Canal closures

Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.

The archive / Bridgwater & Taunton Canal

Bridgwater & Taunton Canal

57.7 closure-days per kilometre (95% range 54.7–60.8) — 1,368 days across 4 closures of this 24km canal.

Lengths from CRT's ArcGIS open data, published under the strictest reading of its licence. A notice is attributed to the whole named waterway, not to a point.

Something was shut here on 7% of this cruising season — 16 of its 231 days — across 1 separate closures.

That means a closure somewhere on the canal, not that the whole canal was impassable. Every closure below names the locks or bridges it sat between.

Nothing is shut on this canal today.

Regions
Wales and South West
On record
4 closures

The season, closure by closure

Each row is one closure. A bar starts and ends where the closure did, and its length is how long it ran; dashed bars have not started yet.

2026-03-15one bar is one closure2026-10-31

Every closure on record

Population

Status

Period

2025 season2026 seasonAll time

Duration

Cause

Asset affected

CRT reason

Region

Showing all 4 closures on the Bridgwater & Taunton Canal.

4
closures
102
closure-days
830
in cruising season
0
no reopening date
What these figures mean
Population
Which closures a figure counts. All closures is everything; Unplanned, in season drops CRT's scheduled winter programme and any day outside the 15 March to 31 October cruising season; CRT winter programme is that maintenance alone.
Defensible duration
The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
Closure-days
One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals.
The season so farweeks with a closure in force
Closures in force each monthclosures active during the month
1
1
2
0
0
0
0
0
1
1
0
0
0
0
1
0
0
May 25Jun 25Jul 25Aug 25Sep 25Oct 25Nov 25Dec 25Jan 26Feb 26Mar 26Apr 26May 26Jun 26Jul 26Aug 26Sep 26
Whereclosure-days by region
Wales and South West1024
4 results · every closure on the Bridgwater & Taunton CanalJump to table
NoticeExtentStartedDays
Albert Street Cutting. Bridgwater & Taunton Canal
Repair · Cause not stated · 1,266 days before this archive
Bridge 1, Victoria Rd to Bridge 4, Albert St2021-11-1271
Bridge 30, Bathpool Swing Bridge, and Bridge 28, Hyde Bridge.
Information · Other cause
Bridge 28, Hyde to Bridge 30, Bathpool Swingbridge2026-07-0915
Bridge 1 Victoria Rd & Lock 2 Newtown Lock.
Information · Weather
Bridge 1, Victoria Rd to Lock 2, Newtown Lock2026-01-2212
Bridgwater & Taunton Canal
Repair · Wear and tear
Lock 6 Higher Lock to Lock 7 Firepool2025-07-074

Download the data · Method and limits · The network