Walsall Canal

37.4 closure-days per kilometre (95% range 34.1–40.7) — 493 days across 9 closures of this 13km canal.

Lengths from CRT's ArcGIS open data, published under the strictest reading of its licence. A notice is attributed to the whole named waterway, not to a point.

Something was shut here on 53% of this cruising season — 122 of its 231 days — across 3 separate closures.

That means a closure somewhere on the canal, not that the whole canal was impassable. Every closure below names the locks or bridges it sat between.

Nothing is shut on this canal today.

Regions
West Midlands
On record
9 closures

The season, closure by closure

Each row is one closure. A bar starts and ends where the closure did, and its length is how long it ran; dashed bars have not started yet.

2026-03-15one bar is one closure2026-10-31

Every closure on record

Population

Status

Period

2025 season2026 seasonAll time

Duration

Cause

Asset affected

CRT reason

Region

Showing all 9 closures on the Walsall Canal.

9
closures
220
closure-days
353
in cruising season
0
no reopening date
What these figures mean
Population
Which closures a figure counts. All closures is everything; Unplanned, in season drops CRT's scheduled winter programme and any day outside the 15 March to 31 October cruising season; CRT winter programme is that maintenance alone.
Defensible duration
The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
Closure-days
One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals.
The season so farweeks with a closure in force
Closures in force each monthclosures active during the month
1
1
2
0
0
2
0
0
0
1
1
0
1
1
2
2
2
May 25Jun 25Jul 25Aug 25Sep 25Oct 25Nov 25Dec 25Jan 26Feb 26Mar 26Apr 26May 26Jun 26Jul 26Aug 26Sep 26
Whereclosure-days by region
West Midlands2209
9 results · every closure on the Walsall CanalJump to table
NoticeExtentStartedDays
Tame Valley No 1 Bridge to Birchills Junction, including Walsall Lock Flight
Pollution Incident · Someone else's works · 273 days before this archive
Tame Valley No 1 Bridge, Ocker Hill to Birchills Junction Bridge2024-08-0135
Walsall Lock Flight
Repair · Vandalism
Lock 8, Walsall Bottom Lock to Lock 1, Walsall Top Lock2026-05-27105
Ryders Green Lock Flight
Low Water Levels · Weather
Lock 1, Ryders Green Top Lock to Lock 8, Ryders Green Bottom Lock2026-07-1962
Walsall Lock Flight
Suspected Vandalism · Vandalism
Lock 1, Walsall Top Lock to Lock 3, Walsall2026-02-206
Lock 5, Walsall
Repair · Wear and tear
Lock 5, Walsall2026-03-255
Emergency Services Incident - Ryders Green Lock Flight
Emergency Services Incident · Nothing failed
Lock 1, Ryders Green Top Lock to Railway Bridge, Hempole Lane2025-10-063
Ryders Green Locks on the Walsall Canal
Emergency Services Incident · Other cause
Lock 1, Ryders Green Top Lock to Lock 8, Ryders Green Bottom Lock2025-07-272
Walsall Lock Flight
Repair · Cause not stated
Lock 8, Walsall Bottom Lock to Lock 1, Walsall Top Lock2025-07-221
Lock 8, Ryders Green
Underwater Obstruction · Other cause
Lock 8, Ryders Green Bottom Lock2025-10-281