The archive / Weaver Navigation
Weaver Navigation
26.9 closure-days per kilometre (95% range 25.2–28.7) — 914 days across 10 closures of this 34km canal.
Lengths from CRT's ArcGIS open data, published under the strictest reading of its licence. A notice is attributed to the whole named waterway, not to a point.
Something was shut here on 83% of this cruising season — 192 of its 231 days — across 4 separate closures.
That means a closure somewhere on the canal, not that the whole canal was impassable. Every closure below names the locks or bridges it sat between.
1 closure is still shut now, and 1 of those has no reopening date. Filter to it.
- Regions
- North West
- On record
- 10 closures
The season, closure by closure
Each row is one closure. A bar starts and ends where the closure did, and its length is how long it ran; dashed bars have not started yet.
Every closure on record
Showing all 10 closures on the Weaver Navigation.
What these figures mean
- Population
- Which closures a figure counts. All closures is everything; Unplanned, in season drops CRT's scheduled winter programme and any day outside the 15 March to 31 October cruising season; CRT winter programme is that maintenance alone.
- Defensible duration
- The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
- Closure-days
- One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals.
| Notice | Extent | Started | Days |
|---|---|---|---|
| Navigation Closure: Anderton Boat Lift | Anderton Boat Lift | 2025-01-03 | 509 |
| Marsh Lock | Marsh Lock | 2025-09-12 | 202 |
| Marsh Lock | Marsh Lock | 2026-07-16 | 68 |
| Weaver Navigation | Church Cut Bridge to Red Lion Visitor Moorings | 2025-12-15 | 7 |
| Sutton Weaver Swing Bridge | Elsan, Sutton Weaver Swing Bridge | 2025-12-08 | 4 |
| Saltersford Lock | Saltersford Large Lock | 2025-08-13 | 2 |
| Weaver Navigation - High Flows - Storm Claudia | Church Cut Bridge to Red Lion Visitor Moorings | 2025-11-15 | 2 |
| Weaver Navigation | Church Cut Bridge to Red Lion Visitor Moorings | 2025-12-01 | 1 |
| Marsh Lock to Winsford Flash | Marsh Lock to Vale Royal Small Lock | 2026-02-09 | 1 |
| Marsh Lock | Marsh Lock | 2026-08-28 | same day |
Showing the 10 longest of 10. Every row links to the notice CRT published.