Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.
The archive / Chesterfield Canal
West Stockwith Lock
A navigation closure on the Chesterfield Canal, 14 September 2026 to 18 September 2026 — 4 days.
Source: this notice on canalrivertrust.org.uk
- Waterway
- Chesterfield Canal
- Region
- Yorkshire and North East
- Started
- 14 September 2026
- Status
- Reopened 18 September 2026
- Days shut
- 4
- CRT reason
- Maintenance
- Cause
- Wear and tear
- Asset
- Lock
Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.
Where
- Chesterfield Canal: Lock 65, West Stockwith Lock to Lock 65, West Stockwith Lock
Updates · 1
24 days with no update after the last one.
25 August 2026 · 0 days since the previous
Please be advised that Lock 65, West Stockwith Lock will be closed to navigation to allow essential refurbishment works to be carried out on the lock gates. The works include refurbishment of the gate hydraulic cylinders, together with renewal of the associated hydraulic cylinder framework and gate bracketry. These repairs are required due to the deteriorating condition of the assets and to address issues with gate operation. Thank you for your patience while these important works are completed.
Cite this: Canal closures, “West Stockwith Lock”, https://crt-stoppages.pages.dev/notice/01a038ff-547d-71ca-b710-a297441d2054.
Every closure on Chesterfield Canal · Download the data · Method and limits