Bridge 1, Manchester Road Bridge
A navigation closure on the South Dock, 16 February 2026 to 20 February 2026 — 4 days.
Source: this notice on canalrivertrust.org.uk
- Waterway
- South Dock
- Region
- London and South East
- Started
- 16 February 2026
- Status
- Reopened 20 February 2026
- Days shut
- 4
- CRT reason
- Repair
- Cause
- Wear and tear
- Asset
- Bridge
Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.
Where
- South Dock: Bridge 1, Manchester Road Bridge to West India Dock Entrance Lock
Updates · 2
42 days with no update after the last one.
9 January 2026 · 246 days since the previous
Following an on-site review, we are pleased to confirm that these works can now be completed within a shorter timeframe. The works will take place over two week-long stoppages, scheduled for 16–20 February and 2–6 March.
8 May 2025 · 0 days since the previous
A navigation and towpath closure are required for a full hydraulic and electrical replacement. These works require a full closure of the bridge and adjacent lock.
Cite this: Canal closures, “Bridge 1, Manchester Road Bridge”, https://crt-stoppages.pages.dev/notice/0196b210-3176-73cf-a7f3-c775f356f93e.
Every closure on South Dock · Download the data · Method and limits