Aqueduct

Too few unplanned closures of this kind in June to August 2026 and the same months a year earlier to tell a change from luck: 0 against 0. How this is tested.

On record
1 closure since May 2025

In force today

No closure of this kind is in force today.

By canal

1 canal has had a closure of this kind. A closure naming two canals counts on both.

Closures of this kind on each canal since May 2025, most first.
CanalClosures
New Junction Canal1

Every closure on record

Showing 1 closure involving a aqueduct.

Period

Rank by

Population

Status

Duration

Cause

Asset affected

CRT reason

Region

1
closures
0
closure-days since May 2025
0
no reopening date
What these figures mean
Population
Which closures a figure counts. All closures is everything; Unplanned closure drops the works CRT flags as its winter programme and any day outside the cruising season (the Friday nearest 15 March to the Sunday before the first Monday in November). Scheduled work CRT does not flag as winter works still counts here. CRT Planned closure is the flagged winter programme alone.
Defensible duration
The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
Closure-days
One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals. They are counted from 1 May 2025, when this archive begins: a closure that started earlier adds only its days since then, though its own row shows its whole length. Every figure and chart counts only the days inside the Period chosen above them.
In force
A closure is in a Period, and a day is one a closure affected, if it was in force at any time that day, including the morning it reopened. Closure-days measure how long, so they count whole days and not the reopening day: a closure can be in a Period and add no closure-day to it.

Closures in force each month

closures active during the month
0
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
May 25Jun 25Jul 25Aug 25Sep 25Oct 25Nov 25Dec 25Jan 26Feb 26Mar 26Apr 26May 26Jun 26Jul 26Aug 26Sep 26

Canals ranked by the season's closures

share of the period's cruising-season days up to today — a closure somewhere on a long canal is likelier, and does not mean the canal was impassableclosures in force on the period's cruising-season days — a longer canal has more to go wrong on

Where

closure-days by regionclosures by region

A region with more canal has more to go wrong on, so these totals partly measure its size. Regions compared by length of canal are on the Reliability page.

What causes them

closure-days by causeclosures by cause

CRT's reason

closure-days by the reason CRT filedclosures by the reason CRT filed

What fails on a lock

closure-days by part — unplanned lock failures naming a partclosures by part — unplanned lock failures naming a part

How long they last

closures by full length, including any days before May 2025 — the bands are not equal in width
1
0
0
0
0
0
<=1d2-7d8-30d31-90d91-365d>365d
1 results · every closure involving a aqueductJump to list

Closures

  1. Don Aqueduct - Essential Works Required w3w ///pint.motorist.bulbs

    New Junction CanalYorkshire and North East

    same day

    From 7 May 2026

    Reopened 7 May 2026

    Where
    Don Aqueduct
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Aqueduct

    An inspection of essential works at the Don Aqueduct will be carried out on Thursday, 7th May 2026. Following the inspection, further closure dates will be required to allow works to take place. These dates will be confirmed as soon as possible.

    CRT's only update, 5 May 2026.