Northampton Arm (GU Canal)

Something was shut here on 27% of this cruising season — 63 of its 231 days — across 3 separate closures.

That means a closure somewhere on the canal, not that the whole canal was impassable. Every closure below names the locks or bridges it sat between.

1 closure is still shut now, and 1 of those has no reopening date. Filter to it.

Regions
East Midlands
On record
8 closures

The season, closure by closure

Each row is one closure. A bar starts and ends where the closure did, and its length is how long it ran; dashed bars have not started yet.

2026-03-15one bar is one closure2026-10-31

Every closure on record

Population

Status

Period

2025 season2026 seasonAll time

Duration

Cause

Asset affected

CRT reason

Region

Showing all 8 closures on the Northampton Arm (GU Canal).

8
closures
140
closure-days
140
in cruising season
1
no reopening date
What these figures mean
Population
Which closures a figure counts. All closures is everything; Unplanned, in season drops CRT's scheduled winter programme and any day outside the 15 March to 31 October cruising season; CRT winter programme is that maintenance alone.
Defensible duration
The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
Closure-days
One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals.
The season so farweeks with a closure in force
Closures in force each monthclosures active during the month
0
2
1
3
1
1
0
0
0
0
0
0
0
1
3
1
1
May 25Jun 25Jul 25Aug 25Sep 25Oct 25Nov 25Dec 25Jan 26Feb 26Mar 26Apr 26May 26Jun 26Jul 26Aug 26Sep 26
Whereclosure-days by region
East Midlands1408
8 results · every closure on the Northampton Arm (GU Canal)Jump to table
NoticeExtentStartedDays
Locks 1 to 17
Low Water Levels · Weather
Lock 1 to Lock 172025-08-2068
Northampton Lock Flight
Low Water Levels · Weather · no reopening date
Lock 1 to Lock 172026-07-2757
Northampton Arm of the Grand Union, between lock14 and lock16
Low Water Levels · Vandalism
Lock 14 to Lock 162025-06-225
Lock 15 Kislingbury, Northampton
Vegetation · Weather
Lock 152025-07-305
Between Lock 15 and Lock 16
Low Water Levels · Cause not stated
Lock 15 to Lock 162026-06-302
Between Lock's 15 and 17 of the Northampton Arm
Low Water Levels · Cause not stated
Lock 15 to Lock 172025-06-271
Lock17, Northampton Arm
Emergency Services Incident · Nothing failed
Lock 172025-08-041
Lock 1 to 13
Repair · Wear and tear
Lock 1 to Lock 132026-07-201