Between Chalk Bridge 27 and Bleak Hall Bridge (A406) 28
A navigation closure on the Lee Navigation, 11 November 2025 to 20 November 2025 — 9 days.
Source: this notice on canalrivertrust.org.uk
- Waterway
- Lee Navigation
- Region
- London and South East
- Started
- 11 November 2025
- Status
- Reopened 20 November 2025
- Days shut
- 9
- CRT reason
- 3rd Party Works
- Cause
- Nothing failed
- Asset
- Bridge
Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.
Where
- Lee Navigation: Bridge 27, Chalk Bridge to Bridge 28, Bleak Hall Bridge (A406)
Updates · 1
44 days with no update after the last one.
7 October 2025 · 0 days since the previous
Construction of new Road Bridge over Lee Navigation (Phase 1 - Install Steel beams/Decking). During crane lifting operations the works will be carried out under night-time navigation & Towpath closures between 11pm – 6am. Advanced warning signage positioned either side of works and area isolated off, with a Towpath diversion route in place.