Canal closures

Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.

The archive / Shropshire Union Canal

Lock 5. Audlem Lock Flight

Scheduled: 22 February 2027 to 5 March 2027 (11 days planned), on the Shropshire Union Canal. It has not started, so it is in no figure — see the archive's Coming up list.

Source: this notice on canalrivertrust.org.uk

Waterway
Shropshire Union Canal
Region
North West
Started
22 February 2027
Status
Scheduled
Days planned
11
CRT reason
Repair
Cause
Wear and tear
Asset
Lock

Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.

Where

Updates · 1

147 days with no update after the last one.

28 April 2026 · 0 days since the previous

A navigation closure is required to allow essential repairs to the lock gates at both the top and bottom of the lock. To carry out the work safely and effectively, the entire flight will be closed so that water levels can be controlled and the works are not flooded while repairs are underway.

Cite this: Canal closures, “Lock 5. Audlem Lock Flight”, https://crt-stoppages.pages.dev/notice/019dd3ac-4841-7264-b2dc-a80cfd7160ea.

Every closure on Shropshire Union Canal · Download the data · Method and limits