Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.
The archive / Leeds & Liverpool Canal
Lock 42, Near Thornton-in-Craven
A navigation closure on the Leeds & Liverpool Canal, 5 January 2026 to 6 February 2026 — 32 days.
Source: this notice on canalrivertrust.org.uk
- Waterway
- Leeds & Liverpool Canal
- Region
- North West
- Started
- 5 January 2026
- Status
- Reopened 6 February 2026
- Days shut
- 32
- CRT reason
- Repair
- Cause
- Wear and tear
- Asset
- Lock
Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.
Where
- Leeds & Liverpool Canal: Lock 44, Top Lock to Bridge 158, Changeline Bridge
Updates · 1
274 days with no update after the last one.
8 May 2025 · 0 days since the previous
A navigational closure is required for bottom gate refurbishment and various repair works.
Cite this: Canal closures, “Lock 42, Near Thornton-in-Craven”, https://crt-stoppages.pages.dev/notice/0196b018-e632-7ebd-8e41-582d4ca14a31.
Every closure on Leeds & Liverpool Canal · Download the data · Method and limits