Sykehouse Lift Bridge not working - burst pipe from the Hydraulic unit. working
A navigation closure on the New Junction Canal, 4 August 2026 to 4 August 2026 — 0 days.
Source: this notice on canalrivertrust.org.uk
- Waterway
- New Junction Canal
- Region
- Yorkshire and North East
- Started
- 4 August 2026
- Status
- Reopened 4 August 2026
- Days shut
- same day
- CRT reason
- Repair
- Cause
- Wear and tear
- Asset
- Lift bridge
Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.
Where
- New Junction Canal: Sykehouse Lock Bridge 5 to Sykehouse Lock Bridge 5
Updates · 2
0 days with no update after the last one.
4 August 2026 · 0 days since the previous
Contractors have attended site and have repaired the burst pipe and the road bridge has been brought back down into position. The navigation closure is taken off.
4 August 2026 · 0 days since the previous
Sykehouse Road Bridge is currently stuck in the open position, causing road traffic to be blocked. The hydraulic unit has a burst pipe and fluid is leaking from it. Unfortunately, the earliest it is able to be attended to and repaired will be tomorrow. We are letting all the local authorities and emergency services know and we will update the notice when the repairs have been carried out and when the navigation is clear. We are aware that there may be oil leaking into the navigation, which will be boomed off by the local team, once the pipe has been fixed.
Cite this: Canal closures, “Sykehouse Lift Bridge not working - burst pipe from the Hydraulic unit. working”, https://crt-stoppages.pages.dev/notice/019fcce7-5e22-7e52-84ac-2cd4f89944e5.
Every closure on New Junction Canal · Download the data · Method and limits