stourbridge

    Stourbridge CanalWest Midlands

    4 days

    From 17 July 2025

    Reopened 21 July 2025

    Where
    Lock 15, Stourbridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Our team will be carrying out further works to the cill over the weekend. Subject to satisfactory concrete curing times, we are aiming to reopen the navigation on Monday or Tuesday. We will provide a further update as soon as we are able to confirm a reopening date and time.…

    Latest of 3 CRT updates, 18 July 2025.

  202. Swarkestone Lock 5

    Trent & Mersey CanalEast Midlands

    4 days

    From 16 October 2025

    Reopened 20 October 2025

    Where
    Lock 5, Swarkestone Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Following further investigation on site, we have made the decision to fully close Swarkestone Lock. The condition of the gate means the lock is not safe to operate. We are exploring options for a repair and will update this notice when we have further informaiton.

    Latest of 2 CRT updates, 16 October 2025.

  203. Marsworth Flight Closure

    Grand Union CanalLondon and South East

    4 days

    From 30 October 2025

    Reopened 3 November 2025

    Where
    Lock 39 to Lock 45
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Following a further assessment the flight will remain closed over the weekend. Work is planned for Monday 3rd November; Please check this notice for updates.

    Latest of 2 CRT updates, 31 October 2025.

  204. Sutton Weaver Swing Bridge

    Weaver NavigationNorth West

    4 days

    From 8 December 2025

    Reopened 12 December 2025

    Where
    Elsan, Sutton Weaver Swing Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    We're pleased to inform you that works on site have been completed ahead of schedule, and the navigation will be open from 4pm today. Please note, the restriction in the area remains ongoing.

    Latest of 2 CRT updates, 12 December 2025.

  205. Woodlesford Lock

    Aire & Calder Navigation Main LineYorkshire and North East

    4 days

    From 5 January 2026

    Reopened 9 January 2026

    Where
    Lock 5, Woodlesford Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Please be aware that Woodlesford Lock will be closed for five days to allow divers to inspect and repair the damaged sill.

    CRT's only update, 23 December 2025.

  206. Fishpond Lock

    Aire & Calder Navigation Main LineYorkshire and North East

    4 days

    From 5 January 2026

    Reopened 9 January 2026

    Where
    Lock 4, Fishpond Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Please note, the completion time for works at Fishpond Lock has been revised to 17:00 on Friday 9th January.

    Latest of 2 CRT updates, 23 December 2025.

  207. Lock 1 Rhodesfield, Top lock, in Ripon

    Ripon CanalYorkshire and North East

    4 days

    From 23 March 2026

    Reopened 27 March 2026

    Where
    Lock 1 / Rhodesfield Lock
    CRT reason
    Repair
    Cause
    Worn out
    Asset
    Lock

    Unfortunately, the condition of Rhodesfield lock has deteriorated and we need to bring forward our works planned for next winter, therefore repairs are required to the lock gates and cill at Lock 1, Rhodesfield, due to timber decay that is affecting the structural condition of…

    CRT's only update, 17 February 2026.

  208. Navigation Closure - Lee Navigation, Lock 8, Aqueduct Lock, Broxbourne

    Lee NavigationLondon and South East

    4 days

    From 10 April 2026

    Reopened 14 April 2026

    Where
    Lock 8, Aqueduct Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Please be advised the paddle and rod are missing from the lower towpath side. A new paddle and bolts planned to be fitted next week.

    Latest of 2 CRT updates, 10 April 2026.

  209. Lock 12

    Ashton CanalNorth West

    4 days

    From 1 May 2026

    Reopened 5 May 2026

    Where
    Lock 12
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation has been temporarily reopened following repairs to the tailgate paddle. During these works, additional defects were identified with the lock mechanism. As a result, our local team will need to return to site to complete full repairs to the lock. Further details can be…

    Latest of 2 CRT updates, 5 May 2026.

  210. Eastwood (Sir Frank Price) Lock

    Sheffield & South Yorkshire NavYorkshire and North East

    4 days

    From 14 May 2026

    Reopened 18 May 2026

    Where
    Eastwood (Sir Frank Price) Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Sluice

    The work has been completed and the lock is back open for use.

    Latest of 2 CRT updates, 18 May 2026.

  211. Salterhebble Guillotine Lock 3 - Operational

    Calder & Hebble NavigationYorkshire and North East

    4 days

    From 18 June 2026

    Reopened 22 June 2026

    CRT's title says reopened

    Where
    Lock 3, Salterhebble Bottom
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    A faulty sensor on the guillotine gate has been isolated and the lock brought back into use. The replacement of the broken sensor will be planned in due course.

    Latest of 3 CRT updates, 22 June 2026.

  212. Navigation Closure - River Stort, Lock 11, Parndon Mill Lock, Harlow Town

    River StortLondon and South East

    4 days

    From 20 July 2026

    Reopened 24 July 2026

    Where
    Lock 11, Parndon Mill Lock
    CRT reason
    Repair
    Cause
    Struck by boat or vehicle
    Asset
    Lock

    We are pleased to advise the repairs have been completed and the lock has re-opened. Thank you for your patience whilst this work was undertaken.

    Latest of 2 CRT updates, 24 July 2026.

  213. Lock 90, Deans Lock

    Leeds & Liverpool CanalNorth West

    4 days

    From 10 September 2026

    Reopened 14 September 2026

    Where
    Dean Lock - Nearside
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Since our last update our engineers have been to site and assessed the damage. Our team are onsite today to start the removal of the old collar and replace it with a new one. It is anticipated that repairs will take a few days. A further update will be provided on or before…

    Latest of 2 CRT updates, 14 September 2026.

  214. Lock 12, Brighouse Bottom Lock, Calder and Hebble Navigation.

    Calder & Hebble NavigationYorkshire and North East

    4 days

    From 11 September 2026

    Reopened 15 September 2026

    Where
    Lock 12, Brighouse Bottom
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Brighouse Bottom Lock (Lock 12) is currently closed after one of the lock gates came free from its bearings. Unfortunately, the lock will remain out of action until we can carry out the necessary repair, which we expect to take place early next week. We'll provide an update as…

    CRT's only update, 11 September 2026.

  215. Lock 28, Yard Lock, Stone

    Trent & Mersey CanalWest Midlands

    3 days

    From 20 May 2025

    Reopened 23 May 2025

    Where
    Lock 28, Yard Lock to Lock 26, Aston Lock
    CRT reason
    Repair
    Cause
    Worn out
    Asset
    Lock

    Please be advised that Aston Lock 26 will be closed today at 3:00 PM to allow for water levels to rise between Aston Lock and Star Lock. This will enable the pounds to refill in preparation for the reopening of the canal at Yard Lock tomorrow. We appreciate your cooperation and…

    Latest of 5 CRT updates, 22 May 2025.

  216. Bridge 31 (Woolhampton Swing bridge), Kennet and Avon Canal

    Kennet & Avon CanalWales and South West

    3 days

    From 23 June 2025

    Reopened 26 June 2025

    Where
    Bridge 31,Woolhampton Swingbridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Please be advised that due to an electrical fault, Bridge 31 (Woolhampton Swing Bridge) is currently closed to navigation. Our M and E technicians are aware and will be on site the morning of Tuesday 24th June to carry out repairs. In the meantime, we apologise for any…

    CRT's only update, 23 June 2025.

  217. Bridge 75A, Grimshaws lane

    Rochdale CanalNorth West

    3 days

    From 4 July 2025

    Reopened 7 July 2025

    Where
    Bridge 75A, Grimshaw Lane Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Bridge

    Navigation is currently closed at Bridge 75A, Grimshaw's Lane on the Rochdale Canal due to an electrical fault with a failed sensor. Our specialist team are sourcing a replacement part and we expect it to be on site and repaired on Sunday 5 July. An update will be provided…

    CRT's only update, 4 July 2025.

  218. Lock 2 Camp Hill Lock

    Grand Union CanalWest Midlands

    3 days

    From 5 July 2025

    Reopened 8 July 2025

    Where
    Lock 3, Camp Hill (Lock 54) New to Lock 1, Camp Hill Top Lock (Lock 52)
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Please be aware that Lock 2 Camp Hill Lock is closed due to damage to the gates which has prevented any further operation. Updates will follow as soon as we ascertain the full damage to the structure.

    CRT's only update, 5 July 2025.

  219. Lock 84 to Lock 92

    Rochdale CanalNorth West

    3 days

    From 3 October 2025

    Reopened 6 October 2025

    Where
    Lock 84 Dale St to Lock 92 Castlefield
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation is closed between Locks 84 and 92 on the Rochdale Canal due to both paddles that have failed at Lock 86. Our local team have tried to carry out a temporary repair, which unfortunately wasn't successful. We have instructed our specialist contractors to attend on Monday…

    CRT's only update, 3 October 2025.

  220. Lock 88

    Rochdale CanalNorth West

    3 days

    From 7 December 2025

    Reopened 10 December 2025

    Where
    Lock 88 Oxford St
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Repairs to Lock 88 has been successfully completed, our local team are onsite replenishing the effected pound. The lock will reopen from 8am tomorrow, Wednesday 10 December.

    Latest of 3 CRT updates, 9 December 2025.

  221. Winkwell swing bridge

    Grand Union CanalLondon and South East

    3 days

    From 19 December 2025

    Reopened 22 December 2025

    Where
    Bridge 147, W'Well Swingbridge
    CRT reason
    Repair
    Cause
    Other cause
    Asset
    Swing bridge

    The power issue in the local area has been resolved and Winkwell swing bridge is now operational.

    Latest of 3 CRT updates, 22 December 2025.

  222. Lock 37 and Lock 38

    Grand Union CanalLondon and South East

    3 days

    From 24 February 2026

    Reopened 27 February 2026

    Where
    Lock 37 to Lock 38
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Due to a lock gate failure locks 37 and 38 will be closed whilst a repair is undertaken. Please check this notice for further updates.

    CRT's only update, 24 February 2026.

  223. Between Lock 24 W and Lock 32W

    Huddersfield Narrow CanalNorth West

    3 days

    From 17 March 2026

    Reopened 20 March 2026

    Where
    Lock 32 West to Lock 24 West
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation is currently closed between Lock 24W and 32W on the Huddersfield Narrow Canal, due to a damaged cill at Lock 29W which is preventing the lock being operated safely. Our local team are planning a method of repair. An update will be provided on or before, Friday 20…

    CRT's only update, 17 March 2026.

  224. Lock 23 - Broken paddle - Repaired

    Rochdale CanalYorkshire and North East

    3 days

    From 17 March 2026

    Reopened 20 March 2026

    Where
    Lock 23
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    The repairs to the paddle have taken place and it is operational.

    Latest of 2 CRT updates, 20 March 2026.

  225. Lock 16 - Broken Paddle - Repaired

    Rochdale CanalYorkshire and North East

    3 days

    From 21 March 2026

    Reopened 24 March 2026

    Where
    Lock 16
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    The stem has been reattached to the paddle and is operational. The repairs have been completed.

    Latest of 2 CRT updates, 24 March 2026.

  226. Lock 35

    Rochdale CanalNorth West

    3 days

    From 28 April 2026

    Reopened 1 May 2026

    Where
    Lock 35
    CRT reason
    Repair
    Cause
    Ground moved
    Asset
    Canal or river

    Navigation is currently closed between lock 35 and lock 36 on Rochdale Canal due to a sinkhole which has appeared in the canal bed. Our local team and engineers are currently on site assessing and planning a method of repair. An update will be provided on or before Friday 1st…

    CRT's only update, 28 April 2026.

  227. Lock 9 To Lock 12

    Ashton CanalNorth West

    3 days

    From 13 May 2026

    Reopened 16 May 2026

    Where
    Lock 18 to Lock 2
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Repairs to Lock 9 and Lock 12 on the Ashton Canal have been successfully completed, our local team are onsite replenishing the effected pounds. Navigation will reopen from 8am tomorrow, Saturday 16, May.

    Latest of 2 CRT updates, 15 May 2026.

  228. Lock 20 Rochdale Canal -operational

    Rochdale CanalYorkshire and North East

    3 days

    From 1 June 2026

    Reopened 4 June 2026

    CRT's title says reopened

    Where
    Lock 20
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    The repairs have been carried out to the jammed head paddle on the offside and to the rack on the towpath side paddle. Lock 20 is operational.

    Latest of 2 CRT updates, 4 June 2026.

  229. Claydon Top Lock 17 to Claydon Bottom lock 21

    Oxford CanalLondon and South East

    3 days

    Fully shut 3 of CRT's 8 days

    From 16 June 2026

    Reopened 24 June 2026

    Where
    Lock 17, Claydon Top Lock to Lock 21, Claydon Bottom Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    We would like to update you that, following repairs carried out by our team to the paddle at Lock 21 on the Claydon Flight yesterday evening, we are delighted to confirm that the assisted passage arrangement will be lifted from 10am today. This means the Claydon Flight is once…

    Latest of 3 CRT updates, 24 June 2026.

  230. Lock 10 Perry Barr.

    Tame Valley CanalWest Midlands

    3 days

    From 29 June 2026

    Reopened 2 July 2026

    Where
    Perry Barr Lock 1, Top Lock to Perry Barr Lock 13, Bottom Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    The repair should be complete and navigation open again by the end of the day.

    Latest of 3 CRT updates, 2 July 2026.

  231. Low Lane Swing Bridge - Fault on Pedestal

    New Junction CanalYorkshire and North East

    3 days

    From 17 July 2026

    Reopened 20 July 2026

    Where
    Low Lane Swing Bridge 2
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Low Lane Swing Bridge is currently out of order as the close button has broken. Contractors have been appointed and it is hoped that the problem will be rectified as soon as possible. This notice will be updated, once the repair has been completed.

    CRT's only update, 17 July 2026.

  232. Lock 28, Hatton

    Grand Union CanalWest Midlands

    3 days

    From 31 July 2026

    Reopened 3 August 2026

    Where
    Lock 28
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation is currently closed at Lock 28 (Hatton) due to an issue with the lock gate. Our teams are assessing the situation and determining the most appropriate course of action. We will provide a further update on Monday. We apologise for the inconvenience and thank you for…

    CRT's only update, 31 July 2026.

  233. Stourbridge Locks 1-16

    Stourbridge CanalWest Midlands

    3 days

    From 14 August 2026

    Reopened 17 August 2026

    Where
    Lock 16, Stourbridge Bottom Lock to Lock 1, Stourbridge Top Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Our Reactive Team are hoping to attend this lock on Monday 17th Aug to make a repair and brace the beam. We will provide an update as soon as we have further information.

    Latest of 2 CRT updates, 14 August 2026.

  234. Bishop Meadow Lock 54

    River SoarEast Midlands

    3 days

    From 21 August 2026

    Reopened 24 August 2026

    Where
    Lock 54 - Bishop Meadow Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Bishop Meadow Lock 54 on the River Soar is closed due to an issue with the lock. This lock is currently not operational and investigations are underway. We will update this notice as soon as we have further information.

    CRT's only update, 21 August 2026.

  235. Lock 1 - 4, Ashton Canal

    Ashton CanalNorth West

    2 days

    From 13 May 2025

    Reopened 15 May 2025

    Where
    Lock 4, Broming Street to Lock 1
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation will be closed between Lock 1 and Lock 4 on the Ashton Canal to allow our teams to carry out emergency repairs to ground paddles and replace structural wall fixings. The locks will remain open until Tuesday 13 May, and our teams will continue to monitor them. If you…

    CRT's only update, 2 May 2025.

  236. Knowle Lock Flight, Knowle, Solihull

    Grand Union CanalWest Midlands

    2 days

    From 2 February 2026

    Reopened 4 February 2026

    Where
    Lock 51, Knowle Top Lock to Lock 47, Knowle Bottom Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigational closure is required to allow us to dewater the lock flight to remove non native species.

    CRT's only update, 7 May 2025.

  237. Navigation Closure; Bridge 1 Stanley Lift Bridge, Peak Forest Canal

    Peak Forest CanalNorth West

    2 days

    From 13 May 2025

    Reopened 15 May 2025

    Where
    Bridge 1, Stanley Lift Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lift bridge

    Navigation remains closed at Stanley Lift Bridge, Bridge 1, on the Peak Forest Canal due to a mechanical fault that is currently preventing the bridge from being safely operated. Our engineers attended the site yesterday and have returned the bridge to its closed position.…

    Latest of 2 CRT updates, 14 May 2025.

  238. Lock 36 South Stratford

    South Stratford CanalWest Midlands

    2 days

    From 18 May 2025

    Reopened 20 May 2025

    Where
    Lock 36
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    We're pleased to advise that the works will be completed ahead of schedule, and navigation at Lock 36 will reopen from 4pm today (Tuesday 20th)

    Latest of 3 CRT updates, 20 May 2025.

  239. Navigation Closure; Between Lock 18 and Lock 10, Ashton Canal

    Ashton CanalNorth West

    2 days

    From 10 June 2025

    Reopened 12 June 2025

    Where
    Lock 18 to Lock 10
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Bridge

    Please be advised that navigation remains closed between Lock 10 and Lock 18 on the Ashton Canal due to a mechanical fault at Bridge 15. Our teams attended the site again today and will return tomorrow. We are currently sourcing the necessary materials and are hopeful that…

    Latest of 2 CRT updates, 11 June 2025.

  240. Aston Lock 26, Little Stoke

    Trent & Mersey CanalWest Midlands

    2 days

    From 15 July 2025

    Reopened 17 July 2025

    Where
    Lock 26, Aston Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Works to the top end lock gate are required due to substantial loss of water affecting the upstream pond. We will deliver these works via a navigational closure between the 15 July and the 17 July 2025 (3 Days). The towpath will remain open.

    CRT's only update, 30 June 2025.

  241. Saltersford Lock

    Weaver NavigationNorth West

    2 days

    From 13 August 2025

    Reopened 15 August 2025

    Where
    Saltersford Large Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Due to a problem with the paddle at Saltersford Lock, our team is currently unable to operate the lock safely. We'll need the help of specialist divers to fix the issue, and we're already working hard to arrange for them to attend as soon as possible. We'll share an update with…

    Latest of 2 CRT updates, 13 August 2025.

  242. Navigation Closure - Stainforth & Keadby Canal, Medge Hall swing bridge, Crowle

    Stainforth & Keadby CanalYorkshire and North East

    2 days

    From 20 August 2025

    Reopened 22 August 2025

    Where
    Medgehall Swing Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Our mechanical Engineers have not been able to attend to site today due to other breakdowns. They will be in attendance on Friday 22nd August.

    Latest of 2 CRT updates, 21 August 2025.

  243. Lock 19, Old Ford Lock

    Lee NavigationLondon and South East

    2 days

    From 23 September 2025

    Reopened 25 September 2025

    Where
    Lock 19, Old Ford Lock, Eastern Side
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Lock 19, Old Ford Lock, the pedestals currently seem to have a fault. They are not allowing the raising or lowering of sluices. The fault will be investigated in the morning on 24/09/25.

    CRT's only update, 23 September 2025.

  244. York Street Lock

    Staffordshire & Worcestershire CnlWest Midlands

    2 days

    Fully shut 2 of CRT's 20 days

    From 16 December 2025

    Reopened 5 January 2026

    Where
    York Street Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    We have been unable to repair the failed paddle, and the lock will therefore remain closed. Repairs will be carried out as part of the planned winter works to replace the top and bottom lock gates, scheduled from 5 January to 13 March (see Notice: ). Passage through the lock can…

    Latest of 2 CRT updates, 16 December 2025.

  245. Trent Lock

    Erewash CanalEast Midlands

    2 days

    From 5 January 2026

    Reopened 7 January 2026

    Where
    Lock 60 - Trent Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Urgent repairs are being carried out on the heel post of the downstream offside gate at Trent Lock, from 8am on 5th January to 4pm on the 7th January. The navigation will be closed but water levels will be maintained, please expect increased activity in the area.

    CRT's only update, 5 January 2026.

  246. Lock 13 West

    Huddersfield Narrow CanalNorth West

    2 days

    From 4 February 2026

    Reopened 6 February 2026

    Where
    Lock 14 West to Lock 12 West
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation remains closed at Lock 13 W on the Huddersfield Narrow Canal due to the failure of the offside head gate paddle. Our local team have attended site and they have inspected the paddle and are now working on a method of repair. A further update will be provided on or…

    Latest of 2 CRT updates, 5 February 2026.

  247. OPENED - Milman Swing Bridge -

    Leeds & Liverpool CanalYorkshire and North East

    2 days

    From 21 March 2026

    Reopened 23 March 2026

    Where
    Bridge 214, Milman Swing Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    The bridge has now been repaired, and power has been restored. The issue is fully resolved, and the bridge is open for passage.

    Latest of 2 CRT updates, 23 March 2026.

  248. Nell Bridge Lock No 32 Cherwell

    Oxford CanalLondon and South East

    2 days

    From 23 March 2026

    Reopened 25 March 2026

    Where
    Lock 32, Nell Bridge Lock
    CRT reason
    Repair
    Cause
    Cause not stated
    Asset
    Lock

    Please be advised that this lock is currently closed due to a blocked by-weir-channel.. Our team are working hard to clear this as quickly as possible. We'll share an update as soon as we have more information. Thank you for your patience and understanding whilst we work to get…

    CRT's only update, 23 March 2026.

  249. Bosley Lock Flight

    Macclesfield CanalNorth West

    2 days

    From 30 March 2026

    Reopened 1 April 2026

    Where
    Bosley Lock 1 to Bosley Lock 12
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation is currently closed between Lock 1 to Lock 12 on the Bosley flight, Macclesfield Canal, this is due to paddle failure at Lock 11 preventing the lock from holding water. Our teams are investigating the cause of the issue and planning the necessary repairs. A further…

    CRT's only update, 30 March 2026.

  250. Lock 12, Beeston Stone Lock, SU-033-006

    Shropshire Union CanalNorth West

    2 days

    From 5 April 2026

    Reopened 7 April 2026

    Where
    Lock 11, Beeston Iron Lock to Lock 13 Tilstone Lock
    CRT reason
    Repair
    Cause
    Struck by boat or vehicle
    Asset
    Lock

    A lock gate has lifted out of position by a boat as the lock was filling.

    CRT's only update, 5 April 2026.

Coming up

Scheduled but not yet started, so in no figure above.

100 scheduled.
ClosureFromPlanned
Navigation Closure - Grand Union Canal, Lk 44 top gate balance Beam replacement, Tring
Grand Union Canal · Repair
28 September 20261 day
Lock 93 Heales Lock.
Kennet & Avon Canal · Repair
5 October 202646 days
Lock 1, Grindley Brook and Bye-Pass Sluice
Llangollen Canal · Repair
19 October 202660 days
Lock 4, Curdworth
Birmingham & Fazeley Canal · Repair
2 November 202646 days
Lock 9, Curdworth
Birmingham & Fazeley Canal · Repair
2 November 202646 days
Lock 10, Ganny Lock, Nearest town Brighouse
Calder & Hebble Navigation · Repair
2 November 202646 days
Lock 18 Shepley - Shepley Bridge, Mirfield
Calder & Hebble Navigation · Repair
2 November 202646 days
Road Lock 8, Stockton Brook
Caldon Canal · Repair
2 November 202646 days
Stensons Lock 71, Ilkeston
Erewash Canal · Repair
2 November 202646 days
Lock 79, Coal Pit Middle, Miles Platting, Manchester
Rochdale Canal · Repair
2 November 202646 days
Lock 4, Galgate
Glasson Branch (Lancaster Canal) · Repair
2 November 202646 days
Lock 51, Bottom Lock, Barrowford
Leeds & Liverpool Canal · Repair
2 November 202646 days
Lock 19, Hirst Lock, Saltaire
Leeds & Liverpool Canal · Repair
2 November 202646 days
Lock 80, Coal Pit Lower, Miles Platting, Manchester
Rochdale Canal · Repair
2 November 202646 days
Lock 49, Navigation Way, Rochdale
Rochdale Canal · Repair
2 November 202646 days
Lock 27, Little Bourton
Oxford Canal · Repair
2 November 202646 days
Lock 25 Cropredy
Oxford Canal · Repair
2 November 202646 days
Hawkesbury Lock
Oxford Canal · Repair
2 November 20264 days
Locks 13,12 and 11 Newlay Locks, Bramley, Leeds
Leeds & Liverpool Canal · Repair
2 November 202646 days
Canal channel - Mamhilad between Bridge 57, Lower Wern and Bridge 65, Mortimer`s
Monmouthshire & Brecon Canal · Repair
2 November 202646 days
Canal channel - Gilwern between Bridge 104, Auckland Bridge and 200m west of Bridge 109, Dan-Y-Parc
Monmouthshire & Brecon Canal · Repair
2 November 202646 days
Lock 11, near Kingswood, Warwickshire
North Stratford Canal · Repair
2 November 202646 days
Lock 14, near kingswood, Warwickshire
North Stratford Canal · Repair
2 November 202646 days
Stourton Lock 4 (Bottom Lock)
Stourbridge Canal · Repair
2 November 202646 days
Lock 5, Stourbridge
Stourbridge Canal · Repair
2 November 202646 days
Lock 29, Wightwick
Staffordshire & Worcestershire Cnl · Repair
2 November 202646 days
Lock 24, Bratch Middle lock
Staffordshire & Worcestershire Cnl · Repair
2 November 202646 days
Lock 18, Swindon lock, Swindon
Staffordshire & Worcestershire Cnl · Repair
2 November 202611 days
Lock 1, Stourbridge, Top lock
Stourbridge Canal · Repair
2 November 202646 days
Gringley Shaw, Lock 62, Gringley on the Hill
Chesterfield Canal · Repair
2 November 202646 days
Lock 38, Penkridge Lock
Staffordshire & Worcestershire Cnl · Repair
2 November 202646 days
Sawbridgeworth Lock 5
River Stort · Repair
2 November 202646 days
Lock 35
Staffordshire & Worcestershire Cnl · Repair
2 November 202646 days
Weir 2A, Llanfrynach weir
Monmouthshire & Brecon Canal · Repair
2 November 202646 days
Lock 68 -Lock 4
Leeds & Liverpool Canal · Repair
2 November 202611 days
Lock 69, Brynich Lock, Brynich, Brecon, Wales
Monmouthshire & Brecon Canal · Repair
9 November 202618 days
River Skell Feeder
Ripon Canal · Repair
16 November 20264 days
Lock 25, Bottom Lock
Leeds & Liverpool Canal · Repair
16 November 202611 days
Weir 11, above Bridge 27, Wood Bridge, Nuneaton
Coventry Canal · Repair
16 November 202625 days
Bosley Lock 11
Macclesfield Canal · Repair
23 November 202611 days
Lock 14, Bascote
Grand Union Canal · Repair
4 January 202767 days
Lock 23, Stoke Hammond Lock
Grand Union Canal · Repair
4 January 202725 days
Lock 8, Rufford
Rufford Branch (L&L Canal) · Repair
4 January 202767 days
Lock 6, Chicken Lock, Rufford
Rufford Branch (L&L Canal) · Repair
4 January 202753 days
Lock 40 Marsworth Flight
Grand Union Canal · Repair
4 January 202725 days
Lock 22E, Slaithewaite, Huddersfield
Huddersfield Narrow Canal · Repair
4 January 202767 days
Lock 6 west, Stalybridge
Huddersfield Narrow Canal · Repair
4 January 202739 days
Lock 10, Marple (lock flight)
Peak Forest Canal · Repair
4 January 202767 days
Lock 4 Marple (lock flight)
Peak Forest Canal · Repair
4 January 202767 days
Lock 3 Marple (lock flight)
Peak Forest Canal · Repair
4 January 202767 days
Lock 2 Marple (lock flight)
Peak Forest Canal · Repair
4 January 202767 days
Lock 15, Bascote
Grand Union Canal · Repair
4 January 202767 days
Lock 17, Bascote
Grand Union Canal · Repair
4 January 202767 days
Lock 51 Rode Heath
Trent & Mersey Canal · Repair
4 January 202767 days
Lock 11, Wolverhampton
Old Main Line · Repair
4 January 202718 days
Lock 43, Worcestershire
Worcester & Birmingham Canal · Repair
4 January 202746 days
Fosse Middle Lock 21, Near Royal Leamington Spa
Grand Union Canal · Repair
4 January 202767 days
Lock 17, Junction Lock
Trent & Mersey Canal · Repair
4 January 202746 days
Wychnor Lock 11
Trent & Mersey Canal · Repair
4 January 202767 days
Lock 51, Bottom gate, Near Stratford-Upon- Avon
South Stratford Canal · Repair
4 January 202711 days
Lock 13. Audlem Lock Flight
Shropshire Union Canal · Repair
4 January 202746 days
Lock 7. Audlem Lock Flight
Shropshire Union Canal · Repair
4 January 202746 days
Bridge 61, White Bridge near Rowington
Grand Union Canal · Repair
4 January 202767 days
Crabtree Swing Bridge 32, New Lane
Leeds & Liverpool Canal · Repair
4 January 202767 days
Glanusk. Between bridges 119 and 125
Monmouthshire & Brecon Canal · Repair
4 January 202767 days
Lock 14, Marple (lock flight)
Peak Forest Canal · Repair
4 January 202767 days
Culvert 49, near Bridge 92, Nantwich Junction Bridge
Shropshire Union Canal · Repair
4 January 202767 days
Lock 12, Rawden Mill
Rochdale Canal · Repair
4 January 202747 days
Peirpoints lock 55 Hassall Green
Trent & Mersey Canal · Repair
4 January 202767 days
Autherley Junction Stop Lock , Wolverhampton
Shropshire Union Canal · Repair
4 January 202767 days
Lock 2, Hawley Lock
Regent's Canal · Repair
4 January 202739 days
Lock 30 Lock Landing, Walsden
Rochdale Canal · Repair
4 January 202767 days
Dean Lock, Shevington, Wigan
Leeds & Liverpool Canal · Repair
4 January 202718 days
Lock 12, Beeston Stone lock
Shropshire Union Canal · Repair
6 January 202716 days
Worksop Town, Lock 50, Worksop
Chesterfield Canal · Repair
11 January 202760 days
Lock 17, Stoke Bruerne
Grand Union Canal · Repair
11 January 202760 days
Lock 20, Stoke Bruerne
Grand Union Canal · Repair
11 January 202760 days
Lock 19, Stoke Bruerne
Grand Union Canal · Repair
11 January 202760 days
Lock 72 Cobblers lock, near Hungerford
Kennet & Avon Canal · Repair
11 January 202721 days
Lock 16, West Huddersfield Narrow Canal, Mossley
Huddersfield Narrow Canal · Repair
11 January 202732 days
Lock 65, Coombes Lock
Monmouthshire & Brecon Canal · Repair
11 January 202732 days
Lock 69, Brynich Lock
Monmouthshire & Brecon Canal · Repair
11 January 202732 days
Bridge 17, Loco Lift bridge, located Quay Street, Huddersfield
Huddersfield Broad Canal · Repair
11 January 202728 days
High Orchard Bridge, St Annes Way, Gloucester
Gloucester & Sharpness Canal · Repair
18 January 202718 days
Lock 75 of the Wigan Flight
Leeds & Liverpool Canal · Repair
25 January 202716 days
Lock 1 Rufford Branch
Rufford Branch (L&L Canal) · Repair
25 January 202711 days
Lock 68, Near Sandbach
Trent & Mersey Canal · Repair
27 January 202716 days
Mann Island Lock, Liverpool
Liverpool Link · Repair
1 February 202739 days
Lock 50, Bushes Lock
Grand Union Canal · Repair
1 February 202739 days
Lock 52, Gas 2 Lock
Grand Union Canal · Repair
1 February 202739 days
Lock 87 Wigan
Leeds & Liverpool Canal · Repair
1 February 202725 days
Lock 74, Lady Capels
Grand Union Canal · Repair
1 February 202711 days
Lock 7, Bath Bottom Lock
Kennet & Avon Canal · Repair
8 February 202722 days
Lock 74 of the Wigan Flight
Leeds & Liverpool Canal · Repair
10 February 202716 days
An old redundant sluice near Bridge 78, Uppermill High Street Bridge, Upper Mill
Huddersfield Narrow Canal · Repair
15 February 202725 days
Lock 5. Audlem Lock Flight
Shropshire Union Canal · Repair
22 February 202711 days
Lock 59, Winkwell Locks
Grand Union Canal · Repair
22 February 202718 days
Lock 29E Marsden, Huddersfield
Huddersfield Narrow Canal · Repair
22 February 202718 days
Sluice 5, downstream of Bridge 99, Stoke Hall Bridge. Barbridge
Shropshire Union Canal · Repair
1 March 202711 days
Purton Upstream Safety Gates, Purton, Berkeley
Gloucester & Sharpness Canal · Repair
1 March 202710 days