All closures / Why they close / Someone else's works
Someone else's works
Unplanned closures with this cause: 6 in June to August 2026 against 4 a year earlier, within what chance produces; tested on its own, not among the trends page's findings. How a change is tested.
- On record
- 51 notices since May 2025: 33 closures, 7 restrictions and 11 not yet started
In force today
No closure with this cause is in force today.
By canal
27 canals have had a closure with this cause. A closure naming two canals counts on both.
| Canal | Closures |
|---|---|
| Leeds & Liverpool Canal | 4 |
| Oxford Canal | 4 |
| Grand Union Canal | 3 |
| Kennet & Avon Canal | 3 |
| Lee Navigation | 3 |
| Liverpool Link | 3 |
| New Junction Canal | 3 |
| Waterworks River | 3 |
| Aire & Calder Navigation Main Line | 2 |
| Birmingham & Warwick Junction Cnl | 2 |
| Coventry Canal | 2 |
| Dudley No 1 Canal | 2 |
Show 15 moreShow fewer
Every closure on record
Showing 33 closures and 7 restrictions whose cause reads “Someone else's works”.
Rank by
Population
8 closures are in neither group: 6 unplanned with no day in the cruising season since May 2025, and 2 not started yet.
Status
Duration
Cause
Asset affected
CRT reason
Region
What these figures mean
- Population
- Which closures a figure counts. All closures is everything; Unplanned closure drops the works CRT flags as its winter programme and any day outside the cruising season (the Friday nearest 15 March to the Sunday before the first Monday in November). Scheduled work CRT does not flag as winter works still counts here. CRT Planned closure is the flagged winter programme alone.
- Defensible duration
- The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
- Closure-days
- One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals. They are counted from 1 May 2025, when this archive begins: a closure that started earlier adds only its days since then, though its own row shows its whole length. Every figure and chart counts only the days inside the Period chosen above them.
- In force
- A closure is in a Period, and a day is one a closure affected, if it was in force at any time that day, including the morning it reopened. Closure-days measure how long, so they count whole days and not the reopening day: a closure can be in a Period and add no closure-day to it.
Closures in force each month
closures active during the monthCanals ranked by the season's closures
share of the period's cruising-season days up to today — a closure somewhere on a long canal is likelier, and does not mean the canal was impassableclosures in force on the period's cruising-season days — a longer canal has more to go wrong onWhere
closure-days by regionclosures by regionA region with more canal has more to go wrong on, so these totals partly measure its size. Regions compared by length of canal are on the Reliability page.
CRT's reason
closure-days by the reason CRT filedclosures by the reason CRT filedWhat fails
closure-days by assetclosures by assetWhat fails on a lock
closure-days by part — unplanned lock failures naming a partclosures by part — unplanned lock failures naming a partHow long they last
closures by full length, including any days before May 2025 — the bands are not equal in widthClosures
Bridge 165, Newton Grange bridge (Changeline bridge) - Closure
Leeds & Liverpool CanalYorkshire and North East
88 days
From 5 May 2025
Reopened 1 August 2025
- Where
- Bridge 165, Changeline Bridge
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Bridge
Navigation will be restricted due to bridge works carried out by 3rd party contractors, this has been scheduled because the navigation is already closed as a result of drought conditions and low water levels.
CRT's only update, 24 June 2025.
The Liverpool Link and Central Docks
Leeds & Liverpool Canal, Liverpool LinkNorth West
51 days
From 15 May 2026
Reopened 5 July 2026
- Where
- Mann Island Lock
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Canal or river
The Liverpool Link will be temporarily closed from 15 May to 5 July while Peel carries out essential construction and maintenance works in the Central Docks. We have worked to keep disruption to a minimum; however, as our rights are limited to permitting our customers to travel…
CRT's only update, 17 March 2026.
Bridge 108, Saltley Viaduct, Birmingham & Warwick Junction Canal
Birmingham & Warwick Junction CnlWest Midlands
51 days
From 14 July 2026
Reopened 3 September 2026
- Where
- Bridge 97, Roving Bridge Bordesley Junc to M6 Viaduct, Salford Junction
- CRT reason
- Low Water Levels
- Cause
- Someone else's works
- Asset
- Bridge
Although the planned HS2 works affecting the Saltley Flight have now been completed, the flight will remain closed to navigation until further notice to help protect water resources and maintain water levels across the wider network during the current period of dry weather.…
Latest of 2 CRT updates, 17 August 2026.
Tat bank Rd Bridge, Oldbury (Stoney lane bridge)
Titford CanalWest Midlands
25 days
From 3 November 2025
Reopened 28 November 2025
- Where
- Tat Bank Bridge
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Bridge
A navigational closure is required for third party contractors to carry out routine maintenance to Tat Bank Road Bridge on behalf of Sandwell MBC. The maintenance will require scaffolding to be in place throughout the works which will reduce the bridges headroom.
CRT's only update, 6 May 2025.
Schenectady Works Pipe Bridge No 2, Schenectady Works Pipe Bridge No 1 & Schenectady Works Road Bridge, Four Ashes, Calf Heath, Wolverhampton
Staffordshire & Worcestershire CnlWest Midlands
25 days
From 24 November 2025
Reopened 19 December 2025
- Where
- Bridge 77 Calf Heath Bridge to Four Ashes Bridge No. 78A
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Bridge
Unfortunately, the third-party contractors carrying out the towpath refresh as part of the West Midlands Interchange Scheme between Four Ashes Bridge (78a) and Calf Heath Bridge (77) have informed us that they are not in a position to complete these works. The originally…
Latest of 3 CRT updates, 6 November 2025.
Adjacent to Bridge 41, Coleshill Road Bridge
Coventry CanalWest Midlands
20 days
From 16 February 2026
Reopened 8 March 2026
- Where
- Bridge 41, Coleshill Road Bridge to Bridge 40, Taverners Bridge
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Canal or river
We would like to clarify that mooring will be suspended between Bridge 41 (Coleshill Road Bridge) and Bridge 40 (Taverners Bridge) for the duration of this stoppage. Thank you for your understanding.
Latest of 2 CRT updates, 30 January 2026.
Navigation Closure - Stainforth & Keadby Canal, FK-024-003, Keadby - Reopened
Stainforth & Keadby CanalYorkshire and North East
17 days
From 12 January 2026
Reopened 29 January 2026
CRT's title says reopened
- Where
- Bridge 83, Keadby Rail Drawbridge
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Other
Network Rail have completed the works and passage is possible.
Latest of 2 CRT updates, 29 January 2026.
West Park Bridge 5. Multi-use footbridge connecting West Park to Broad Street in Long Eaton.
Erewash CanalEast Midlands
14 days
From 27 February 2026
Reopened 13 March 2026
- Where
- Lock 61 - Long Eaton to Fixed Weir 5A
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Bridge
A navigation and towpath closure is required to facilitate the removal of the existing footbridge, in preparation for its replacement with a modern, curving footbridge which will open up and enhance the canal and local area. This is a government-funded, local authority delivered…
CRT's only update, 16 September 2025.
Railway Bridge 2 next to Colne Bridge Lock, Colne Bridge
Huddersfield Broad CanalYorkshire and North East
12 days
From 22 July 2025
Reopened 3 August 2025
- Where
- Lock 2, Colne Bridge Lock to Lock 1
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Bridge
A navigation and towpath closure are required to allow Third Party Contractors working on behalf of Network Rail to install a new bridge deck. A pontoon crash deck is required over the canal to prevent debris falling into the watercourse or onto public on the towpath. These…
CRT's only update, 1 May 2025.
Leeds & Liverpool Canal, Liverpool Link
Liverpool LinkNorth West
12 days
From 8 July 2026
Reopened 20 July 2026
- Where
- Great Howard St.- Stanley Dock Bridge to Bascule Bridge - Stanley
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Canal or river
Following the successful completion of works in the central docks by Peel Ports, the Liverpool Link will reopen to boaters from Monday 20 July. Bookings are now open and available to book online, or you can contact us at…
Latest of 2 CRT updates, 17 July 2026.
HS2 Oxford Canal Viaduct, nearest structure is OX-057-002, Wormleighton, Warwickshire
Oxford CanalWest Midlands
4 days
From 9 March 2026
Reopened 13 March 2026
- Where
- Bridge 127, Stoneton Bridge to Bridge 128, Willisons Bridge
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Bridge
After completing a further on site review, the HS2 contractor has advised that the works can be delivered during a one‑week stoppage. As a result, the revised dates are 9 March to 13 March 2026.
Latest of 3 CRT updates, 27 February 2026.
HS2 Oxford Canal Viaduct, nearest structure is OX-057-002, Wormleighton, Warwickshire
Oxford CanalWest Midlands
2 days
From 12 November 2025
Reopened 14 November 2025
- Where
- Bridge 127, Stoneton Bridge to Bridge 128, Willisons Bridge
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Bridge
The contractor building the HS2 viaduct over the Oxford Canal no longer requires the full duration of the November 2025 navigation stoppage to undertake their planned works. The works will start on 12 November 2025 instead of 3 November 2025. Post Christmas stoppage of the canal…
Latest of 2 CRT updates, 31 October 2025.
HS2 Longhole Viaduct, Ufton, Warwickshire
Grand Union CanalWest Midlands
2 days
From 4 March 2026
Reopened 6 March 2026
- Where
- Bridge 30, Welsh Road to Lock 19, Wood Lock
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Bridge
We're pleased to let you know that the works at HS2 Longhole Viaduct have been completed ahead of schedule, and the navigation is now open.
Latest of 3 CRT updates, 6 March 2026.
Bridgewater Road Bridge, Stratford Marsh
Waterworks RiverLondon and South East
1 day
From 17 June 2025
Reopened 18 June 2025
- Where
- Northern Outfall Sewer Bridge to Railway Bridge Over Waterworks River
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Bridge
We have been informed by the Third party that after reviewing their method of work, they need to complete phases 3 and 4 of these works as daytime closures rather than nighttime closures. The new dates for this closure are the 17 and 18 June 2025.
Latest of 2 CRT updates, 1 May 2025.
Proposed bridge location is near the Trent Basin (North Bank - Easting 458870, Northing 338836, South Bank, Easting 458863, Northing 338741)
River TrentEast Midlands
1 day
From 10 November 2025
Reopened 11 November 2025
- Where
- Bridge 13, Lady Bay Bridge to Bridge 13A, Sailing Club Continuation
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Bridge
We're pleased to announce that the third-party works at this location have been completed ahead of schedule. Both the navigation and towpath are now open.
Latest of 2 CRT updates, 11 November 2025.
Lock 1, Atherstone Top Lock
Coventry CanalWest Midlands
1 day
From 11 November 2025
Reopened 12 November 2025
- Where
- Lock 1, Atherstone Top Lock
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Canal or river
A Third party will be doing an eel survey in the Coventry Canal, which is a requirement for eel screening. The Environment Agency are aware. They will be placing a fyke net in the navigation to enable this. This navigation closure will run from 13:00 on the 11 November through…
CRT's only update, 3 July 2025.
Lock 1, Braunston to Lock 6, Top Lock
Grand Union CanalEast Midlands
1 day
From 10 November 2025
Reopened 11 November 2025
- Where
- Lock 1, Braunston to Lock 6, Top Lock
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Canal or river
A Third party will be doing various eel surveys in the Grand Union Canal, which is a requirement for eel screening. The Environment Agency are aware. They will be placing a fyke net in the navigation to enable this. This navigation closure will run from 9am on the 10th November…
CRT's only update, 3 July 2025.
Liverpool Link At Jesse Hartley Way, Central Docks, Channel Bridge
Liverpool LinkNorth West
1 day
From 2 September 2026
Reopened 3 September 2026
- Where
- Central Docks Channel New Bridge
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Bridge
Third party contractors will be on site at the Liverpool Link, at Jesse Hartley Way, Central Docks, Channel Bridge on Wednesday 2 September from 8.00am to Thursday 3 September 6pm, The works involves lifting and positioning bridge support beams onto the abutments, this will take…
CRT's only update, 20 August 2026.
Bridgewater Road Bridge, Stratford Marsh
Waterworks RiverLondon and South East
same day
From 19 September 2025
Reopened 19 September 2025
- Where
- Northern Outfall Sewer Bridge to Railway Bridge Over Waterworks River
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Bridge
We have been informed by the Third party that after reviewing their method of work, phase 4 of 4, removal of the temporary bridge, will now take place on the 19 September between 6:00 and 21:00. The navigation and towpath will be closed between these times.
Latest of 3 CRT updates, 23 June 2025.
Accommodation bridge 10
Hertford Union CanalLondon and South East
2 days
From 28 May 2025
Ended 30 May 2025
Restriction, not a full closure
- Where
- Accommodation Bridge 10
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Bridge
To improve local pedestrian and cycle infrastructure over the canal in Hackney Wick. The existing footbridge at the junction of the Hertford Union Canal and the River Lea has been removed and is due to be replaced with a higher capacity structure. The works will involve closing…
CRT's only update, 6 May 2025.
Bulholme Lock - Planned power outage
Aire & Calder Navigation Main LineYorkshire and North East
same day
From 22 May 2025
Reopened 22 May 2025
- Where
- Lock 10, Bulholme Lock
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Lock
We have been advised that Northern Powergrid have a planned power cut which is to take place on the 22nd of May 2025 between 9am and 2pm, whilst they carry out Over Head Line Maintenance.
CRT's only update, 12 May 2025.
Aubrey's Lift Bridge 221
Oxford CanalLondon and South East
same day
From 27 May 2025
Reopened 27 May 2025
- Where
- Bridge 221, Aubreys Lift Bridge
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Lift bridge
Planned power Outage on 27/05 between 0930-1200 Noon. May affect operation of automated lift bridge.
CRT's only update, 26 May 2025.
Bridgewater Road Bridge, Stratford Marsh
Waterworks RiverLondon and South East
same day
From 1 August 2025
Reopened 1 August 2025
- Where
- Northern Outfall Sewer Bridge to Railway Bridge Over Waterworks River
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Bridge
Phase 3 of 4 - Installation of a new road bridge. Following on from the phase 1 and 2 works that were completed last winter, Phase 3, which is the installation of the new road bridge will be taking place on the 1st August 2025 between the hours on 6:00 and 21:00. The navigation…
CRT's only update, 20 June 2025.
Lee Navigation, Between Bridge 27 - Chalk Bridge and Bridge 28 - Bleak Hall Bridge (A406), Enfield, N18 3QQ.
Lee NavigationLondon and South East
25 days
From 1 September 2025
Ended 26 September 2025
Restriction, not a full closure
- Where
- Bridge 27, Chalk Bridge to Bridge 28, Bleak Hall Bridge (A406)
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Canal or river
Construction of new Road Bridge over Lee Navigation (Phase 1 - Install Steel beams/Permanent Formwork). For Health & Safety reasons during crane lifting operations the works will be carried out under night-time navigation & Towpath closures between 11pm – 6am. Advanced warning…
CRT's only update, 20 June 2025.
Navigation Closure Between Bridge 27 Chalk Bridge and Bridge 28 Bleak Hall Bridge (A406), Edmonton
Lee NavigationLondon and South East
15 days
From 1 September 2025
Ended 16 September 2025
Restriction, not a full closure
- Where
- Bridge 27, Chalk Bridge to Bridge 28, Bleak Hall Bridge (A406)
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Canal or river
Vinci Construction UK Ltd working on behalf of Meridian Water are constructing a new bridge across the navigation. To carry out the works they will need night time canal stoppages (11pm to 6am) 1/9/25 to 5/9/25 and 8/9/25 to 25/9/25 and 14/11/25 to 6/1/26 and a 24 hour towpath…
CRT's only update, 22 July 2025.
Wykewell Lift Bridge & Moors Swing Bridge - Planned power outage
Stainforth & Keadby CanalYorkshire and North East
same day
From 13 August 2025
Reopened 13 August 2025
- Where
- Wykewell Lift Bridge to Moores Swing Bridge
- CRT reason
- Information
- Cause
- Someone else's works
- Asset
- Swing bridge
We have been informed by Northern Powergrid that there will be a planned power outage in the Thorne area on Wednesday, 13th August between 0800 - 1700. Please note that Wykewell Lift and Moores Swing bridges will not be operational during the power outage.
CRT's only update, 6 August 2025.
Navigation Closure - Huddersfield Narrow Canal, HN-013-001 Rail bridge (rail bridge outside Standedge Visitor Centre), Standedge
Huddersfield Narrow CanalYorkshire and North East
4 days
From 15 September 2025
Ended 19 September 2025
Restriction, not a full closure
- Where
- Bridge 61,Tunnel End Railway Bridge.
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Bridge
Network Rail be carrying out core sampling to the bridge on a night time closure work shift. This will be on Monday 15th September, Tuesday 16th September, Wednesday 16th September and Thursday 17th September from the hours of 11pm to 7am the following day.
CRT's only update, 20 August 2025.
Tunnel End Rail Bridge - Huddersfield Narrow
Huddersfield Narrow CanalYorkshire and North East
14 days
From 15 September 2025
Ended 29 September 2025
Restriction, not a full closure
- Where
- Bridge 61,Tunnel End Railway Bridge.
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Bridge
Network rail contractors are carrying out coring works on the rail bridge. This will mean the canal is closed each night 22.00 to 06.00
CRT's only update, 11 September 2025.
Upper Lode Lock.
River Severn NavigationWales and South West
same day
From 24 September 2025
Reopened 24 September 2025
- Where
- Upper Lode Lock
- CRT reason
- Information
- Cause
- Someone else's works
- Asset
- Lock
Please be advised that Upper Lode Lock will be closed on Wednesday 24th September from 8:00am until 6:00pm due to a loss of electrical supply. We apologise for any inconvenience this may cause and appreciate your understanding. You are welcome to contact us at…
CRT's only update, 18 September 2025.
Bulholme Lock
Aire & Calder Navigation Main LineYorkshire and North East
same day
From 2 October 2025
Reopened 2 October 2025
- Where
- Lock 10, Bulholme Lock
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Lock
We have been advised that Northern Powergrid have a planned power cut which is taking place today, Thursday 2nd October, between 8am and 4pm, whilst they are cutting back trees in the area, near overhead power cables. This means there will be no power to Lock 10, Bulholme Lock…
CRT's only update, 2 October 2025.
Between Chalk Bridge 27 and Bleak Hall Bridge (A406) 28
Lee NavigationLondon and South East
9 days
From 11 November 2025
Ended 20 November 2025
Restriction, not a full closure
- Where
- Bridge 27, Chalk Bridge to Bridge 28, Bleak Hall Bridge (A406)
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Bridge
Construction of new Road Bridge over Lee Navigation (Phase 1 - Install Steel beams/Decking). During crane lifting operations the works will be carried out under night-time navigation & Towpath closures between 11pm – 6am. Advanced warning signage positioned either side of works…
CRT's only update, 7 October 2025.
Woodnook Lock
Wakefield Branch (Aire & Calder)Yorkshire and North East
same day
From 9 November 2025
Reopened 9 November 2025
- Where
- Lock 6, Woodnook Lock
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Lock
Northern Powergrid will be carrying out work to the power supply in the area, affecting the lock. Please be aware that the lock will not be operational between 09:30 and 15:30 on 9th November.
CRT's only update, 31 October 2025.
Navigation Closure - Wakefield Branch (Aire & Calder), Lock 6, Woodnook Lock, Normanton due to Third Party Works
Wakefield Branch (Aire & Calder)Yorkshire and North East
same day
From 23 December 2025
Reopened 23 December 2025
- Where
- Lock 6, Woodnook Lock
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Lock
Description: Northern Powergrid require a power outage for pole replacement works, meaning that the lock will be closed on 23rd December. Instructions: Boaters should plan their movements to avoid use of the lock on 23rd December.
CRT's only update, 15 December 2025.
Woodside Bridge to Round Oak (2) Bridge, Dudley, Brierley Hill
Dudley No 1 CanalWest Midlands
33 days
From 4 June 2026
Ended 7 July 2026
Restriction, not a full closure
- Where
- Round Oak (2) Bridge to Woodside Bridge
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Bridge
Third-party contractors working on the Wednesbury to Brierley Hill Metro extension will be carrying out night-time works to install a new bridge over the canal as part of the new Metro line. To facilitate these works, the canal will be closed at night only from: 04/06/26 at…
CRT's only update, 12 May 2026.
Ufton Swingbridge.
Kennet & Avon CanalWales and South West
same day
From 26 May 2026
Reopened 26 May 2026
- Where
- Bridge 25A, Ufton Swingbridge
- CRT reason
- Information
- Cause
- Someone else's works
- Asset
- Swing bridge
Please be aware that Scottish & Southern Electricity will be carrying out a planned power outage which will affect Ufton Swingbridge on Tuesday 26th May between 9am to 4pm. You are welcome to contact us at enquiries.walessouthwest@canalrivertrust.org.uk if you would like to…
CRT's only update, 26 May 2026.
Tyle Mill Swingbridge.
Kennet & Avon CanalWales and South West
same day
From 26 May 2026
Reopened 26 May 2026
- Where
- Bridge 23, Tyle Mill Swingbridge
- CRT reason
- Information
- Cause
- Someone else's works
- Asset
- Swing bridge
Please be aware that Scottish & Southern Electricity will be carrying out a planned power outage which will affect Tyle Mill Swingbridge on Tuesday 26th May between 9am to 4pm. You are welcome to contact us at enquiries.walessouthwest@canalrivertrust.org.uk if you would like to…
CRT's only update, 26 May 2026.
Northern Powergrid planned outage at Kirkhouse Green Bridge on the Wednesday 19th August from 08:30hrs to 16:30hrs
New Junction CanalYorkshire and North East
same day
From 19 August 2026
Reopened 19 August 2026
- Where
- Kirkhouse Green Lift Bridge 4
- CRT reason
- Information
- Cause
- Someone else's works
- Asset
- Bridge
Northern Powergrid have got a planned outage to carry out works. Kirkhouse Green Bridge will not be able to operate on the Wednesday 19th August from 08:30hrs to 16:30hrs.
CRT's only update, 6 August 2026.
Northern Powergrid Planned outage at Low Lane Bridge on Wed 19th August from 08:30 - 16:30hrs
New Junction CanalYorkshire and North East
same day
From 19 August 2026
Reopened 19 August 2026
- Where
- Low Lane Swing Bridge 2
- CRT reason
- Information
- Cause
- Someone else's works
- Asset
- Bridge
Northern Powergrid have got a planned outage to carry out works. Low Lane Bridge will not be able to operate on the Wednesday 19th August from 08:30hrs to 16:30hrs.
CRT's only update, 6 August 2026.
Northern Powergrid planned outage to Top Lane Bridge on the Wednesday 19th August from 08:30hrs - 16:30hrs
New Junction CanalYorkshire and North East
same day
From 19 August 2026
Reopened 19 August 2026
- Where
- Top Lane Lift Bridge 3
- CRT reason
- Information
- Cause
- Someone else's works
- Asset
- Bridge
Northern Powergrid have got a planned outage to carry out works. Top Lane Bridge will not be able to operate on the Wednesday 19th August from 08:30hrs to 16:30hrs.
CRT's only update, 6 August 2026.
Navigation Closure - Leeds & Liverpool Canal, Moss Bridge, Rodley, Rodley
Leeds & Liverpool CanalYorkshire and North East
same day
From 17 August 2026
Reopened 17 August 2026
- Where
- Bridge, Water Pipe Crossing
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Other
The overhead gantry is going to be removed resulting in a navigation closure while the works are being carried out. The work is expected to be completed in one evening.
CRT's only update, 14 August 2026.
Showing the 40 longest of 40. Every row links to the notice CRT published.
Coming up
Scheduled but not yet started, so in no figure above.
| Closure | From | Planned |
|---|---|---|
| Navigation Closure - Dudley No 1 Canal, Canal and Towpath from Round Oak (2) Bridge to Woodside Bridge , Dudley DY5 1LJ | 5 October 2026 | 5 days |
| Bridge 179C, Union Footbridge, Skipton | 2 November 2026 | 46 days |
| Between Bridge 60, Town Bridge and Bridge 58, A339 flyover, Newbury | 2 November 2026 | 41 days |
| Bridge 108F Saltley Underbridge ( High Speed 2 ) | 2 November 2026 | 130 days |
| Bridge 128 Willison's Bridge, Wormleighton | 2 November 2026 | 130 days |
| Curzon Viaduct (High Speed 2) Curzon Street Birmingham | 25 November 2026 | 107 days |
| Bridge 70, Wolseley Bridge | 4 January 2027 | 67 days |
| Bridge 31, Oblique Bridge, St Pancras, London | 29 January 2027 | 42 days |
| Bridge 11A - Manchester City | 1 February 2027 | 6 days |
| Between Lock 8, Branston Lock & Bridge 33E, Ordish Bridge | 1 March 2027 | 4 days |
| Bridge 37, Railway Bridge replacement, Dewsbury Arm - Calder & Hebble Canal | 17 April 2027 | — |