Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.
All closures / What fails / Lock
Lock
Unplanned closures of this kind: 120 in June to August 2026 against 59 a year earlier, up by more than chance would produce; the result holds across all 33 tests. How this is tested.
- On record
- 582 notices since May 2025: 481 closures, 13 restrictions and 88 not yet started
In force today
12 closures of this kind are in force today, longest shut first. Filter the explorer to them.
| Canal | Where | Since | Days shut |
|---|---|---|---|
| Lee Navigation | Lock 2, Ware Lock | 21 January 2026 | 248 |
| Northampton Arm (GU Canal) | Lock 1 to Lock 17 | 27 July 2026 | 58 |
| Caldon Canal | Froghall Basin Lock | 30 July 2026 | 58 |
| Macclesfield Canal | Bosley Lock 1 to Bosley Lock 12 | 11 August 2026 | 42 |
| Oxford Canal | Lock 33, Aynho Weir Lock | 17 August 2026 | 40 |
| Weaver Navigation | Marsh Lock | 16 July 2026 | 38 |
| River Soar | Lock 55 - Zouch Lock | 20 August 2026 | 37 |
| Leicester Line (Grand Union Canal) | Lock 1 to Lock 7 | 13 July 2026 | 25 |
| Glasson Branch (Lancaster Canal) | Lock No.4 | 4 September 2026 | 22 |
| River Soar | Lock 48 - Cossington Lock | 7 September 2026 | 19 |
| Rochdale Canal | Lock 56 | 9 September 2026 | 17 |
| Stainforth & Keadby Canal | Keadby Lock | 26 September 2026 | same day |
By canal
66 canals have had a closure of this kind. A closure naming two canals counts on both.
| Canal | Closures |
|---|---|
| Grand Union Canal | 70 |
| Rochdale Canal | 36 |
| Trent & Mersey Canal | 31 |
| Leeds & Liverpool Canal | 28 |
| Huddersfield Narrow Canal | 25 |
| Lee Navigation | 21 |
| Kennet & Avon Canal | 20 |
| Oxford Canal | 20 |
| Staffordshire & Worcestershire Cnl | 20 |
| Shropshire Union Canal | 19 |
| Calder & Hebble Navigation | 18 |
| Regent's Canal | 14 |
Show 54 moreShow fewer
Every closure on record
Showing 481 closures and 13 restrictions involving a lock.
Rank by
Population
67 closures are in neither group: 64 unplanned with no day in the cruising season since May 2025, and 3 not started yet.
Status
Duration
Cause
Asset affected
Lock part
Unplanned lock failures naming a part
CRT reason
Region
What these figures mean
- Population
- Which closures a figure counts. All closures is everything; Unplanned closure drops the works CRT flags as its winter programme and any day outside the cruising season (the Friday nearest 15 March to the Sunday before the first Monday in November). Scheduled work CRT does not flag as winter works still counts here. CRT Planned closure is the flagged winter programme alone.
- Defensible duration
- The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
- Closure-days
- One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals. They are counted from 1 May 2025, when this archive begins: a closure that started earlier adds only its days since then, though its own row shows its whole length. Every figure and chart counts only the days inside the Period chosen above them.
- In force
- A closure is in a Period, and a day is one a closure affected, if it was in force at any time that day, including the morning it reopened. Closure-days measure how long, so they count whole days and not the reopening day: a closure can be in a Period and add no closure-day to it.
Closures in force each month
closures active during the month- In force
- Announced, not yet reached
Canals ranked by the season's closures
share of the period's cruising-season days up to today — a closure somewhere on a long canal is likelier, and does not mean the canal was impassableclosures in force on the period's cruising-season days — a longer canal has more to go wrong onWhere
closure-days by regionclosures by regionA region with more canal has more to go wrong on, so these totals partly measure its size. Regions compared by length of canal are on the Reliability page.
What causes them
closure-days by causeclosures by causeShow 7 moreShow fewer
Show 7 moreShow fewer
CRT's reason
closure-days by the reason CRT filedclosures by the reason CRT filedShow 7 moreShow fewer
Show 7 moreShow fewer
What fails on a lock
closure-days by part — unplanned lock failures naming a partclosures by part — unplanned lock failures naming a partShow 4 moreShow fewer
Show 4 moreShow fewer
How long they last
closures by full length, including any days before May 2025 — the bands are not equal in widthClosures
Navigation Closure - Lee Navigation, Ware Lock
Lee NavigationLondon and South East
248 days
From 21 January 2026
No reopening date
Still shut
- Where
- Lock 2, Ware Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The navigation closure remains in place and will continue until the EA replaces the gates. Further update will be provided as soon as additional information becomes available from the EA regarding the programme for works and any future navigation arrangements. If you would like…
Latest of 13 CRT updates, 8 September 2026. 18 days without another.
Marsh Lock
Weaver NavigationNorth West
193 days
Fully shut 193 of CRT's 202 days
From 12 September 2025
Reopened 2 April 2026
- Where
- Marsh Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Our teams are currently awaiting the delivery of, and training on, the powered windlass, which will support future operations. Bookings are now open, and customers can reserve a slot online or by contacting our Customer Services team on 03030 404040. From 13 April, bookings will…
Latest of 11 CRT updates, 27 March 2026.
Lock 58, Tardebigge Top Lock
Worcester & Birmingham CanalWest Midlands
191 days
From 17 February 2025
Reopened 27 August 2025
118 of them since this archive began on 1 May 2025
- Where
- Lock 58
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We're pleased to confirm that, despite the discovery of an additional significant void requiring further work, repairs at Tardebigge Top Lock remain on schedule. The lock is due to reopen on Wednesday 27th August. Please note that upon reopening, Tardebigge Lock Flight will be…
Latest of 9 CRT updates, 18 August 2025.
Lock 40, Wilmcote Top Lock
South Stratford CanalWest Midlands
147 days
From 24 January 2025
Reopened 20 June 2025
50 of them since this archive began on 1 May 2025
- Where
- Lock 40, Wilmcote Top Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
To clarify, there will be no restrictions once navigation opens. We expect navigation to be open by 5 PM today.
Latest of 7 CRT updates, 20 June 2025.
Dukes Cut Lock 44A
Dukes Cut (Oxford Canal)London and South East
133 days
Fully shut 133 of CRT's 386 days
From 21 August 2024
Reopened 11 September 2025
- Where
- Lock 44A, Dukes Cut Lock
- CRT reason
- Information
- Cause
- Broke, cause not given
- Asset
- Lock
Repairs to the paddle gearing completed Lock now open to navigation
Latest of 4 CRT updates, 11 September 2025.
Lock 5, Kelston Lock
Kennet & Avon CanalWales and South West
132 days
Fully shut 132 of CRT's 182 days
From 10 September 2025
Reopened 11 March 2026
- Where
- Lock 5, Kelston Lock
- CRT reason
- Repair
- Cause
- Other cause
- Asset
- Lock
Further to the notice below, please be advised that Kelston Lock (Lock 5) is now closed pending the replacement of the lock gates. Unfortunately, due to elevated water levels, it is not possible to undertake the necessary works during the winter period. For safety reasons, the…
Latest of 6 CRT updates, 10 November 2025.
Perry Barr Lock Flight
Tame Valley CanalWest Midlands
123 days
From 9 June 2025
Reopened 10 October 2025
- Where
- Perry Barr Lock 1, Top Lock to Perry Barr Lock 13, Bottom Lock
- CRT reason
- Low Water Levels
- Cause
- Planned works
- Asset
- Lock
This section is still closed due to low water levels. Whilst the closure is in place engineers are investigating the locks for any potential damage, so some maybe empty. We will continue to monitor the situation closely and will provide further updates.
Latest of 4 CRT updates, 3 October 2025.
Navigation Closure: Lock 7, Glasson Branch, Lancaster Canal
Glasson Branch (Lancaster Canal)North West
114 days
From 3 February 2025
Reopened 28 May 2025
27 of them since this archive began on 1 May 2025
- Where
- Lock No.7, Glasson Basin Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We are pleased to advise navigation is now open at Lock 7 on the Glasson Branch of the Lancaster Canal following a successful repair.
Latest of 4 CRT updates, 28 May 2025.
Lock 103 Burghfield Lock
Kennet & Avon CanalWales and South West
109 days
From 17 January 2026
Reopened 6 May 2026
- Where
- Lock 103, Burghfield Lock
- CRT reason
- Repair
- Cause
- Struck by boat or vehicle
- Asset
- Lock
Further to the notice below, work is planned to start at Burghfield Lock on the 11th May and our contractors estimate that the repair will take 3 weeks. Thank you for your patience and understanding while these essential repairs are carried out. You are welcome to contact us at…
Latest of 7 CRT updates, 6 May 2026.
Lock 38, Penkridge Lock
Staffordshire & Worcestershire CnlWest Midlands
107 days
From 31 December 2025
Reopened 17 April 2026
- Where
- Lock 38 Penkridge Lock to Lock 37 Filance Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We are pleased to report that good progress has been made at Penkridge Lock. The bywash culvert liner has now been installed and is awaiting grouting. Grouting of the liner is planned to take place on Monday and Tuesday, subject to the timely delivery of materials. Following…
Latest of 14 CRT updates, 10 April 2026.
Walsall Lock Flight
Walsall CanalWest Midlands
105 days
From 27 May 2026
Reopened 9 September 2026
- Where
- Lock 8, Walsall Bottom Lock to Lock 1, Walsall Top Lock
- CRT reason
- Repair
- Cause
- Worn out
- Asset
- Lock
The repair works are now nearing completion, and we are pleased to advise that Walsall Lock Flight is expected to reopen to navigation on Wednesday 9 September. Before travelling, please check the latest navigation notices and stoppage information, as other restrictions may…
Latest of 6 CRT updates, 7 September 2026.
Quoisley Lock, near Marbury
Llangollen CanalNorth West
81 days
From 5 January 2026
Reopened 27 March 2026
- Where
- Quoisley Lock,
- CRT reason
- Repair
- Cause
- Worn out
- Asset
- Lock
We wanted to let you know that the works at Quoisley Lock will require additional time to complete. During the dewatering of the lock, it was identified that the lock gates were in significantly worse condition than expected, making repair unfeasible. New gates are therefore…
Latest of 2 CRT updates, 2 March 2026.
Lock 19 Gas Pipe Lock - near Kibworth Harcourt
Leicester Line (Grand Union Canal)East Midlands
74 days
From 12 January 2026
Reopened 27 March 2026
- Where
- Lock 19 - Gas Pipe Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Work at Gas Pipe Lock has been delayed by severe weather and flooding in early January, which held up the start of the planned stoppage by two weeks. The project includes full replacement of both lock gates, repairs, and lock ladder renewal. Because the original programme…
Latest of 2 CRT updates, 13 February 2026.
Lock 36 - Gees Lock - Near Whetstone
Leicester Line (Grand Union Canal)East Midlands
73 days
From 19 January 2026
Reopened 2 April 2026
- Where
- Lock 36 - Gees Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Works at Gees Lock 36 are running behind schedule due to operational challenges, including low water levels affecting access to the site. Progress has also been slowed by limited lifting capacity, as only one crane boat is currently available. Flooding elsewhere on the network…
Latest of 4 CRT updates, 20 March 2026.
Locks 42, 43 and 44 - Marsworth Flight
Grand Union CanalLondon and South East
73 days
From 6 January 2026
Reopened 20 March 2026
- Where
- Lock 42 to Lock 44
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Work on the Marsworth Flight has been delayed by severe weather throughout the project. As a result, the team has been unable to complete all required repairs within the original stoppage window. To allow the remaining work to be completed safely and to the required standard, we…
Latest of 4 CRT updates, 4 March 2026.
Todmorden Lock
Rochdale CanalYorkshire and North East
71 days
From 17 June 2025
Reopened 27 August 2025
- Where
- Lock 19
- CRT reason
- Inspections
- Cause
- Broke, cause not given
- Asset
- Lock
Our Engineering Team have updated us with the works undertaken. The guillotine gate wire ropes and associated components have been changed. There are additional works still taking place to ensure the safe use of the Guillotine Lock once it is open and additional safety checks…
Latest of 6 CRT updates, 22 August 2025.
Advice - Grand Union Canal, Clitheroe's Lock, Lock 99, Brentford
Grand Union CanalLondon and South East
70 days
Fully shut 70 of CRT's 71 days
From 27 May 2025
Reopened 6 August 2025
- Where
- Lock 99, Clitheroes Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Clitheroe's lock remains closed while essential repair work continues. We would like to inform you that concrete is currently being poured as part of the ongoing cill repair works. The concrete will require at least three full days to cure properly. On Monday, 4th of August, we…
Latest of 13 CRT updates, 1 August 2025.
Lock 87, Ham lock, near Thatcham
Kennet & Avon CanalWales and South West
67 days
From 3 November 2025
Reopened 9 January 2026
- Where
- Lock 87, Ham Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Unfortunately, we now require additional time on site to complete these works to the required standard. The stoppage will now end on 9th January. We have experienced challenges with effectively damming the lock, which has caused delays in replacing the bottom gates. To ensure…
Latest of 3 CRT updates, 12 December 2025.
Lock 81 and Top Lock 65, Near Wigan
Leeds & Liverpool CanalNorth West
67 days
From 5 January 2026
Reopened 13 March 2026
- Where
- Lock 85, Lock 21 to Lock 65, Top Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please be advised that, in addition to the advertised works at Locks 81 and 65, we will also be carrying out repair works at Lock 75, which require the lock to be dewatered. The stoppage dates and closure location remain unchanged as originally communicated. Both teams have…
Latest of 2 CRT updates, 16 January 2026.
Lock 12, Brighouse Bottom
Calder & Hebble NavigationYorkshire and North East
67 days
From 5 January 2026
Reopened 13 March 2026
- Where
- Bridge 2, Elland to Lock 15, Kirklees Low Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for a full lock gate replacement & general repairs
CRT's only update, 7 May 2025.
Lock 5, Woodside Mills - Near Elland
Calder & Hebble NavigationYorkshire and North East
67 days
From 5 January 2026
Reopened 13 March 2026
- Where
- Lock 3, Salterhebble Bottom to Lock 5, Woodside Mills
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for a full lock gate replacement & general repairs
CRT's only update, 7 May 2025.
Lock 36 Otherton, Penkridge
Staffordshire & Worcestershire CnlWest Midlands
67 days
From 5 January 2026
Reopened 13 March 2026
- Where
- Littleton Colliery Railway Bridge 80A to Bridge 83 Lyne Hill Bridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
The gates are composite and after further investigations are going to require off-site refurbishment. We require additional time at this stoppage to complete the works to the necessary standard. Starting the works a bit earlier will allow us to complete by the original 13 March…
Latest of 2 CRT updates, 12 September 2025.
Lock 37, Penkridge
Staffordshire & Worcestershire CnlWest Midlands
67 days
From 5 January 2026
Reopened 13 March 2026
- Where
- Bridge 84, Filance Bridge to Bridge 85, Princefield Bridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for top and bottom gate replacements and quoin repairs.
CRT's only update, 8 May 2025.
Lock 48, Worksop Stret Lock - Near Worksop
Chesterfield CanalYorkshire and North East
60 days
From 12 January 2026
Reopened 13 March 2026
- Where
- Lock 48, Worksop Stret Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for a full lock gate replacement & general repairs
CRT's only update, 7 May 2025.
Lock 4, Adderley
Shropshire Union CanalWest Midlands
60 days
From 12 January 2026
Reopened 13 March 2026
- Where
- Adderley Lock 5 to Adderley Lock 1
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for top and bottom gate replacements and brickwork repairs. We will also be doing lock landing repairs below lock 4.
CRT's only update, 8 May 2025.
Lock 4
Glasson Branch (Lancaster Canal)North West
59 days
From 5 January 2026
Reopened 5 March 2026
- Where
- Lock No.4
- CRT reason
- Repair
- Cause
- Worn out
- Asset
- Lock
We are pleased to confirm that work to replace the paddles at Lock 4 on the Glasson Branch is planned to commence on Monday 02 March, and is expected to take a few days to complete. Navigation remains closed until the work is completed. We will provide an update on or before…
Latest of 5 CRT updates, 20 February 2026.
Lock 21 East - Closed in preparation for repairs to the stop plank grooves
Huddersfield Narrow CanalYorkshire and North East
58 days
From 22 October 2025
Reopened 19 December 2025
- Where
- Lock 21 East, Waterside Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Lock 21 East will be locked up due to preparation work that is needed for the repairs to the stop plank grooves, taking place under the Winter Stoppages Works. This is to ensure that the team are working in the conditions needed to undertake the preparation work for the Winter…
CRT's only update, 21 October 2025.
Rushall Lock Flight
Rushall CanalWest Midlands
58 days
Fully shut 58 of CRT's 70 days
From 15 July 2026
Reopened 23 September 2026
- Where
- Lock 1, Top Lock Rushall to Lock 9, Rushall
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Lock
Due to the ongoing dry weather and drought conditions affecting much of England, the Rushall Canal remains closed to navigation. We continue to monitor conditions on a daily basis and will provide further updates as the situation develops. This notice will be reviewed again at…
Latest of 3 CRT updates, 21 August 2026.
Northampton Lock Flight
Northampton Arm (GU Canal)East Midlands
58 days
Fully shut 58 of CRT's 61 days
From 27 July 2026
No reopening date
Still shut
- Where
- Lock 1 to Lock 17
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Lock
Recent rainfall has not improved conditions enough to allow the Northampton Arm to fully reopen. However, having reviewed the current situation, we believe that a limited period of navigation can be accommodated without having a significant impact on water resources elsewhere on…
Latest of 3 CRT updates, 10 September 2026. 16 days without another.
Perry Barr Lock Flight
Tame Valley CanalWest Midlands
58 days
From 27 July 2026
Reopened 23 September 2026
- Where
- Perry Barr Lock 1, Top Lock to Perry Barr Lock 13, Bottom Lock
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Lock
Due to the ongoing dry weather and drought conditions affecting most of England, Perry Barr Lock Flight remains closed. We are continuing to monitor conditions and will update this notice as the situation develops.
Latest of 5 CRT updates, 28 August 2026.
Froghall Basin Lock
Caldon CanalWest Midlands
58 days
From 30 July 2026
Due to reopen 23 October 2026
Still shut
- Where
- Froghall Basin Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Repairs to Froghall Basin Lock have now been scheduled. Works are currently planned to commence during the week commencing 14 September 2026 and are expected to take approximately six weeks, with completion anticipated by 23 October 2026, subject to conditions on site. Please…
Latest of 2 CRT updates, 18 August 2026. 39 days without another.
Newly Top Lock to Office Lock - Closed
Leeds & Liverpool CanalYorkshire and North East
56 days
From 23 June 2025
Reopened 18 August 2025
- Where
- Lock 13, Newlay Top Lock to Lock 2, Office Lock
- CRT reason
- Low Water Levels
- Cause
- Worn out
- Asset
- Lock
We are pleased to let you know that repairs to Oddy lock have now been completed. Our team took advantage of the recent navigation closure to carry out this important work whilst the lock was out of use. Although the repair is now finished, navigation in this area remains closed…
Latest of 6 CRT updates, 18 August 2025.
Navigation Closure – Pocklington Canal from Lock 8 to Lock 9
Pocklington CanalYorkshire and North East
56 days
From 13 July 2026
Reopened 7 September 2026
- Where
- Lock 8, Gardam Lock to Lock 9 / Cottingwith Lock
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Lock
The navigation closure has been lifted but it will be on a booked passage system to use Lock 9. Please see the new notice that has been issued.
Latest of 2 CRT updates, 7 September 2026.
Lock 5, Camp Hill
Grand Union CanalWest Midlands
53 days
From 5 January 2026
Reopened 27 February 2026
- Where
- Lock 6, Camp Hill (Lock 57) to Lock 1, Camp Hill Top Lock (Lock 52)
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Due to additional work identified while on site, this stoppage will be extended and is now planned to complete on 27 February. During the course of the project, our team identified further brickwork repairs that were not included in the original scope. In addition, we found that…
Latest of 2 CRT updates, 12 February 2026.
Lock 21 - Pywells Lock - near Kibworth Harcourt
Leicester Line (Grand Union Canal)East Midlands
53 days
From 12 January 2026
Reopened 6 March 2026
- Where
- Lock 21 - Pywells Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We'd like to clarify the nature of the upcoming works at Pywells Lock. The project has always been intended for gate repairs rather than a full gate replacement. The schedule remains unchanged, as other essential works are also planned during this 8-week stoppage. These repairs…
Latest of 2 CRT updates, 5 December 2025.
Lock 20, Dowley Gap Bottom Lock - Near Bingley
Leeds & Liverpool CanalYorkshire and North East
53 days
From 5 January 2026
Reopened 27 February 2026
- Where
- Lock 21, Dowley Gap Top Lock to Bridge 206, Dowley Gap Changeline Bridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please note the towpath will no longer be closed during these works.
Latest of 2 CRT updates, 29 June 2025.
Lock 8, Mayroyd - Near Hebden Bridge
Rochdale CanalYorkshire and North East
53 days
From 5 January 2026
Reopened 27 February 2026
- Where
- Bridge 14, Fallingroyd Tunnel to Lock 8, Mayroyd
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Following a detailed inspection after the canal was dewatered, we have identified that the repairs required are more extensive than originally anticipated. These works will now require specialist contractor involvement. To ensure the repairs are completed safely and to the…
Latest of 2 CRT updates, 5 February 2026.
Kegworth Flood Lock 57
River SoarEast Midlands
53 days
From 1 September 2025
Reopened 24 October 2025
- Where
- Lock 57 - Kegworth Shallow Flood Lock
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
Over the last two years, planned work on the River Soar over the winter period has been severely impacted by flooding. To give us the best chance of completing the planned double lock gate replacement at Kegworth Lock we are moving this work forward to start on 1st September…
CRT's only update, 24 July 2025.
Lock 12, Napton on the Hill
Oxford CanalWest Midlands
52 days
From 26 January 2026
Reopened 19 March 2026
- Where
- Lock 8, Napton Bottom Lock to Lock 14, Adkins Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We would like to offer our sincere apologies, as we require an extension of up to 6 days to complete the remaining works on site. During the removal and installation of the gates this week, our team identified several unforeseen issues that could not have been detected before…
Latest of 4 CRT updates, 13 March 2026.
Atherstone Lock Flight
Coventry CanalWest Midlands
52 days
From 4 August 2026
Restriction from 25 September 2026
Now a restriction: boats can pass, with limits
- Where
- Lock 1, Atherstone Top Lock to Lock 11
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Lock
Following ongoing monitoring of water resources and canal levels, the Atherstone Lock Flight will move to restricted operating hours from Friday 25 September 2026. The flight will be open daily between 10.00am and 3.00pm, with the last entry at 2.00pm. These measures are being…
Latest of 5 CRT updates, 23 September 2026.
York street lock - Stourport on Severn
Staffordshire & Worcestershire CnlWest Midlands
51 days
From 5 January 2026
Reopened 25 February 2026
- Where
- York Street Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We're pleased to let you know that the works at York Street Lock have been completed ahead of schedule, and the navigation is now open.
Latest of 4 CRT updates, 25 February 2026.
Turnerwood Lock 37
Chesterfield CanalYorkshire and North East
49 days
From 1 September 2025
Reopened 20 October 2025
- Where
- Lock 37, Turnerwood Bottom Lock
- CRT reason
- Maintenance
- Cause
- Worn out
- Asset
- Lock
We will be carrying out essential works to replace the top and bottom lock gates at Turnerwood Lock 37 on the Chesterfield Canal. The gates have reached the end of their serviceable life, and replacement is necessary to ensure the continued safe and reliable operation of the…
CRT's only update, 1 August 2025.
Lock 81, Hamstead Lock, near Hamstead Marshall
Kennet & Avon CanalWales and South West
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Lock 81, Hamstead Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please note the towpath will no longer be closed during these works.
Latest of 2 CRT updates, 29 June 2025.
Lock 13, Tilstone
Shropshire Union CanalNorth West
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Lock 13 Tilstone Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigational closure is required for top and bottom gate repair works and ladder hoop modifications.
CRT's only update, 6 May 2025.
Locks 22, 26, 27 and 28 West, Diggle
Huddersfield Narrow CanalNorth West
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Bridge66, Ward Lane Bridge to Bridge 71, Wool Road
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please be advised that the works at Lock 22W have been completed and the lock is now open. The stoppage now runs from Bridge 66, Ward Lane Bridge, to Bridge 71, Wool Road Bridge, while works continue at Locks 26W, 27W, and 28W.
Latest of 4 CRT updates, 26 November 2025.
Lock 2, Camp Hill
Grand Union CanalWest Midlands
46 days
From 5 January 2026
Reopened 20 February 2026
- Where
- Lock 6, Camp Hill (Lock 57) to Lock 1, Camp Hill Top Lock (Lock 52)
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for top and bottom lock gate replacements. We will also be doing lock chamber brickwork repairs.
CRT's only update, 7 May 2025.
Bank Dole Lock (5) in Knottingley
Bank Dole CutYorkshire and North East
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Trundles Lane Bridge to Bank Dole Lock (Lock 5)
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for downstream gate replacements & upstream lock gate repairs.
CRT's only update, 7 May 2025.
Lock 7, Top Lock - Near Long Buckby Wharf
Grand Union CanalEast Midlands
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Lock 7, Top Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Following a review of the works and customer feedback, this stoppage will now commence on 03/11/2025 to align with the start of the Intensive Maintenance Period.
Latest of 3 CRT updates, 17 September 2025.
Lock 81 and Miles Platting Bridge, Manchester
Rochdale CanalNorth West
46 days
From 5 January 2026
Reopened 20 February 2026
- Where
- Lock 66 Tannersfield Highest to Bridge 88, Red Hill Street Bridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
This navigational closure will encompass 2 pieces of work, the navigation will be closed from bridge 88 through to lock 66. We will be replacing the top & bottom gates of lock 81 along with masonry repairs, ladder & paddle works. We will also be doing leakage repairs to the…
CRT's only update, 8 May 2025.
Lock 20, Kingswood
North Stratford CanalWest Midlands
46 days
From 5 January 2026
Reopened 20 February 2026
- Where
- Lock 20
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We're pleased to confirm that the works at Kingswood Lock 20 will be completed ahead of schedule, and navigation will reopen on 20 February. Some works will continue on the lockside after navigation has reopened, but these will not affect boat movements. Thank you for your…
Latest of 2 CRT updates, 17 February 2026.
Lock 1 - Near Mirfield
Huddersfield Broad CanalYorkshire and North East
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Bridge 3b, Pipebridge 2 to Lock 1
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for a full lock gate replacement and wash wall repairs.
CRT's only update, 8 May 2025.
Lock 15 East, Golcar Brook Lock and Lock 18 East, Can Lock - Near Huddersfield
Huddersfield Narrow CanalYorkshire and North East
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Lock 9 East, Isis Lock to Lock 31 East
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
This closure now encompasses two pieces of work. We will be doing top gate replacement and bottom gate repairs to Lock 15 East and a full lock gate replacement (upstream and downstream) to Lock 18 East along with general repairs.
Latest of 2 CRT updates, 29 June 2025.
Sykehouse Lock - Near Thorne
New Junction CanalYorkshire and North East
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Don Aqueduct to New Junction End Culvert
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for bottom and top gate repairs. We will also be working on the upstream cill and doing sluice and ladder repair works.
CRT's only update, 8 May 2025.
Lock 56 - Kegworth New Lock - Near Kegworth
River SoarEast Midlands
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Lock 56 - Kegworth New Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for top gate replacement and general lock repairs.
CRT's only update, 8 May 2025.
Lock 34, Somerton deep lock
Oxford CanalLondon and South East
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Lock 34, Somerton Deep Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for top lock gate replacement.
CRT's only update, 11 May 2025.
Lock 7, Worcester
Worcester & Birmingham CanalWest Midlands
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Lock 7, Bilford
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please note the towpath will no longer be closed during these works.
Latest of 2 CRT updates, 29 June 2025.
Wolverhampton Lock Flight
Old Main LineWest Midlands
46 days
Fully shut 46 of CRT's 58 days
From 20 July 2026
Reopened 16 September 2026
- Where
- Lock 21, Wolverhampton to Wolverhampton Top Lock
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Lock
Following recent rainfall and an improvement in water levels, we are pleased to advise that the closure at Wolverhampton Lock Flight is expected to be lifted and navigation restored by the end of the day. We would like to thank customers for their patience and understanding…
Latest of 7 CRT updates, 16 September 2026.
Spon Lane Locks
Spon Lane LocksWest Midlands
45 days
Fully shut 45 of CRT's 52 days
From 20 July 2026
Reopened 10 September 2026
- Where
- Lock 1, Spon Lane Top Lock to Lock 3, Spon Lane Bottom Lock
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Lock
Following recent rainfall and an improvement in water levels, we are pleased to advise that the closure at Spon Lane Locks is expected to be lifted and navigation restored from 9:00am tomorrow. We would like to thank customers for their patience and understanding during this…
Latest of 4 CRT updates, 9 September 2026.
Lock 87, Manchester
Rochdale CanalNorth West
44 days
From 2 February 2026
Reopened 18 March 2026
- Where
- Lock 84 Dale St to Lock 92 Castlefield
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We would like to make you aware that we are having to extend the closure at Lock 87 due to delays and additional work requirements. Planned crane lift dates had to be moved at short notice because they coincided with the Chinese New Year parade. Whilst on site with the lock…
Latest of 2 CRT updates, 27 February 2026.
Lock 18
Ashton CanalNorth West
44 days
From 1 October 2025
Reopened 14 November 2025
- Where
- Lock 18 to Lock 1
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We're pleased to confirm that the works at Lock 18 on the Ashton Canal have now been completed. We are currently awaiting the contractors to dismantle the scaffolding before navigation can be reopened. A further update will be provided on Friday, 14 November.
Latest of 5 CRT updates, 13 November 2025.
Brades Lock Flight
Gower Branch (New Main Line)West Midlands
44 days
Fully shut 44 of CRT's 51 days
From 20 July 2026
Reopened 9 September 2026
- Where
- Lock 1 Brades Double to Lock 3, Brades Locks, Gower Branch
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Lock
Due to the ongoing dry weather and drought conditions affecting much of England, Brades Lock Flight remains closed to navigation. We continue to monitor conditions on a daily basis and will provide further updates as the situation develops. This notice will be reviewed again at…
Latest of 3 CRT updates, 21 August 2026.
Star Lock 27, Stone
Trent & Mersey CanalWest Midlands
42 days
From 3 November 2025
Reopened 15 December 2025
- Where
- Lock 28, Yard Lock to Bridge 93, Stafford Road Bridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We're pleased to inform you that works on site have been completed ahead of schedule, and the navigation is open.
Latest of 3 CRT updates, 15 December 2025.
Kegworth New Lock 56
River SoarEast Midlands
42 days
From 2 February 2026
Reopened 16 March 2026
- Where
- Lock 56 - Kegworth New Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Ongoing flooding on the River Soar continues to prevent works at Kegworth from being carried out safely. As a result, the works cannot be completed by the original end date of Friday 6th March. The navigation closure has therefore been extended until 20th March to allow river…
Latest of 3 CRT updates, 4 March 2026.
Bottom Barge Lock, Stourport Basin
Staffordshire & Worcestershire CnlWest Midlands
42 days
From 10 July 2026
Reopened 21 August 2026
- Where
- Bottom Barge Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please be advised that the planned works at Bottom Barge Lock, Stourport Basin, have now been successfully completed. Our teams are currently demobilising the site and removing equipment from the area. The lock will be fully reopened and available for navigation from 16:00…
Latest of 8 CRT updates, 20 August 2026.
Lock 2, Colne Bridge Lock - Broken Mechanism, Balance Beam Dropped - Repaired and operational
Huddersfield Broad CanalYorkshire and North East
42 days
From 24 July 2026
Reopened 4 September 2026
CRT's title says reopened
- Where
- Lock 2, Colne Bridge Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The repairs to the balance beam have been successfully completed and Lock 2 is operational.
Latest of 5 CRT updates, 4 September 2026.
Bosley Flight
Macclesfield CanalNorth West
42 days
Fully shut 42 of CRT's 46 days
From 11 August 2026
No reopening date
Still shut
- Where
- Bosley Lock 1 to Bosley Lock 12
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Due to a paddle failure at Lock 3 over the weekend, we are extending the reopening of the Bosley Lock Flight by an additional day to allow boats currently travelling through this section of the Macclesfield Canal to complete their journey. The Bosley Flight will now remain open…
Latest of 5 CRT updates, 14 September 2026. 12 days without another.
lock 72, Scothmans
Rochdale CanalNorth West
41 days
From 6 June 2025
Reopened 17 July 2025
- Where
- Lock 72 Scothmans
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We're pleased to inform you that all works at Lock 72 on the Rochdale Canal are now complete. Our teams are currently in the process of demobilising equipment and removing dams from the lock. These works will be completed by 1pm, on Thursday 17 July. Please note this area has…
Latest of 5 CRT updates, 16 July 2025.
Navigation Closure - Oxford Canal, Ayhno lock 33 , Adderbury
Oxford CanalLondon and South East
40 days
From 17 August 2026
Due to reopen 2 October 2026
Still shut
- Where
- Lock 33, Aynho Weir Lock
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
Lock 33 is being closed due to drought conditions, whilst this is in place we will be completely a 2027 stoppage to change both top and bottom lock gates and stop plank groves. There will be review points throughout the works if conditions change and they canal is to re-open.…
CRT's only update, 10 August 2026. 47 days without another.
Glasson Branch - Lock 1, near Galgate
Glasson Branch (Lancaster Canal)North West
39 days
From 5 January 2026
Reopened 13 February 2026
- Where
- Lock No.1 to Lock No.6
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigational closure is required for top gate replacements and wood paddle replacement on the bottom gates. We will also be doing some lock wall grouting and paving repairs.
CRT's only update, 7 May 2025.
Lock 35, Hatton
Grand Union CanalWest Midlands
39 days
From 3 November 2025
Reopened 12 December 2025
- Where
- Lock 46, Hatton Top Lock to Lock 26, Hatton Bottom Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We're pleased to inform you that works on site are due to complete ahead of schedule. The navigation will be open from 4pm on Friday 12th December.
Latest of 2 CRT updates, 10 December 2025.
Lock 14 - Near Bridge 23, Holmcoat Road Bridge
Rochdale CanalYorkshire and North East
39 days
From 19 January 2026
Reopened 27 February 2026
- Where
- Lock 14
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Following a recent review, we're now confident that the works can be completed within a shorter stoppage window. The revised stoppage dates are 19th January to 27th February.
Latest of 2 CRT updates, 3 November 2025.
Brades Locks, Lock 1 to Lock 3
Gower Branch (New Main Line)West Midlands
39 days
From 15 September 2025
Reopened 24 October 2025
- Where
- Lock 1 Brades Double to Lock 3, Brades Locks, Gower Branch
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We will be undertaking works at Brades Lock 3, including the replacement of both the top and bottom gates, as well as the installation of a new lock ladder. To carry out these works safely, the navigation will be closed from Lock 1 (Brades Top Lock) through to Lock 3 from 15…
CRT's only update, 21 July 2025.
Don Aqueduct
New Junction CanalYorkshire and North East
39 days
From 3 November 2025
Reopened 12 December 2025
- Where
- Don Aqueduct
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
Essential maintenance work will be taking place on both guillotine locks at Don Aqueduct. As part of these works, our engineering teams will be replacing the steel lifting cables which operate the guillotine lock gates. This maintenance is critical to ensuring the continued safe…
CRT's only update, 17 September 2025.
Smethwick Locks, Birmingham
Old Main LineWest Midlands
39 days
Fully shut 39 of CRT's 46 days
From 20 July 2026
Reopened 4 September 2026
- Where
- Lock 1, Smethwick to Lock 3, Smethwick
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Lock
Following recent rainfall and an improvement in water levels, we are pleased to advise that the closure at Smethwick Locks is expected to be lifted and navigation restored from 8:00am tomorrow. We would like to thank customers for their patience and understanding during this…
Latest of 4 CRT updates, 3 September 2026.
Hertford Union Locks 1 to 3 closed due to boat strike
Hertford Union CanalLondon and South East
38 days
From 8 December 2025
Reopened 15 January 2026
- Where
- Lock 1, Top Lock to Lock 3, Bottom Lock
- CRT reason
- Information
- Cause
- Struck by boat or vehicle
- Asset
- Lock
Work are scheduled for the week commending 12.01.2026 to complete a repair. We will update this notice by 16.01.2026 once we have more information from our regional team and contractors. Thank you for your ongoing patience and cooperation.
Latest of 4 CRT updates, 9 January 2026.
Marsh Lock
Weaver NavigationNorth West
38 days
Fully shut 38 of CRT's 72 days
From 16 July 2026
No reopening date
Still shut
- Where
- Marsh Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Since our last update, contractors have completed their inspections and mechanical parts have now been ordered; however, as these parts are being manufactured, delivery is expected to take up to five weeks. Unfortunately, due to a mechanical fault being found, we are currently…
Latest of 9 CRT updates, 18 September 2026. 8 days without another.
Lock 100 Sulhamstead Lock, Kennet & Avon Canal
Kennet & Avon CanalWales and South West
38 days
Fully shut 38 of CRT's 40 days
From 1 August 2026
Reopened 10 September 2026
- Where
- Lock 100, Sulhamstead Lock
- CRT reason
- Boating Incident
- Cause
- Broke, cause not given
- Asset
- Lock
Further to the notice below, we are pleased to advise that the repair to Sulhamstead Lock has now been completed and the navigation is open. Thank you for your patience.
Latest of 9 CRT updates, 10 September 2026.
Lock 3, Calcutt
Grand Union CanalWest Midlands
37 days
From 3 November 2025
Reopened 10 December 2025
- Where
- Lock 1 to Lock 3
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We're pleased to inform you that works on site have been completed ahead of schedule, and the navigation is now open.
Latest of 2 CRT updates, 10 December 2025.
Zouch Lock 55
River SoarEast Midlands
37 days
From 20 August 2026
No reopening date
Still shut
- Where
- Lock 55 - Zouch Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
On Wednesday, our team identified issues with both the lock cill and the mitre. As the location of the lock makes these complex issues to fix, our team will be working with specialist contractors to carry out the necessary works in the shortest possible timeframe. Site set-up is…
Latest of 4 CRT updates, 18 September 2026. 8 days without another.
Lock 10, Audlem
Shropshire Union CanalNorth West
32 days
From 26 January 2026
Reopened 27 February 2026
- Where
- Lock 10 Audlem
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Following a site review of the works, we're now confident that the works can be completed within a shorter stoppage window than originally planned. The revised stoppage dates are 26th January to 27th February, meaning the whole of the Shropshire Union Canal will be open for most…
Latest of 2 CRT updates, 28 November 2025.
Lock 76, near Dutton
Trent & Mersey CanalNorth West
32 days
From 19 January 2026
Reopened 20 February 2026
- Where
- Lock 76
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Following a recent review, we're now confident that the works can be completed within a shorter stoppage window. The revised stoppage dates are 19 January 2026 to 20 February 2026.
Latest of 2 CRT updates, 3 October 2025.
Lock 42, Near Thornton-in-Craven
Leeds & Liverpool CanalNorth West
32 days
From 5 January 2026
Reopened 6 February 2026
- Where
- Lock 44, Top Lock to Bridge 158, Changeline Bridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigational closure is required for bottom gate refurbishment and various repair works.
CRT's only update, 8 May 2025.
Lock 8, Gardam Lock - Near Melbourne
Pocklington CanalYorkshire and North East
32 days
From 8 September 2025
Reopened 10 October 2025
- Where
- Swingbridge 7 to Lock 8, Gardam Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Unfortunately, this stoppage has been extended by a week. During the dismantling of the gates, components not originally scheduled for replacement were found to be in poor condition. This extension will allow our technicians to carry out a full assessment and formalise a…
Latest of 3 CRT updates, 3 October 2025.
Lock 10, Barton Turns
Trent & Mersey CanalWest Midlands
32 days
From 3 November 2025
Reopened 5 December 2025
- Where
- Lock 10, Barton Lock
- CRT reason
- Repair
- Cause
- Worn out
- Asset
- Lock
Due to a change in methodology for these works, we're pleased to announce that this stoppage is now scheduled to finish at 4:00 PM on Friday, 5th December.
Latest of 3 CRT updates, 25 November 2025.
Lock 37, Dashwood Lock
Oxford CanalLondon and South East
32 days
From 3 November 2025
Reopened 5 December 2025
- Where
- Lock 37, Dashwood Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We're pleased to inform you that works on site have been completed ahead of schedule, and the navigation is now open. Please note: Our team is still carrying out some minor remedial work onsite, but this will not affect navigation.
Latest of 2 CRT updates, 5 December 2025.
Bosley Lock 7
Macclesfield CanalNorth West
32 days
From 10 November 2025
Reopened 12 December 2025
- Where
- Bosley Lock 1 to Bosley Lock 12
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We're pleased to inform you that works on site have been completed ahead of schedule, and the navigation will be open from 4pm today.
Latest of 4 CRT updates, 12 December 2025.
Lock 13, Stewponey Lock
Staffordshire & Worcestershire CnlWest Midlands
32 days
From 5 January 2026
Reopened 6 February 2026
- Where
- Lock 13 Stewponey Lock to Bridge 32 Stewponey Old Bridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We are pleased to confirm that works at Lock 13 have been completed and the lock is now open.
Latest of 2 CRT updates, 6 February 2026.
Stamp End Lock 1
River WithamEast Midlands
31 days
From 17 October 2025
Reopened 17 November 2025
- Where
- Lock 1, Stamp End Lock
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
Unfortunately, a delay with the supply of material needed for the work to Stamp End Lock has meant that work will not be finished on Monday 3rd November as originally planned. We will update this notice by Monday 17th November or sooner if we have more information.
Latest of 3 CRT updates, 31 October 2025.
Lock 1 to Lock 12, Bosley, Maccelesfield Canal
Macclesfield CanalNorth West
30 days
Fully shut 30 of CRT's 31 days
From 16 May 2026
Reopened 16 June 2026
- Where
- Bosley Lock 1 to Bosley Services
- CRT reason
- Boating Incident
- Cause
- Struck by boat or vehicle
- Asset
- Lock
Our contractors are now in the final stages of completing the repairs at Lock 12, Bosley, on the Macclesfield Canal. The welding is expected to be completed on the balance beam by 4:00 pm on Tuesday, 16 June, after which we hope to reopen the lock. We apologise for the continued…
Latest of 9 CRT updates, 12 June 2026.
Lock 2 Rufford Branch
Rufford Branch (L&L Canal)North West
29 days
From 9 February 2026
Reopened 10 March 2026
- Where
- Lock No.1, Rufford Branch to Lock 7, Rufford Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We're pleased to let you know that the works at Lock 2 Rufford Branch have been completed ahead of schedule, and the navigation is now open.
Latest of 2 CRT updates, 10 March 2026.
Lock 83 , Lock 19 near Wigan
Leeds & Liverpool CanalNorth West
28 days
From 19 January 2026
Reopened 16 February 2026
- Where
- Lock 83, Lock 19
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We are pleased to confirm that the works at Lock 83, Lock 19 have now been completed. Please note that the Wigan Flight remains closed due to the ongoing works at Lock 65.
Latest of 3 CRT updates, 16 February 2026.
Lock 77, Brunsden, near Kintbury
Kennet & Avon CanalWales and South West
25 days
From 12 January 2026
Reopened 6 February 2026
- Where
- Lock 77, Brunsden Lock to Lock 76, Wire Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please note the towpath will no longer be closed during these works.
Latest of 2 CRT updates, 29 June 2025.
Lock 42, Littlebrough
Rochdale CanalNorth West
25 days
From 5 January 2026
Reopened 30 January 2026
- Where
- Lock 37, West Summit to Lock 45
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigational closure is required for top and bottom gate refurbishment and various repair works.
CRT's only update, 8 May 2025.
Lock 1, Wolverhampton
Old Main LineWest Midlands
25 days
From 24 November 2025
Reopened 19 December 2025
- Where
- Lock 21, Wolverhampton to Lock 1, Top Lock, Wolverhampton
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Following the emergency works we have done this summer; there are still elements of the planned works left to undertake. During this closure we will be checking the fitting of the gate and replacing the cill, we will also be replacing the brickwork between locks 1 and 2 and…
Latest of 2 CRT updates, 29 June 2025.
Lock 5, near bridge 3, near Burscough
Rufford Branch (L&L Canal)North West
25 days
From 26 January 2026
Reopened 20 February 2026
- Where
- Lock No.1, Rufford Branch to Lock 5, German's Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We want to advise that the works at Lock 5, Burscough will remain ongoing until Friday 20 February. The team is making good progress on site; however, the activity is taking slightly longer to complete than originally anticipated. There are no additional works causing delay — we…
Latest of 2 CRT updates, 17 February 2026.
Lock 63, Sandbach malkins bank, near bridge 151
Trent & Mersey CanalNorth West
25 days
From 3 November 2025
Reopened 28 November 2025
- Where
- Lk 63, Clear Water Lock - Towpath Side to Bridge 150
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
A navigational closure is required to repair the head and tail gates of both locks.
CRT's only update, 29 June 2025.
Lock 7, Bevere Lock
River Severn NavigationWales and South West
25 days
From 22 September 2025
Reopened 17 October 2025
- Where
- Lock 7 Bevere Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Further to the notice below, please be advised that from 17th to 19th September, divers and team members will be working at Bevere Lock in preparation for the main stoppage starting on 22nd September. Navigation will remain open on the above dates but delays may occur while…
Latest of 2 CRT updates, 3 September 2025.
Iron Lock 11 in Beeston, Cheshire
Shropshire Union CanalNorth West
25 days
From 2 March 2026
Reopened 27 March 2026
- Where
- Lock 10, Wharton's Lock to Lock 12, Beeston Stone Lock
- CRT reason
- Repair
- Cause
- Worn out
- Asset
- Lock
Repairs at Beeston Lock 11 have been progressing well, and the planned works on the head gate have now been completed. However, some unexpected conditions on site are affecting the next stage of the programme. The team has been unable to achieve a full seal on one of our dams.…
Latest of 2 CRT updates, 19 March 2026.
Lock 76 Rochdale Canal
Rochdale CanalNorth West
25 days
From 30 March 2026
Reopened 24 April 2026
- Where
- Lock 54 to Lock 81 Butler Street
- CRT reason
- Repair
- Cause
- Worn out
- Asset
- Lock
Our team is now on site and has begun repairs to the lock gate at Lock 76. We expect the work to be completed by Friday, 24th April We will provide a further update on or before Friday, 24th April.
Latest of 3 CRT updates, 20 April 2026.
Watford Lock Flight
Leicester Line (Grand Union Canal)East Midlands
25 days
Fully shut 25 of CRT's 75 days
From 13 July 2026
No reopening date
Still shut
- Where
- Lock 1 to Lock 7
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Lock
Recent rainfall has not sufficiently affected reservoir levels to allow Watford Lock Flight to reopen. The flight will remain closed until levels have improved significantly. We will continue to monitor reservoir levels and update this notice when conditions change.
Latest of 5 CRT updates, 15 September 2026. 11 days without another.
Lock 1 to lock 18
Ashton CanalNorth West
25 days
From 2 August 2026
Reopened 27 August 2026
- Where
- Lock 18 to Lock 1
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation remains closed between Lock 1 and Lock 18 on the Ashton Canal due to a head gate failure at Lock 18. Our team has now taken delivery of the brace for the head gate and has received the necessary permissions from the council. We anticipate that the team will be on site…
Latest of 5 CRT updates, 25 August 2026.
Lock 7, Railway Lock
Caldon CanalWest Midlands
24 days
From 29 September 2025
Reopened 23 October 2025
- Where
- Lock 7 Railway Lock
- CRT reason
- Maintenance
- Cause
- Broke, cause not given
- Asset
- Lock
As part of the ongoing National Grouting Programme, lock grouting works are scheduled to take place at Lock 7, Railway Lock from Monday 29th September to Thursday 23rd October. These works will involve the injection of grout from the towpath side of the lock chamber wall to a…
CRT's only update, 9 September 2025.
Lock 5, City Road Lock
Regent's CanalLondon and South East
23 days
From 3 November 2025
Reopened 26 November 2025
- Where
- Islington Tunnel to Lock 5, City Road Lock
- CRT reason
- Maintenance
- Cause
- Worn out
- Asset
- Lock
Unfortunately, this stoppage has been further delayed due to challenges encountered when fitting the balance beams and paddle gearing to the new gates. The stoppage will now finish at 4:00 pm on 26 November. We apologise for any inconvenience caused.
Latest of 5 CRT updates, 25 November 2025.
Lock 2, Hack Green
Shropshire Union CanalNorth West
22 days
From 9 February 2026
Reopened 3 March 2026
- Where
- Lock 2, Hack Green Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Following our previous update, we would like to provide further information regarding the repairs at Lock 2, Hack Green. Our original team scheduled to undertake the balance beam replacement has been delayed while completing other emergency repair works elsewhere in the North…
Latest of 3 CRT updates, 19 February 2026.
Lock 9, Mile end Regents Canal
Regent's CanalLondon and South East
22 days
From 24 July 2026
Reopened 15 August 2026
- Where
- Lock 9, Mile End Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please be advised all repair works are complete at Mile End Lock, and the area is being cleared. The lock will reopen at 9am tomorrow morning.
Latest of 5 CRT updates, 14 August 2026.
Lock 65 to Lock 85, Wigan Flight
Leeds & Liverpool CanalNorth West
22 days
From 20 August 2026
Reopened 11 September 2026
- Where
- Lock 85, Lock 21 to Lock 65, Top Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation remains closed between Lock 65 and Lock 85 on the Wigan Flight of the Leeds & Liverpool Canal. Our team are looking to start the repairs to the detached head cill at Lock 69 week commencing Monday 7 September. Repairs are expected to take one week. A further update…
Latest of 3 CRT updates, 1 September 2026.
Lock 4
Glasson Branch (Lancaster Canal)North West
22 days
From 4 September 2026
No reopening date
Still shut
- Where
- Lock No.4
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Since our last update, our team has attended the site at Lock 4 on the Glasson Branch and identified a suitable method of repair. Our team is now awaiting delivery of the materials required to repair the damaged paddle. Once these materials have been received, a date for the…
Latest of 2 CRT updates, 10 September 2026. 16 days without another.
Lock 11 West
Huddersfield Narrow CanalNorth West
21 days
From 19 September 2025
Reopened 10 October 2025
- Where
- Lock 11 West
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Our contractors have completed the grouting works at Lock 11 West ahead of schedule and plan for navigation to resume Friday 10 October from 5pm.
Latest of 2 CRT updates, 8 October 2025.
Huddersfield Narrow Canal, Lock 33E, Marsden
Huddersfield Narrow CanalYorkshire and North East
20 days
From 30 July 2025
Reopened 19 August 2025
- Where
- Lock 33 East
- CRT reason
- Inspections
- Cause
- Worn out
- Asset
- Lock
We have identified a section of wall at the foot of the lock chamber of Lock 33, which appears to be in poor condition. Engineers have been informed and are attending to inspect the wall today. The lock will be chained off whilst the inspection is taking place.
CRT's only update, 30 July 2025.
Old Ford Lock, Lock 8, Regents Canal, RE-012-003
Regent's CanalLondon and South East
20 days
From 20 September 2025
Reopened 10 October 2025
- Where
- Lock 8, Old Ford Lock
- CRT reason
- Boating Incident
- Cause
- Struck by boat or vehicle
- Asset
- Lock
Our team are still undertaking repairs. We will update as soon as possible.
Latest of 5 CRT updates, 10 October 2025.
Lock 1 to Lock 16 Marple Flight
Peak Forest CanalNorth West
20 days
From 9 June 2026
Reopened 29 June 2026
- Where
- Lock 1 to Lock 16
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We have now established a method of repair for the damaged balance beam at Lock 10 on the Peak Forest Canal. The team will be on site from 8:00 am on Monday 29 June to carry out the replacement of the balance beam. We currently anticipate that the works will be completed on the…
Latest of 5 CRT updates, 23 June 2026.
Cossington Lock 48
River SoarEast Midlands
19 days
From 7 September 2026
Due to reopen 23 October 2026
Still shut
- Where
- Lock 48 - Cossington Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We're carrying out essential improvements at Cossington Lock 48, including the replacement of the top and bottom lock gates. To complete this work safely, a stoppage will be in place from 7th September to 23rd October 2026. Previous stoppages on the River Soar have been…
CRT's only update, 30 March 2026. 180 days without another.
Lock 3 Factory, Tipton
New MainlineWest Midlands
18 days
From 3 November 2025
Reopened 21 November 2025
- Where
- Lock 3, Factory Locks, Tipton
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for top side lock gate replacement.
CRT's only update, 7 May 2025.
Lock 9 Aston
Birmingham & Fazeley CanalWest Midlands
18 days
From 23 February 2026
Reopened 13 March 2026
- Where
- Lock 1, Aston Top Lock to Aston Lock 11
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for top side lock gate replacements. We will also be replacing some lock chamber brickwork.
CRT's only update, 7 May 2025.
Lock 8, Curdworth
Birmingham & Fazeley CanalWest Midlands
18 days
From 5 January 2026
Reopened 23 January 2026
- Where
- Lock 1, Curdworth Top Lock to Lock 11, Curdworth
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for top side lock gate replacements. We will also be doing forebay sandstone repairs and trash screen repairs.
CRT's only update, 7 May 2025.
Lock 80
Grand Union CanalLondon and South East
18 days
From 23 February 2026
Reopened 13 March 2026
- Where
- Lock 80, Lot Mead
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please note the towpath is now open for the duration of these works.
Latest of 2 CRT updates, 29 June 2025.
Lock 48, Barrowford
Leeds & Liverpool CanalNorth West
18 days
From 23 February 2026
Reopened 13 March 2026
- Where
- Lock 51, Bottom Lock to Lock 45, Top Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
This navigational closure will encompass 2 pieces of work, the navigation will be closed from Lock 45 through to lock 51. We will be refurbishing the top gates and paddles of locks 46 and 48, we will also be doing some repointing too.
CRT's only update, 8 May 2025.
Lock 1 Aston, West Felton
Montgomery CanalWest Midlands
18 days
From 3 November 2025
Reopened 21 November 2025
- Where
- Lock 1, Aston Locks
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigational closure is required for lock gate replacement.
CRT's only update, 8 May 2025.
Lock 13, Stourbridge
Stourbridge CanalWest Midlands
18 days
From 23 February 2026
Reopened 13 March 2026
- Where
- Lock 16, Stourbridge Bottom Lock to Lock 1, Stourbridge Top Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for top gate replacement and lock ladder repair.
CRT's only update, 8 May 2025.
Lock 46
Leeds & Liverpool CanalNorth West
18 days
From 2 February 2026
Reopened 20 February 2026
- Where
- Lock 51, Bottom Lock to Lock 45, Top Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
This navigational closure will encompass 2 pieces of work, the navigation will be closed from Lock 45 through to lock 51. We will be refurbishing the top gates and paddles of locks 46 and 48, we will also be doing some repointing too.
CRT's only update, 8 May 2025.
Lock 7, Actons
Regent's CanalLondon and South East
18 days
From 1 December 2025
Reopened 19 December 2025
- Where
- Lock 7, Actons Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please be advised that, due to delays at City Road Lock, this stoppage will now commence on Monday, 1st December. This later start will provide time for travel through the area and onward to winter moorings over the coming weekend.
Latest of 5 CRT updates, 27 November 2025.
Lock 1, Rufford branch
Rufford Branch (L&L Canal)North West
18 days
From 18 August 2025
Reopened 5 September 2025
- Where
- Lock 1, Top Lock Swing Bridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We are pleased to advise the works to replace the paddles at Lock 1 on the Rufford Branch are now complete. Our contractors will be on site tomorrow to remove the dams and navigation is anticipated to resume tomorrow, Friday 5 September by 4pm.
Latest of 4 CRT updates, 4 September 2025.
Lock 4, Bosley
Macclesfield CanalNorth West
18 days
From 13 October 2025
Reopened 31 October 2025
- Where
- Bosley Lock 1 to Bosley Lock 12
- CRT reason
- Repair
- Cause
- Struck by boat or vehicle
- Asset
- Lock
We're pleased to confirm that works at Bosley Lock 4 are now nearing completion. The navigation will reopen from 10am on Friday 31st October.
Latest of 2 CRT updates, 30 October 2025.
Lock 10e, Milnsbridge
Huddersfield Narrow CanalYorkshire and North East
18 days
From 1 December 2025
Reopened 19 December 2025
- Where
- Lock 9 East, Isis Lock to Lock 11 East, Library Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please note: A clearly signposted diversion route will be available for towpath users throughout the closure period of this stoppage.
Latest of 2 CRT updates, 10 November 2025.
Lock 1, New Marton, above Welsh Frankton
Llangollen CanalWest Midlands
18 days
From 9 February 2026
Reopened 27 February 2026
- Where
- Lock 1, New Marton Locks
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We need to introduce an emergency stoppage at Lock 1, New Marton, above Welsh Frankton, on the Llangollen Canal to allow essential repair works to be carried out. The bottom gate has developed a serious water leak, which is preventing the lock from filling correctly. Repairs are…
CRT's only update, 27 January 2026.
Foxton Lock Flight
Leicester Line (Grand Union Canal)East Midlands
17 days
From 22 December 2025
Reopened 8 January 2026
- Where
- Lock 8 to Lock 17
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Unfortunately, today's attempt to repair the red paddle at Lock 17 was not successful. The team was unable to reattach the paddle due to high water levels, which will require additional stop planks and pumping to lower. This work will need specialist support and cannot be…
Latest of 3 CRT updates, 2 January 2026.
Lock 56
Rochdale CanalNorth West
17 days
From 9 September 2026
No reopening date
Still shut
- Where
- Lock 56
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Since our last update repairs to the paddle mechanism at Lock 56 have been delayed whilst the necessary safety assessments are carried out. We anticipate repairs to start on Monday 21 September A further update will be provided on or before Tuesday 22 September.
Latest of 4 CRT updates, 18 September 2026. 8 days without another.
Lock 13, Itchington Bottom Lock
Grand Union CanalWest Midlands
16 days
From 25 June 2025
Reopened 11 July 2025
- Where
- Lock 13, Itchington Bottom Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Further to our previous update, please be advised that our team will be commencing work on site tomorrow (Thursday 10th July). We are aiming to complete the necessary works and reopen navigation by Friday 11th July. We will provide a further update on Friday to confirm progress…
Latest of 3 CRT updates, 9 July 2025.
Lock 5 (Kelston Lock), Kennet and Avon canal
Kennet & Avon CanalWales and South West
16 days
Fully shut 16 of CRT's 16 days
From 25 August 2025
Reopened 10 September 2025
- Where
- Lock 5, Kelston Lock
- CRT reason
- Boating Incident
- Cause
- Other cause
- Asset
- Lock
Please be advised that further to the notice below, following our engineer's assessment, Lock 5 (Kelston lock) will remain closed for public use until further notice. We will however be operating an assisted passage to our customers over the coming weeks. Our operational staff…
Latest of 5 CRT updates, 8 September 2025.
Lock 59 To Lock 64
Leeds & Liverpool CanalNorth West
16 days
From 11 May 2026
Reopened 27 May 2026
- Where
- Lock 64, Bottom Lock to Lock 59, Lock 2
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Due to other priority works our reactive team where delayed carrying out the repairs to Lock 60 on the Leeds & Liverpool Canal. The reactive team are currently now on site repairing the damaged tail gate cill. As a result navigation remains closed between Lock 59 and Lock 64…
Latest of 2 CRT updates, 20 May 2026.
Lock 52 Heathy Lock.
Kennet & Avon CanalWales and South West
15 days
From 30 December 2025
Reopened 14 January 2026
- Where
- Lock 52, Heathy Close Lock
- CRT reason
- Repair
- Cause
- Worn out
- Asset
- Lock
Please be advised that repairs to the lock beam will take place as soon as we can safely mobilize to site. We anticipate this being towards the end of this week, or start of the following week once access via work boat is possible. We apologies for any inconvenience caused and…
Latest of 2 CRT updates, 5 January 2026.
Lock 5, Rufford Branch, German's Lock
Rufford Branch (L&L Canal)North West
14 days
From 21 November 2025
Reopened 5 December 2025
- Where
- Lock 5, German's Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please be aware: Following a further review of this stoppage, the navigation will remain closed for the entire duration to ensure all necessary work is completed within the stoppage window. It will not be open over the weekend as previously advertised. We apologise for any…
Latest of 3 CRT updates, 21 November 2025.
Lock 26, Aston Lock
Trent & Mersey CanalWest Midlands
14 days
From 14 January 2026
Reopened 28 January 2026
- Where
- Lock 28, Yard Lock to Lock 26, Aston Lock
- CRT reason
- Repair
- Cause
- Worn out
- Asset
- Lock
We are sorry to announce the addition of these works to our winter works programme, which will allow us to carry out essential repairs to the gates and lock chamber at Lock 26. We are undertaking this now because the condition of the gates has continued to deteriorate, and…
CRT's only update, 19 December 2025.
Marsh Lane Lock 27
Kennet & Avon CanalWales and South West
14 days
From 16 February 2026
Reopened 2 March 2026
- Where
- Lock 44, Sir Hugh Stockwell to Lock 26, Devizes Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We're pleased to let you know that the works at Marsh Lane Lock 27 have been completed ahead of schedule, and the navigation is now open.
Latest of 3 CRT updates, 2 March 2026.
Between Lock 1 and Lock 18
Ashton CanalNorth West
14 days
From 16 April 2026
Reopened 30 April 2026
- Where
- Lock 18 to Lock 1
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation remains closed between Locks 1 and 18 on the Ashton Canal due to the cill on the tail gates at Lock 10 becoming dislodged. Repairs were initially scheduled to take place, but have been delayed while the team sourced the necessary water pumps to carry out the work. A…
Latest of 4 CRT updates, 29 April 2026.
Lock 26w
Huddersfield Narrow CanalNorth West
14 days
From 1 May 2026
Reopened 15 May 2026
- Where
- Lock 26 West
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation remains closed due to a damaged cill at Lock 26W on the Huddersfield Narrow Canal. This damage is preventing the lock from sealing, resulting in the lock being filled and operated safely. The local team have experienced delays in sourcing the necessary parts to carry…
Latest of 2 CRT updates, 5 May 2026.
Tuel Lane lock passage closed from 29th May 17:00hrs. Reopening from Friday 12th June.
Rochdale CanalYorkshire and North East
14 days
From 29 May 2026
Reopened 12 June 2026
- Where
- Lock 1 to Lock 3/4
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
I am sorry the previous message stated you need to book passage through Tuel. This is no longer the case. We will reopen the lock on Friday 12 June and passage will be available following this pattern: Mondays and Fridays 0800-1600 no prior booking required Sundays 1000-1500 no…
Latest of 5 CRT updates, 10 June 2026.
Lock 7 west Huddersfield Narrow Canal
Huddersfield Narrow CanalNorth West
13 days
From 20 June 2026
Reopened 3 July 2026
- Where
- Lock 7 West
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Due to a failed paddle, the lock is not operational at this time. An update will be provided by16:00 on Monday afternoon.
CRT's only update, 20 June 2026.
Lock 19 Marsh Lock
Staffordshire & Worcestershire CnlWest Midlands
13 days
From 9 July 2026
Reopened 22 July 2026
- Where
- Lock 18 Swindon Lock to Lock 20 Botterham Bottom Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
A replacement brace is required and is currently being manufactured. Once available, our team will install the brace and complete the necessary repairs. We currently expect works to be completed and navigation to reopen by Thursday 23 July 2026. We apologise for the…
Latest of 2 CRT updates, 13 July 2026.
Lock 45
Rochdale CanalNorth West
13 days
From 28 July 2026
Reopened 10 August 2026
- Where
- Lock 45
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation remains closed at Lock 45 on the Rochdale Canal due to a damaged paddle, which is preventing the lock from filling. We are currently awaiting the availability of the necessary resources before the repair works can begin. Once these are in place, our team will arrange…
Latest of 3 CRT updates, 5 August 2026.
Lock 44, Greenberfield, near Bridge 157
Leeds & Liverpool CanalNorth West
12 days
From 8 January 2026
Reopened 20 January 2026
- Where
- Lock 44, Top Lock to Lock 43, Middle Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigational closure is required to replace the ground paddle on the off side of the lock.
CRT's only update, 29 June 2025.
Lock 47, Dudswell lock
Grand Union CanalLondon and South East
11 days
From 12 January 2026
Reopened 23 January 2026
- Where
- Lock 47, Dudswell Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please note the towpath will no longer be closed during these works.
Latest of 2 CRT updates, 29 June 2025.
Lock 69, Nash Mills
Grand Union CanalLondon and South East
11 days
From 2 February 2026
Reopened 13 February 2026
- Where
- Lock 69, Nash Mills
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
The works at Lock 68 have been deferred to a later date. However, the works at Lock 69 will proceed as planned, with revised dates.
Latest of 3 CRT updates, 7 August 2025.
Lock 14, Fradley
Trent & Mersey CanalWest Midlands
11 days
From 8 December 2025
Reopened 19 December 2025
- Where
- Lock 14, Common Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for top end gate replacement as well as cill and anchor plate repairs.
CRT's only update, 8 May 2025.
Navigation Closure - Lee Navigation, Lock 1a, Carpenter's Road Lock
Old River LeaLondon and South East
11 days
From 16 May 2025
Reopened 27 May 2025
- Where
- Lock 1a, Carpenter's Road Lock
- CRT reason
- Information
- Cause
- Broke, cause not given
- Asset
- Lock
Carpenters Road Lock is currently due to a technical fault. Engineers are aware and will repair the fault as soon as possible.
CRT's only update, 16 May 2025.
Lapworth Lock 9
North Stratford CanalWest Midlands
11 days
From 8 December 2025
Reopened 19 December 2025
- Where
- Lock 9
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Our reactive response team attended site today to identify the issue and develop a repair plan. The team will return on Thursday and Friday to carry out the necessary works, with the aim of reopening navigation on Monday afternoon.
Latest of 5 CRT updates, 17 December 2025.
Navigation Closure - Lee Navigation, Ware Lock, Ware
Lee NavigationLondon and South East
11 days
From 9 January 2026
Reopened 20 January 2026
- Where
- Lock 2, Ware Lock
- CRT reason
- Inspections
- Cause
- Broke, cause not given
- Asset
- Lock
Please be advised that due to unexpected maintenance work, the decision has been made to close Ware lock with immediate effect to complete necessary repairs. There will also be no pedestrian access while the works are carried out.
Latest of 2 CRT updates, 9 January 2026.
Lock 46 - Littleborough
Rochdale CanalNorth West
11 days
From 9 March 2026
Reopened 20 March 2026
- Where
- Lock 46
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Essential paddle works are required at Lock 46, and to complete this safely and effectively, a full navigation closure will be in place for the duration of the works. This stoppage is necessary to ensure the continued reliability and safe operation of the lock. We recognise the…
CRT's only update, 27 February 2026.
Navigation Closure Request, Huddersfield Narrow Canal, Lock 34E - Snapped Paddle - Repaired, now open
Huddersfield Narrow CanalYorkshire and North East
11 days
From 30 March 2026
Reopened 10 April 2026
CRT's title says reopened
- Where
- Lock 34 East
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The repairs have all been completed and the Stoppage is removed. Boaters due to be moving down the Marsden Flight are being contacted by the team to coordinate the passage through from Lock 42 East to Lock 32 East. Please be aware that the Stoppage at Lock 24 East is still on…
Latest of 4 CRT updates, 10 April 2026.
Lock 2, Stourbridge
Stourbridge CanalWest Midlands
10 days
From 16 February 2026
Reopened 26 February 2026
- Where
- Lock 2, Stourbridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We're pleased to let you know that the works at Stourbridge Lock 2 have been completed ahead of schedule, and the navigation is now open.
Latest of 2 CRT updates, 26 February 2026.
Lock 29W
Huddersfield Narrow CanalNorth West
10 days
From 5 May 2026
Reopened 15 May 2026
- Where
- Lock 32 West to Lock 24 West
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation is currently closed at Lock 29W on the Huddersfield Narrow Canal, due to a damaged cill which is preventing the lock being operated safely. Our specialist team are planning to attend site to carry out the emergency repairs. An update will be provided on or before…
CRT's only update, 5 May 2026.
Ryders Green Lock Flight
Walsall CanalWest Midlands
10 days
Fully shut 10 of CRT's 61 days
From 20 July 2026
Reopened 19 September 2026
- Where
- Lock 1, Ryders Green Top Lock to Lock 8, Ryders Green Bottom Lock
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Lock
Following recent rainfall and an improvement in water levels, we are pleased to advise that the closure at Ryders Green is expected to be lifted and navigation restored by tomorrow. (Saturday 19 September) We would like to thank customers for their patience and understanding…
Latest of 8 CRT updates, 18 September 2026.
Lock 28 W, Huddersfield Narrow Canal
Huddersfield Narrow CanalNorth West
9 days
From 7 May 2025
Reopened 16 May 2025
- Where
- Lock 28 West
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We are pleased to advise navigation is back open at Lock 28W on the Huddersfield Narrow Canal following a successful repair.
Latest of 2 CRT updates, 16 May 2025.
Lock 2 , Rufford Branch , Burscough
Rufford Branch (L&L Canal)North West
9 days
Fully shut 9 of CRT's 11 days
From 10 November 2025
Reopened 21 November 2025
- Where
- Lock 2, 2Nd Lock Rufford Branch
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Unfortunately, this stoppage has been extended until 21st November due to additional work identified on site. This change will affect the stoppage dates for the grouting work at Lock 5, Rufford Branch, which will now run from 21st November to 5th December.
Latest of 2 CRT updates, 18 November 2025.
RE-004-017 - Lock 1A, Hampstead Road Lock RE-004-021 - Lock 2, Hawley Lock RE-004-024 - Lock 3, Kentish Town Lock
Regent's CanalLondon and South East
8 days
Fully shut 8 of CRT's 9 days
From 13 May 2025
Reopened 22 May 2025
- Where
- Lock 1A, Hampstead Road Lock to Lock 3, Kentish Town Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We are delighted to report that the Camden locks are now open. The Hampstead Road lock currently available for operational use is Lock 1b.
Latest of 6 CRT updates, 22 May 2025.
Wolverhampton Lock Flight, Old Main Line
Old Main LineWest Midlands
8 days
From 5 June 2025
Reopened 13 June 2025
- Where
- Lock 21, Wolverhampton to Lock 1, Top Lock, Wolverhampton
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We've received an update from the team. A new gate is required to complete the necessary repairs. This gate will be ready for collection from our Bradley workshop on Tuesday. We plan to transport the gate using a tug and hopper, with installation scheduled for Wednesday…
Latest of 2 CRT updates, 5 June 2025.
Deep Lock Bath
Kennet & Avon CanalWales and South West
8 days
From 12 September 2025
Reopened 20 September 2025
- Where
- Lock 8/9, Bath Deep Lock
- CRT reason
- Boating Incident
- Cause
- Other cause
- Asset
- Lock
Further to the notice below, please be advised that the boat which unfortunately capsized at Deep Lock 8/9 Bath, will be re-floated by Friday 19th September. We will update this notice again should the removal take place before Friday. You are welcome to contact us at…
Latest of 2 CRT updates, 15 September 2025.
Lock 88, Oxford Street
Rochdale CanalNorth West
8 days
From 12 January 2026
Reopened 20 January 2026
- Where
- Lock 88 Oxford St
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We are pleased to confirm that the works at Lock 88 have been completed and the navigation is now open.
Latest of 2 CRT updates, 20 January 2026.
Lock 81, Butler Street To Lock 83, Brownsfield
Rochdale CanalNorth West
8 days
From 5 March 2026
Reopened 13 March 2026
- Where
- Lock 81 Butler Street to Lock 83 Brownsfield
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation remains closed between Lock 81 and Lock 83 on the Rochdale Canal due to a loose cill at Lock 82. Our local team attended site today to carry out an investigation and are now developing a repair plan for the cill. A further update will be provided on or before Friday…
Latest of 2 CRT updates, 9 March 2026.
Between Lock 65 and Lock 85
Leeds & Liverpool CanalNorth West
8 days
From 14 April 2026
Reopened 22 April 2026
- Where
- Lock 85, Lock 21 to Lock 65, Top Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation remains closed between Lock 65 and Lock 85 on the Leeds and Liverpool Canal due to a disconnected paddle at lock 70. The team have a successfully planned a method of repair and are currently waiting on parts to be manufactured. A further update will be provided on or…
Latest of 3 CRT updates, 17 April 2026.
River Severn Navigation- Diglis Large Lock 6
River Severn NavigationWales and South West
8 days
From 27 May 2026
Reopened 4 June 2026
- Where
- Lock 6 Diglis (Large)
- CRT reason
- Information
- Cause
- Broke, cause not given
- Asset
- Lock
Further to the notice below, we are pleased to confirm the works at Diglis Lock 6 have now been completed and the navigation is now open. You are welcome to contact us at enquiries.walessouthwest@canalrivertrust.org.uk or 03030 404040 if you would like to discuss this…
Latest of 3 CRT updates, 4 June 2026.
Upper Lode Lock.
River Severn NavigationWales and South West
8 days
From 13 August 2026
Reopened 21 August 2026
- Where
- Upper Lode Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Further to the notice below, we are pleased to advise that Upper Lode Lock has been repaired and is now fully operational. Thank you for your patience.
Latest of 3 CRT updates, 21 August 2026.
Navigation Closure - Lee Navigation, Lock 10, Waltham Common Lock and Lock 9, Cheshunt Lock, Cheshunt
Lee NavigationLondon and South East
7 days
From 20 August 2025
Reopened 27 August 2025
- Where
- Lock 10, Waltham Common Lock to Lock 9, Cheshunt Lock
- CRT reason
- Inspections
- Cause
- Cause not stated
- Asset
- Lock
Unfortunately we've had to move this closure ahead of schedule based upon new data from the Environment Agency. We will closing all navigation between Lock 10 and Lock 9 from the 20th of August at 15:30pm and reopening at 27th of August at 09:00am. We will be reviewing this…
Latest of 2 CRT updates, 19 August 2025.
Lock 103, Burghfield Lock
Kennet & Avon CanalWales and South West
7 days
Fully shut 7 of CRT's 9 days
From 15 October 2025
Reopened 24 October 2025
- Where
- Lock 103, Burghfield Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
A navigation closure is required to carry out essential repairs to the bottom lock gates, which were recently damaged. A temporary fix was implemented at the time to extend operation through the summer, but this stoppage will allow us to complete a more permanent and robust…
CRT's only update, 18 September 2025.
Lock 6 - Castle Lock
Nottingham & Beeston CanalEast Midlands
7 days
From 16 February 2026
Reopened 23 February 2026
- Where
- Lock 6 - Castle Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We're pleased to let you know that the works at Castle Lock 6 have been completed ahead of schedule, and the navigation is now open.
Latest of 2 CRT updates, 23 February 2026.
Tinsley Lock Flight
Sheffield & Tinsley CanalYorkshire and North East
7 days
From 24 March 2026
Reopened 31 March 2026
- Where
- Lock 1 Tinsley to Tinsley No.12 Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The Tinsley flight will be closed to boaters as a dive time will be supporting sluice repairs on Tinsley No.3 Lock. This notice will be updated when the navigation closure is lifted.
CRT's only update, 18 March 2026.
Oxclose Lock - Reopened
Ripon CanalYorkshire and North East
7 days
From 20 March 2026
Reopened 27 March 2026
CRT's title says reopened
- Where
- Lock 3, Oxclose Lock
- CRT reason
- Pollution Incident
- Cause
- Pollution
- Asset
- Lock
The booms have been removed and a reed clearance and pollution clean up from the spill has been carried out by Third Party Contractors. Oxclose Lock is now open for passage.
Latest of 3 CRT updates, 27 March 2026.
Navigation Closure - Grand Union Canal, Lock 84 Copper Mill Lock, Harefield
Grand Union CanalLondon and South East
7 days
From 17 April 2026
Reopened 24 April 2026
- Where
- Lock 84, Copper Mill Lock
- CRT reason
- Suspected Vandalism
- Cause
- Vandalism
- Asset
- Lock
The ground paddle has been repaired and the gates have been lined. The gates still leak below the water, increasing the time it takes for the lock to fill. Operatives will return in the morning to complete the repair. Once we have a further update we will update this notice…
Latest of 4 CRT updates, 23 April 2026.
Kibworth Top Lock 18 to Cranes Lock 22
Leicester Line (Grand Union Canal)East Midlands
7 days
From 22 May 2026
Reopened 29 May 2026
- Where
- Lock 18 - Kibworth Top Lock to Lock 22 - Cranes Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The towpath side bottom gate at Kibworth Top Lock 18 has come away from the headpost causing the gate and beam to fail. This repair will need assessing by our Engineers and a repair is being planned for as soon as possible. We will update this notice with further information…
CRT's only update, 22 May 2026.
Lock 23E, Huddersfield Narrow Canal - Repaired and reopened
Huddersfield Narrow CanalYorkshire and North East
7 days
From 22 May 2026
Reopened 29 May 2026
CRT's title says reopened
- Where
- Lock 23 East
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The dive team have attended this morning and have repaired the paddle. The lock is now operational for boaters to use.
Latest of 4 CRT updates, 29 May 2026.
Tinsley No.3 Lock to Holmes Lock
Sheffield & Tinsley Canal, Sheffield & South Yorkshire NavYorkshire and North East
7 days
From 14 September 2026
Restriction from 21 September 2026
Now a restriction: boats can pass, with limits
- Where
- Tinsley No.3 Lock to Tinsley No.12 Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Passage through the Tinsley Flight on Thursday the 24th of September is now fully booked. We are now also offering passage on Monday the 28th of September and Thursday the 1st of October. Advanced booking is required for these days. Booking requests should be made through…
Latest of 3 CRT updates, 22 September 2026.
Between Greens Lock 68 and Trent Lock 60 - Erewash Canal
Erewash CanalEast Midlands
6 days
From 6 May 2025
Reopened 12 May 2025
- Where
- Lock 68 - Greens Lock to Lock 60 - Trent Lock
- CRT reason
- Low Water Levels
- Cause
- Broke, cause not given
- Asset
- Lock
Water levels downstream of the Erewash Canal along the Trent lock pound have not recovered and are at a lower level. The navigation closure is extended between Green Lock 68 and Trent Lock 60. We are working to restore waters as quickly as possible and will update this notice by…
Latest of 4 CRT updates, 11 May 2025.
City Road Lock closure
Regent's CanalLondon and South East
6 days
Fully shut 6 of CRT's 11 days
From 25 April 2025
Reopened 6 May 2025
none of them since this archive began on 1 May 2025
- Where
- Lock 5, City Road Lock
- CRT reason
- Suspected Vandalism
- Cause
- Cause not stated
- Asset
- Lock
We are pleased to announce that we have now got everything in place to be able to offer assisted passage through City Road Lock for single narrow craft only. The days/times are as follows: Thursday 1st May 2025 1030 1400 Friday 2nd May 2025 1030 1400 Saturday 3rd May 2025 1030…
CRT's only update, 6 May 2025.
Lock 2, Rufford Branch
Rufford Branch (L&L Canal)North West
6 days
From 4 June 2025
Reopened 10 June 2025
- Where
- Lock 2, 2Nd Lock Rufford Branch
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation remains closed at Lock 2 on the Rufford Branch of the Leeds & Liverpool Canal due to a blockage in the paddle mechanism. Works are scheduled to begin on Tuesday, when we hope to reopen navigation using one paddle by installing a temporary plate in the paddle chamber.…
Latest of 2 CRT updates, 6 June 2025.
Lock 5 of the Watford Flight - Leicester Line (Grand Union Canal)
Leicester Line (Grand Union Canal)East Midlands
6 days
From 5 June 2025
Reopened 11 June 2025
- Where
- Lock 5
- CRT reason
- Repair
- Cause
- Struck by boat or vehicle
- Asset
- Lock
Multiple Teams from across the Trust have been on site this morning to assess and attempt to repair the damage. Unfortunately, their attempts have been unsuccessful and the Lock remains inoperable. Specialist equipment is required to lift the gate so that some further work can…
Latest of 2 CRT updates, 6 June 2025.
Aston Lock 10
Birmingham & Fazeley CanalWest Midlands
6 days
From 2 July 2025
Reopened 8 July 2025
- Where
- Aston Lock 10
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please be advised our reactive response team is now scheduled to attend tomorrow (Tuesday 8th July) to assess the situation and develop a suitable repair plan for the failed lock beam at Lock 10 on the Aston Flight. In the meantime, navigation remains possible via the…
Latest of 3 CRT updates, 7 July 2025.
Lock 40, Summit Lock
Trent & Mersey CanalWest Midlands
6 days
From 26 August 2025
Reopened 1 September 2025
- Where
- Lock 40 Summit Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We will be carrying out essential repairs to re-fix the loose metal bumper at Lock 40 on Monday 1st September. The site will be set up in the morning, including fencing off the area, dewatering the lock, and installing lifting equipment. Once this is complete, the repair works…
Latest of 2 CRT updates, 28 August 2025.
Lock 15 to Lock 18
Ashton CanalNorth West
6 days
From 2 October 2025
Reopened 8 October 2025
- Where
- Bridge 18, Ashton Hill Lane Road Bridge to Lock 15
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The faulty head paddle at Lock 17 has now been repaired. Navigation through lock 1 to 18 is also temporarily closed due to repairs at Lock 18. You can find more details and updates here.
Latest of 2 CRT updates, 8 October 2025.
Walsall Lock Flight
Walsall CanalWest Midlands
6 days
From 20 February 2026
Reopened 26 February 2026
- Where
- Lock 1, Walsall Top Lock to Lock 3, Walsall
- CRT reason
- Suspected Vandalism
- Cause
- Vandalism
- Asset
- Lock
The lock flight will remain closed until the team have dewatered it and removed the rubble. We will provide a further update on Thursday.
Latest of 2 CRT updates, 24 February 2026.
Lock 3W
Huddersfield Narrow CanalNorth West
6 days
From 12 March 2026
Reopened 18 March 2026
- Where
- Lock 3 West
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Our local team is currently planning the necessary repair works at Lock 3W on the Huddersfield Narrow Canal. These works are expected to be completed by Friday, 20 March. We will provide a further update on Friday, 20 March, or sooner if the situation changes.
Latest of 3 CRT updates, 16 March 2026.
Navigation Closure - Regent's Canal, Lock 8 Old Ford, Bow
Regent's CanalLondon and South East
6 days
From 12 May 2026
Reopened 18 May 2026
- Where
- Lock 8, Old Ford Lock
- CRT reason
- Repair
- Cause
- Struck by boat or vehicle
- Asset
- Lock
A stoppage is required to replace the top gates and balance beams at LK 8 Old Ford, the existing gates had emergency holding repairs made in November 2025, after being severely damaged due to boat strike. Top stop plank installation is required to carry out the gate replacement…
CRT's only update, 13 March 2026.
Lock 6 - repaired and operational
Rochdale CanalYorkshire and North East
6 days
From 13 June 2026
Reopened 19 June 2026
CRT's title says reopened
- Where
- Lock 3/4 to Lock 7
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The repairs at Lock 6 have been completed and it is operational.
Latest of 3 CRT updates, 19 June 2026.
Lock 6 - Lock gates are being ashed to help water levels recover. - Reopened
Rochdale CanalYorkshire and North East
6 days
From 23 June 2026
Reopened 29 June 2026
CRT's title says reopened
- Where
- Lock 6, Brearley
- CRT reason
- Low Water Levels
- Cause
- Broke, cause not given
- Asset
- Lock
Lock 6 is now open as the water levels have recovered over the weekend.
Latest of 4 CRT updates, 29 June 2026.
Lock 1 Top Lock - Lock 9 Rushall
Rushall CanalWest Midlands
6 days
From 25 June 2026
Reopened 1 July 2026
- Where
- Lock 1, Top Lock Rushall to Lock 9, Rushall
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Following attendance on site, it has been identified that stop planks are required to facilitate the repair. Once the stop planks are in place, we will be able to access the area safely and commence the necessary repair works to refit the paddle. We apologise for the continued…
Latest of 2 CRT updates, 26 June 2026.
Lock 45 Rochdale canal
Rochdale CanalNorth West
6 days
From 18 July 2026
Reopened 24 July 2026
- Where
- Lock 34 to Lock 45
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Due to a failed paddle on lock 45, its not possible to operate the lock for boat passage. Works are currently being plan for repairs. Further update will be provided on monday afternoon
CRT's only update, 18 July 2026.
Carpenters Road Lock LO-001-002 Old River Lea
Old River LeaLondon and South East
5 days
From 30 May 2025
Reopened 4 June 2025
- Where
- Lock 1a, Carpenter's Road Lock
- CRT reason
- Maintenance
- Cause
- Broke, cause not given
- Asset
- Lock
Due to an equipment failure at Carpenters Road Lock it is anticipated that the lock will be out of service until at least Friday 6 June 2025.
CRT's only update, 30 May 2025.
Navigation Closure - Lee Navigation, Parndon Mill Lock, Parndon
River StortLondon and South East
5 days
From 16 July 2025
Reopened 21 July 2025
- Where
- Lock 11, Parndon Mill Lock to Lock 10, Burnt Mill Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
After a successful repair we are delighted to reopen Parndon Mill Lock for navigation.
Latest of 3 CRT updates, 21 July 2025.
Lock 57
Rochdale CanalNorth West
5 days
From 3 January 2026
Reopened 8 January 2026
- Where
- Lock 57
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation remains closed at lock 57 on the Rochdale Canal due to a paddle failure. The local team have attended site and are continuing to investigate a solution for a repair. A further update will be provided Tuesday 13 January 2026.
Latest of 3 CRT updates, 6 January 2026.
Lock 12 – Pulteney Gardens Lock.
Kennet & Avon CanalWales and South West
5 days
From 12 March 2026
Reopened 17 March 2026
- Where
- Lock 12, Pulteney Gardens Lock
- CRT reason
- Information
- Cause
- Broke, cause not given
- Asset
- Lock
Please be advised that Lock 12, Pulteney Gardens Lock is currently closed due to an issue with the gate. Our colleagues are scheduled to attend site tomorrow to undertake further investigation. This notice will be updated with additional information as soon as it becomes…
CRT's only update, 12 March 2026.
Lock 5, Walsall
Walsall CanalWest Midlands
5 days
From 25 March 2026
Reopened 30 March 2026
- Where
- Lock 5, Walsall
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please be advised that the repair of the paddle at Lock 5, on the Walsall Canal, is not expected to be complete before the end of next week. We apologise for any inconvenience and will post any further updates on here.
Latest of 2 CRT updates, 26 March 2026.
Wolverhampton Lock Flight
Old Main LineWest Midlands
5 days
From 18 June 2026
Reopened 23 June 2026
- Where
- Lock 21, Wolverhampton to Lock 1, Top Lock, Wolverhampton
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We're pleased to advise that the repair will be completed by 12noon today (Tuesday 23 June) The lock flight will reopen with no restrictions.
Latest of 3 CRT updates, 23 June 2026.
Lock 5, Edward Kilner Lock - Sinkhole has opened up - repairs are needed. - open
Rochdale CanalYorkshire and North East
5 days
From 24 June 2026
Reopened 29 June 2026
- Where
- Lock 5, Edward Kilner
- CRT reason
- Repair
- Cause
- Ground moved
- Asset
- Lock
The repairs have been carried out and Lock 5 is now open as the water levels have recovered sufficiently over the weekend.
Latest of 4 CRT updates, 29 June 2026.
Watford Lock Flight
Leicester Line (Grand Union Canal)East Midlands
5 days
From 23 July 2026
Reopened 28 July 2026
- Where
- Lock 1 to Lock 7
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
There has been a delay in getting the required equipment on site to complete the repair. As soon as the equipment is available, we will start work. We will update this notice as soon as we have further information.
Latest of 2 CRT updates, 27 July 2026.
Temporary Closure Water Management - Limehouse Lock
Limehouse BasinLondon and South East
5 days
Fully shut 5 of CRT's 6 days
From 21 August 2026
Reopened 27 August 2026
- Where
- Lock 1, Limehouse Ship Lock
- CRT reason
- Low Water Levels
- Cause
- Nothing failed
- Asset
- Lock
Please be advised that Limehouse lock will reopen on Thursday 27 August. The usual booking process will apply for all passages. To support our ongoing efforts to conserve and protect water levels and manage resources, the lock will continue to operate on a reduced schedule and…
Latest of 2 CRT updates, 24 August 2026.
Stoke Bruerne Lock Flight
Grand Union CanalEast Midlands
4 days
From 26 January 2026
Reopened 30 January 2026
- Where
- Lock 14, Top Lock to Lock 20
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigational closure is required to remove invasive non native fish species.
CRT's only update, 7 May 2025.
Navigation Closure - Oxford Canal, Grants Lock; Lock 30, Bodicote
Oxford CanalLondon and South East
4 days
Fully shut 4 of CRT's 14 days
From 10 June 2025
Reopened 24 June 2025
- Where
- Lock 30, Grants Lock
- CRT reason
- Boating Incident
- Cause
- Struck by boat or vehicle
- Asset
- Lock
We are pleased to share that work on Grant's Lock has been completed ahead of schedule. The lock will reopen and be fully operational from 12:00 PM on 24th June 2025
Latest of 4 CRT updates, 24 June 2025.
Lock 45 Grand Union
Grand Union CanalLondon and South East
4 days
From 26 June 2025
Reopened 30 June 2025
- Where
- Lock 45
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Due to an issue with the paddle at lock 45, the lock has been temporarily closed whilst a repair is undertaken
CRT's only update, 26 June 2025.
Bridgwater & Taunton Canal
Bridgwater & Taunton CanalWales and South West
4 days
From 7 July 2025
Reopened 11 July 2025
- Where
- Lock 6 Higher Lock to Lock 7 Firepool
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please be advised that due to a damaged Heel post, Lock 6 (Higher Maunsel lock) will be closed until Friday 11th July. To facilitate this repair, the water level between Lock 6 (Higher Maunsel) and Lock 7 (Firepool lock) will dropped by approximately 12 inches. In the meantime…
CRT's only update, 7 July 2025.
Lock 15, Stourbridge
Stourbridge CanalWest Midlands
4 days
From 17 July 2025
Reopened 21 July 2025
- Where
- Lock 15, Stourbridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Our team will be carrying out further works to the cill over the weekend. Subject to satisfactory concrete curing times, we are aiming to reopen the navigation on Monday or Tuesday. We will provide a further update as soon as we are able to confirm a reopening date and time.…
Latest of 3 CRT updates, 18 July 2025.
Swarkestone Lock 5
Trent & Mersey CanalEast Midlands
4 days
From 16 October 2025
Reopened 20 October 2025
- Where
- Lock 5, Swarkestone Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Following further investigation on site, we have made the decision to fully close Swarkestone Lock. The condition of the gate means the lock is not safe to operate. We are exploring options for a repair and will update this notice when we have further informaiton.
Latest of 2 CRT updates, 16 October 2025.
Marsworth Flight Closure
Grand Union CanalLondon and South East
4 days
From 30 October 2025
Reopened 3 November 2025
- Where
- Lock 39 to Lock 45
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Following a further assessment the flight will remain closed over the weekend. Work is planned for Monday 3rd November; Please check this notice for updates.
Latest of 2 CRT updates, 31 October 2025.
Shardlow Lock 2
Trent & Mersey CanalEast Midlands
4 days
From 1 December 2025
Reopened 5 December 2025
- Where
- Lock 2, Shardlow Lock
- CRT reason
- Maintenance
- Cause
- Broke, cause not given
- Asset
- Lock
Repairs will be undertaken at Shardlow Lock 2 from Monday 1st December starting 8:00am through to Friday 5th December finishing at 4:00pm. The repairs are to extend the life of the top gate mitre post on the offside.
CRT's only update, 10 November 2025.
Woodlesford Lock
Aire & Calder Navigation Main LineYorkshire and North East
4 days
From 5 January 2026
Reopened 9 January 2026
- Where
- Lock 5, Woodlesford Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please be aware that Woodlesford Lock will be closed for five days to allow divers to inspect and repair the damaged sill.
CRT's only update, 23 December 2025.
Fishpond Lock
Aire & Calder Navigation Main LineYorkshire and North East
4 days
From 5 January 2026
Reopened 9 January 2026
- Where
- Lock 4, Fishpond Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please note, the completion time for works at Fishpond Lock has been revised to 17:00 on Friday 9th January.
Latest of 2 CRT updates, 23 December 2025.
Lock 3, Brierly Hill Road
Stourbridge CanalWest Midlands
4 days
From 25 December 2025
Reopened 29 December 2025
- Where
- Lock 3, Stourbridge
- CRT reason
- Underwater Obstruction
- Cause
- Other cause
- Asset
- Lock
Please be aware there is a sunken boat in the bottom of Lock 3, near Leys Junction, and is currently blocking navigation through the lock. We will provide further updates as soon as they are available. For any questions or concerns, please get in touch with us on 0303 040 4040…
CRT's only update, 25 December 2025.
King's Sutton Lock No 31
Oxford CanalLondon and South East
4 days
From 12 January 2026
Reopened 16 January 2026
- Where
- Lock 31, Kings Sutton Lock
- CRT reason
- Underwater Obstruction
- Cause
- Other cause
- Asset
- Lock
Please be advised that this lock is currently closed due to a fouled bottom gate caused by an underwater obstruction. Our team are working hard to clear this as quickly as possible. We'll share an update as soon as we have more information. Thank you for your patience and…
CRT's only update, 12 January 2026.
Lock 1 Rhodesfield, Top lock, in Ripon
Ripon CanalYorkshire and North East
4 days
From 23 March 2026
Reopened 27 March 2026
- Where
- Lock 1 / Rhodesfield Lock
- CRT reason
- Repair
- Cause
- Worn out
- Asset
- Lock
Unfortunately, the condition of Rhodesfield lock has deteriorated and we need to bring forward our works planned for next winter, therefore repairs are required to the lock gates and cill at Lock 1, Rhodesfield, due to timber decay that is affecting the structural condition of…
CRT's only update, 17 February 2026.
Navigation Closure - Lee Navigation, Lock 8, Aqueduct Lock, Broxbourne
Lee NavigationLondon and South East
4 days
From 10 April 2026
Reopened 14 April 2026
- Where
- Lock 8, Aqueduct Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please be advised the paddle and rod are missing from the lower towpath side. A new paddle and bolts planned to be fitted next week.
Latest of 2 CRT updates, 10 April 2026.
Lock 19, Old Ford Lock
Lee NavigationLondon and South East
4 days
From 12 April 2026
Reopened 16 April 2026
- Where
- Lock 19, Old Ford Lock, Eastern Side
- CRT reason
- Boating Incident
- Cause
- Other cause
- Asset
- Lock
The River Canal Rescue team attended the situation and require additional time in order to remove the blockage. This notice will be updated as soon as additional information is available. Thank you for your continued understanding and patience.
Latest of 4 CRT updates, 16 April 2026.
Between Lock 24W and Lock 32W
Huddersfield Narrow CanalNorth West
4 days
From 17 April 2026
Reopened 21 April 2026
- Where
- Lock 32 West to Lock 24 West
- CRT reason
- Low Water Levels
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation remains closed due to low water levels between Lock 24W and Lock 32W on the Huddersfield Narrow Canal. Following further investigation, damage was found to the lock cill at Lock 29W, which is preventing the lock from sealing properly and being filled. The team will be…
Latest of 2 CRT updates, 20 April 2026.
Lock 12
Ashton CanalNorth West
4 days
From 1 May 2026
Reopened 5 May 2026
- Where
- Lock 12
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation has been temporarily reopened following repairs to the tailgate paddle. During these works, additional defects were identified with the lock mechanism. As a result, our local team will need to return to site to complete full repairs to the lock. Further details can be…
Latest of 2 CRT updates, 5 May 2026.
Salterhebble Guillotine Lock 3 - Operational
Calder & Hebble NavigationYorkshire and North East
4 days
From 18 June 2026
Reopened 22 June 2026
CRT's title says reopened
- Where
- Lock 3, Salterhebble Bottom
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
A faulty sensor on the guillotine gate has been isolated and the lock brought back into use. The replacement of the broken sensor will be planned in due course.
Latest of 3 CRT updates, 22 June 2026.
Navigation Closure - River Stort, Lock 11, Parndon Mill Lock, Harlow Town
River StortLondon and South East
4 days
From 20 July 2026
Reopened 24 July 2026
- Where
- Lock 11, Parndon Mill Lock
- CRT reason
- Repair
- Cause
- Struck by boat or vehicle
- Asset
- Lock
We are pleased to advise the repairs have been completed and the lock has re-opened. Thank you for your patience whilst this work was undertaken.
Latest of 2 CRT updates, 24 July 2026.
West Stockwith Lock
Chesterfield CanalYorkshire and North East
4 days
From 14 September 2026
Reopened 18 September 2026
- Where
- Lock 65, West Stockwith Lock
- CRT reason
- Maintenance
- Cause
- Worn out
- Asset
- Lock
Please be advised that Lock 65, West Stockwith Lock will be closed to navigation to allow essential refurbishment works to be carried out on the lock gates. The works include refurbishment of the gate hydraulic cylinders, together with renewal of the associated hydraulic…
CRT's only update, 25 August 2026.
Lock 90, Deans Lock
Leeds & Liverpool CanalNorth West
4 days
From 10 September 2026
Reopened 14 September 2026
- Where
- Dean Lock - Nearside
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Since our last update our engineers have been to site and assessed the damage. Our team are onsite today to start the removal of the old collar and replace it with a new one. It is anticipated that repairs will take a few days. A further update will be provided on or before…
Latest of 2 CRT updates, 14 September 2026.
Lock 12, Brighouse Bottom Lock, Calder and Hebble Navigation.
Calder & Hebble NavigationYorkshire and North East
4 days
From 11 September 2026
Reopened 15 September 2026
- Where
- Lock 12, Brighouse Bottom
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Brighouse Bottom Lock (Lock 12) is currently closed after one of the lock gates came free from its bearings. Unfortunately, the lock will remain out of action until we can carry out the necessary repair, which we expect to take place early next week. We'll provide an update as…
CRT's only update, 11 September 2026.
Lock 28, Yard Lock, Stone
Trent & Mersey CanalWest Midlands
3 days
From 20 May 2025
Reopened 23 May 2025
- Where
- Lock 28, Yard Lock to Lock 26, Aston Lock
- CRT reason
- Repair
- Cause
- Worn out
- Asset
- Lock
Please be advised that Aston Lock 26 will be closed today at 3:00 PM to allow for water levels to rise between Aston Lock and Star Lock. This will enable the pounds to refill in preparation for the reopening of the canal at Yard Lock tomorrow. We appreciate your cooperation and…
Latest of 5 CRT updates, 22 May 2025.
Lock 2 Camp Hill Lock
Grand Union CanalWest Midlands
3 days
From 5 July 2025
Reopened 8 July 2025
- Where
- Lock 3, Camp Hill (Lock 54) New to Lock 1, Camp Hill Top Lock (Lock 52)
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please be aware that Lock 2 Camp Hill Lock is closed due to damage to the gates which has prevented any further operation. Updates will follow as soon as we ascertain the full damage to the structure.
CRT's only update, 5 July 2025.
Whitley Lock
Aire & Calder Navigation Main LineYorkshire and North East
3 days
Fully shut 3 of CRT's 4 days
From 18 July 2025
Reopened 22 July 2025
- Where
- Lock 12, Whitley Lock
- CRT reason
- Maintenance
- Cause
- Broke, cause not given
- Asset
- Lock
Thanks to the operatives, the top gates at Whitley lock have now been repaired and the lock is once again fully operational.
Latest of 4 CRT updates, 22 July 2025.
Lock 84 to Lock 92
Rochdale CanalNorth West
3 days
From 3 October 2025
Reopened 6 October 2025
- Where
- Lock 84 Dale St to Lock 92 Castlefield
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation is closed between Locks 84 and 92 on the Rochdale Canal due to both paddles that have failed at Lock 86. Our local team have tried to carry out a temporary repair, which unfortunately wasn't successful. We have instructed our specialist contractors to attend on Monday…
CRT's only update, 3 October 2025.
Audlem Lock 1, Head Gates
Shropshire Union CanalNorth West
3 days
From 3 October 2025
Reopened 6 October 2025
- Where
- Audlem Lock 1
- CRT reason
- Underwater Obstruction
- Cause
- Other cause
- Asset
- Lock
There is an underwater obstruction on the head gate at Audlem Lock 1 which is restricting the gates from closing fully to enable seal, allowing the lock to empty. An operations team has been on site this afternoon and into the evening but the cause of the blockage is still…
CRT's only update, 3 October 2025.
Lock 88
Rochdale CanalNorth West
3 days
From 7 December 2025
Reopened 10 December 2025
- Where
- Lock 88 Oxford St
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Repairs to Lock 88 has been successfully completed, our local team are onsite replenishing the effected pound. The lock will reopen from 8am tomorrow, Wednesday 10 December.
Latest of 3 CRT updates, 9 December 2025.
Navigation Closure, Hardmead Lock - Lock 3
Lee NavigationLondon and South East
3 days
From 19 December 2025
Reopened 22 December 2025
- Where
- Lock 3, Hardmead Lock
- CRT reason
- Underwater Obstruction
- Cause
- Cause not stated
- Asset
- Lock
Due to an obstruction on the cill we've closed Hardmead Lock till our team can resolve the issue.
CRT's only update, 19 December 2025.
Navigation Closure - Grand Union Canal, Lock 100, Brentford Lock, Brentford
Grand Union CanalLondon and South East
3 days
From 16 January 2026
Reopened 19 January 2026
- Where
- Lock 100A, Brentford Lock
- CRT reason
- Maintenance
- Cause
- Broke, cause not given
- Asset
- Lock
Due to a technical fault with the lock powerpack, Brentford lock is currently inoperable. Thank you for your understanding and cooperation at this time.
CRT's only update, 16 January 2026.
Hertford Union - Middle Lock
Hertford Union CanalLondon and South East
3 days
From 6 February 2026
Reopened 9 February 2026
- Where
- Lock 1, Top Lock to Lock 2, Middle Lock
- CRT reason
- Maintenance
- Cause
- Other cause
- Asset
- Lock
Clarification, Please be advised that the navigation is currently closed due to an obstruction blocking the lock gates from closing fully. The bottom pound will need to be lowered to access fully and the mooring within the bottom pound will need to be vacated by 8am on the 9th…
Latest of 2 CRT updates, 6 February 2026.
Lock 37 and Lock 38
Grand Union CanalLondon and South East
3 days
From 24 February 2026
Reopened 27 February 2026
- Where
- Lock 37 to Lock 38
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Due to a lock gate failure locks 37 and 38 will be closed whilst a repair is undertaken. Please check this notice for further updates.
CRT's only update, 24 February 2026.
Between Lock 24 W and Lock 32W
Huddersfield Narrow CanalNorth West
3 days
From 17 March 2026
Reopened 20 March 2026
- Where
- Lock 32 West to Lock 24 West
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation is currently closed between Lock 24W and 32W on the Huddersfield Narrow Canal, due to a damaged cill at Lock 29W which is preventing the lock being operated safely. Our local team are planning a method of repair. An update will be provided on or before, Friday 20…
CRT's only update, 17 March 2026.
Lock 23 - Broken paddle - Repaired
Rochdale CanalYorkshire and North East
3 days
From 17 March 2026
Reopened 20 March 2026
- Where
- Lock 23
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The repairs to the paddle have taken place and it is operational.
Latest of 2 CRT updates, 20 March 2026.
Lock 16 - Broken Paddle - Repaired
Rochdale CanalYorkshire and North East
3 days
From 21 March 2026
Reopened 24 March 2026
- Where
- Lock 16
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The stem has been reattached to the paddle and is operational. The repairs have been completed.
Latest of 2 CRT updates, 24 March 2026.
Lock 9 To Lock 12
Ashton CanalNorth West
3 days
From 13 May 2026
Reopened 16 May 2026
- Where
- Lock 18 to Lock 2
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Repairs to Lock 9 and Lock 12 on the Ashton Canal have been successfully completed, our local team are onsite replenishing the effected pounds. Navigation will reopen from 8am tomorrow, Saturday 16, May.
Latest of 2 CRT updates, 15 May 2026.
Lock 20 Rochdale Canal -operational
Rochdale CanalYorkshire and North East
3 days
From 1 June 2026
Reopened 4 June 2026
CRT's title says reopened
- Where
- Lock 20
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The repairs have been carried out to the jammed head paddle on the offside and to the rack on the towpath side paddle. Lock 20 is operational.
Latest of 2 CRT updates, 4 June 2026.
Navigation Closure - Lock 30 Grants Lock, Banbury, South Oxford Canal
Oxford CanalLondon and South East
3 days
From 10 June 2026
Reopened 13 June 2026
- Where
- Lock 30, Grants Lock
- CRT reason
- Boating Incident
- Cause
- Broke, cause not given
- Asset
- Lock
We'd like to let you know following an inspection carried out this morning by our team, we have identified the damage and the repairs required to the gate paddle and rod. We are now making arrangements for our engineers to carry out the necessary repairs as soon as possible. We…
Latest of 2 CRT updates, 11 June 2026.
Claydon Top Lock 17 to Claydon Bottom lock 21
Oxford CanalLondon and South East
3 days
Fully shut 3 of CRT's 8 days
From 16 June 2026
Reopened 24 June 2026
- Where
- Lock 17, Claydon Top Lock to Lock 21, Claydon Bottom Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We would like to update you that, following repairs carried out by our team to the paddle at Lock 21 on the Claydon Flight yesterday evening, we are delighted to confirm that the assisted passage arrangement will be lifted from 10am today. This means the Claydon Flight is once…
Latest of 3 CRT updates, 24 June 2026.
Mexborough Top Lock to Mexborough Low Lock
Sheffield & South Yorkshire NavYorkshire and North East
3 days
From 26 June 2026
Reopened 29 June 2026
- Where
- Mexborough Top Lock to Mexborough Low Lock
- CRT reason
- 3rd Party Works
- Cause
- Other cause
- Asset
- Lock
National Grid have confirmed that they have installed a generator and the power is back on. The locks are now back open for use as normal.
Latest of 2 CRT updates, 29 June 2026.
Lock 10 Perry Barr.
Tame Valley CanalWest Midlands
3 days
From 29 June 2026
Reopened 2 July 2026
- Where
- Perry Barr Lock 1, Top Lock to Perry Barr Lock 13, Bottom Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The repair should be complete and navigation open again by the end of the day.
Latest of 3 CRT updates, 2 July 2026.
Lock 28, Hatton
Grand Union CanalWest Midlands
3 days
From 31 July 2026
Reopened 3 August 2026
- Where
- Lock 28
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation is currently closed at Lock 28 (Hatton) due to an issue with the lock gate. Our teams are assessing the situation and determining the most appropriate course of action. We will provide a further update on Monday. We apologise for the inconvenience and thank you for…
CRT's only update, 31 July 2026.
Stourbridge Locks 1-16
Stourbridge CanalWest Midlands
3 days
From 14 August 2026
Reopened 17 August 2026
- Where
- Lock 16, Stourbridge Bottom Lock to Lock 1, Stourbridge Top Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Our Reactive Team are hoping to attend this lock on Monday 17th Aug to make a repair and brace the beam. We will provide an update as soon as we have further information.
Latest of 2 CRT updates, 14 August 2026.
Bishop Meadow Lock 54
River SoarEast Midlands
3 days
From 21 August 2026
Reopened 24 August 2026
- Where
- Lock 54 - Bishop Meadow Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Bishop Meadow Lock 54 on the River Soar is closed due to an issue with the lock. This lock is currently not operational and investigations are underway. We will update this notice as soon as we have further information.
CRT's only update, 21 August 2026.
Lock 34 Boggs Lock, Penkridge, Stafford ST19 5PR
Staffordshire & Worcestershire CnlWest Midlands
3 days
From 31 August 2026
Reopened 3 September 2026
- Where
- Lock 34 Boggs Lock
- CRT reason
- Boating Incident
- Cause
- Broke, cause not given
- Asset
- Lock
Our Reactive Response Team have been out to assess the broken beam and repairs needed today, and will be returning tomorrow, 2nd September, to carry out the repairs. They are hopeful that they will complete these repairs tomorrow. Further update will be posted as soon as works…
Latest of 2 CRT updates, 1 September 2026.
Lock 1 - 4, Ashton Canal
Ashton CanalNorth West
2 days
From 13 May 2025
Reopened 15 May 2025
- Where
- Lock 4, Broming Street to Lock 1
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation will be closed between Lock 1 and Lock 4 on the Ashton Canal to allow our teams to carry out emergency repairs to ground paddles and replace structural wall fixings. The locks will remain open until Tuesday 13 May, and our teams will continue to monitor them. If you…
CRT's only update, 2 May 2025.
Lock 38, South Stratford Canal
South Stratford CanalWest Midlands
2 days
From 5 May 2025
Reopened 7 May 2025
- Where
- Lock 38
- CRT reason
- Boating Incident
- Cause
- Struck by boat or vehicle
- Asset
- Lock
Please be advised that we expect navigation to reopen by 2:00 PM today. Thank you for your continued patience.
Latest of 2 CRT updates, 7 May 2025.
Knowle Lock Flight, Knowle, Solihull
Grand Union CanalWest Midlands
2 days
From 2 February 2026
Reopened 4 February 2026
- Where
- Lock 51, Knowle Top Lock to Lock 47, Knowle Bottom Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigational closure is required to allow us to dewater the lock flight to remove non native species.
CRT's only update, 7 May 2025.
Lock 3 (Swineford Lock)
Kennet & Avon CanalWales and South West
2 days
From 17 May 2025
Reopened 19 May 2025
- Where
- Kennet & Avon Canal - 132
- CRT reason
- Boating Incident
- Cause
- Broke, cause not given
- Asset
- Lock
Please be advised that due to a damaged Paddle, Lock 3 (Swineford Lock) is currently inoperable and as such closed to navigation. Our operations team will be in attendance on Monday 19th May with a suitable craft to facilitate a repair. In the meantime, we apologise for any…
CRT's only update, 17 May 2025.
Lock 36 South Stratford
South Stratford CanalWest Midlands
2 days
From 18 May 2025
Reopened 20 May 2025
- Where
- Lock 36
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We're pleased to advise that the works will be completed ahead of schedule, and navigation at Lock 36 will reopen from 4pm today (Tuesday 20th)
Latest of 3 CRT updates, 20 May 2025.
Lock 11 Beeston Iron
Shropshire Union CanalNorth West
2 days
From 15 June 2025
Reopened 17 June 2025
- Where
- Lock 11, Beeston Iron Lock to Lock 12, Beeston Stone Lock
- CRT reason
- Low Water Levels
- Cause
- Broke, cause not given
- Asset
- Lock
Our local engineering team has investigated the leak at Beeston Iron Lock on the Shropshire Union Canal and identified the need for a temporary repair to the cill. Arrangements are being made for a work boat to carry out these temporary repairs until a permanent repair can take…
Latest of 2 CRT updates, 16 June 2025.
Aston Lock 26, Little Stoke
Trent & Mersey CanalWest Midlands
2 days
From 15 July 2025
Reopened 17 July 2025
- Where
- Lock 26, Aston Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Works to the top end lock gate are required due to substantial loss of water affecting the upstream pond. We will deliver these works via a navigational closure between the 15 July and the 17 July 2025 (3 Days). The towpath will remain open.
CRT's only update, 30 June 2025.
Long Sandall Lock
Sheffield & South Yorkshire NavYorkshire and North East
2 days
From 6 July 2025
Reopened 8 July 2025
- Where
- Long Sandall Lock
- CRT reason
- Information
- Cause
- Broke, cause not given
- Asset
- Lock
Due to an issue with the user pedestals at Long Sandall, the lock is out of operation. Our engineers will be attending site in the morning (07/07) to carry out a repair.
CRT's only update, 6 July 2025.
Chesterfield Lock 60, Whitsunday Pie Lock
Chesterfield CanalYorkshire and North East
2 days
Fully shut 2 of CRT's 4 days
From 20 July 2025
Reopened 24 July 2025
- Where
- Lock 60, Whit Sunday Pie Lock
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Lock
Contractors have attended site and have cleared half of the tree that they could safely reach. Contractors will be back to clear the navigation of the other half of the tree with specialist winch equipment on Wednesday 23/07/25. Boaters are requested that they proceed with…
Latest of 2 CRT updates, 22 July 2025.
Saltersford Lock
Weaver NavigationNorth West
2 days
From 13 August 2025
Reopened 15 August 2025
- Where
- Saltersford Large Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Due to a problem with the paddle at Saltersford Lock, our team is currently unable to operate the lock safely. We'll need the help of specialist divers to fix the issue, and we're already working hard to arrange for them to attend as soon as possible. We'll share an update with…
Latest of 2 CRT updates, 13 August 2025.
Lock 56
Grand Union CanalLondon and South East
2 days
From 16 August 2025
Reopened 18 August 2025
- Where
- Lock 56
- CRT reason
- Low Water Levels
- Cause
- Broke, cause not given
- Asset
- Lock
Lock 56 has now re-opened for passage; thank you for your patience whilst our team undertook the repair.
Latest of 2 CRT updates, 18 August 2025.
Showing the 250 longest of 494. Every row links to the notice CRT published.
Coming up
Scheduled but not yet started, so in no figure above.
What fails · Canals · Reliability · Trends · Download data