Something was shut here on 29% of this cruising season — 66 of its 231 days — across 6 separate closures.

That means a closure somewhere on the canal, not that the whole canal was impassable. Every closure below names the locks or bridges it sat between.

1 closure is still shut now, and 1 of those has no reopening date. Filter to it.

Regions
London and South East
On record
8 closures

The season, closure by closure

Each row is one closure. A bar starts and ends where the closure did, and its length is how long it ran; dashed bars have not started yet.

2026-03-15one bar is one closure2026-10-31

Every closure on record

Population

Status

Period

2025 season2026 seasonAll time

Duration

Cause

Asset affected

CRT reason

Region

Showing all 8 closures on the Hertford Union Canal.

8
closures
110
closure-days
69
in cruising season
1
no reopening date
What these figures mean
Population
Which closures a figure counts. All closures is everything; Unplanned, in season drops CRT's scheduled winter programme and any day outside the 15 March to 31 October cruising season; CRT winter programme is that maintenance alone.
Defensible duration
The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
Closure-days
One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals.
The season so farweeks with a closure in force
Closures in force each monthclosures active during the month
1
0
0
0
0
0
0
1
1
1
1
1
0
0
3
2
1
May 25Jun 25Jul 25Aug 25Sep 25Oct 25Nov 25Dec 25Jan 26Feb 26Mar 26Apr 26May 26Jun 26Jul 26Aug 26Sep 26
Whereclosure-days by region
London and South East1108
8 results · every closure on the Hertford Union CanalJump to table
NoticeExtentStartedDays
Navigation Closure - Hertford Union Canal, Top Lock, Lock 1 - Bottom Lock, Lock 3, Bow/Hackney Wick
Low Water Levels · Cause not stated · no reopening date
Lock 1, Top Lock to Lock 3, Bottom Lock2026-07-3054
Hertford Union Locks 1 to 3 closed due to boat strike
Information · Struck by boat or vehicle
Lock 1, Top Lock to Lock 3, Bottom Lock2025-12-0838
Navigation Closure - Hertford Union Canal, Between Top Lock 1 and Bottom Lock 3, Bow
Low Water Levels · Cause not stated
Lock 1, Top Lock to Lock 3, Bottom Lock2026-07-286
Navigation Closure - Hertford Union Canal, Top Lock, Lock 1 - Bottom Lock, Lock 3, Bow / Hackney Wick
Low Water Levels · Cause not stated
Lock 1, Top Lock to Lock 3, Bottom Lock2026-07-205
Accommodation bridge 10
3rd Party Works · Nothing failed
Accommodation Bridge 102025-05-273
Hertford Union - Middle Lock
Maintenance · Other cause
Lock 1, Top Lock to Lock 2, Middle Lock2026-02-063
Hertford Union Canal
Emergency Services Incident · Nothing failed
Stop Gates 1 to Accommodation Bridge 102026-04-241
Navigation Closure - Hertford Union Canal, Lock 1, Bow, London
Repair · Wear and tear
Lock 1, Top Lock2026-03-25same day

Not counted

Cancelled notices and ones whose dates cannot be right are in no figure on this page. They are kept here because CRT published them.

1 notices excluded from the figures.
NoticeStateStarted
Navigation Closure - Hertford Union Canal, Top Lock, Lock 1 - Bottom Lock, Lock 3, Bow/Hackney WickCompleted30 July 2026