Dudley No 1 Canal
Something was shut here on 15% of this cruising season — 34 of its 231 days — across 1 separate closures.
That means a closure somewhere on the canal, not that the whole canal was impassable. Every closure below names the locks or bridges it sat between.
Nothing is shut on this canal today.
- Regions
- West Midlands
- On record
- 4 closures
The season, closure by closure
Each row is one closure. A bar starts and ends where the closure did, and its length is how long it ran; dashed bars have not started yet.
Every closure on record
Showing all 3 closures on the Dudley No 1 Canal.
What these figures mean
- Population
- Which closures a figure counts. All closures is everything; Unplanned, in season drops CRT's scheduled winter programme and any day outside the 15 March to 31 October cruising season; CRT winter programme is that maintenance alone.
- Defensible duration
- The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
- Closure-days
- One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals.
| Notice | Extent | Started | Days |
|---|---|---|---|
| Woodside Bridge to Round Oak (2) Bridge, Dudley, Brierley Hill | Round Oak (2) Bridge to Woodside Bridge | 2026-06-04 | 33 |
| Pipe Bridge next to Peartree Lane Bridge | Pipe Bridge next to Peartree Lane Bridge | 2025-06-02 | 4 |
| Blowers Green Lock, Dudley No 1 Canal | Lock, Blowers Green Lock | 2025-06-13 | same day |
Showing the 3 longest of 3. Every row links to the notice CRT published.
Coming up
Scheduled but not yet started, so in no figure above.
| Closure | From | Planned |
|---|---|---|
| Navigation Closure - Dudley No 1 Canal, Canal and Towpath from Round Oak (2) Bridge to Woodside Bridge , Dudley DY5 1LJ | 5 October 2026 | 5 days |
Not counted
Cancelled notices and ones whose dates cannot be right are in no figure on this page. They are kept here because CRT published them.
| Notice | State | Started |
|---|---|---|
| Navigation Closure - Dudley No 1 Canal, Canal and Towpath from Round Oak (2) Bridge to Woodside Bridge , Dudley DY5 1LJ | Published | 5 October 2026 |