Canal closures

Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.

The archive / Aire & Calder Navigation Main Line

Aire & Calder Navigation Main Line

0.3 closure-days per kilometre (95% range 0.2–0.5) — 17 days across 13 closures of this 55km canal.

Lengths from CRT's ArcGIS open data, published under the strictest reading of its licence. A notice is attributed to the whole named waterway, not to a point.

Something was shut here on 4% of this cruising season — 9 of its 231 days — across 6 separate closures.

That means a closure somewhere on the canal, not that the whole canal was impassable. Every closure below names the locks or bridges it sat between.

Nothing is shut on this canal today.

Regions
Yorkshire and North East
On record
13 closures

The season, closure by closure

Each row is one closure. A bar starts and ends where the closure did, and its length is how long it ran; dashed bars have not started yet.

2026-03-15one bar is one closure2026-10-31

Every closure on record

Population

Status

Period

2025 season2026 seasonAll time

Duration

Cause

Asset affected

CRT reason

Region

Showing all 13 closures on the Aire & Calder Navigation Main Line.

13
closures
17
closure-days
8
in cruising season
0
no reopening date
What these figures mean
Population
Which closures a figure counts. All closures is everything; Unplanned, in season drops CRT's scheduled winter programme and any day outside the 15 March to 31 October cruising season; CRT winter programme is that maintenance alone.
Defensible duration
The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
Closure-days
One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals.
The season so farweeks with a closure in force
Closures in force each monthclosures active during the month
1
1
1
0
0
1
0
0
3
0
1
0
0
0
1
4
0
May 25Jun 25Jul 25Aug 25Sep 25Oct 25Nov 25Dec 25Jan 26Feb 26Mar 26Apr 26May 26Jun 26Jul 26Aug 26Sep 26
Whereclosure-days by region
Yorkshire and North East1713
13 results · every closure on the Aire & Calder Navigation Main LineJump to table
NoticeExtentStartedDays
Whitley Lock
Maintenance · Wear and tear
Lock 12, Whitley Lock2025-07-184
Woodlesford Lock
Repair · Wear and tear
Lock 5, Woodlesford Lock2026-01-054
Fishpond Lock
Repair · Wear and tear
Lock 4, Fishpond Lock2026-01-054
Lemonroyd Lock - Sluice failure
Repair · Cause not stated
Lock 7, Lemonroyd Lock2025-06-081
Leeds Lock on Aire and Calder - Closed due to Electrical Issue - Repaired
Repair · Cause not stated
Lock 1, Leeds Lock2026-01-141
Woodlesford Lock
Maintenance · Wear and tear
Lock 5, Woodlesford Lock2026-03-301
Woodlesford Lock - Divers on Site
Repair · Wear and tear
Lock 5, Woodlesford Lock2026-07-141
Lock 7, Lemonroyd Lock
Repair · Wear and tear
Lock 7, Lemonroyd Lock2026-08-161
Bulholme Lock - Planned power outage
3rd Party Works · Nothing failed
Lock 10, Bulholme Lock2025-05-22same day
Bulholme Lock
3rd Party Works · Nothing failed
Lock 10, Bulholme Lock2025-10-02same day
Lemonroyd Lock - Divers on Site 10th August
Maintenance · Wear and tear
Lock 7, Lemonroyd Lock2026-08-10same day
Lemonroyd Lock - Divers on Site 12th August
Maintenance · Wear and tear
Lock 7, Lemonroyd Lock2026-08-12same day
Woodlesford Lock, Aire & Calder Navigation.
Repair · Cause not stated
Lock 5, Woodlesford Lock2026-08-08same day

Download the data · Method and limits · The network