Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.
The archive / Leeds & Liverpool Canal
Bridge 9, Handcocks Swing Bridge
A navigation closure on the Leeds & Liverpool Canal, 26 January 2026 to 27 January 2026 — 1 days.
Source: this notice on canalrivertrust.org.uk
- Waterway
- Leeds & Liverpool Canal
- Region
- North West
- Started
- 26 January 2026
- Status
- Reopened 27 January 2026
- Days shut
- 1
- CRT reason
- Repair
- Cause
- Wear and tear
- Asset
- Swing bridge
Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.
What CRT said it was for
The hydraulic hose has now been repaired and navigation has now reopened.
Where
- Leeds & Liverpool Canal: Bridge 9, Handcocks Swing Bridge to Bridge 9, Handcocks Swing Bridge
Updates · 1
1 days with no update after the last one.
26 January 2026 · 0 days since the previous
Navigation is currently closed at Bridge 9, Handcocks Swing Bridge on the Leeds & Liverpool Canal due to a fault with the hydraulic hose that operates the swing bridge. Our contractors have been informed and will be attending site tomorrow to assess the issue and plan a method of repair. An update will be provided on or before Friday, 30 January.
Cite this: Canal closures, “Bridge 9, Handcocks Swing Bridge”, https://crt-stoppages.pages.dev/notice/019bfb04-a660-7d35-8b1e-beddda8e4e4d.
Every closure on Leeds & Liverpool Canal · Download the data · Method and limits