7.0 closure-days per kilometre (95% range 5.7–8.3) — 108 days across 4 closures of this 15km canal.
Lengths from CRT's ArcGIS open data, published under the strictest reading of its licence. A notice is attributed to the whole named waterway, not to a point.
Something was shut here on 26% of this cruising season — 59 of its 231 days — across 2 separate closures.
That means a closure somewhere on the canal, not that the whole canal was impassable. Every closure below names the locks or bridges it sat between.
Nothing is shut on this canal today.
- Regions
- Yorkshire and North East
- On record
- 4 closures
The season, closure by closure
Each row is one closure. A bar starts and ends where the closure did, and its length is how long it ran; dashed bars have not started yet.
Every closure on record
Showing all 4 closures on the Pocklington Canal.
What these figures mean
- Population
- Which closures a figure counts. All closures is everything; Unplanned, in season drops CRT's scheduled winter programme and any day outside the 15 March to 31 October cruising season; CRT winter programme is that maintenance alone.
- Defensible duration
- The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
- Closure-days
- One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals.
| Notice | Extent | Started | Days |
|---|---|---|---|
| Navigation Closure – Pocklington Canal from Lock 8 to Lock 9 | Lock 8, Gardam Lock to Lock 9 / Cottingwith Lock | 2026-07-13 | 56 |
| Lock 8, Gardam Lock - Near Melbourne | Swingbridge 7 to Lock 8, Gardam Lock | 2025-09-08 | 32 |
| Swingbridge 7 - Closed (Unable to swing) | Swingbridge 7 | 2025-06-26 | 19 |
| East Cottingwith Lock (Lock 9) - Diving operation to undertake repairs | Lock 9 / Cottingwith Lock | 2026-05-27 | 1 |
Showing the 4 longest of 4. Every row links to the notice CRT published.