Cill

Too few unplanned closures of this kind in June to August 2026 and the same months a year earlier to tell a change from luck: 4 against 1. How this is tested.

On record
17 closures since May 2025

In force today

No closure of this kind is in force today.

By canal

10 canals have had a closure of this kind. A closure naming two canals counts on both.

Closures of this kind on each canal since May 2025, most first.
CanalClosures
Huddersfield Narrow Canal4
Leeds & Liverpool Canal3
Aire & Calder Navigation Main Line2
Grand Union Canal2
Ashton Canal1
Lee Navigation1
Oxford Canal1
Rochdale Canal1
Staffordshire & Worcestershire Cnl1
Stourbridge Canal1

Every closure on record

Showing 17 closures involving a lock cill.

Period

Rank by

Population

4 closures are in neither group: 4 unplanned with no day in the cruising season since May 2025.

Status

Duration

Cause

Asset affected

Lock part

Unplanned lock failures naming a part

CRT reason

Region

17
closures
220
closure-days since May 2025
201
in cruising season
0
no reopening date
What these figures mean
Population
Which closures a figure counts. All closures is everything; Unplanned closure drops the works CRT flags as its winter programme and any day outside the cruising season (the Friday nearest 15 March to the Sunday before the first Monday in November). Scheduled work CRT does not flag as winter works still counts here. CRT Planned closure is the flagged winter programme alone.
Defensible duration
The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
Closure-days
One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals. They are counted from 1 May 2025, when this archive begins: a closure that started earlier adds only its days since then, though its own row shows its whole length. Every figure and chart counts only the days inside the Period chosen above them.
In force
A closure is in a Period, and a day is one a closure affected, if it was in force at any time that day, including the morning it reopened. Closure-days measure how long, so they count whole days and not the reopening day: a closure can be in a Period and add no closure-day to it.

Closures in force each month

closures active during the month
1
1
2
1
0
0
0
1
2
0
2
3
3
1
2
2
1
May 25Jun 25Jul 25Aug 25Sep 25Oct 25Nov 25Dec 25Jan 26Feb 26Mar 26Apr 26May 26Jun 26Jul 26Aug 26Sep 26

Canals ranked by the season's closures

share of the period's cruising-season days up to today — a closure somewhere on a long canal is likelier, and does not mean the canal was impassableclosures in force on the period's cruising-season days — a longer canal has more to go wrong on

Where

closure-days by regionclosures by region

A region with more canal has more to go wrong on, so these totals partly measure its size. Regions compared by length of canal are on the Reliability page.

What causes them

closure-days by causeclosures by cause

CRT's reason

closure-days by the reason CRT filedclosures by the reason CRT filed

How long they last

closures by full length, including any days before May 2025 — the bands are not equal in width
3
6
6
2
0
0
<=1d2-7d8-30d31-90d91-365d>365d
17 results · every closure involving a lock cillJump to list

Closures

  1. Advice - Grand Union Canal, Clitheroe's Lock, Lock 99, Brentford

    Grand Union CanalLondon and South East

    70 days

    Fully shut 70 of CRT's 71 days

    From 27 May 2025

    Reopened 6 August 2025

    Where
    Lock 99, Clitheroes Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Clitheroe's lock remains closed while essential repair work continues. We would like to inform you that concrete is currently being poured as part of the ongoing cill repair works. The concrete will require at least three full days to cure properly. On Monday, 4th of August, we…

    Latest of 13 CRT updates, 1 August 2025.

  2. Bottom Barge Lock, Stourport Basin

    Staffordshire & Worcestershire CnlWest Midlands

    42 days

    From 10 July 2026

    Reopened 21 August 2026

    Where
    Bottom Barge Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Please be advised that the planned works at Bottom Barge Lock, Stourport Basin, have now been successfully completed. Our teams are currently demobilising the site and removing equipment from the area. The lock will be fully reopened and available for navigation from 16:00…

    Latest of 8 CRT updates, 20 August 2026.

  3. Lock 65 to Lock 85, Wigan Flight

    Leeds & Liverpool CanalNorth West

    22 days

    From 20 August 2026

    Reopened 11 September 2026

    Where
    Lock 85, Lock 21 to Lock 65, Top Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation remains closed between Lock 65 and Lock 85 on the Wigan Flight of the Leeds & Liverpool Canal. Our team are looking to start the repairs to the detached head cill at Lock 69 week commencing Monday 7 September. Repairs are expected to take one week. A further update…

    Latest of 3 CRT updates, 1 September 2026.

  4. Lock 59 To Lock 64

    Leeds & Liverpool CanalNorth West

    16 days

    From 11 May 2026

    Reopened 27 May 2026

    Where
    Lock 64, Bottom Lock to Lock 59, Lock 2
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Due to other priority works our reactive team where delayed carrying out the repairs to Lock 60 on the Leeds & Liverpool Canal. The reactive team are currently now on site repairing the damaged tail gate cill. As a result navigation remains closed between Lock 59 and Lock 64…

    Latest of 2 CRT updates, 20 May 2026.

  5. Between Lock 1 and Lock 18

    Ashton CanalNorth West

    14 days

    From 16 April 2026

    Reopened 30 April 2026

    Where
    Lock 18 to Lock 1
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation remains closed between Locks 1 and 18 on the Ashton Canal due to the cill on the tail gates at Lock 10 becoming dislodged. Repairs were initially scheduled to take place, but have been delayed while the team sourced the necessary water pumps to carry out the work. A…

    Latest of 4 CRT updates, 29 April 2026.

  6. Lock 26w

    Huddersfield Narrow CanalNorth West

    14 days

    From 1 May 2026

    Reopened 15 May 2026

    Where
    Lock 26 West
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation remains closed due to a damaged cill at Lock 26W on the Huddersfield Narrow Canal. This damage is preventing the lock from sealing, resulting in the lock being filled and operated safely. The local team have experienced delays in sourcing the necessary parts to carry…

    Latest of 2 CRT updates, 5 May 2026.

  7. Lock 29W

    Huddersfield Narrow CanalNorth West

    10 days

    From 5 May 2026

    Reopened 15 May 2026

    Where
    Lock 32 West to Lock 24 West
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation is currently closed at Lock 29W on the Huddersfield Narrow Canal, due to a damaged cill which is preventing the lock being operated safely. Our specialist team are planning to attend site to carry out the emergency repairs. An update will be provided on or before…

    CRT's only update, 5 May 2026.

  8. Lock 81, Butler Street To Lock 83, Brownsfield

    Rochdale CanalNorth West

    8 days

    From 5 March 2026

    Reopened 13 March 2026

    Where
    Lock 81 Butler Street to Lock 83 Brownsfield
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation remains closed between Lock 81 and Lock 83 on the Rochdale Canal due to a loose cill at Lock 82. Our local team attended site today to carry out an investigation and are now developing a repair plan for the cill. A further update will be provided on or before Friday…

    Latest of 2 CRT updates, 9 March 2026.

  9. Lock 15, Stourbridge

    Stourbridge CanalWest Midlands

    4 days

    From 17 July 2025

    Reopened 21 July 2025

    Where
    Lock 15, Stourbridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Our team will be carrying out further works to the cill over the weekend. Subject to satisfactory concrete curing times, we are aiming to reopen the navigation on Monday or Tuesday. We will provide a further update as soon as we are able to confirm a reopening date and time.…

    Latest of 3 CRT updates, 18 July 2025.

  10. Woodlesford Lock

    Aire & Calder Navigation Main LineYorkshire and North East

    4 days

    From 5 January 2026

    Reopened 9 January 2026

    Where
    Lock 5, Woodlesford Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Please be aware that Woodlesford Lock will be closed for five days to allow divers to inspect and repair the damaged sill.

    CRT's only update, 23 December 2025.

  11. Fishpond Lock

    Aire & Calder Navigation Main LineYorkshire and North East

    4 days

    From 5 January 2026

    Reopened 9 January 2026

    Where
    Lock 4, Fishpond Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Please note, the completion time for works at Fishpond Lock has been revised to 17:00 on Friday 9th January.

    Latest of 2 CRT updates, 23 December 2025.

  12. Between Lock 24W and Lock 32W

    Huddersfield Narrow CanalNorth West

    4 days

    From 17 April 2026

    Reopened 21 April 2026

    Where
    Lock 32 West to Lock 24 West
    CRT reason
    Low Water Levels
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation remains closed due to low water levels between Lock 24W and Lock 32W on the Huddersfield Narrow Canal. Following further investigation, damage was found to the lock cill at Lock 29W, which is preventing the lock from sealing properly and being filled. The team will be…

    Latest of 2 CRT updates, 20 April 2026.

  13. Navigation Closure, Hardmead Lock - Lock 3

    Lee NavigationLondon and South East

    3 days

    From 19 December 2025

    Reopened 22 December 2025

    Where
    Lock 3, Hardmead Lock
    CRT reason
    Underwater Obstruction
    Cause
    Cause not stated
    Asset
    Lock

    Due to an obstruction on the cill we've closed Hardmead Lock till our team can resolve the issue.

    CRT's only update, 19 December 2025.

  14. Between Lock 24 W and Lock 32W

    Huddersfield Narrow CanalNorth West

    3 days

    From 17 March 2026

    Reopened 20 March 2026

    Where
    Lock 32 West to Lock 24 West
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation is currently closed between Lock 24W and 32W on the Huddersfield Narrow Canal, due to a damaged cill at Lock 29W which is preventing the lock being operated safely. Our local team are planning a method of repair. An update will be provided on or before, Friday 20…

    CRT's only update, 17 March 2026.

  15. Soulbury Three Locks, near Stoke Hammond, Buckinghamshire

    Grand Union CanalLondon and South East

    1 day

    Fully shut 1 of CRT's 7 days

    From 15 April 2026

    Reopened 22 April 2026

    Where
    Lock 24, Three Locks bottom to Lock 26, Three Locks top
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Please note there has been an amendment to the assisted passage time for Wednesday 22nd April. The new timeslot is as follows: Wednesday 22nd April 09:00 - 14:00 Thursday 23rd and Friday 24th remain unchanged.

    Latest of 7 CRT updates, 21 April 2026.

  16. Lock 65 to Lock 85, Wigan flight

    Leeds & Liverpool CanalNorth West

    1 day

    From 3 June 2026

    Reopened 4 June 2026

    Where
    Lock 85, Lock 21 to Lock 65, Top Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Navigation is currently closed along the Wigan flight, Lock 65 to Lock 85, on the Leeds & Liverpool Canal due to damaged cills at Lock 70 and Lock 75 on the Leeds & Liverpool Canal. Our team needs to dewater the affected locks to allow us to investigate and create a method of…

    Latest of 2 CRT updates, 3 June 2026.

  17. Slat Mill Lock 26

    Oxford CanalLondon and South East

    same day

    From 3 July 2026

    Reopened 3 July 2026

    Where
    Lock 26, Slat Mill Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Canal closure at Slat Mill Lock 26 Friday 3rd July 2026 Start at 8am and re-open at 12 noon Repair being undertaken to reduce water loss through the top gate cill. Thank you for your patience while this essential water saving repair is undertaken

    CRT's only update, 2 July 2026.