Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.
The archive / Leeds & Liverpool Canal
Leeds & Liverpool Canal
4.0 closure-days per kilometre (95% range 3.7–4.3) — 825 days across 63 closures of this 205km canal.
Lengths from CRT's ArcGIS open data, published under the strictest reading of its licence. A notice is attributed to the whole named waterway, not to a point.
Something was shut here on 48% of this cruising season — 112 of its 231 days — across 26 separate closures.
That means a closure somewhere on the canal, not that the whole canal was impassable. Every closure below names the locks or bridges it sat between.
Nothing is shut on this canal today.
- Regions
- North West, Yorkshire and North East
- On record
- 74 closures
The season, closure by closure
Each row is one closure. A bar starts and ends where the closure did, and its length is how long it ran; dashed bars have not started yet.
Every closure on record
Showing all 63 closures on the Leeds & Liverpool Canal.
What these figures mean
- Population
- Which closures a figure counts. All closures is everything; Unplanned, in season drops CRT's scheduled winter programme and any day outside the 15 March to 31 October cruising season; CRT winter programme is that maintenance alone.
- Defensible duration
- The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
- Closure-days
- One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals.
| Notice | Extent | Started | Days |
|---|---|---|---|
| Lock Flights, Wigan to Leeds | Lock 85, Lock 21 to Lock 2, Office Lock | 2025-05-22 | 140 |
| Bridge 165, Newton Grange bridge (Changeline bridge) - Closure | Bridge 165, Changeline Bridge | 2025-05-05 | 88 |
| Lock 81 and Top Lock 65, Near Wigan | Lock 85, Lock 21 to Lock 65, Top Lock | 2026-01-05 | 67 |
| Newly Top Lock to Office Lock - Closed | Lock 13, Newlay Top Lock to Lock 2, Office Lock | 2025-06-23 | 56 |
| Bingley 3 & 5 Rise - Closed | Lock 29, Bingley 5 Rise Top Lock to Lock 22, Bingley 3 Rise Bottom Lock | 2025-06-25 | 55 |
| Lock 20, Dowley Gap Bottom Lock - Near Bingley | Lock 21, Dowley Gap Top Lock to Bridge 206, Dowley Gap Changeline Bridge | 2026-01-05 | 53 |
| The Liverpool Link and Central Docks | Mann Island Lock | 2026-05-15 | 51 |
| Lock 42, Near Thornton-in-Craven | Lock 44, Top Lock to Bridge 158, Changeline Bridge | 2026-01-05 | 32 |
| Between Bridge 5 and Bridge 5A, Leeds & Liverpool Canal | Bridge 5, Swift's Bridge to Bridge 5A, Fleetwood's Bridge | 2025-11-21 | 31 |
| Lock 83 , Lock 19 near Wigan | Lock 83, Lock 19 | 2026-01-19 | 28 |
| Anchor Lock, Lock 33 | Lock 33, Anchor Lock | 2025-04-29 | 21 |
| Lock 65 to Lock 85, Wigan Flight | Lock 85, Lock 21 to Lock 65, Top Lock | 2026-08-20 | 22 |
| Lock 48, Barrowford | Lock 51, Bottom Lock to Lock 45, Top Lock | 2026-02-23 | 18 |
| Lock 46 | Lock 51, Bottom Lock to Lock 45, Top Lock | 2026-02-02 | 18 |
| PLANNED CLOSURE - Bridge 181 Snaygill Swing Bridge | Bridge 181, Snaygill Swing Bridge | 2026-05-05 | 16 |
| Lock 59 To Lock 64 | Lock 64, Bottom Lock to Lock 59, Lock 2 | 2026-05-11 | 16 |
| Between Bridges 59B & 60 | Bridge 59B, Shedfield Bridge to Bridge 60, Haigh Park Bridge | 2025-10-08 | 14 |
| Lock 44, Greenberfield, near Bridge 157 | Lock 44, Top Lock to Lock 43, Middle Lock | 2026-01-08 | 12 |
| Bridge 5, Swift's Bridge | Bridge 5, Swift's Bridge | 2025-12-23 | 10 |
| Between Lock 65 and Lock 85 | Lock 85, Lock 21 to Lock 65, Top Lock | 2026-04-14 | 8 |
| Bridge 123 | Culvert 22, U/s Netherton S.Br. Sewer | 2025-11-20 | 6 |
| Bridge 29 | Bridge 29, Gregsons bridge | 2025-11-28 | 5 |
| Bridge 188, Grange Swing Bridge - Planned Closure | Bridge 188, Grange Swing Bridge | 2025-06-23 | 4 |
| Bridge 42 and Lock 91 | Weir, Appley Lock to Bridge 42, Appley Bridge | 2025-09-18 | 4 |
| Lock 90, Deans Lock | Dean Lock - Nearside | 2026-09-10 | 4 |
| Drone Show Event - Evenings of 11th November 2025 to 14th November 2025 - Salts Mill | Bridge 207A, Victoria Rd Bridge to Bridge 207E, Salts Mill Road Bridge | 2025-11-11 | 3 |
| Lock 89 to Lock 87 | Lock 89 to Lock 87 | 2026-05-12 | 3 |
| Navigation Closure; Bridge 31, New Lane Swing Bridge, Leeds & Liverpool Canal | Bridge 31, New Lane Swing Bridge | 2025-06-10 | 2 |
| Lock 85-Lock 86 - Leeds & Liverpool Canal Lock 1 - Leigh Branch | Lock 1, Top Lock, Leigh Branch | 2025-07-28 | 2 |
| Lock 1, River Lock Upstream on Leeds and Liverpool Canal | Lock 1, River Lock | 2025-08-01 | 2 |
| OPENED - Milman Swing Bridge - | Bridge 214, Milman Swing Bridge | 2026-03-21 | 2 |
| Bridge 74a | Bridge 74A, Railway Bridge | 2026-04-14 | 2 |
| CLOSED - Bridge 199, Micklethwaite Swing Bridge, Leeds & Liverpool | Bridge 199, Micklethwaite Swing Bridge | 2026-05-25 | 2 |
| Bridge 49aa Scot Lane Bridge | Bridge 49aa Scot Lane Bridge | 2026-06-01 | 2 |
| Locks 65 to Lock 85 | Lock 85, Lock 21 to Lock 65, Top Lock | 2026-06-24 | 2 |
| CLOSED - Kirkstall, Forge and Newlay Locks | Lock 13, Newlay Top Lock to Lock 7, Kirkstall Little Lock | 2026-07-23 | 2 |
| Bridge 182A, Bradley Swing Bridge | Bridge 182A, Bradley Swing Bridge | 2025-05-30 | 1 |
| Between Bridge 47 and Bridge 48 | Bridge 47, Crooke bridge to Bridge 48, Lower Road bridge | 2025-06-02 | 1 |
| Navigation Closure; Between Lock 85 and 86, Leeds & Liverpool, and Lock 1, Leigh Branch (L&L Canal) | Lock 1, Top Lock, Leigh Branch | 2025-06-03 | 1 |
| Navigation Closure; Between Lock 85 and 86, Leeds & Liverpool, and Lock 1, Leigh Branch (L&L Canal) | Lock 1, Top Lock, Leigh Branch | 2025-06-10 | 1 |
| Navigation Closure; Between Lock 86, Leeds & Liverpool, and Lock 1, Leigh Branch (L&L Canal) | Lock 1, Top Lock, Leigh Branch | 2025-06-24 | 1 |
| Bridge 16, Bells Lane | Bridge 16, Bells Lane Swing Bridge | 2025-07-02 | 1 |
| Bridge 187, Warehouse Swingbridge | Bridge 187, Warehouse Swing Bridge | 2025-07-26 | 1 |
| Handcocks Swing Bridge | Bridge 9, Handcocks Swing Bridge | 2025-08-27 | 1 |
| Leeds & Liverpool Canal, Gallows Bridge, Skipton, Skipton - removal of bridge | Bridge 179, Gallows Footbridge | 2025-11-03 | 1 |
| Lock 19, Hirst Lock | Lock 19, Hirst Lock | 2025-12-07 | 1 |
| Gallows Bridge, Skipton | Bridge 179, Gallows Footbridge | 2025-12-15 | 1 |
| Bridge 31, New Lane Swing Bridge | Bridge 31, New Lane Swing Bridge | 2026-01-15 | 1 |
| Bridge 9, Handcocks Swing Bridge | Bridge 9, Handcocks Swing Bridge | 2026-01-26 | 1 |
| Between Lock 85, 86 and Lock 1 (Leigh Branch) | Lock 1, Top Lock, Leigh Branch | 2026-04-07 | 1 |
| Bank Newton and Gargrave section closure to low water levels - reopened | Lock 36, Bank Newton Bottom Lock to Higherland Lock Sanitary Station | 2026-05-18 | 1 |
| Lock 65 to Lock 85, Wigan flight | Lock 85, Lock 21 to Lock 65, Top Lock | 2026-06-03 | 1 |
| Closed - Bridge 209, Dock Swing Bridge Leeds & Liverpool Canal | Bridge 209, Dock Swing Bridge | 2026-06-26 | 1 |
| Bingley 3 & 5 Rise - Closed | Lock 29, Bingley 5 Rise Top Lock to Lock 22, Bingley 3 Rise Bottom Lock | 2026-07-10 | 1 |
| Bank Newton to Gargrave | Leeds & Liverpool Canal - 047 to Leeds & Liverpool Canal - 051 | 2026-07-11 | 1 |
| Lock 65 to Lock 85 | Lock 85, Lock 21 to Bridge 64, Arley Bridge | 2026-07-15 | 1 |
| Lock 58 to Lock 64, Leeds & Liverpool Canal | Lock 64, Bottom Lock to Lock 58, Top Lock | 2026-01-14 | same day |
| CLOSED - Bridge 187 Warehouse Swing Bridge | Bridge 187, Warehouse Swing Bridge | 2026-04-29 | same day |
| CLOSED - Bridge 199, Micklethwaite Swing Bridge, Leeds & Liverpool | Bridge 199, Micklethwaite Swing Bridge | 2026-05-27 | same day |
| Bingley Five and Three Rise Locks to Remain Closed on Saturday, 11th July | Lock 29, Bingley 5 Rise Top Lock to Lock 22, Bingley 3 Rise Bottom Lock | 2026-07-11 | same day |
| Kirkstall, Forge and Newlay Locks to remain closed, Saturday 11th July | Lock 13, Newlay Top Lock to Lock 7, Kirkstall Little Lock | 2026-07-11 | same day |
| Bridge 187, Warehouse Swing Bridge - no power | Bridge 187, Warehouse Swing Bridge | 2026-07-24 | same day |
| Navigation Closure - Leeds & Liverpool Canal, Moss Bridge, Rodley, Rodley | Bridge, Water Pipe Crossing | 2026-08-17 | same day |
Showing the 63 longest of 63. Every row links to the notice CRT published.
Coming up
Scheduled but not yet started, so in no figure above.
| Closure | From | Planned |
|---|---|---|
| Lock 51, Bottom Lock, Barrowford | 2 November 2026 | 46 days |
| Lock 19, Hirst Lock, Saltaire | 2 November 2026 | 46 days |
| Locks 13,12 and 11 Newlay Locks, Bramley, Leeds | 2 November 2026 | 46 days |
| Bridge 179C, Union Footbridge, Skipton | 2 November 2026 | 46 days |
| Lock 68 -Lock 4 | 2 November 2026 | 11 days |
| Lock 25, Bottom Lock | 16 November 2026 | 11 days |
| Crabtree Swing Bridge 32, New Lane | 4 January 2027 | 67 days |
| Dean Lock, Shevington, Wigan | 4 January 2027 | 18 days |
| Lock 75 of the Wigan Flight | 25 January 2027 | 16 days |
| Lock 87 Wigan | 1 February 2027 | 25 days |
| Lock 74 of the Wigan Flight | 10 February 2027 | 16 days |
Not counted
Cancelled notices and ones whose dates cannot be right are in no figure on this page. They are kept here because CRT published them.