The archive / Dewsbury Arm (Calder & Hebble Nav)
Bridge 37, Railway Bridge replacement, Dewsbury Arm - Calder & Hebble Canal
Scheduled: 17 April 2027 to , on the Dewsbury Arm (Calder & Hebble Nav). It has not started, so it is in no figure — see the archive's Coming up list.
Source: this notice on canalrivertrust.org.uk
- Waterway
- Dewsbury Arm (Calder & Hebble Nav)
- Region
- Yorkshire and North East
- Started
- 17 April 2027
- Status
- Scheduled
- Days planned
- —
- CRT reason
- 3rd Party Works
- Cause
- Cause not stated
- Asset
- Bridge
Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.
Where
- Dewsbury Arm (Calder & Hebble Nav): Bridge 21, Double Lock to Slipway, Saville Town
Updates · 1
0 days with no update after the last one.
23 September 2026 · 0 days since the previous
A navigation closure is required on the Dewsbury Arm to enable the replacement of a Network Rail bridge that has reached the end of its serviceable life. The works will be carried out by contractors on behalf of the Transpennine Route Upgrade programme. To undertake the bridge replacement safely, a substantial crash deck will be installed across the full width of the canal beneath the bridge. This temporary structure is required to allow the removal of the existing bridge deck, repairs and preparation of the bridge abutments, and the installation of the new bridge deck. Boat movements will be facilitated during suitable breaks in the construction programme where it is safe and practical to do so. Opportunities for passage may be available at key stages of the works, including during bridge deck removal activities when temporary works can be adjusted to allow access. Every effort will be made to minimise the duration of the closure and we will provide further updates as the detailed construction programme is finalised. We have worked closely with Network Rail and local marinas to minimise the impact of these essential works on customers and will continue to provide updates as the programme develops. We thank customers for their understanding while this important infrastructure project is carried out.
Cite this: Canal closures, “Bridge 37, Railway Bridge replacement, Dewsbury Arm - Calder & Hebble Canal”, https://crt-stoppages.pages.dev/notice/01a0cded-af32-7d17-8cc4-566de96d4a2c.