Pound between Lock 6 and Lock 7, Mytholmroyd - Low water Levels - extending to Lock 5

A navigation closure on the Rochdale Canal, 14 September 2026 to 17 September 2026 — 3 days.

Source: this notice on canalrivertrust.org.uk

Waterway
Rochdale Canal
Region
Yorkshire and North East
Started
14 September 2026
Status
Reopened 17 September 2026
Days shut
3
CRT reason
Low Water Levels
Cause
Cause not stated
Asset
Canal or river

Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.

What CRT said it was for

Water levels have recovered

Where

Updates · 3

1 days with no update after the last one.

16 September 2026 · 1 days since the previous

The pound at Lock 5 is still very low, so unfortunately is unable to be reopened. The team will check again close to the end of the working day.

15 September 2026 · 1 days since the previous

The team have been closely monitoring the water levels and they have not fully recovered to a navigable level. Pound 5 (between Lock 5 and Lock 6) is down half of its capacity, so we shall be extending the closure to Lock 5 too. This allows recovery time for this section of the canal overnight and we hope, should levels recover to be able to open it tomorrow. We will update the notice tomorrow with further information.

14 September 2026 · 0 days since the previous

The pound between Lock 6 and Lock 7 on the Rochdale Canal is experiencing low water levels and is current not navigable. The padlocks will be left on the Lock 7 until the levels recover to a navigable level. The notice will be lifted when the water levels are enough for boat movement.

Cite this: Canal closures, “Pound between Lock 6 and Lock 7, Mytholmroyd - Low water Levels - extending to Lock 5”, https://crt-stoppages.pages.dev/notice/01a09f28-5c5f-76bb-8c2c-32eff1626d9d.

Every closure on Rochdale Canal · Download the data · Method and limits