Something was shut here on 1% of this cruising season — 3 of its 231 days — across 1 separate closures.
That means a closure somewhere on the canal, not that the whole canal was impassable. Every closure below names the locks or bridges it sat between.
Nothing is shut on this canal today.
- Regions
- West Midlands
- On record
- 5 closures
The season, closure by closure
Each row is one closure. A bar starts and ends where the closure did, and its length is how long it ran; dashed bars have not started yet.
Every closure on record
Showing all 4 closures on the Digbeth Branch (Birm'm & Fazeley).
What these figures mean
- Population
- Which closures a figure counts. All closures is everything; Unplanned, in season drops CRT's scheduled winter programme and any day outside the 15 March to 31 October cruising season; CRT winter programme is that maintenance alone.
- Defensible duration
- The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
- Closure-days
- One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals.
| Notice | Extent | Started | Days |
|---|---|---|---|
| Belmont Row Bridge, Birmingham | Belmont Row Bridge | 2025-12-04 | 33 |
| Ashted Locks, Digbeth Branch | Lock 1, Ashted Top Lock to Lock 6, Ashted Bottom Lock | 2026-09-16 | 2 |
| Ashted Lock 6 | Lock 6, Ashted Bottom Lock | 2025-11-10 | same day |
| Lock 3, Ashted | Lock 3, Ashted | 2025-12-03 | same day |
Showing the 4 longest of 4. Every row links to the notice CRT published.
Coming up
Scheduled but not yet started, so in no figure above.
| Closure | From | Planned |
|---|---|---|
| Curzon Viaduct (High Speed 2) Curzon Street Birmingham | 25 November 2026 | 107 days |
Not counted
Cancelled notices and ones whose dates cannot be right are in no figure on this page. They are kept here because CRT published them.
| Notice | State | Started |
|---|---|---|
| Curzon Viaduct (High Speed 2) Curzon Street Birmingham | Published | 25 November 2026 |