Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.
All closures / Regions / Yorkshire and North East
Yorkshire and North East
7.0 closure-days per mile in the 12 months to 26 September 2026 (could plausibly be 4.0–10.2) — 2,217 days across 134 closures on the 314 miles of waterway CRT looks after here.
Since 1 May 2025, the Yorkshire and North East has lost 8.2 closure days per mile of waterway (could plausibly be 5.4–10.9), which cannot be told apart from the network's 8.3.
The range allows for luck. Lengths from CRT's ArcGIS open data, published under the strictest reading of its licence: non-commercial use, attribution to Canal & River Trust, and no warranty. Every region compared by length of waterway is on the Reliability page.
Unplanned closures in this region: 75 in June to August 2026 against 27 a year earlier, up by more than chance would produce; the result holds across all 33 tests. How this is tested.
- On record
- 234 closures since May 2025
In force today
6 closures in this region are in force today, longest shut first. Filter the explorer to them.
| Canal | Where | Since | Days shut |
|---|---|---|---|
| Springs Branch (L&L Canal) | Springs Branch - Visitor Moorings to Bridge 2, Mill Bridge | 8 January 2016 | 3,914 |
| Huddersfield Narrow Canal | Lock 1 East, Stanley Dawson Lock to Lock 31 East | 15 June 2026 | 103 |
| Ripon Canal | Lock 1 / Rhodesfield Lock to Lock 2, Bellfurrows Lock | 6 July 2026 | 82 |
| Ripon Canal | Lock 3, Oxclose Lock | 6 July 2026 | 43 |
| Stainforth & Keadby Canal | Godnow Swing Bridge | 25 September 2026 | 1 |
| Stainforth & Keadby Canal | Keadby Lock | 26 September 2026 | same day |
By canal
21 canals have had a closure in this region. A closure naming two canals counts on both.
| Canal | Closures |
|---|---|
| Rochdale Canal | 36 |
| Leeds & Liverpool Canal | 30 |
| Calder & Hebble Navigation | 22 |
| Huddersfield Narrow Canal | 22 |
| Sheffield & South Yorkshire Nav | 19 |
| New Junction Canal | 17 |
| Stainforth & Keadby Canal | 16 |
| Chesterfield Canal | 14 |
| Huddersfield Broad Canal | 14 |
| Aire & Calder Navigation Main Line | 13 |
| Wakefield Branch (Aire & Calder) | 9 |
| Ripon Canal | 6 |
Show 9 moreShow fewer
| Canal | Closures |
|---|---|
| River Ouse | 6 |
| Sheffield & Tinsley Canal | 5 |
| Pocklington Canal | 4 |
| Selby Canal | 3 |
| Tees Navigation | 2 |
| Bank Dole Cut | 1 |
| Dewsbury Arm (Calder & Hebble Nav) | 1 |
| Springs Branch (L&L Canal) | 1 |
| Ure Navigation | 1 |
Every closure on record
Showing 209 closures and 10 restrictions in the Yorkshire and North East region.
Rank by
Population
29 closures are in neither group: 27 unplanned with no day in the cruising season since May 2025, and 2 not started yet.
Status
Duration
Cause
Asset affected
Lock part
Unplanned lock failures naming a part
Water problem
Unplanned failures naming one
CRT reason
Region
What these figures mean
- Population
- Which closures a figure counts. All closures is everything; Unplanned closure drops the works CRT flags as its winter programme and any day outside the cruising season (the Friday nearest 15 March to the Sunday before the first Monday in November). Scheduled work CRT does not flag as winter works still counts here. CRT Planned closure is the flagged winter programme alone.
- Defensible duration
- The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
- Closure-days
- One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals. They are counted from 1 May 2025, when this archive begins: a closure that started earlier adds only its days since then, though its own row shows its whole length. Every figure and chart counts only the days inside the Period chosen above them.
- In force
- A closure is in a Period, and a day is one a closure affected, if it was in force at any time that day, including the morning it reopened. Closure-days measure how long, so they count whole days and not the reopening day: a closure can be in a Period and add no closure-day to it.
Closures in force each month
closures active during the monthCanals ranked by the season's closures
share of the period's cruising-season days up to today — a closure somewhere on a long canal is likelier, and does not mean the canal was impassableclosures in force on the period's cruising-season days — a longer canal has more to go wrong onWhat causes them
closure-days by causeclosures by causeShow 7 moreShow fewer
Show 7 moreShow fewer
CRT's reason
closure-days by the reason CRT filedclosures by the reason CRT filedShow 8 moreShow fewer
Show 8 moreShow fewer
What fails
closure-days by assetclosures by assetShow 4 moreShow fewer
Show 4 moreShow fewer
What fails on a lock
closure-days by part — unplanned lock failures naming a partclosures by part — unplanned lock failures naming a partShow 1 moreShow fewer
Show 1 moreShow fewer
How long they last
closures by full length, including any days before May 2025 — the bands are not equal in widthClosures
Springs Branch of the Leeds & Liverpool Canal - From Springs Branch Moorings L1 to Bridge 2, Mill Bridge
Springs Branch (L&L Canal)Yorkshire and North East
3,914 days
From 8 January 2016
No reopening date
Still shut
513 of them since this archive began on 1 May 2025
- Where
- Springs Branch - Visitor Moorings to Bridge 2, Mill Bridge
- CRT reason
- Information
- Cause
- Ground moved
- Asset
- Canal or river
This section of navigation remains closed and we are continuing to liaise with relevant parties to work towards a resolution. The restricted width means that powered boats will not get passed the obstruction, therefore such crafts should not proceed past the moorings. This…
Latest of 2 CRT updates, 1 May 2025. 513 days without another.
Huddersfield Narrow Canal Locks 1E - 42E - Closed
Huddersfield Narrow CanalYorkshire and North East
266 days
From 28 March 2025
Reopened 19 December 2025
232 of them since this archive began on 1 May 2025
- Where
- Lock 1 East, Stanley Dawson Lock to Lock 42 East
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
The start point and the end point for the closure is from Lock 1E to Lock 42E. The North West section of the Huddersfield Narrow Canal is now open.
Latest of 13 CRT updates, 24 November 2025.
Pollution Incident spanning Pudding Dyke Bridge to Dog Kennel Bridge
Chesterfield CanalYorkshire and North East
200 days
From 31 October 2025
Reopened 19 May 2026
- Where
- Bridge 34, Thorpe Pudding Dyke Bridge to Bridge 31, Kiveton Dog Kennel Bridge
- CRT reason
- Pollution Incident
- Cause
- Pollution
- Asset
- Canal or river
Contractors have visited site and removed all of the containment methods, the navigation is now open for use as normal.
Latest of 10 CRT updates, 19 May 2026.
Lock 1-4 - Monday passage only 9am to 3pm.
Rochdale CanalYorkshire and North East
126 days
Fully shut 126 of CRT's 128 days
From 6 April 2025
Reopened 12 August 2025
101 of them since this archive began on 1 May 2025
- Where
- Lock 1 to Lock 3/4
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Canal or river
The investigation works have progressed and we are able to provide a window of passage from Lock 1 to Lock 4 on Mondays only from 9am to 3pm, water levels permitting. The local team will be closely monitoring the water levels and communicating with the engineers carrying out the…
Latest of 17 CRT updates, 11 August 2025.
From 15th June - Lock 1E to Lock 31E will be closed.
Huddersfield Narrow CanalYorkshire and North East
103 days
From 15 June 2026
No reopening date
Still shut
- Where
- Lock 1 East, Stanley Dawson Lock to Lock 31 East
- CRT reason
- Maintenance
- Cause
- Weather
- Asset
- Canal or river
Works taking place at Slaithwaite Reservoir have necessitated a drawdown of reservoir levels that has been ongoing for several months. With recent warm, dry weather and an increase in boat movement on the canal, we have insufficient water resources to maintain navigation for the…
CRT's only update, 29 May 2026. 120 days without another.
Bridge 165, Newton Grange bridge (Changeline bridge) - Closure
Leeds & Liverpool CanalYorkshire and North East
88 days
From 5 May 2025
Reopened 1 August 2025
- Where
- Bridge 165, Changeline Bridge
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Bridge
Navigation will be restricted due to bridge works carried out by 3rd party contractors, this has been scheduled because the navigation is already closed as a result of drought conditions and low water levels.
CRT's only update, 24 June 2025.
Low water levels from Lock 1 to Lock 2
Ripon CanalYorkshire and North East
82 days
From 6 July 2026
No reopening date
Still shut
- Where
- Lock 1 / Rhodesfield Lock to Lock 2, Bellfurrows Lock
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
Navigation Closure – Rhodesfield & Bellfurrows Locks- Ripon canal Type: Navigation Closure Waterway: Ripon Canal Region: Yorkshire & North East Effective From: 6 July 2026 Until: Further notice (ongoing) Reason: Low Water Levels Affected Section * From: Lock 1 – Rhodesfield Lock…
CRT's only update, 1 July 2026. 87 days without another.
Todmorden Lock
Rochdale CanalYorkshire and North East
71 days
From 17 June 2025
Reopened 27 August 2025
- Where
- Lock 19
- CRT reason
- Inspections
- Cause
- Broke, cause not given
- Asset
- Lock
Our Engineering Team have updated us with the works undertaken. The guillotine gate wire ropes and associated components have been changed. There are additional works still taking place to ensure the safe use of the Guillotine Lock once it is open and additional safety checks…
Latest of 6 CRT updates, 22 August 2025.
Lock 12, Brighouse Bottom
Calder & Hebble NavigationYorkshire and North East
67 days
From 5 January 2026
Reopened 13 March 2026
- Where
- Bridge 2, Elland to Lock 15, Kirklees Low Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for a full lock gate replacement & general repairs
CRT's only update, 7 May 2025.
Lock 5, Woodside Mills - Near Elland
Calder & Hebble NavigationYorkshire and North East
67 days
From 5 January 2026
Reopened 13 March 2026
- Where
- Lock 3, Salterhebble Bottom to Lock 5, Woodside Mills
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for a full lock gate replacement & general repairs
CRT's only update, 7 May 2025.
Lock 48, Worksop Stret Lock - Near Worksop
Chesterfield CanalYorkshire and North East
60 days
From 12 January 2026
Reopened 13 March 2026
- Where
- Lock 48, Worksop Stret Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for a full lock gate replacement & general repairs
CRT's only update, 7 May 2025.
Lock 21 East - Closed in preparation for repairs to the stop plank grooves
Huddersfield Narrow CanalYorkshire and North East
58 days
From 22 October 2025
Reopened 19 December 2025
- Where
- Lock 21 East, Waterside Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Lock 21 East will be locked up due to preparation work that is needed for the repairs to the stop plank grooves, taking place under the Winter Stoppages Works. This is to ensure that the team are working in the conditions needed to undertake the preparation work for the Winter…
CRT's only update, 21 October 2025.
Navigation Closure from Lock 5 to Lock 16 - Low water levels
Rochdale CanalYorkshire and North East
57 days
From 16 June 2025
Reopened 12 August 2025
- Where
- Lock 5, Edward Kilner to Lock 16
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
The section between Lock 5 and Lock 16 remains closed. The team have been closely monitoring the navigation from Lock 5 to Lock 16 and there is still very little improvement on the water levels as they are still currently very low. The lock gates have been padlocked to prevent…
Latest of 6 CRT updates, 25 July 2025.
Newly Top Lock to Office Lock - Closed
Leeds & Liverpool CanalYorkshire and North East
56 days
From 23 June 2025
Reopened 18 August 2025
- Where
- Lock 13, Newlay Top Lock to Lock 2, Office Lock
- CRT reason
- Low Water Levels
- Cause
- Worn out
- Asset
- Lock
We are pleased to let you know that repairs to Oddy lock have now been completed. Our team took advantage of the recent navigation closure to carry out this important work whilst the lock was out of use. Although the repair is now finished, navigation in this area remains closed…
Latest of 6 CRT updates, 18 August 2025.
Navigation Closure – Pocklington Canal from Lock 8 to Lock 9
Pocklington CanalYorkshire and North East
56 days
From 13 July 2026
Reopened 7 September 2026
- Where
- Lock 8, Gardam Lock to Lock 9 / Cottingwith Lock
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Lock
The navigation closure has been lifted but it will be on a booked passage system to use Lock 9. Please see the new notice that has been issued.
Latest of 2 CRT updates, 7 September 2026.
Bingley 3 & 5 Rise - Closed
Leeds & Liverpool CanalYorkshire and North East
55 days
From 25 June 2025
Reopened 19 August 2025
- Where
- Lock 29, Bingley 5 Rise Top Lock to Lock 22, Bingley 3 Rise Bottom Lock
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
Due to low water levels and the continuation of this dry weather Bingley 5 Rise and Bingley 3 Rise have not received enough water for us to open Thursday of this week as planned. The lock flights will remain closed, and we will keep this situation under review and provide an…
CRT's only update, 25 June 2025.
Lock 20, Dowley Gap Bottom Lock - Near Bingley
Leeds & Liverpool CanalYorkshire and North East
53 days
From 5 January 2026
Reopened 27 February 2026
- Where
- Lock 21, Dowley Gap Top Lock to Bridge 206, Dowley Gap Changeline Bridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please note the towpath will no longer be closed during these works.
Latest of 2 CRT updates, 29 June 2025.
Lock 8, Mayroyd - Near Hebden Bridge
Rochdale CanalYorkshire and North East
53 days
From 5 January 2026
Reopened 27 February 2026
- Where
- Bridge 14, Fallingroyd Tunnel to Lock 8, Mayroyd
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Following a detailed inspection after the canal was dewatered, we have identified that the repairs required are more extensive than originally anticipated. These works will now require specialist contractor involvement. To ensure the repairs are completed safely and to the…
Latest of 2 CRT updates, 5 February 2026.
Mechanical Failure at Barmby Tidal Barrage - Now Operational
River OuseYorkshire and North East
51 days
From 13 July 2026
Reopened 2 September 2026
CRT's title says reopened
- Where
- Barmby Tidal Barrage
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Other
The Environment Agency have informed us that the mechanical fault has been fixed. Barmby Tidal Barrage is operational. For any information regarding Barmby Barrage, please contact them directly on 0208 474 8798.
Latest of 2 CRT updates, 2 September 2026.
Turnerwood Lock 37
Chesterfield CanalYorkshire and North East
49 days
From 1 September 2025
Reopened 20 October 2025
- Where
- Lock 37, Turnerwood Bottom Lock
- CRT reason
- Maintenance
- Cause
- Worn out
- Asset
- Lock
We will be carrying out essential works to replace the top and bottom lock gates at Turnerwood Lock 37 on the Chesterfield Canal. The gates have reached the end of their serviceable life, and replacement is necessary to ensure the continued safe and reliable operation of the…
CRT's only update, 1 August 2025.
Bank Dole Lock (5) in Knottingley
Bank Dole CutYorkshire and North East
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Trundles Lane Bridge to Bank Dole Lock (Lock 5)
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for downstream gate replacements & upstream lock gate repairs.
CRT's only update, 7 May 2025.
Lock 1 - Near Mirfield
Huddersfield Broad CanalYorkshire and North East
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Bridge 3b, Pipebridge 2 to Lock 1
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for a full lock gate replacement and wash wall repairs.
CRT's only update, 8 May 2025.
Lock 15 East, Golcar Brook Lock and Lock 18 East, Can Lock - Near Huddersfield
Huddersfield Narrow CanalYorkshire and North East
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Lock 9 East, Isis Lock to Lock 31 East
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
This closure now encompasses two pieces of work. We will be doing top gate replacement and bottom gate repairs to Lock 15 East and a full lock gate replacement (upstream and downstream) to Lock 18 East along with general repairs.
Latest of 2 CRT updates, 29 June 2025.
Sykehouse Lock - Near Thorne
New Junction CanalYorkshire and North East
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Don Aqueduct to New Junction End Culvert
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for bottom and top gate repairs. We will also be working on the upstream cill and doing sluice and ladder repair works.
CRT's only update, 8 May 2025.
Closed - Oxclose Lock
Ripon CanalYorkshire and North East
43 days
Fully shut 43 of CRT's 82 days
From 6 July 2026
No reopening date
Still shut
- Where
- Lock 3, Oxclose Lock
- CRT reason
- Information
- Cause
- Weather
- Asset
- Canal or river
Oxclose Lock remains closed while additional investigations are carried out to identify and assess areas of water loss through the lock chamber. Specialist engineers will undertake microgravity surveys and detailed inspections, from Monday 14th September 2026, to determine the…
Latest of 8 CRT updates, 3 September 2026. 23 days without another.
Lock 2, Colne Bridge Lock - Broken Mechanism, Balance Beam Dropped - Repaired and operational
Huddersfield Broad CanalYorkshire and North East
42 days
From 24 July 2026
Reopened 4 September 2026
CRT's title says reopened
- Where
- Lock 2, Colne Bridge Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The repairs to the balance beam have been successfully completed and Lock 2 is operational.
Latest of 5 CRT updates, 4 September 2026.
Lock 14 - Near Bridge 23, Holmcoat Road Bridge
Rochdale CanalYorkshire and North East
39 days
From 19 January 2026
Reopened 27 February 2026
- Where
- Lock 14
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Following a recent review, we're now confident that the works can be completed within a shorter stoppage window. The revised stoppage dates are 19th January to 27th February.
Latest of 2 CRT updates, 3 November 2025.
Don Aqueduct
New Junction CanalYorkshire and North East
39 days
From 3 November 2025
Reopened 12 December 2025
- Where
- Don Aqueduct
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
Essential maintenance work will be taking place on both guillotine locks at Don Aqueduct. As part of these works, our engineering teams will be replacing the steel lifting cables which operate the guillotine lock gates. This maintenance is critical to ensuring the continued safe…
CRT's only update, 17 September 2025.
Lock 8, Gardam Lock - Near Melbourne
Pocklington CanalYorkshire and North East
32 days
From 8 September 2025
Reopened 10 October 2025
- Where
- Swingbridge 7 to Lock 8, Gardam Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Unfortunately, this stoppage has been extended by a week. During the dismantling of the gates, components not originally scheduled for replacement were found to be in poor condition. This extension will allow our technicians to carry out a full assessment and formalise a…
Latest of 3 CRT updates, 3 October 2025.
Tinsley Flight - closed due to low water levels.
Sheffield & Tinsley CanalYorkshire and North East
32 days
From 3 July 2026
Reopened 4 August 2026
- Where
- Lock 1 Tinsley to Tinsley Lock 1 Basin
- CRT reason
- Low Water Levels
- Cause
- Cause not stated
- Asset
- Canal or river
The water levels along the Tinsley flight have almost recovered to a navigable level. Due to this we will be taking bookings for Tuesday the 4th of August onwards. Please contact the customer service team on 0303 040 4040 to make a booking.
Latest of 9 CRT updates, 31 July 2026.
Bridge 22, Burntacres Bridge
Rochdale CanalYorkshire and North East
25 days
From 2 February 2026
Reopened 27 February 2026
- Where
- Lock 13 to Lock 14
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Bridge
Following a recent review, we're now confident that the works can be completed within a shorter stoppage window. The revised stoppage dates are 2nd February to 27th February.
Latest of 3 CRT updates, 3 November 2025.
Huddersfield Narrow Canal, Lock 33E, Marsden
Huddersfield Narrow CanalYorkshire and North East
20 days
From 30 July 2025
Reopened 19 August 2025
- Where
- Lock 33 East
- CRT reason
- Inspections
- Cause
- Worn out
- Asset
- Lock
We have identified a section of wall at the foot of the lock chamber of Lock 33, which appears to be in poor condition. Engineers have been informed and are attending to inspect the wall today. The lock will be chained off whilst the inspection is taking place.
CRT's only update, 30 July 2025.
Doncaster Lock
Sheffield & South Yorkshire NavYorkshire and North East
20 days
From 16 December 2025
Reopened 5 January 2026
- Where
- Doncaster Lock
- CRT reason
- High Water Levels
- Cause
- Weather
- Asset
- Canal or river
Due to rising water levels Doncaster Lock is temporarily closed. Water levels will continue to reviewed over the coming days and this notice will be updated accordingly
Latest of 2 CRT updates, 18 December 2025.
Swingbridge 7 - Closed (Unable to swing)
Pocklington CanalYorkshire and North East
19 days
From 26 June 2025
Reopened 15 July 2025
- Where
- Swingbridge 7
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Swing bridge
Swingbridge 7 is unable to swing due to a fault with the pintle and is currently inoperable. Mechanical & Electrical team have notified us that they will be attending site to start work on Thursday, 3rd July. They anticipate that works will last 2-3 weeks. We will update this…
Latest of 2 CRT updates, 30 June 2025.
Lock 10e, Milnsbridge
Huddersfield Narrow CanalYorkshire and North East
18 days
From 1 December 2025
Reopened 19 December 2025
- Where
- Lock 9 East, Isis Lock to Lock 11 East, Library Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please note: A clearly signposted diversion route will be available for towpath users throughout the closure period of this stoppage.
Latest of 2 CRT updates, 10 November 2025.
Navigation Closure - Stainforth & Keadby Canal, FK-024-003, Keadby - Reopened
Stainforth & Keadby CanalYorkshire and North East
17 days
From 12 January 2026
Reopened 29 January 2026
CRT's title says reopened
- Where
- Bridge 83, Keadby Rail Drawbridge
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Other
Network Rail have completed the works and passage is possible.
Latest of 2 CRT updates, 29 January 2026.
PLANNED CLOSURE - Bridge 181 Snaygill Swing Bridge
Leeds & Liverpool CanalYorkshire and North East
16 days
From 5 May 2026
Reopened 21 May 2026
- Where
- Bridge 181, Snaygill Swing Bridge
- CRT reason
- Maintenance
- Cause
- Broke, cause not given
- Asset
- Swing bridge
Notice – Bridge 181 (Snaygill Swing Bridge) Please be advised that Bridge 181, Snaygill Swing Bridge, will be closed from Tuesday 5th May to Friday 22nd May. Essential works have been scheduled during this period, including pintle refurbishment and bearing replacement, due to…
CRT's only update, 27 April 2026.
Naburn Lock - operational
River OuseYorkshire and North East
14 days
From 23 January 2026
Reopened 6 February 2026
CRT's title says reopened
- Where
- Naburn Large Lock
- CRT reason
- High Water Levels
- Cause
- Weather
- Asset
- Canal or river
The team have been closely monitoring Naburn Lock and the water levels have dropped and the lock has been checked by our Electricial engineers. It has been confirmed that it is safe to operate and the water levels have dropped to an operational level. Naburn lock are open.
Latest of 4 CRT updates, 6 February 2026.
Fallen tree across canal and towpath above Birkhouse Lane Road Bridge
Huddersfield Narrow CanalYorkshire and North East
14 days
From 10 March 2026
Reopened 24 March 2026
- Where
- Bridge 29, Birkhouse Lane Road Bridge to Culvert 5
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
The tree has been removed and the navigation and towpath is accessible.
Latest of 4 CRT updates, 24 March 2026.
Tuel Lane lock passage closed from 29th May 17:00hrs. Reopening from Friday 12th June.
Rochdale CanalYorkshire and North East
14 days
From 29 May 2026
Reopened 12 June 2026
- Where
- Lock 1 to Lock 3/4
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
I am sorry the previous message stated you need to book passage through Tuel. This is no longer the case. We will reopen the lock on Friday 12 June and passage will be available following this pattern: Mondays and Fridays 0800-1600 no prior booking required Sundays 1000-1500 no…
Latest of 5 CRT updates, 10 June 2026.
Bridge 23 Cooper Bridge Viaduct on the River Calder. Between Battye Cut and Lk16 Cooper Bridge - Removed and reopened
Calder & Hebble NavigationYorkshire and North East
14 days
From 11 June 2026
Reopened 25 June 2026
CRT's title says reopened
- Where
- Lock 16, Cooper Bridge to Flood Gates, Battyeford
- CRT reason
- Underwater Obstruction
- Cause
- Broke, cause not given
- Asset
- Bridge
Network Rail have completed the repairs and the removal of the stonework from the river. The navigation has been reopened for passage.
Latest of 7 CRT updates, 25 June 2026.
Closure from Lock 8 to Lock 5 due to low water levels. - Reopened
Rochdale CanalYorkshire and North East
14 days
From 27 July 2026
Reopened 10 August 2026
CRT's title says reopened
- Where
- Lock 5, Edward Kilner to Lock 8, Mayroyd
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
The local team have been closely monitoring the water levels over the weekend. The bywash is on at Lock 6, and the Lock 5 water levels have recovered enough for navigation. The closure is being removed and the local team will have the padlocks taken off to allow for boat…
Latest of 9 CRT updates, 10 August 2026.
Railway Bridge 2 next to Colne Bridge Lock, Colne Bridge
Huddersfield Broad CanalYorkshire and North East
12 days
From 22 July 2025
Reopened 3 August 2025
- Where
- Lock 2, Colne Bridge Lock to Lock 1
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Bridge
A navigation and towpath closure are required to allow Third Party Contractors working on behalf of Network Rail to install a new bridge deck. A pontoon crash deck is required over the canal to prevent debris falling into the watercourse or onto public on the towpath. These…
CRT's only update, 1 May 2025.
Near Mexborough Railway bridge, bridge 49
Sheffield & South Yorkshire NavYorkshire and North East
11 days
From 28 December 2025
Reopened 8 January 2026
- Where
- Conisbrough Railway Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
The tree has been removed and the navigation is open for passage as normal.
Latest of 2 CRT updates, 8 January 2026.
Navigation Closure Request, Huddersfield Narrow Canal, Lock 34E - Snapped Paddle - Repaired, now open
Huddersfield Narrow CanalYorkshire and North East
11 days
From 30 March 2026
Reopened 10 April 2026
CRT's title says reopened
- Where
- Lock 34 East
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The repairs have all been completed and the Stoppage is removed. Boaters due to be moving down the Marsden Flight are being contacted by the team to coordinate the passage through from Lock 42 East to Lock 32 East. Please be aware that the Stoppage at Lock 24 East is still on…
Latest of 4 CRT updates, 10 April 2026.
Sykehouse Road Bridge
New Junction CanalYorkshire and North East
11 days
From 10 September 2026
Restriction from 21 September 2026
Now a restriction: boats can pass, with limits
- Where
- Sykehouse Road Bridge 7
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lift bridge
Sykehouse Lift Bridge is currently closed to navigation due to a mechanical fault with the pump that operates the bridge. The pump has been removed and sent to a specialist for inspection, and at this stage we cannot rule out that repair or remanufacture could take several…
Latest of 5 CRT updates, 21 September 2026.
Bridge 83, Keadby Rail Drawbridge
Stainforth & Keadby CanalYorkshire and North East
10 days
From 31 October 2025
Reopened 10 November 2025
- Where
- Bridge 83, Keadby Rail Drawbridge
- CRT reason
- 3rd Party Works
- Cause
- Broke, cause not given
- Asset
- Lift bridge
Network rail have advised us that the bridge is back open and operating as normal.
Latest of 2 CRT updates, 10 November 2025.
Don Doors and Doncaster Lock - Now OPEN
New Junction Canal, Sheffield & South Yorkshire NavYorkshire and North East
10 days
Fully shut 10 of CRT's 25 days
From 5 February 2026
Reopened 2 March 2026
CRT's title says reopened
- Where
- Doncaster Lock
- CRT reason
- High Water Levels
- Cause
- Weather
- Asset
- Canal or river
Due to a reduction in water levels, Don Doors and Doncaster Lock are now open for passage. Staff will continue to monitor the levels as the Spring Tides are due this week.
Latest of 5 CRT updates, 16 February 2026.
Lock 6, Brearley-16 Rochdale Canal - REOPENED
Rochdale CanalYorkshire and North East
10 days
From 17 July 2026
Reopened 27 July 2026
CRT's title says reopened
- Where
- Lock 6, Brearley to Lock 16
- CRT reason
- Low Water Levels
- Cause
- Vandalism
- Asset
- Canal or river
We have been closely monitoring the water levels and there is enough for passage so we are reopening this section from Lock 16 to Lock 6. Below Lock 12 down to Lock 6, it is navigable but may be a little lower than usual, however we have boats travelling downstream which will…
Latest of 8 CRT updates, 27 July 2026.
Keadby Rail Drawbridge - now operational
Stainforth & Keadby CanalYorkshire and North East
9 days
From 17 November 2025
Reopened 26 November 2025
CRT's title says reopened
- Where
- Bridge 83, Keadby Rail Drawbridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lift bridge
Repairs have been completed and the bridge is now operational.
Latest of 2 CRT updates, 26 November 2025.
Don Doors and Doncaster Lock
New Junction Canal, Sheffield & South Yorkshire NavYorkshire and North East
9 days
Fully shut 9 of CRT's 11 days
From 26 January 2026
Reopened 6 February 2026
- Where
- Doncaster Lock
- CRT reason
- High Water Levels
- Cause
- Weather
- Asset
- Canal or river
The Don doors on the new junction canal will be staying down today, and Doncaster lock will remain closed as we monitor the river levels due to the predicted weather.
Latest of 4 CRT updates, 6 February 2026.
Bridge 41A, Sandy Lane Bridge
Chesterfield CanalYorkshire and North East
8 days
From 31 August 2026
Reopened 8 September 2026
- Where
- Bridge 41A, Sandy Lane Bridge
- CRT reason
- Underwater Obstruction
- Cause
- Weather
- Asset
- Canal or river
We have had confirmation from contractors that the obstruction has been removed. The navigation is now open as normal.
Latest of 2 CRT updates, 8 September 2026.
From Lock 11 to Lock 12 on Rochdale Canal - Towpath section has reopened
Rochdale CanalYorkshire and North East
7 days
From 12 June 2025
Reopened 19 June 2025
CRT's title says reopened
- Where
- Lock 11 to Lock 12
- CRT reason
- Event
- Cause
- Ground moved
- Asset
- Towpath
The sinkhole has been repaired and is open for towpath use for pedestrians and other towpath users. The navigation is still closed.
Latest of 3 CRT updates, 10 July 2025.
Selby Swingbridge - Assisted passage daily 9am to 12 noon - Update: Closure
Selby CanalYorkshire and North East
7 days
Fully shut 7 of CRT's 9 days
From 12 August 2025
Reopened 21 August 2025
- Where
- Selby Swingbridge 1
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Swing bridge
Unfortunately no further information has been received, so the status of Selby Swingbridge is still closed. On receiving any further information, the notice will be updated.
Latest of 3 CRT updates, 20 August 2025.
Fallen Tree nr Bridge 3 at Rosegrove Lane, Sowerby Bridge.
Rochdale CanalYorkshire and North East
7 days
From 14 November 2025
Reopened 21 November 2025
- Where
- Bridge 3, High Royd Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
We have had confirmation that contractors are on site today to remove the fallen tree. This will be completed by 4pm today.
Latest of 2 CRT updates, 21 November 2025.
Tinsley Lock Flight
Sheffield & Tinsley CanalYorkshire and North East
7 days
From 24 March 2026
Reopened 31 March 2026
- Where
- Lock 1 Tinsley to Tinsley No.12 Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The Tinsley flight will be closed to boaters as a dive time will be supporting sluice repairs on Tinsley No.3 Lock. This notice will be updated when the navigation closure is lifted.
CRT's only update, 18 March 2026.
Oxclose Lock - Reopened
Ripon CanalYorkshire and North East
7 days
From 20 March 2026
Reopened 27 March 2026
CRT's title says reopened
- Where
- Lock 3, Oxclose Lock
- CRT reason
- Pollution Incident
- Cause
- Pollution
- Asset
- Lock
The booms have been removed and a reed clearance and pollution clean up from the spill has been carried out by Third Party Contractors. Oxclose Lock is now open for passage.
Latest of 3 CRT updates, 27 March 2026.
Lock 23E, Huddersfield Narrow Canal - Repaired and reopened
Huddersfield Narrow CanalYorkshire and North East
7 days
From 22 May 2026
Reopened 29 May 2026
CRT's title says reopened
- Where
- Lock 23 East
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The dive team have attended this morning and have repaired the paddle. The lock is now operational for boaters to use.
Latest of 4 CRT updates, 29 May 2026.
Low water levels from Lock 20 to Lock 24 - Reopened
Rochdale CanalYorkshire and North East
7 days
From 27 May 2026
Reopened 3 June 2026
CRT's title says reopened
- Where
- Lock 20 to Lock 24
- CRT reason
- Low Water Levels
- Cause
- Other cause
- Asset
- Canal or river
The team have been closely monitoring the water levels and they have recovered enough for passage to be possible. The closure has been removed and the section is navigable.
Latest of 3 CRT updates, 3 June 2026.
Fallen tree across Ure Navigation and the towpath upstream of Milby Lock - W3W///thighs.divisible.slant - Removed
Ure NavigationYorkshire and North East
7 days
From 1 June 2026
Reopened 8 June 2026
- Where
- Bridge 9, Boroughbridge Roundabout to Milby Lock (Lock 3)
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Contractors have attended to the site and the fallen tree blocking the navigation and towpath has been removed.
Latest of 2 CRT updates, 8 June 2026.
Tinsley No.3 Lock to Holmes Lock
Sheffield & Tinsley Canal, Sheffield & South Yorkshire NavYorkshire and North East
7 days
From 14 September 2026
Restriction from 21 September 2026
Now a restriction: boats can pass, with limits
- Where
- Tinsley No.3 Lock to Tinsley No.12 Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Passage through the Tinsley Flight on Thursday the 24th of September is now fully booked. We are now also offering passage on Monday the 28th of September and Thursday the 1st of October. Advanced booking is required for these days. Booking requests should be made through…
Latest of 3 CRT updates, 22 September 2026.
Keadby Rail Drawbridge, Bridge 83
Stainforth & Keadby CanalYorkshire and North East
6 days
From 7 May 2025
Reopened 13 May 2025
- Where
- Bridge 83, Keadby Rail Drawbridge
- CRT reason
- Repair
- Cause
- Weather
- Asset
- Lift bridge
Keadby Rail Drawbridge is still closed and the high temperatures are affecting the operating mechanisms. The bridge can operate once the temperature has dropped below 26 degrees and has stayed below for 12 hours. We will wait for an update from Network Rail once this condition…
Latest of 3 CRT updates, 12 May 2025.
Bridge 83, Keadby Rail Drawbridge - now operational
Stainforth & Keadby CanalYorkshire and North East
6 days
From 28 November 2025
Reopened 4 December 2025
CRT's title says reopened
- Where
- Bridge 83, Keadby Rail Drawbridge
- CRT reason
- 3rd Party Works
- Cause
- Broke, cause not given
- Asset
- Lift bridge
The repairs were carried out and the bridge is now operational.
Latest of 2 CRT updates, 4 December 2025.
Lock 25E - closed due to head paddles left up and is drained. - Reopened
Huddersfield Narrow CanalYorkshire and North East
6 days
From 3 June 2026
Reopened 9 June 2026
CRT's title says reopened
- Where
- Lock 25 East
- CRT reason
- Low Water Levels
- Cause
- Other cause
- Asset
- Canal or river
The water levels in this section have recovered and navigation is possible at Lock 25 East. The closure has been removed.
Latest of 2 CRT updates, 9 June 2026.
Lock 6 - repaired and operational
Rochdale CanalYorkshire and North East
6 days
From 13 June 2026
Reopened 19 June 2026
CRT's title says reopened
- Where
- Lock 3/4 to Lock 7
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The repairs at Lock 6 have been completed and it is operational.
Latest of 3 CRT updates, 19 June 2026.
Lock 6 - Lock gates are being ashed to help water levels recover. - Reopened
Rochdale CanalYorkshire and North East
6 days
From 23 June 2026
Reopened 29 June 2026
CRT's title says reopened
- Where
- Lock 6, Brearley
- CRT reason
- Low Water Levels
- Cause
- Broke, cause not given
- Asset
- Lock
Lock 6 is now open as the water levels have recovered over the weekend.
Latest of 4 CRT updates, 29 June 2026.
Keadby Rail Drawbridge - operational
Stainforth & Keadby CanalYorkshire and North East
5 days
From 10 April 2026
Reopened 15 April 2026
CRT's title says reopened
- Where
- Bridge 83, Keadby Rail Drawbridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lift bridge
We have had confirmation from Network Rail that repairs have been completed and Keadby Rail Drawbridge is back in working order.
Latest of 2 CRT updates, 15 April 2026.
Fallen tree across the canal at Upper Brearley Lock 6 - REMOVED
Rochdale CanalYorkshire and North East
5 days
From 16 April 2026
Reopened 21 April 2026
- Where
- Lock 6, Brearley
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
The tree has been removed and the navigation is open to passage.
Latest of 3 CRT updates, 21 April 2026.
Between Lk24 and LK8 - recovered and reopened
Huddersfield Narrow CanalYorkshire and North East
5 days
From 6 June 2026
Reopened 11 June 2026
CRT's title says reopened
- Where
- Lock 9 East, Isis Lock to Slipway Lock 24E
- CRT reason
- Low Water Levels
- Cause
- Other cause
- Asset
- Canal or river
Our Operations Team have been working very hard on this section and have managed to recover the water levels. We are able to reopen this length of canal from Lock 24E to Lock 8E.
Latest of 5 CRT updates, 11 June 2026.
Lock 5, Edward Kilner Lock - Sinkhole has opened up - repairs are needed. - open
Rochdale CanalYorkshire and North East
5 days
From 24 June 2026
Reopened 29 June 2026
- Where
- Lock 5, Edward Kilner
- CRT reason
- Repair
- Cause
- Ground moved
- Asset
- Lock
The repairs have been carried out and Lock 5 is now open as the water levels have recovered sufficiently over the weekend.
Latest of 4 CRT updates, 29 June 2026.
Bridge 188, Grange Swing Bridge - Planned Closure
Leeds & Liverpool CanalYorkshire and North East
4 days
From 23 June 2025
Reopened 27 June 2025
- Where
- Bridge 188, Grange Swing Bridge
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Swing bridge
Works commencing 23.06.2025 for 5 days. Bridge will be in canal closed position but the footpath over the bridge is also closed. Works are being carried out due to some additional funding as part of the Silsden to Kildwick towpath works, these works needed to be carried out…
CRT's only update, 13 June 2025.
Keadby Rail Bridge
Stainforth & Keadby CanalYorkshire and North East
4 days
From 13 November 2025
Reopened 17 November 2025
- Where
- Bridge 83, Keadby Rail Drawbridge
- CRT reason
- Information
- Cause
- Broke, cause not given
- Asset
- Swing bridge
Network Rail has advised us that Keadby Canal Swing Bridge cannot be opened for boats to pass until further notice due to ongoing signalling issues. The Signalling Team is due to attend site today. This notice will be updated as soon as we receive confirmation from Network Rail…
CRT's only update, 13 November 2025.
Woodlesford Lock
Aire & Calder Navigation Main LineYorkshire and North East
4 days
From 5 January 2026
Reopened 9 January 2026
- Where
- Lock 5, Woodlesford Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please be aware that Woodlesford Lock will be closed for five days to allow divers to inspect and repair the damaged sill.
CRT's only update, 23 December 2025.
Fishpond Lock
Aire & Calder Navigation Main LineYorkshire and North East
4 days
From 5 January 2026
Reopened 9 January 2026
- Where
- Lock 4, Fishpond Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please note, the completion time for works at Fishpond Lock has been revised to 17:00 on Friday 9th January.
Latest of 2 CRT updates, 23 December 2025.
Don doors and Doncaster Lock - NOW OPEN
New Junction Canal, Sheffield & South Yorkshire NavYorkshire and North East
4 days
From 22 January 2026
Reopened 26 January 2026
CRT's title says reopened
- Where
- Doncaster Lock
- CRT reason
- High Water Levels
- Cause
- Weather
- Asset
- Canal or river
Water levels have now dropped sufficiently to allow Doncaster Lock on the Sheffield and South Yorkshire Navigation and the Don Doors on the New Junction Canal to reopen.
Latest of 3 CRT updates, 26 January 2026.
Lock 1 Rhodesfield, Top lock, in Ripon
Ripon CanalYorkshire and North East
4 days
From 23 March 2026
Reopened 27 March 2026
- Where
- Lock 1 / Rhodesfield Lock
- CRT reason
- Repair
- Cause
- Worn out
- Asset
- Lock
Unfortunately, the condition of Rhodesfield lock has deteriorated and we need to bring forward our works planned for next winter, therefore repairs are required to the lock gates and cill at Lock 1, Rhodesfield, due to timber decay that is affecting the structural condition of…
CRT's only update, 17 February 2026.
Huddersfield Broad Canal Closure - Reopened
Huddersfield Broad CanalYorkshire and North East
4 days
From 26 February 2026
Reopened 2 March 2026
CRT's title says reopened
- Where
- Aspley Basin Waste Weir to Bridge 1, Lock 1 (Cooper Bridge)
- CRT reason
- Low Water Levels
- Cause
- Vandalism
- Asset
- Canal or river
The water levels have been closely monitored over the weekend and this has given the levels the time to recover. The Huddersfield Broad Canal has reopened and crafts are able to navigate the canal.
Latest of 4 CRT updates, 2 March 2026.
Bridge 22 Queen Street South - Boat rescued
Huddersfield Narrow CanalYorkshire and North East
4 days
From 25 April 2026
Reopened 29 April 2026
- Where
- Coal Wharf Lock (Disused former Lock 2E)
- CRT reason
- Boating Incident
- Cause
- Weather
- Asset
- Canal or river
The boat has been rescued and is no longer stuck on the Huddersfield Narrow Canal. However, the closure from Lock 1E to Lock 8E is still in place and we shall be reviewing it tomorrow and updating the notice.
Latest of 3 CRT updates, 29 April 2026.
Eastwood (Sir Frank Price) Lock
Sheffield & South Yorkshire NavYorkshire and North East
4 days
From 14 May 2026
Reopened 18 May 2026
- Where
- Eastwood (Sir Frank Price) Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Sluice
The work has been completed and the lock is back open for use.
Latest of 2 CRT updates, 18 May 2026.
Lock 9E and Lock 20E HNC - low water levels - Recovered and operational.
Huddersfield Narrow CanalYorkshire and North East
4 days
From 30 May 2026
Reopened 3 June 2026
CRT's title says reopened
- Where
- Lock 9 East, Isis Lock to Lock 20 East, Spot Lock
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
The water levels have been closely monitored by the local team and the water levels have recovered enough to allow for passage. Passage through Lock 9E to Lock 20E is now possible.
Latest of 3 CRT updates, 3 June 2026.
Lock 25e - 30 metres below - fallen tree blocking navigation - Removed
Huddersfield Narrow CanalYorkshire and North East
4 days
From 4 June 2026
Reopened 8 June 2026
- Where
- Lock 24 East to Lock 25 East
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Contractors have been on site and have removed the tree from the navigation.
Latest of 2 CRT updates, 8 June 2026.
Salterhebble Guillotine Lock 3 - Operational
Calder & Hebble NavigationYorkshire and North East
4 days
From 18 June 2026
Reopened 22 June 2026
CRT's title says reopened
- Where
- Lock 3, Salterhebble Bottom
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
A faulty sensor on the guillotine gate has been isolated and the lock brought back into use. The replacement of the broken sensor will be planned in due course.
Latest of 3 CRT updates, 22 June 2026.
Navigation Closure - Rochdale Canal, Lock 25 to Lock 30, Todmorden - low water levels
Rochdale CanalYorkshire and North East
4 days
From 8 July 2026
Reopened 12 July 2026
- Where
- Lock 25 to Lock 30
- CRT reason
- Low Water Levels
- Cause
- Other cause
- Asset
- Canal or river
The navigation remains closed from Lock 25 to Lock 30 as water levels are still below those required for safe navigation. The levels are slowly recovering; however, the navigation will remain closed today to allow further replenishment. The team is continuing to monitor the…
Latest of 2 CRT updates, 9 July 2026.
West Stockwith Lock
Chesterfield CanalYorkshire and North East
4 days
From 14 September 2026
Reopened 18 September 2026
- Where
- Lock 65, West Stockwith Lock
- CRT reason
- Maintenance
- Cause
- Worn out
- Asset
- Lock
Please be advised that Lock 65, West Stockwith Lock will be closed to navigation to allow essential refurbishment works to be carried out on the lock gates. The works include refurbishment of the gate hydraulic cylinders, together with renewal of the associated hydraulic…
CRT's only update, 25 August 2026.
Lock 12, Brighouse Bottom Lock, Calder and Hebble Navigation.
Calder & Hebble NavigationYorkshire and North East
4 days
From 11 September 2026
Reopened 15 September 2026
- Where
- Lock 12, Brighouse Bottom
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Brighouse Bottom Lock (Lock 12) is currently closed after one of the lock gates came free from its bearings. Unfortunately, the lock will remain out of action until we can carry out the necessary repair, which we expect to take place early next week. We'll provide an update as…
CRT's only update, 11 September 2026.
Whitley Lock
Aire & Calder Navigation Main LineYorkshire and North East
3 days
Fully shut 3 of CRT's 4 days
From 18 July 2025
Reopened 22 July 2025
- Where
- Lock 12, Whitley Lock
- CRT reason
- Maintenance
- Cause
- Broke, cause not given
- Asset
- Lock
Thanks to the operatives, the top gates at Whitley lock have now been repaired and the lock is once again fully operational.
Latest of 4 CRT updates, 22 July 2025.
Rotherham flood gate - closed
Sheffield & South Yorkshire NavYorkshire and North East
3 days
From 14 November 2025
Reopened 17 November 2025
- Where
- Rotherham Lock
- CRT reason
- High Water Levels
- Cause
- Weather
- Asset
- Canal or river
We have received confirmation that the flood gate has now been lifted.
Latest of 2 CRT updates, 17 November 2025.
Navigation Closure - Huddersfield Broad Canal, Between Falls Lock, Lock 8 and Red Doles Lock, Lock 9, Huddersfield - OPEN
Huddersfield Broad CanalYorkshire and North East
3 days
From 6 March 2026
Reopened 9 March 2026
- Where
- Lock 9, Red Doles Lock to Lock 8, Falls Lock
- CRT reason
- Information
- Cause
- Ground moved
- Asset
- Canal or river
The water levels have recovered over the weekend and the section of navigation is now open.
Latest of 2 CRT updates, 9 March 2026.
Lock 23 - Broken paddle - Repaired
Rochdale CanalYorkshire and North East
3 days
From 17 March 2026
Reopened 20 March 2026
- Where
- Lock 23
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The repairs to the paddle have taken place and it is operational.
Latest of 2 CRT updates, 20 March 2026.
Lock 16 - Broken Paddle - Repaired
Rochdale CanalYorkshire and North East
3 days
From 21 March 2026
Reopened 24 March 2026
- Where
- Lock 16
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The stem has been reattached to the paddle and is operational. The repairs have been completed.
Latest of 2 CRT updates, 24 March 2026.
Tree across the navigation between Lock 9, Red Dole Lock and Bridge 11a, blocking passage. Removed
Huddersfield Broad CanalYorkshire and North East
3 days
From 15 May 2026
Reopened 18 May 2026
- Where
- Bridge 11a, Vine St Accomodation Bridge to Lock 9, Red Doles Lock
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
The tree has been removed and the navigation is open for navigation
Latest of 2 CRT updates, 18 May 2026.
Lock 20 Rochdale Canal -operational
Rochdale CanalYorkshire and North East
3 days
From 1 June 2026
Reopened 4 June 2026
CRT's title says reopened
- Where
- Lock 20
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The repairs have been carried out to the jammed head paddle on the offside and to the rack on the towpath side paddle. Lock 20 is operational.
Latest of 2 CRT updates, 4 June 2026.
CLOSED -Selby Toll Road Bridge - Unable to swing
River OuseYorkshire and North East
3 days
From 8 June 2026
Reopened 11 June 2026
- Where
- Selby Toll Road Bridge
- CRT reason
- Maintenance
- Cause
- Broke, cause not given
- Asset
- Swing bridge
We have been advised by North Yorkshire County Council that Selby Toll Road Bridge has developed a mechanical fault and is currently unable to swing. As a result, the bridge is closed to all navigation traffic until further notice while the issue is investigated and repaired. We…
CRT's only update, 8 June 2026.
Mexborough Top Lock to Mexborough Low Lock
Sheffield & South Yorkshire NavYorkshire and North East
3 days
From 26 June 2026
Reopened 29 June 2026
- Where
- Mexborough Top Lock to Mexborough Low Lock
- CRT reason
- 3rd Party Works
- Cause
- Other cause
- Asset
- Lock
National Grid have confirmed that they have installed a generator and the power is back on. The locks are now back open for use as normal.
Latest of 2 CRT updates, 29 June 2026.
Fallen tree blocking navigation at Bridge 3a. Pipebridge 1 - Removed
Huddersfield Broad CanalYorkshire and North East
3 days
From 3 July 2026
Reopened 6 July 2026
- Where
- Bridge 3a, Pipebridge 1
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
The fallen tree has been removed and the navigation is clear for passage.
Latest of 2 CRT updates, 6 July 2026.
Low Lane Swing Bridge - Fault on Pedestal
New Junction CanalYorkshire and North East
3 days
From 17 July 2026
Reopened 20 July 2026
- Where
- Low Lane Swing Bridge 2
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Swing bridge
Low Lane Swing Bridge is currently out of order as the close button has broken. Contractors have been appointed and it is hoped that the problem will be rectified as soon as possible. This notice will be updated, once the repair has been completed.
CRT's only update, 17 July 2026.
Pound between Lock 6 and Lock 7, Mytholmroyd - Low water Levels - extending to Lock 5
Rochdale CanalYorkshire and North East
3 days
From 14 September 2026
Reopened 17 September 2026
- Where
- Lock 5, Edward Kilner to Lock 7
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
The pound at Lock 5 is still very low, so unfortunately is unable to be reopened. The team will check again close to the end of the working day.
Latest of 3 CRT updates, 16 September 2026.
Ranby - Fallen tree
Chesterfield CanalYorkshire and North East
2 days
From 30 June 2025
Reopened 2 July 2025
- Where
- Chesterfield Canal - 035
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
There is a large tree blocking the navigation at ///shocking.caused.inclined. Contractors have confirmed that they will be on site at 5pm today (01/07) to remove the tree. We will update this notice when the tree has been removed.
Latest of 2 CRT updates, 1 July 2025.
Long Sandall Lock
Sheffield & South Yorkshire NavYorkshire and North East
2 days
From 6 July 2025
Reopened 8 July 2025
- Where
- Long Sandall Lock
- CRT reason
- Information
- Cause
- Broke, cause not given
- Asset
- Lock
Due to an issue with the user pedestals at Long Sandall, the lock is out of operation. Our engineers will be attending site in the morning (07/07) to carry out a repair.
CRT's only update, 6 July 2025.
Chesterfield Lock 60, Whitsunday Pie Lock
Chesterfield CanalYorkshire and North East
2 days
Fully shut 2 of CRT's 4 days
From 20 July 2025
Reopened 24 July 2025
- Where
- Lock 60, Whit Sunday Pie Lock
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Lock
Contractors have attended site and have cleared half of the tree that they could safely reach. Contractors will be back to clear the navigation of the other half of the tree with specialist winch equipment on Wednesday 23/07/25. Boaters are requested that they proceed with…
Latest of 2 CRT updates, 22 July 2025.
Lock 1, River Lock Upstream on Leeds and Liverpool Canal
Leeds & Liverpool CanalYorkshire and North East
2 days
From 1 August 2025
Reopened 3 August 2025
- Where
- Lock 1, River Lock
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
Please be advised that Lock 1 (River Lock Upstream) on the Leeds & Liverpool Canal is currently closed due to low water levels. At this time, we are unable to confirm when the lock will reopen. Water levels are being monitored, and we will provide updates as soon as further…
CRT's only update, 1 August 2025.
Navigation Closure - Stainforth & Keadby Canal, Medge Hall swing bridge, Crowle
Stainforth & Keadby CanalYorkshire and North East
2 days
From 20 August 2025
Reopened 22 August 2025
- Where
- Medgehall Swing Bridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Swing bridge
Our mechanical Engineers have not been able to attend to site today due to other breakdowns. They will be in attendance on Friday 22nd August.
Latest of 2 CRT updates, 21 August 2025.
Navigation Closure - Huddersfield Broad Canal, Between Falls Lock, Lock 8 and Red Doles Lock, Lock 9, Huddersfield
Huddersfield Broad CanalYorkshire and North East
2 days
From 4 March 2026
Reopened 6 March 2026
- Where
- Lock 9, Red Doles Lock to Lock 8, Falls Lock
- CRT reason
- Low Water Levels
- Cause
- Ground moved
- Asset
- Canal or river
A void has appeared in the bed of the canal therefore the water level cannot be maintained at navigable levels. Please do not attempt to navigate the Broad until we can fix it. The levels downstream of the void will also be affected as there's no flow to keep them navigable.…
CRT's only update, 4 March 2026.
OPENED - Milman Swing Bridge -
Leeds & Liverpool CanalYorkshire and North East
2 days
From 21 March 2026
Reopened 23 March 2026
- Where
- Bridge 214, Milman Swing Bridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Swing bridge
The bridge has now been repaired, and power has been restored. The issue is fully resolved, and the bridge is open for passage.
Latest of 2 CRT updates, 23 March 2026.
Lock 9, Red Doles Lock - Tree fallen across the navigation - REMOVED
Huddersfield Broad CanalYorkshire and North East
2 days
From 5 May 2026
Reopened 7 May 2026
- Where
- Lock 9, Red Doles Lock
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
The tree was successfully removed from the navigation. The navigation is clear for passage.
Latest of 3 CRT updates, 7 May 2026.
CLOSED - Bridge 199, Micklethwaite Swing Bridge, Leeds & Liverpool
Leeds & Liverpool CanalYorkshire and North East
2 days
From 25 May 2026
Reopened 27 May 2026
- Where
- Bridge 199, Micklethwaite Swing Bridge
- CRT reason
- Information
- Cause
- Weather
- Asset
- Swing bridge
Now that temperatures have dropped the issue has been resolved and the swing bridge is back open for use as normal.
Latest of 3 CRT updates, 27 May 2026.
Godnow Swnigbridge
Stainforth & Keadby CanalYorkshire and North East
2 days
From 30 May 2026
Reopened 1 June 2026
- Where
- Godnow Swing Bridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Swing bridge
Due to an issue with the Hydraulic system at Godnow Swingbridge, Please be advised that the bridge is not operational at this time, We have booked in our contractors for Monday morning to attempt to resolve this issue, Apologies for any inconvenience.
CRT's only update, 30 May 2026.
Lock 14 East - low water levels - Recovered and reopened
Huddersfield Narrow CanalYorkshire and North East
2 days
From 9 June 2026
Reopened 11 June 2026
CRT's title says reopened
- Where
- Lock 14 East, Ramsden Lock
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
The water levels have recovered. Lock 14E is operational.
Latest of 2 CRT updates, 11 June 2026.
Lock19 - 24 Rochdale - Navigable
Rochdale CanalYorkshire and North East
2 days
From 30 June 2026
Reopened 2 July 2026
- Where
- Lock 19 to Lock 24
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Our team have attended site and the water levels have recovered enough for the section to be navigable. The closure has been removed.
Latest of 3 CRT updates, 2 July 2026.
Fallen tree blocking 2/3rd's of the width of Selby Canal at Brayton Bridge. - Tree has been removed.
Selby CanalYorkshire and North East
2 days
From 6 July 2026
Reopened 8 July 2026
- Where
- Brayton Railway Bridge to Brayton Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Contractors attended to the tree today and have removed it. The section of Selby canal is clear and open to boat movement.
Latest of 3 CRT updates, 8 July 2026.
Wall Clasped near Bridge 3, Edward Road - Closed from Rochdale Lock 1 to Salterhebble Lock 1 - OPEN
Rochdale Canal, Calder & Hebble NavigationYorkshire and North East
2 days
From 15 July 2026
Reopened 17 July 2026
- Where
- Lock 1
- CRT reason
- Underwater Obstruction
- Cause
- Broke, cause not given
- Asset
- Other
The team have attended site and have placed buoys close to the wall. The navigation section is open to passage but we will advise skippers of all crafts to navigate towards the towpath side away from the wall, to ensure safe boating.
Latest of 4 CRT updates, 17 July 2026.
CLOSED - Kirkstall, Forge and Newlay Locks
Leeds & Liverpool CanalYorkshire and North East
2 days
From 23 July 2026
Reopened 25 July 2026
- Where
- Lock 13, Newlay Top Lock to Lock 7, Kirkstall Little Lock
- CRT reason
- Information
- Cause
- Vandalism
- Asset
- Canal or river
Our local team has attended site and assessed the water levels along this section of the canal. While levels have improved since the temporary closure was put in place, they have not yet recovered sufficiently to allow navigation to reopen safely. To ensure there is enough water…
Latest of 2 CRT updates, 24 July 2026.
Sykehouse Lock - not working due to a faulty hydraulic unit.
New Junction CanalYorkshire and North East
2 days
From 7 August 2026
Reopened 9 August 2026
- Where
- Sykehouse Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
A fault has occurred with the hydraulic Unit on Sykehouse Lock. It has been reported to Engineers and they will be in attendance within the next 72 hours. We will update the notice when the hydraulic unit has been repaired and the lock is operational again.
CRT's only update, 7 August 2026.
Tinsley flight - CLOSED 29th-30th August
Sheffield & Tinsley Canal, Sheffield & South Yorkshire NavYorkshire and North East
2 days
Fully shut 2 of CRT's 2 days
From 29 August 2026
Reopened 31 August 2026
- Where
- Lock 1 Tinsley to Tinsley No.12 Lock
- CRT reason
- Information
- Cause
- Nothing failed
- Asset
- Lock
The Tinsley Lock flight will be closed on the 29th and 30th of August due to staff sickness. It will be open as normal for boaters from the 31st of August.
CRT's only update, 26 August 2026.
Tinsley Flight - closed 12th and 13th of September
Sheffield & Tinsley Canal, Sheffield & South Yorkshire NavYorkshire and North East
2 days
Fully shut 2 of CRT's 4 days
From 10 September 2026
Reopened 14 September 2026
- Where
- Lock 1 Tinsley to Tinsley No.12 Lock
- CRT reason
- Information
- Cause
- Nothing failed
- Asset
- Lock
The Tinsley Flight will be closed on the 12th and 13th of September due to staff sickness. It will be back open as normal for assisted passage from Monday the 14th of September onwards.
CRT's only update, 10 September 2026.
Figure of 3 Bottom - Blown Paddle
Calder & Hebble NavigationYorkshire and North East
1 day
From 29 May 2025
Reopened 30 May 2025
- Where
- Lock 24, Figure Of Three Bottom
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
A navigation closure is currently in effect due to a paddle failure. Operatives will be on site in the morning to assess the necessary repairs. An update will be provided by 4:00 PM on Friday, 30th May.
CRT's only update, 29 May 2025.
Bridge 182A, Bradley Swing Bridge
Leeds & Liverpool CanalYorkshire and North East
1 day
From 30 May 2025
Reopened 31 May 2025
- Where
- Bridge 182A, Bradley Swing Bridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Swing bridge
A fault has developed with Bradley Swingbridge, passage through the bridge is not possible at this time. Engineers will be attending on 31/5/25 AM to undertake repairs. We will update this notice by 12:30 on 31/5/25 or when works have been completed.
CRT's only update, 30 May 2025.
Selby Swing Bridge
Selby CanalYorkshire and North East
1 day
From 6 June 2025
Reopened 7 June 2025
- Where
- Selby Swingbridge 1
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Swing bridge
Selby Swing Bridge is currently out of action due to a mechanical fault. Staff are on site. An update will be provided as soon as possible
CRT's only update, 6 June 2025.
Lemonroyd Lock - Sluice failure
Aire & Calder Navigation Main LineYorkshire and North East
1 day
From 8 June 2025
Reopened 9 June 2025
- Where
- Lock 7, Lemonroyd Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Sluice
The downstream far side sluice has developed a fault. A navigation closure is in place. Our mechanical and engineering team have been made aware and we will update the notice once we have more information to share.
CRT's only update, 8 June 2025.
Worksop Town Lock
Chesterfield CanalYorkshire and North East
1 day
Fully shut 1 of CRT's 7 days
From 12 June 2025
Reopened 19 June 2025
- Where
- Lock 50, Worksop Town Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
A navigation closure is scheduled from 08:00 on Wednesday, 18th June to 18:00 on Thursday, 19th June. A repair is required to the headpost of the upstream gate. The pound upstream of Worksop Town Lock will need to be lowered to facilitate the repair.
CRT's only update, 12 June 2025.
Kings Road Lock
Wakefield Branch (Aire & Calder)Yorkshire and North East
1 day
From 6 July 2025
Reopened 7 July 2025
- Where
- Wakefield Branch (Aire & Calder) - 007
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We would like to inform you that Kingsroad Lock is now back in operation following the successful resolution of the recent fault affecting the system. Earlier this morning, our engineering team attended the site to carry out further diagnostics and repairs. Upon inspection, they…
Latest of 2 CRT updates, 7 July 2025.
Thornes Lock - Failed Paddle
Calder & Hebble NavigationYorkshire and North East
1 day
From 24 July 2025
Reopened 25 July 2025
- Where
- Lock 27, Thornes
- CRT reason
- Information
- Cause
- Broke, cause not given
- Asset
- Lock
The team have attended site to attend the paddle at Thornes Lock. The paddle has been swapped but the repair was not sufficient enough to create a seal, making it unsafe to operate. The Lock has been closed as a result. We will update this notice by 3pm on Friday, 25th July.
CRT's only update, 24 July 2025.
Bridge 187, Warehouse Swingbridge
Leeds & Liverpool CanalYorkshire and North East
1 day
From 26 July 2025
Reopened 27 July 2025
- Where
- Bridge 187, Warehouse Swing Bridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Swing bridge
Contractors have attended site and discovered that the issue with the bridge is that the locking mechanism is bent. This locking mechanism needs to be repaired or replaced for the bridge to be reopened. The locking mechanism has been sent off to attempt to repair this, but it is…
Latest of 2 CRT updates, 26 July 2025.
Lock 13 to Lock 14
Rochdale CanalYorkshire and North East
1 day
From 16 August 2025
Reopened 17 August 2025
- Where
- Rochdale Canal - 012
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
Rochdale Canal – Navigation Update Please be advised that water levels between Locks 13 and 14 on the Rochdale Canal have dropped significantly, leaving some boats grounded and restricted in movement. Our team is aware of the situation and will be working to restore levels as…
CRT's only update, 16 August 2025.
Leeds & Liverpool Canal, Gallows Bridge, Skipton, Skipton - removal of bridge
Leeds & Liverpool CanalYorkshire and North East
1 day
From 3 November 2025
Reopened 4 November 2025
- Where
- Bridge 179, Gallows Footbridge
- CRT reason
- 3rd Party Works
- Cause
- Planned works
- Asset
- Bridge
This section of navigation will be closed whilst the bridge is removed to be taken away and upgraded. This will be done overnight, so will no cause no inconvenience to boaters.
CRT's only update, 28 October 2025.
Lock 19, Hirst Lock
Leeds & Liverpool CanalYorkshire and North East
1 day
From 7 December 2025
Reopened 8 December 2025
- Where
- Lock 19, Hirst Lock
- CRT reason
- Emergency Services Incident
- Cause
- Nothing failed
- Asset
- Lock
Hirst Lock and the immediate surrounding area is currently closed due to an emergency services incident.
CRT's only update, 7 December 2025.
Gallows Bridge, Skipton
Leeds & Liverpool CanalYorkshire and North East
1 day
From 15 December 2025
Reopened 16 December 2025
- Where
- Bridge 179, Gallows Footbridge
- CRT reason
- 3rd Party Works
- Cause
- Planned works
- Asset
- Bridge
The new Gallows bridge is to be lifted into place overnight on Monday, 15th December, into the morning of Tuesday, 16th December. The canal will be closed in the location of the bridge from approximately 16.00 until the bridge lift is completed. The canal will be open from 06.00…
CRT's only update, 9 December 2025.
Leeds Lock on Aire and Calder - Closed due to Electrical Issue - Repaired
Aire & Calder Navigation Main LineYorkshire and North East
1 day
From 14 January 2026
Reopened 15 January 2026
- Where
- Lock 1, Leeds Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Engineers have attended Leeds Lock and the repairs have been carried out. It is back on pedestal operation.
Latest of 2 CRT updates, 15 January 2026.
Lock 19 - Todmorden - Gearing mechanism failure - Now repaired
Rochdale CanalYorkshire and North East
1 day
From 15 January 2026
Reopened 16 January 2026
- Where
- Lock 19
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The gearing mechanism has been repaired and the lock is operational.
Latest of 2 CRT updates, 16 January 2026.
Woodlesford Lock
Aire & Calder Navigation Main LineYorkshire and North East
1 day
From 30 March 2026
Reopened 31 March 2026
- Where
- Lock 5, Woodlesford Lock
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
Woodlesford Lock will be closed for passage from 08:00 on Monday 30th until 18:00 on Tuesday 31st March. This is to allow the Operations Team to fit replacement anchors.
CRT's only update, 27 March 2026.
Loco Liftbridge is out of action - snapped key in lock - Now Operational
Huddersfield Broad CanalYorkshire and North East
1 day
From 15 April 2026
Reopened 16 April 2026
CRT's title says reopened
- Where
- Bridge 17, Quay Street Loco Liftbridge
- CRT reason
- Repair
- Cause
- Other cause
- Asset
- Lift bridge
Contractors have attended site and the snapped key has been removed from the mechanism. The Loco Lift bridge is operational.
Latest of 2 CRT updates, 16 April 2026.
Lock 33, Double Bottom Lock - closure
Chesterfield CanalYorkshire and North East
1 day
From 20 April 2026
Reopened 21 April 2026
- Where
- Lock 33, Double Bottom Lock (Top)
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The lock will be closed for navigation as the upstream ground paddles are dewatered to allow for inspection and repair. This notice will be updated when the repairs have been completed and the lock is re opened for use.
CRT's only update, 16 April 2026.
Lock 42E to Lock 41E - closed due to Silt removal.
Huddersfield Narrow CanalYorkshire and North East
1 day
From 22 April 2026
Reopened 23 April 2026
- Where
- Lock 41 East to Lock 42 East
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Canal or river
The local team are undertaking silt removal from Lock 41E to Lock 42E so a navigation closure is needed to be in place. This will also impact pedestrian access on the towpath between these two locks as the towpath will be worked upon to act as a platform to retrieve the silt…
CRT's only update, 22 April 2026.
Sykehouse Lock Road Bridge- Out of Action
New Junction CanalYorkshire and North East
1 day
Fully shut 1 of CRT's 3 days
From 28 April 2026
Reopened 1 May 2026
- Where
- Sykehouse Lock
- CRT reason
- Repair
- Cause
- Worn out
- Asset
- Bridge
Sykehouse Lock has been repaired and it is back to boater operation.
Latest of 5 CRT updates, 1 May 2026.
Keadby Rail Drawbridge - non-operational
Stainforth & Keadby CanalYorkshire and North East
1 day
From 1 May 2026
Reopened 2 May 2026
- Where
- Bridge 83, Keadby Rail Drawbridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lift bridge
Keadby Rail Drawbridge is closed due to a snapped connecting rod, Network Rail are currently trying to source a replacement part. This notice will be updated once we receive further information.
CRT's only update, 1 May 2026.
Lock 45, Doefield Dun Lock
Chesterfield CanalYorkshire and North East
1 day
From 14 May 2026
Reopened 15 May 2026
- Where
- Lock 45, Doefield Dun Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Sluice
The lock will be dewatered to allow for repairs to be carried out to a broken sluice. The lock will be open for usage during Thursday evening from 5pm onwards. This notice will be updated once the repair has been completed.
CRT's only update, 12 May 2026.
Navigation Closure - Rochdale Canal, Lock 25, Todmorden - Reopened
Rochdale CanalYorkshire and North East
1 day
From 13 May 2026
Reopened 14 May 2026
CRT's title says reopened
- Where
- Lock 25 to Lock 26
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
The water levels between Lock 25 and Lock 26 have recovered overnight to a sufficient level for navigation to be possible for skippers. This section is reopened.
Latest of 2 CRT updates, 14 May 2026.
Bank Newton and Gargrave section closure to low water levels - reopened
Leeds & Liverpool CanalYorkshire and North East
1 day
From 18 May 2026
Reopened 19 May 2026
CRT's title says reopened
- Where
- Lock 36, Bank Newton Bottom Lock to Higherland Lock Sanitary Station
- CRT reason
- Low Water Levels
- Cause
- Other cause
- Asset
- Canal or river
The navigation has recovered and water levels are back to a navigable level. The stoppage has been lifted.
Latest of 2 CRT updates, 19 May 2026.
Navigation Restriction - Huddersfield Broad Canal, Between lock 8 and Lock 9, Fartown - Culvert repairs completed at 2pm today - navigation reopen 2pm onwards.
Huddersfield Broad CanalYorkshire and North East
1 day
From 20 May 2026
Reopened 21 May 2026
- Where
- Lock 9, Red Doles Lock to Lock 8, Falls Lock
- CRT reason
- Maintenance
- Cause
- Broke, cause not given
- Asset
- Culvert
The Culvert repairs are currently underway and shall be completed by 2pm. The navigation will be open from 2pm onwards.
Latest of 2 CRT updates, 21 May 2026.
Sprotbrough Lock
Sheffield & South Yorkshire NavYorkshire and North East
1 day
From 20 May 2026
Reopened 21 May 2026
- Where
- Sprotbrough Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Sprotbrough Lock is currently unavailable for passage, due to the failure of a solenoid in the downstream pedestal. Our Mechanical and Electrical team will be on site tomorrow morning (Thursday, 21st May) to facilitate a repair. This notice will be updated when more information…
CRT's only update, 20 May 2026.
East Cottingwith Lock (Lock 9) - Diving operation to undertake repairs
Pocklington CanalYorkshire and North East
1 day
From 27 May 2026
Reopened 28 May 2026
- Where
- Lock 9 / Cottingwith Lock
- CRT reason
- Inspections
- Cause
- Broke, cause not given
- Asset
- Lock
East Cottingwith Lock (Lock 9) will be closed to navigation from 08:00 on 27 May 2026 until 17:00 on 28 May 2026. A specialist dive team will be carrying out underwater repairs to the lock gates to help conserve water resources at East Cottingwith lock. For safety reasons, no…
CRT's only update, 21 May 2026.
Bridge 62, Hayton Smeath Lane Road Bridge
Chesterfield CanalYorkshire and North East
1 day
From 29 May 2026
Reopened 30 May 2026
- Where
- Bridge 62, Hayton Smeath Lane Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Due to a fallen tree in the navigation, the navigation is closed just to the south of Bridge 62, Hayton Smeath Lane Road Bridge, and passage is not possible. Contractors will be out on site to remove the tree when possible. The towpath remains unaffected by this. Apologies for…
CRT's only update, 29 May 2026.
CLOSURE - Swinton (Waddington) Lock to Sprotbrough Lock
Sheffield & South Yorkshire NavYorkshire and North East
1 day
From 1 June 2026
Reopened 2 June 2026
- Where
- Swinton (Waddington) Lock to Sprotbrough Lock
- CRT reason
- Emergency Services Incident
- Cause
- Nothing failed
- Asset
- Canal or river
The navigation is currently closed due to an ongoing police incident. We will update this notice once the police have advised that the navigation can be re-opened.
CRT's only update, 1 June 2026.
Salterhebble bottom lock - NOW OPEN
Calder & Hebble NavigationYorkshire and North East
1 day
From 14 June 2026
Reopened 15 June 2026
CRT's title says reopened
- Where
- Lock 3, Salterhebble Bottom
- CRT reason
- Maintenance
- Cause
- Broke, cause not given
- Asset
- Lock
Repairs to the guillotine lock at the tail gates of Lock 3, Salterhebble bottom lock have now been completed and the lock is fully operational.
Latest of 2 CRT updates, 15 June 2026.
Closed - Bridge 209, Dock Swing Bridge Leeds & Liverpool Canal
Leeds & Liverpool CanalYorkshire and North East
1 day
From 26 June 2026
Reopened 27 June 2026
- Where
- Bridge 209, Dock Swing Bridge
- CRT reason
- Maintenance
- Cause
- Weather
- Asset
- Swing bridge
Due to the high temperatures causing a malfunction, Bridge 209 – Dock Swing Bridge is currently closed and will be inspected tomorrow, Saturday 27th June. Our team will attend the site in the morning to carry out the necessary checks and ensure the bridge is safe to reopen. We…
CRT's only update, 26 June 2026.
Salterhebble middle basin
Calder & Hebble NavigationYorkshire and North East
1 day
From 28 June 2026
Reopened 29 June 2026
- Where
- Lock 2, Salterhebble Middle
- CRT reason
- Low Water Levels
- Cause
- Cause not stated
- Asset
- Canal or river
Levels have dropped overnight but is now being topped up throughout the day
CRT's only update, 28 June 2026.
Loco Bridge - unoperable due to a key stuck in the lock. - Fixed and operational
Huddersfield Broad CanalYorkshire and North East
1 day
From 2 July 2026
Reopened 3 July 2026
CRT's title says reopened
- Where
- Bridge 17, Quay Street Loco Liftbridge
- CRT reason
- Information
- Cause
- Other cause
- Asset
- Lift bridge
M&E attended early this morning and the issue has been resolved. The Loco lift bridge is operational.
Latest of 2 CRT updates, 3 July 2026.
Bingley 3 & 5 Rise - Closed
Leeds & Liverpool CanalYorkshire and North East
1 day
From 10 July 2026
Reopened 11 July 2026
- Where
- Lock 29, Bingley 5 Rise Top Lock to Lock 22, Bingley 3 Rise Bottom Lock
- CRT reason
- Information
- Cause
- Nothing failed
- Asset
- Lock
Due to todays high temperatures and forecasted extreme heat later today we will be closing Bingley Five and Three Rise locks at 12.30pm. These will re-open as normal tomorrow. We will continue to exercise operational flexibility to best manage the welfare of our colleagues and…
CRT's only update, 10 July 2026.
Woodlesford Lock - Divers on Site
Aire & Calder Navigation Main LineYorkshire and North East
1 day
From 14 July 2026
Reopened 15 July 2026
- Where
- Lock 5, Woodlesford Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
The closure at Woodlesford Lock will be extended into Wednesday morning, until 8:00am. This is to allow the concrete more time to fully set.
Latest of 2 CRT updates, 14 July 2026.
Bank Newton to Gargrave
Leeds & Liverpool CanalYorkshire and North East
1 day
From 11 July 2026
Reopened 12 July 2026
- Where
- Leeds & Liverpool Canal - 047 to Leeds & Liverpool Canal - 051
- CRT reason
- Information
- Cause
- Nothing failed
- Asset
- Canal or river
| To protect the health, safety and wellbeing of our staff and volunteers during the forecast high temperatures this afternoon, the Leeds & Liverpool Canal between Bank Newton and Gargrave will be temporarily closed to navigation from this afternoon. The canal is scheduled to…
CRT's only update, 11 July 2026.
Kings Road Lock - Closure
Wakefield Branch (Aire & Calder)Yorkshire and North East
1 day
From 13 July 2026
Reopened 14 July 2026
- Where
- Lock 3, Kings Road Lock
- CRT reason
- Information
- Cause
- Planned works
- Asset
- Lock
Due to divers being on site at Birkwood Lock today, Kings Road Lock will be closed until tomorrow morning, Tuesday 14th July. This is to maintain water levels in the short pound between Kings Road and Birkwood Locks. The lock will reopen at 08:00 tomorrow.
CRT's only update, 13 July 2026.
Birkwood Lock - Divers on Site
Wakefield Branch (Aire & Calder)Yorkshire and North East
1 day
From 13 July 2026
Reopened 14 July 2026
- Where
- Lock 2, Birkwood Lock to Lock 6, Woodnook Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Reissued due to administrative issue regarding the date tomorrow. The lock will remain closed until 08:00 tomorrow, Tuesday 14th July, to ensure that the concrete used to repair the cill has set. As part of our continued commitment to the Better Boating Plan, we will be carrying…
Latest of 2 CRT updates, 13 July 2026.
Navigation Closure - Rochdale Canal, Locks 20 to 24, Todmorden - Tuesday July 21st
Rochdale CanalYorkshire and North East
1 day
From 21 July 2026
Reopened 22 July 2026
- Where
- Lock 20 to Lock 24
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Lock 20 will be closed on Tuesday, July 21st to allow the team to repair the paddle at Lock 20. We will be closing the flight from Lock 24, to prevent an excess of water in the area and to ensure that there is no boat movement during this time to prevent overtopping whilst the…
Latest of 2 CRT updates, 20 July 2026.
Lock 6, Woodnook Lock - closed due to a broken collar, gates cannot be operated. OPEN
Wakefield Branch (Aire & Calder)Yorkshire and North East
1 day
From 16 July 2026
Reopened 17 July 2026
- Where
- Lock 6, Woodnook Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The repairs have been completed and it is operational.
Latest of 2 CRT updates, 17 July 2026.
Sykehouse Lock
New Junction CanalYorkshire and North East
1 day
From 19 July 2026
Reopened 20 July 2026
- Where
- Sykehouse Lock
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Swing bridge
Sykhouse Lock Closure Notice Date: Sunday, 19 July 2026 From 3:00 pm on Sunday, 19 July 2026, Sykhouse Lock will be temporarily closed to allow essential maintenance to be carried out on the swing bridge crossing the lock. A member of the Canal & River Trust will be on site from…
CRT's only update, 19 July 2026.
Keadby Lock - closure
Stainforth & Keadby CanalYorkshire and North East
1 day
Fully shut 1 of CRT's 17 days
From 28 July 2026
Reopened 14 August 2026
- Where
- Keadby Lock
- CRT reason
- Information
- Cause
- Nothing failed
- Asset
- Lock
Keadby Lock will now be open on the 22nd - 23rd of August. The closure on the 14th of August will still be taking place.
Latest of 2 CRT updates, 3 August 2026.
Boundary Lock - Thorpe Top Treble Lock
Chesterfield CanalYorkshire and North East
1 day
From 30 July 2026
Reopened 31 July 2026
- Where
- Lock 41A, Boundary Lock to Lock 20, Thorpe Top Treble Lock (Top)
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
The water levels have recovered to a navigable level and this section is back open to boaters as normal.
Latest of 2 CRT updates, 31 July 2026.
Barnby Dun Lift Bridge
Sheffield & South Yorkshire NavYorkshire and North East
1 day
From 2 August 2026
Reopened 3 August 2026
- Where
- Barnby Dun Lift Bridge
- CRT reason
- Vehicle Incident
- Cause
- Struck by boat or vehicle
- Asset
- Lift bridge
Please be advised that due to a vehicle colliding with the safety barriers at Barnby Dun Lift bridge that the bridge is closed to all boat traffic. Contractors are on their way today to try and attempt a repair. Apologies for any inconvenience caused.
CRT's only update, 2 August 2026.
Lock 7, Lemonroyd Lock
Aire & Calder Navigation Main LineYorkshire and North East
1 day
From 16 August 2026
Reopened 17 August 2026
- Where
- Lock 7, Lemonroyd Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
A team have attended site and fixed the hydraulic power pack. The lock is now back open for use as normal.
Latest of 2 CRT updates, 17 August 2026.
Woodnook Lock, Wakefield Branch of the Aire and Calder Navigation.
Wakefield Branch (Aire & Calder)Yorkshire and North East
1 day
From 18 August 2026
Reopened 19 August 2026
- Where
- Lock 6, Woodnook Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Woodnook Lock will be closed to navigation on the 17th August 2026 (tomorrow), and potentially 18th August 2026, whilst a team of diving contractors caries out repairs to a paddle. Please bear with us while this essential work is completed. If the repairs are finished sooner…
CRT's only update, 17 August 2026.
Rhodesfield Lock to Canal Basin Ripon
Ripon CanalYorkshire and North East
1 day
From 13 September 2026
Reopened 14 September 2026
- Where
- Ripon Canal - 001 to Ripon Canal - 002
- CRT reason
- Emergency Services Incident
- Cause
- Nothing failed
- Asset
- Canal or river
| | | --- | | Temporary Navigation Closure – Ripon Canal Sunday 13 September 2026 To ensure the safety of our customers, volunteers, staff and emergency services, navigation on the Ripon Canal is temporarily suspended between Rhodesfield Lock and Ripon Canal Basin with immediate…
CRT's only update, 13 September 2026.
Godnow Swingbridge - barriers are not working
Stainforth & Keadby CanalYorkshire and North East
1 day
From 25 September 2026
No reopening date
Still shut
- Where
- Godnow Swing Bridge
- CRT reason
- Repair
- Cause
- Not read yet
- Asset
- Swing bridge
Godnow Swing Bridge is currently closed as the barriers are not functionally correctly. The barriers have been isolated and the power switched off to them to close it to boat traffic. We have our Mechanical & Electrics Team attending to site on Monday of which we will be able to…
CRT's only update, 25 September 2026. 1 day without another.
Anchor Lock, Lock 33
Leeds & Liverpool CanalYorkshire and North East
23 days
From 29 April 2025
Ended 22 May 2025
Restriction, not a full closure
- Where
- Lock 33, Anchor Lock
- CRT reason
- Low Water Levels
- Cause
- Nothing failed
- Asset
- Lock
Please refer to Leeds & Liverpool Canal Lock Flights, Wigan to Leeds | Canal & River Trust for updates on this lock, This lock is included in the closure until further notice.
Latest of 2 CRT updates, 22 May 2025.
Navigation Closure , Tunnel End rail bridge, Huddersfield Narrow Canal - Overnight coring works
Huddersfield Narrow CanalYorkshire and North East
5 days
From 18 May 2025
Ended 23 May 2025
Restriction, not a full closure
- Where
- Bridge 61,Tunnel End Railway Bridge.
- CRT reason
- 3rd Party Works
- Cause
- Planned works
- Asset
- Bridge
The navigation will be closed between 20.00 and 06.00 each night between 19 May and 23 May due to coring works taking place.
CRT's only update, 9 May 2025.
The Official Birthday of his Majesty the King - Royal Salute - Museum Gardens York
River OuseYorkshire and North East
same day
From 14 June 2025
Reopened 14 June 2025
- Where
- Scarborough Rail Bridge to Lendal Bridge
- CRT reason
- Event
- Cause
- Nothing failed
- Asset
- Canal or river
Please be aware that the River Ouse navigation will be closed for craft movement during the times stated between Scarborough Rail and Lendal bridges. Craft can remain on the York Museum Gardens moorings during the Gun Salute, however a safety exclusion zone will be in place and…
CRT's only update, 12 May 2025.
Bulholme Lock - Planned power outage
Aire & Calder Navigation Main LineYorkshire and North East
same day
From 22 May 2025
Reopened 22 May 2025
- Where
- Lock 10, Bulholme Lock
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Lock
We have been advised that Northern Powergrid have a planned power cut which is to take place on the 22nd of May 2025 between 9am and 2pm, whilst they carry out Over Head Line Maintenance.
CRT's only update, 12 May 2025.
Mexborough Low Lock - Downstream Sluice Paddle, Diver Investigations
Sheffield & South Yorkshire NavYorkshire and North East
same day
From 3 July 2025
Reopened 3 July 2025
- Where
- Mexborough Low Lock
- CRT reason
- Inspections
- Cause
- Broke, cause not given
- Asset
- Lock
There will be a closure in place at Mexborough Low Lock on Thursday, 3rd July. A dive in another area completed ahead of schedule and work at Mexborough will take place a day earlier than planned. The dive is required as the downstream nearside sluice paddle has become…
Latest of 2 CRT updates, 2 July 2025.
Sowerby Long Bridge - Tree blocking towpath & navigation - Now removed
Rochdale CanalYorkshire and North East
same day
From 27 June 2025
Reopened 27 June 2025
- Where
- Bridge 2, Sowerby Long Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
The tree has now been removed. Towpath and Navigation is clear.
Latest of 2 CRT updates, 27 June 2025.
Long Sandall - Visitor Moorings CLOSED
Sheffield & South Yorkshire NavYorkshire and North East
7 days
From 4 July 2025
Ended 11 July 2025
Restriction, not a full closure
- Where
- Long Sandal Lock - Visitor Moorings
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Moorings
The Visitor Moorings at Long Sandall are temporarily closed as the CRT workboat is carrying out some work on a sluice. The work will take place between Friday 4th July up to and including Thursday, 11th July. Please can all currently moored boats be removed from the area to…
CRT's only update, 4 July 2025.
Wykewell Lift Bridge & Moors Swing Bridge - Planned power outage
Stainforth & Keadby CanalYorkshire and North East
same day
From 13 August 2025
Reopened 13 August 2025
- Where
- Wykewell Lift Bridge to Moores Swing Bridge
- CRT reason
- Information
- Cause
- Someone else's works
- Asset
- Swing bridge
We have been informed by Northern Powergrid that there will be a planned power outage in the Thorne area on Wednesday, 13th August between 0800 - 1700. Please note that Wykewell Lift and Moores Swing bridges will not be operational during the power outage.
CRT's only update, 6 August 2025.
Navigation Closure - Huddersfield Narrow Canal, HN-013-001 Rail bridge (rail bridge outside Standedge Visitor Centre), Standedge
Huddersfield Narrow CanalYorkshire and North East
4 days
From 15 September 2025
Ended 19 September 2025
Restriction, not a full closure
- Where
- Bridge 61,Tunnel End Railway Bridge.
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Bridge
Network Rail be carrying out core sampling to the bridge on a night time closure work shift. This will be on Monday 15th September, Tuesday 16th September, Wednesday 16th September and Thursday 17th September from the hours of 11pm to 7am the following day.
CRT's only update, 20 August 2025.
Tunnel End Rail Bridge - Huddersfield Narrow
Huddersfield Narrow CanalYorkshire and North East
14 days
From 15 September 2025
Ended 29 September 2025
Restriction, not a full closure
- Where
- Bridge 61,Tunnel End Railway Bridge.
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Bridge
Network rail contractors are carrying out coring works on the rail bridge. This will mean the canal is closed each night 22.00 to 06.00
CRT's only update, 11 September 2025.
Lock 9 Brookfoot to Lock 10 Ganny
Calder & Hebble NavigationYorkshire and North East
same day
From 12 September 2025
Reopened 12 September 2025
- Where
- Lock 9, Brookfoot to Lock 10, Ganny
- CRT reason
- Maintenance
- Cause
- Broke, cause not given
- Asset
- Lock
Our maintenance team need to drain this pound in order to carry out repairs to a failed gate paddle at Ganny Lock. Draw down will commence at 10am and we will re-open navigation by 5pm.
CRT's only update, 12 September 2025.
River Tees - Firework Display
Tees NavigationYorkshire and North East
same day
From 28 September 2025
Reopened 28 September 2025
- Where
- Infinity Footbridge to Footbridge over Ornamental Canal
- CRT reason
- Event
- Cause
- Nothing failed
- Asset
- Canal or river
A Firework is taking place organised by Stockton Borough Council. The River Tees from Infinity Bridge to Footbridge over Ornamental Canal is to be closed to passage on the Sunday 28th September from 6pm to 10pm due to the Firework Display that is taking place. The River is…
Latest of 2 CRT updates, 22 September 2025.
Doncaster Lock & Don Doors - New Junction
New Junction Canal, Sheffield & South Yorkshire NavYorkshire and North East
same day
From 21 September 2025
Reopened 21 September 2025
- Where
- Doncaster Lock
- CRT reason
- High Water Levels
- Cause
- Weather
- Asset
- Canal or river
Due to rising water levels, Doncaster Lock and Don Doors on the New junction are temporarily closed this morning (Sunday 21st Sept), hopefully the water levels should settle down by the afternoon and the navigation will be ok re-open.
CRT's only update, 21 September 2025.
Bulholme Lock
Aire & Calder Navigation Main LineYorkshire and North East
same day
From 2 October 2025
Reopened 2 October 2025
- Where
- Lock 10, Bulholme Lock
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Lock
We have been advised that Northern Powergrid have a planned power cut which is taking place today, Thursday 2nd October, between 8am and 4pm, whilst they are cutting back trees in the area, near overhead power cables. This means there will be no power to Lock 10, Bulholme Lock…
CRT's only update, 2 October 2025.
Woodnook Lock
Wakefield Branch (Aire & Calder)Yorkshire and North East
same day
From 9 November 2025
Reopened 9 November 2025
- Where
- Lock 6, Woodnook Lock
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Lock
Northern Powergrid will be carrying out work to the power supply in the area, affecting the lock. Please be aware that the lock will not be operational between 09:30 and 15:30 on 9th November.
CRT's only update, 31 October 2025.
Drone Show Event - Evenings of 11th November 2025 to 14th November 2025 - Salts Mill
Leeds & Liverpool CanalYorkshire and North East
3 days
From 11 November 2025
Ended 14 November 2025
Restriction, not a full closure
- Where
- Bridge 207A, Victoria Rd Bridge to Bridge 207E, Salts Mill Road Bridge
- CRT reason
- Event
- Cause
- Nothing failed
- Asset
- Canal or river
BD25 City of Culture t/a The Bradford Culture Company Ltd is organising a drone show which is taking place over Salts Mill, with the audience viewing from Roberts Park. The shows take place on the evenings of Tuesday 11 Nov, Wednesday 12 Nov, Thursday 13 Nov and Friday 14…
CRT's only update, 4 November 2025.
Navigation Closure - Wakefield Branch (Aire & Calder), Lock 6, Woodnook Lock, Normanton due to Third Party Works
Wakefield Branch (Aire & Calder)Yorkshire and North East
same day
From 23 December 2025
Reopened 23 December 2025
- Where
- Lock 6, Woodnook Lock
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Lock
Description: Northern Powergrid require a power outage for pole replacement works, meaning that the lock will be closed on 23rd December. Instructions: Boaters should plan their movements to avoid use of the lock on 23rd December.
CRT's only update, 15 December 2025.
Keadby Rail Drawbridge - fixed
Stainforth & Keadby CanalYorkshire and North East
same day
From 20 April 2026
Reopened 20 April 2026
- Where
- Bridge 83, Keadby Rail Drawbridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lift bridge
The fault has been fixed and the bridge is now operational again.
Latest of 2 CRT updates, 20 April 2026.
Tuel Lane Lock - tree has fallen across the navigation and towpath
Rochdale CanalYorkshire and North East
same day
From 22 April 2026
Reopened 22 April 2026
- Where
- Lock 3/4
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
A tree has fallen across the navigation and the towpath at Tuel Lane Lock on the Rochdale Canal. We have raised the job with contractors and we are having it on a callout to be attended to today to remove it. Being a busy part of the Rochdale Canal, it is essential that it is…
CRT's only update, 22 April 2026.
CLOSED - Bridge 187 Warehouse Swing Bridge
Leeds & Liverpool CanalYorkshire and North East
same day
From 29 April 2026
Reopened 29 April 2026
- Where
- Bridge 187, Warehouse Swing Bridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Swing bridge
Warehouse Swing Bridge, Bridge 187 is currently not operational and has no electric power. Contractors are to attend to site to investigate and to undertake the repairs needed to the asset. We will update the notice once the bridge is operational.
CRT's only update, 29 April 2026.
Lock 1E - padlocked, but will be opened on request to conserve water levels.
Huddersfield Narrow CanalYorkshire and North East
same day
From 5 May 2026
Ended 5 May 2026
Restriction, not a full closure
- Where
- Lock 1 East, Stanley Dawson Lock
- CRT reason
- Low Water Levels
- Cause
- Nothing failed
- Asset
- Lock
Lock 1E will not be padlocked and passage will be available through the lock.
Latest of 2 CRT updates, 5 May 2026.
Don Aqueduct - Essential Works Required w3w ///pint.motorist.bulbs
New Junction CanalYorkshire and North East
same day
From 7 May 2026
Reopened 7 May 2026
- Where
- Don Aqueduct
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Aqueduct
An inspection of essential works at the Don Aqueduct will be carried out on Thursday, 7th May 2026. Following the inspection, further closure dates will be required to allow works to take place. These dates will be confirmed as soon as possible.
CRT's only update, 5 May 2026.
Mexborough Top Lock
Sheffield & South Yorkshire NavYorkshire and North East
same day
From 13 May 2026
Reopened 13 May 2026
- Where
- Mexborough Top Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Sluice
The work on the sluice has been completed and the lock is back open for use as normal.
Latest of 2 CRT updates, 13 May 2026.
Planned Closure - Don Aqueduct (Cancelled)
New Junction CanalYorkshire and North East
same day
From 18 May 2026
Ended 18 May 2026
Restriction, not a full closure
- Where
- Don Aqueduct
- CRT reason
- Inspections
- Cause
- Planned works
- Asset
- Lock
Please note that the planned closure for the essential maintenance inspections at Don Aqueduct has now been cancelled due to unforeseen circumstances. At present, both guillotine locks will remain open and navigation will continue as normal. We will provide a further update once…
Latest of 2 CRT updates, 18 May 2026.
CLOSED - Bridge 199, Micklethwaite Swing Bridge, Leeds & Liverpool
Leeds & Liverpool CanalYorkshire and North East
same day
From 27 May 2026
Reopened 27 May 2026
- Where
- Bridge 199, Micklethwaite Swing Bridge
- CRT reason
- Information
- Cause
- Weather
- Asset
- Swing bridge
M&E have attended site and resolved the issue with the swing bridge. The bridge is now back open for navigation.
Latest of 2 CRT updates, 27 May 2026.
Naburn Lock closed for diving operation to repair the gate chain - Wednesday 17th June 8am - 5pm
River OuseYorkshire and North East
same day
From 17 June 2026
Reopened 17 June 2026
- Where
- Naburn Large Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please be advised that Naburn Lock will be closed to all navigation between 08:00 and 17:00 on Wednesday, 17 June 2026. This temporary closure is necessary to allow essential repair works to be carried out on the underwater chains. During this time, passage through the lock will…
CRT's only update, 10 June 2026.
Greenwood Lock Paddle Replacement
Calder & Hebble NavigationYorkshire and North East
same day
From 16 June 2026
Reopened 16 June 2026
- Where
- Lock 19, Greenwood
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please be aware that the Navigation will be closed at Greenwood Lock from 09:30 to 14:00 today. This is to allow our Direct Services team to replace a broken paddle.
CRT's only update, 16 June 2026.
Tuel Lane passage - Closed - No passage today
Rochdale CanalYorkshire and North East
same day
From 26 June 2026
Reopened 26 June 2026
- Where
- Lock 1 to Lock 3/4
- CRT reason
- Low Water Levels
- Cause
- Nothing failed
- Asset
- Lock
Tuel Lane Lock is closed today from 2:15pm as we have a Navigation Closure on at Lock 5 and boats would not be able to go through Tuel Lane (upstream) to turn around and we have no boat traffic wishing to enter the Tuel Lane Lock in a downstream direction. The Tuel Lane Lock…
CRT's only update, 26 June 2026.
Broadcut Top Lock - Paddle Repairs
Calder & Hebble NavigationYorkshire and North East
same day
From 3 July 2026
Reopened 3 July 2026
- Where
- Lock 25, Broad Cut Top
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please could boaters be aware that Broadcut Lock will be closed for approximately four hours today, from 11am. This is to allow our Direct Services to carry out paddle repairs at the lock.
CRT's only update, 3 July 2026.
Lock 20 - repairs to the head paddle
Rochdale CanalYorkshire and North East
same day
From 7 July 2026
Reopened 7 July 2026
- Where
- Lock 20
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The works that were planned for the head paddles at Lock 20, unfortunately were unable to take place today. The lock will revert back to operating on one head paddle. We hope to be able to carry out the repairs to the faulty head paddle as soon as possible, potentially close to…
Latest of 2 CRT updates, 7 July 2026.
Brookfoot Lock, Paddle Repairs - NOW OPERATIONAL
Calder & Hebble NavigationYorkshire and North East
same day
From 9 July 2026
Reopened 9 July 2026
CRT's title says reopened
- Where
- Lock 9, Brookfoot
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Work to repair the paddles has finished for today and will restart at 10am tomorrow. A further notice will be issued to confirm start and end times for tomorrow's closure, in the morning.
Latest of 2 CRT updates, 9 July 2026.
Broadcut Top Lock - Closed Due to Paddle Repairs
Calder & Hebble NavigationYorkshire and North East
same day
From 10 July 2026
Reopened 10 July 2026
- Where
- Lock 25, Broad Cut Top
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Broadcut Top Lock will again be closed this morning, whilst our operatives continue with repairs to the paddles.
CRT's only update, 10 July 2026.
Woodnook Lock - Divers on Site
Wakefield Branch (Aire & Calder)Yorkshire and North East
same day
From 15 July 2026
Reopened 15 July 2026
- Where
- Lock 6, Woodnook Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
As part of our continued commitment to the Better Boating Plan, we will be carrying out essential underwater repair works at Woodnook Lock on Wednesday to improve the reliability and performance of the lock gates. Specialist commercial divers will be undertaking repairs to the…
CRT's only update, 10 July 2026.
Bingley Five and Three Rise Locks to Remain Closed on Saturday, 11th July
Leeds & Liverpool CanalYorkshire and North East
same day
From 11 July 2026
Reopened 11 July 2026
- Where
- Lock 29, Bingley 5 Rise Top Lock to Lock 22, Bingley 3 Rise Bottom Lock
- CRT reason
- Information
- Cause
- Nothing failed
- Asset
- Lock
Due to continued high temperatures and forecasted extreme heat for Saturday, Bingley Five and Three Rise locks will remain closed for the day. We will continue to monitor the temperatures and provide an update for Sunday, tomorrow.
CRT's only update, 10 July 2026.
Kirkstall, Forge and Newlay Locks to remain closed, Saturday 11th July
Leeds & Liverpool CanalYorkshire and North East
same day
From 11 July 2026
Reopened 11 July 2026
- Where
- Lock 13, Newlay Top Lock to Lock 7, Kirkstall Little Lock
- CRT reason
- Information
- Cause
- Nothing failed
- Asset
- Lock
Due to continued high temperatures and forecasted extreme heat for Saturday, Kirkstall, Forge and Newlay locks will remain closed for the day. We will continue to monitor the temperatures and provide an update for Sunday, tomorrow.
CRT's only update, 10 July 2026.
Lock 9 to Lock 12, Rochdale Canal
Rochdale CanalYorkshire and North East
same day
From 13 July 2026
Reopened 13 July 2026
- Where
- Lock 9, Blackpit Hebden Bridge to Lock 12
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
Navigation will be closed between Lock 9 and Lock 12 on the Rochdale Canal due to low water levels. A further update will be provided by 9am Tuesday 14th July.
CRT's only update, 13 July 2026.
Bridge 187, Warehouse Swing Bridge - no power
Leeds & Liverpool CanalYorkshire and North East
same day
From 24 July 2026
Reopened 24 July 2026
- Where
- Bridge 187, Warehouse Swing Bridge
- CRT reason
- Maintenance
- Cause
- Other cause
- Asset
- Swing bridge
We have been advised by National Grid that there is currently a power outage in the Kildwick area that is expected to continue for the rest of the evening and into the night. Due to this, Bridge 187 Warehouse Swing Bridge cannot be operated by boaters. The issue should be sorted…
CRT's only update, 24 July 2026.
Princess Of Wales Bridge to Millennium Bridge
Tees NavigationYorkshire and North East
same day
From 2 August 2026
Reopened 2 August 2026
- Where
- Princess Of Wales Bridge to Millennium Bridge
- CRT reason
- Event
- Cause
- Nothing failed
- Asset
- Canal or river
A firework display will be taking place on Sunday 2nd August 2026 between 9:30pm until 11:00pm on the Tees Navigation. The event will be taking place between Princess of Wales Bridge and Millennium Bridge. To ensure the safety of all our customers, the towpath will be closed…
CRT's only update, 29 July 2026.
Woodnook Lock
Wakefield Branch (Aire & Calder)Yorkshire and North East
same day
From 14 August 2026
Reopened 14 August 2026
- Where
- Lock 6, Woodnook Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
As part of our continued commitment to the Better Boating Plan, we will be carrying out essential underwater repair works at Woodnook Lock on Friday, 14th August, to improve the reliability and performance of the lock gates. Specialist commercial divers will be undertaking…
CRT's only update, 30 July 2026.
Lemonroyd Lock - Divers on Site 10th August
Aire & Calder Navigation Main LineYorkshire and North East
same day
From 10 August 2026
Reopened 10 August 2026
- Where
- Lock 7, Lemonroyd Lock
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
As part of our continued commitment to the Better Boating Plan, we will be carrying out essential underwater repair works at Lemonroyd Lock on Monday 10th August, to improve the reliability and performance of the lock gates. Specialist commercial divers will be undertaking…
CRT's only update, 30 July 2026.
Lemonroyd Lock - Divers on Site 12th August
Aire & Calder Navigation Main LineYorkshire and North East
same day
From 12 August 2026
Reopened 12 August 2026
- Where
- Lock 7, Lemonroyd Lock
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
As part of our continued commitment to the Better Boating Plan, we will be carrying out essential underwater repair works at Lemonroyd Lock on Wednesday, 12th August, to improve the reliability and performance of the lock gates. Specialist commercial divers will be undertaking…
CRT's only update, 30 July 2026.
Figure of Three Locks - Divers on Site 11th August
Calder & Hebble NavigationYorkshire and North East
same day
From 11 August 2026
Reopened 11 August 2026
- Where
- Lock 23, Figure Of Three Top
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
As part of our continued commitment to the Better Boating Plan, we will be carrying out essential underwater repair works at Figure of Three on Tuesday 11th August, to improve the reliability and performance of the lock gates. Specialist commercial divers will be undertaking…
CRT's only update, 30 July 2026.
Figure of Three Locks - Divers On Site 14th August
Calder & Hebble NavigationYorkshire and North East
same day
From 14 August 2026
Reopened 14 August 2026
- Where
- Lock 23, Figure Of Three Top
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
As part of our continued commitment to the Better Boating Plan, we will be carrying out essential underwater repair works at Figure of Three on Friday 14th August, to improve the reliability and performance of the lock gates. Specialist commercial divers will be undertaking…
CRT's only update, 30 July 2026.
Lock 15 - large tree trunk wedged under tail paddles. Removed
Rochdale CanalYorkshire and North East
same day
From 4 August 2026
Reopened 4 August 2026
- Where
- Lock15
- CRT reason
- Underwater Obstruction
- Cause
- Weather
- Asset
- Lock
The large tree has been removed from under Lock 15. The closure has been lifted.
Latest of 2 CRT updates, 4 August 2026.
Sykehouse Lift Bridge not working - burst pipe from the Hydraulic unit. working
New Junction CanalYorkshire and North East
same day
From 4 August 2026
Reopened 4 August 2026
- Where
- Sykehouse Lock Bridge 5
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lift bridge
Contractors have attended site and have repaired the burst pipe and the road bridge has been brought back down into position. The navigation closure is taken off.
Latest of 2 CRT updates, 4 August 2026.
Lock 23 - work to replace the head paddles
Rochdale CanalYorkshire and North East
same day
From 6 August 2026
Reopened 6 August 2026
- Where
- Lock 23
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
Lock 23 will be closed on Thursday August 6th to replace the old head paddles that are needing to be replaced with new paddles. Please do not move in this area and follow any instructions given should your craft be close to the maintenance works. The notice will be update and…
CRT's only update, 5 August 2026.
Northern Powergrid planned outage at Kirkhouse Green Bridge on the Wednesday 19th August from 08:30hrs to 16:30hrs
New Junction CanalYorkshire and North East
same day
From 19 August 2026
Reopened 19 August 2026
- Where
- Kirkhouse Green Lift Bridge 4
- CRT reason
- Information
- Cause
- Someone else's works
- Asset
- Bridge
Northern Powergrid have got a planned outage to carry out works. Kirkhouse Green Bridge will not be able to operate on the Wednesday 19th August from 08:30hrs to 16:30hrs.
CRT's only update, 6 August 2026.
Northern Powergrid Planned outage at Low Lane Bridge on Wed 19th August from 08:30 - 16:30hrs
New Junction CanalYorkshire and North East
same day
From 19 August 2026
Reopened 19 August 2026
- Where
- Low Lane Swing Bridge 2
- CRT reason
- Information
- Cause
- Someone else's works
- Asset
- Bridge
Northern Powergrid have got a planned outage to carry out works. Low Lane Bridge will not be able to operate on the Wednesday 19th August from 08:30hrs to 16:30hrs.
CRT's only update, 6 August 2026.
Northern Powergrid planned outage to Top Lane Bridge on the Wednesday 19th August from 08:30hrs - 16:30hrs
New Junction CanalYorkshire and North East
same day
From 19 August 2026
Reopened 19 August 2026
- Where
- Top Lane Lift Bridge 3
- CRT reason
- Information
- Cause
- Someone else's works
- Asset
- Bridge
Northern Powergrid have got a planned outage to carry out works. Top Lane Bridge will not be able to operate on the Wednesday 19th August from 08:30hrs to 16:30hrs.
CRT's only update, 6 August 2026.
Woodlesford Lock, Aire & Calder Navigation.
Aire & Calder Navigation Main LineYorkshire and North East
same day
From 8 August 2026
Reopened 8 August 2026
- Where
- Lock 5, Woodlesford Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Engineers have finished at site and the lock will be reopen to the public once staff have completed final checks. Thank you.
Latest of 2 CRT updates, 8 August 2026.
Navigation Closure - Leeds & Liverpool Canal, Moss Bridge, Rodley, Rodley
Leeds & Liverpool CanalYorkshire and North East
same day
From 17 August 2026
Reopened 17 August 2026
- Where
- Bridge, Water Pipe Crossing
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Other
The overhead gantry is going to be removed resulting in a navigation closure while the works are being carried out. The work is expected to be completed in one evening.
CRT's only update, 14 August 2026.
Lock 25, Broad Cut Top Lock
Calder & Hebble NavigationYorkshire and North East
1 day
From 18 August 2026
Ended 19 August 2026
Restriction, not a full closure
- Where
- Lock 25, Broad Cut Top
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Lock 25, Broad Cut Top will be closed from now to 3pm today, then again tomorrow (19th August) from 8am to 3pm. This is to allow for paddle repairs to be carried out. Any further updates will be posted on this notice.
CRT's only update, 18 August 2026.
CLOSED - Lock 10, Ganny Lock
Calder & Hebble NavigationYorkshire and North East
same day
From 21 August 2026
Reopened 21 August 2026
- Where
- Lock 10, Ganny
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please be advised that Lock 10, Ganny is currently closed due to a technical issue, and the lock will remain closed until the necessary repairs have been completed. A team attended the site today to assess the issue. They will return at the start of next week to attempt to…
CRT's only update, 21 August 2026.
Lock 8 is non operational as replacing the footboard platform, offside tail paddle unable to be used.
Huddersfield Broad CanalYorkshire and North East
2 days
From 7 September 2026
Ended 9 September 2026
Restriction, not a full closure
- Where
- Lock 8, Falls Lock
- CRT reason
- Repair
- Cause
- Struck by boat or vehicle
- Asset
- Lock
The footboards and elbows have been removed and taken to the Fabrications company to be repaired/remade. We will update the notice when further updates are received on the progress of the works.
Latest of 2 CRT updates, 8 September 2026.
Thorne Lock - CLOSURE
Stainforth & Keadby CanalYorkshire and North East
same day
From 24 September 2026
Reopened 24 September 2026
- Where
- Thorne Lock
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
Thorne Lock will be closed to navigation today while essential grouting work is carried out, the electricity supply will be switched off during the works. The lock will reopen as usual at 5 pm. We apologise for any inconvenience this causes.
CRT's only update, 24 September 2026.
Top lock at Brighouse Basin is closed due to a pollution incident
Calder & Hebble NavigationYorkshire and North East
same day
From 25 September 2026
Reopened 25 September 2026
- Where
- Lock 11, Brighouse Top
- CRT reason
- Pollution Incident
- Cause
- Pollution
- Asset
- Canal or river
Brighouse Top Lock will been closed due to a pollution incident. A powder fire extinguisher has been found in the canal causing a white powdery film affect in the water. This can harmful be to wildlife and the ecology should it get into the river. Our Ecology Team will be…
CRT's only update, 25 September 2026.
Keadby Lock
Stainforth & Keadby CanalYorkshire and North East
same day
From 26 September 2026
Due to reopen 28 September 2026
Still shut
- Where
- Keadby Lock
- CRT reason
- Repair
- Cause
- Not read yet
- Asset
- Lock
A hydraulic leak has developed on the downstream gates at Keadby Lock, which means the lock is currently unable to operate and passage is not possible. Our Mechanical & Electrical team is scheduled to attend site on Monday 28 September to investigate and carry out repairs. We…
CRT's only update, 26 September 2026.
Showing the 219 longest of 219. Every row links to the notice CRT published.
Coming up
Scheduled but not yet started, so in no figure above.
| Closure | From | Planned |
|---|---|---|
| Lock 10, Ganny Lock, Nearest town Brighouse | 2 November 2026 | 46 days |
| Lock 18 Shepley - Shepley Bridge, Mirfield | 2 November 2026 | 46 days |
| Lock 19, Hirst Lock, Saltaire | 2 November 2026 | 46 days |
| Locks 13,12 and 11 Newlay Locks, Bramley, Leeds | 2 November 2026 | 46 days |
| Bridge 179C, Union Footbridge, Skipton | 2 November 2026 | 46 days |
| Gringley Shaw, Lock 62, Gringley on the Hill | 2 November 2026 | 46 days |
| ROYAL SALUTE- THE BIRTHDAY OF HIS MAJESTY THE KING | 14 November 2026 | 0 days |
| River Skell Feeder | 16 November 2026 | 4 days |
| Lock 22E, Slaithewaite, Huddersfield | 4 January 2027 | 67 days |
| Lock 12, Rawden Mill | 4 January 2027 | 47 days |
| Lock 30 Lock Landing, Walsden | 4 January 2027 | 67 days |
| Worksop Town, Lock 50, Worksop | 11 January 2027 | 60 days |
| Bridge 17, Loco Lift bridge, located Quay Street, Huddersfield | 11 January 2027 | 28 days |
| Lock 29E Marsden, Huddersfield | 22 February 2027 | 18 days |
| Bridge 37, Railway Bridge replacement, Dewsbury Arm - Calder & Hebble Canal | 17 April 2027 | — |
Not counted
Notices in no closure figure on this page: cancelled, duplicates, and ones whose dates cannot be right. They are kept here because CRT published them.
Regions · Canals · Reliability · Trends · Download data