Hydraulics

Too few unplanned closures of this kind in June to August 2026 and the same months a year earlier to tell a change from luck: 2 against 0. How this is tested.

On record
6 closures since May 2025

In force today

No closure of this kind is in force today.

By canal

6 canals have had a closure of this kind. A closure naming two canals counts on both.

Closures of this kind on each canal since May 2025, most first.
CanalClosures
Aire & Calder Navigation Main Line1
Chesterfield Canal1
Grand Union Canal1
Lee Navigation1
New Junction Canal1
River Trent1

Every closure on record

Showing 6 closures involving a lock hydraulics.

Period

Rank by

Population

1 closure is in neither group: 1 unplanned with no day in the cruising season since May 2025.

Status

Duration

Cause

Asset affected

Lock part

Unplanned lock failures naming a part

CRT reason

Region

6
closures
12
closure-days since May 2025
9
in cruising season
0
no reopening date
What these figures mean
Population
Which closures a figure counts. All closures is everything; Unplanned closure drops the works CRT flags as its winter programme and any day outside the cruising season (the Friday nearest 15 March to the Sunday before the first Monday in November). Scheduled work CRT does not flag as winter works still counts here. CRT Planned closure is the flagged winter programme alone.
Defensible duration
The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
Closure-days
One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals. They are counted from 1 May 2025, when this archive begins: a closure that started earlier adds only its days since then, though its own row shows its whole length. Every figure and chart counts only the days inside the Period chosen above them.
In force
A closure is in a Period, and a day is one a closure affected, if it was in force at any time that day, including the morning it reopened. Closure-days measure how long, so they count whole days and not the reopening day: a closure can be in a Period and add no closure-day to it.

Closures in force each month

closures active during the month
0
0
0
0
0
0
0
0
1
0
0
0
1
0
0
2
2
May 25Jun 25Jul 25Aug 25Sep 25Oct 25Nov 25Dec 25Jan 26Feb 26Mar 26Apr 26May 26Jun 26Jul 26Aug 26Sep 26

Canals ranked by the season's closures

share of the period's cruising-season days up to today — a closure somewhere on a long canal is likelier, and does not mean the canal was impassableclosures in force on the period's cruising-season days — a longer canal has more to go wrong on

Where

closure-days by regionclosures by region

A region with more canal has more to go wrong on, so these totals partly measure its size. Regions compared by length of canal are on the Reliability page.

What causes them

closure-days by causeclosures by cause

CRT's reason

closure-days by the reason CRT filedclosures by the reason CRT filed

How long they last

closures by full length, including any days before May 2025 — the bands are not equal in width
3
3
0
0
0
0
<=1d2-7d8-30d31-90d91-365d>365d
6 results · every closure involving a lock hydraulicsJump to list

Closures

  1. West Stockwith Lock

    Chesterfield CanalYorkshire and North East

    4 days

    From 14 September 2026

    Reopened 18 September 2026

    Where
    Lock 65, West Stockwith Lock
    CRT reason
    Maintenance
    Cause
    Worn out
    Asset
    Lock

    Please be advised that Lock 65, West Stockwith Lock will be closed to navigation to allow essential refurbishment works to be carried out on the lock gates. The works include refurbishment of the gate hydraulic cylinders, together with renewal of the associated hydraulic…

    CRT's only update, 25 August 2026.

  2. Navigation Closure - Grand Union Canal, Lock 100, Brentford Lock, Brentford

    Grand Union CanalLondon and South East

    3 days

    From 16 January 2026

    Reopened 19 January 2026

    Where
    Lock 100A, Brentford Lock
    CRT reason
    Maintenance
    Cause
    Broke, cause not given
    Asset
    Lock

    Due to a technical fault with the lock powerpack, Brentford lock is currently inoperable. Thank you for your understanding and cooperation at this time.

    CRT's only update, 16 January 2026.

  3. Sykehouse Lock - not working due to a faulty hydraulic unit.

    New Junction CanalYorkshire and North East

    2 days

    From 7 August 2026

    Reopened 9 August 2026

    Where
    Sykehouse Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    A fault has occurred with the hydraulic Unit on Sykehouse Lock. It has been reported to Engineers and they will be in attendance within the next 72 hours. We will update the notice when the hydraulic unit has been repaired and the lock is operational again.

    CRT's only update, 7 August 2026.

  4. Newark Town Lock on the River Trent

    River TrentEast Midlands

    1 day

    From 9 May 2026

    Reopened 10 May 2026

    Where
    Lock 13, Newark Town Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    There has been a mechanical fault with the top gate at Newark Town Lock, the top gate has suffered a hydraulic failure and our contractors are on the call out to attend site immediately. Unfortunately the lock is closed until further notice.

    CRT's only update, 9 May 2026.

  5. Lock 7, Lemonroyd Lock

    Aire & Calder Navigation Main LineYorkshire and North East

    1 day

    From 16 August 2026

    Reopened 17 August 2026

    Where
    Lock 7, Lemonroyd Lock
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    A team have attended site and fixed the hydraulic power pack. The lock is now back open for use as normal.

    Latest of 2 CRT updates, 17 August 2026.

  6. Tottenham Lock

    Lee NavigationLondon and South East

    1 day

    From 5 September 2026

    Reopened 6 September 2026

    Where
    Lock 17, Tottenham Lock, Eastern Side
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Lock

    Fault with hydraulic power pack preventing lock operations. Repair currently anticipated by late afternoon on Sunday 6th September.

    CRT's only update, 5 September 2026.

What fails · Canals · Reliability · Trends · Download data