Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.
All closures / Why they close / Planned works
Planned works
Unplanned closures with this cause: 18 in June to August 2026 against 7 a year earlier, up by more than chance would produce; tested on its own, not among the trends page's findings. How a change is tested.
- On record
- 211 notices since May 2025: 137 closures, 6 restrictions and 68 not yet started
In force today
2 closures with this cause are in force today, longest shut first. Filter the explorer to them.
| Canal | Where | Since | Days shut |
|---|---|---|---|
| Oxford Canal | Lock 33, Aynho Weir Lock | 17 August 2026 | 40 |
| River Soar | Lock 48 - Cossington Lock | 7 September 2026 | 19 |
By canal
53 canals have had a closure with this cause. A closure naming two canals counts on both.
| Canal | Closures |
|---|---|
| Grand Union Canal | 30 |
| Leeds & Liverpool Canal | 17 |
| Rochdale Canal | 11 |
| Monmouthshire & Brecon Canal | 10 |
| Shropshire Union Canal | 10 |
| Trent & Mersey Canal | 10 |
| Staffordshire & Worcestershire Cnl | 9 |
| Huddersfield Narrow Canal | 8 |
| Calder & Hebble Navigation | 6 |
| Kennet & Avon Canal | 6 |
| New Junction Canal | 5 |
| Oxford Canal | 5 |
Show 41 moreShow fewer
Every closure on record
Showing 137 closures and 6 restrictions whose cause reads “Planned works”.
Rank by
Population
11 closures are in neither group: 10 unplanned with no day in the cruising season since May 2025, and 1 not started yet.
Status
Duration
Cause
Asset affected
CRT reason
Region
What these figures mean
- Population
- Which closures a figure counts. All closures is everything; Unplanned closure drops the works CRT flags as its winter programme and any day outside the cruising season (the Friday nearest 15 March to the Sunday before the first Monday in November). Scheduled work CRT does not flag as winter works still counts here. CRT Planned closure is the flagged winter programme alone.
- Defensible duration
- The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
- Closure-days
- One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals. They are counted from 1 May 2025, when this archive begins: a closure that started earlier adds only its days since then, though its own row shows its whole length. Every figure and chart counts only the days inside the Period chosen above them.
- In force
- A closure is in a Period, and a day is one a closure affected, if it was in force at any time that day, including the morning it reopened. Closure-days measure how long, so they count whole days and not the reopening day: a closure can be in a Period and add no closure-day to it.
Closures in force each month
closures active during the monthCanals ranked by the season's closures
share of the period's cruising-season days up to today — a closure somewhere on a long canal is likelier, and does not mean the canal was impassableclosures in force on the period's cruising-season days — a longer canal has more to go wrong onWhere
closure-days by regionclosures by regionA region with more canal has more to go wrong on, so these totals partly measure its size. Regions compared by length of canal are on the Reliability page.
CRT's reason
closure-days by the reason CRT filedclosures by the reason CRT filedShow 1 moreShow fewer
Show 1 moreShow fewer
What fails
closure-days by assetclosures by assetShow 4 moreShow fewer
Show 4 moreShow fewer
What fails on a lock
closure-days by part — unplanned lock failures naming a partclosures by part — unplanned lock failures naming a partHow long they last
closures by full length, including any days before May 2025 — the bands are not equal in widthClosures
Lock 1 to the Aylesbury Arm Basin
Aylesbury Arm (Grand Union Canal)London and South East
226 days
From 16 June 2025
Reopened 28 January 2026
- Where
- Lock 1 to Lock 16
- CRT reason
- Low Water Levels
- Cause
- Planned works
- Asset
- Canal or river
We are pleased to advise the Aylesbury Arm will re-open fully tomorrow 28th January 2026 at 10:00 am. Thank you for your patience whilst the arm was closed.
Latest of 8 CRT updates, 27 January 2026.
Spouthouse Embankment, Perry Barr, Birmingham
Tame Valley CanalWest Midlands
130 days
From 3 November 2025
Reopened 13 March 2026
- Where
- Culvert 3, Hampstead to Perry Barr Lock 1, Top Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Embankment
A navigation and towpath closure are required for significant canal bed replacement works to two areas of the canal over the length of Spouthouse Embankment. The canal will be drained between Gorse Farm Bridge and Tower Hill and works will also include canal wall rebuild and…
CRT's only update, 8 May 2025.
Perry Barr Lock Flight
Tame Valley CanalWest Midlands
123 days
From 9 June 2025
Reopened 10 October 2025
- Where
- Perry Barr Lock 1, Top Lock to Perry Barr Lock 13, Bottom Lock
- CRT reason
- Low Water Levels
- Cause
- Planned works
- Asset
- Lock
This section is still closed due to low water levels. Whilst the closure is in place engineers are investigating the locks for any potential damage, so some maybe empty. We will continue to monitor the situation closely and will provide further updates.
Latest of 4 CRT updates, 3 October 2025.
Lock 19 Gas Pipe Lock - near Kibworth Harcourt
Leicester Line (Grand Union Canal)East Midlands
74 days
From 12 January 2026
Reopened 27 March 2026
- Where
- Lock 19 - Gas Pipe Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Work at Gas Pipe Lock has been delayed by severe weather and flooding in early January, which held up the start of the planned stoppage by two weeks. The project includes full replacement of both lock gates, repairs, and lock ladder renewal. Because the original programme…
Latest of 2 CRT updates, 13 February 2026.
Lock 36 - Gees Lock - Near Whetstone
Leicester Line (Grand Union Canal)East Midlands
73 days
From 19 January 2026
Reopened 2 April 2026
- Where
- Lock 36 - Gees Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Works at Gees Lock 36 are running behind schedule due to operational challenges, including low water levels affecting access to the site. Progress has also been slowed by limited lifting capacity, as only one crane boat is currently available. Flooding elsewhere on the network…
Latest of 4 CRT updates, 20 March 2026.
Locks 42, 43 and 44 - Marsworth Flight
Grand Union CanalLondon and South East
73 days
From 6 January 2026
Reopened 20 March 2026
- Where
- Lock 42 to Lock 44
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Work on the Marsworth Flight has been delayed by severe weather throughout the project. As a result, the team has been unable to complete all required repairs within the original stoppage window. To allow the remaining work to be completed safely and to the required standard, we…
Latest of 4 CRT updates, 4 March 2026.
Lock 87, Ham lock, near Thatcham
Kennet & Avon CanalWales and South West
67 days
From 3 November 2025
Reopened 9 January 2026
- Where
- Lock 87, Ham Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Unfortunately, we now require additional time on site to complete these works to the required standard. The stoppage will now end on 9th January. We have experienced challenges with effectively damming the lock, which has caused delays in replacing the bottom gates. To ensure…
Latest of 3 CRT updates, 12 December 2025.
Canal bed inspections, Glan Usk
Monmouthshire & Brecon CanalWales and South West
67 days
From 5 January 2026
Reopened 13 March 2026
- Where
- Bridge 120, Baylis Bridge to Bridge 125, Dyfnant Bridge
- CRT reason
- Inspections
- Cause
- Planned works
- Asset
- Canal or river
A navigational closure to allow inspection and repairs of the canal bed.
CRT's only update, 6 May 2025.
Canal bed inspections, Lower Llangynidr
Monmouthshire & Brecon CanalWales and South West
67 days
From 5 January 2026
Reopened 13 March 2026
- Where
- Bridge 125, Dyfnant Bridge to Bridge 129, Panteague
- CRT reason
- Inspections
- Cause
- Planned works
- Asset
- Canal or river
A navigational closure to allow inspection and repairs of the canal bed.
CRT's only update, 6 May 2025.
Canal bed inspections, Cross Oak, Nr Talybont-on-Usk
Monmouthshire & Brecon CanalWales and South West
67 days
From 5 January 2026
Reopened 13 March 2026
- Where
- Bridge 146, Chilson Bridge to Bridge 152, Castle Bridge
- CRT reason
- Inspections
- Cause
- Planned works
- Asset
- Canal or river
A navigational closure to allow inspection and repairs of the canal bed
CRT's only update, 6 May 2025.
Lock 81 and Top Lock 65, Near Wigan
Leeds & Liverpool CanalNorth West
67 days
From 5 January 2026
Reopened 13 March 2026
- Where
- Lock 85, Lock 21 to Lock 65, Top Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please be advised that, in addition to the advertised works at Locks 81 and 65, we will also be carrying out repair works at Lock 75, which require the lock to be dewatered. The stoppage dates and closure location remain unchanged as originally communicated. Both teams have…
Latest of 2 CRT updates, 16 January 2026.
Lock 12, Brighouse Bottom
Calder & Hebble NavigationYorkshire and North East
67 days
From 5 January 2026
Reopened 13 March 2026
- Where
- Bridge 2, Elland to Lock 15, Kirklees Low Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for a full lock gate replacement & general repairs
CRT's only update, 7 May 2025.
Lock 5, Woodside Mills - Near Elland
Calder & Hebble NavigationYorkshire and North East
67 days
From 5 January 2026
Reopened 13 March 2026
- Where
- Lock 3, Salterhebble Bottom to Lock 5, Woodside Mills
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for a full lock gate replacement & general repairs
CRT's only update, 7 May 2025.
Lock 36 Otherton, Penkridge
Staffordshire & Worcestershire CnlWest Midlands
67 days
From 5 January 2026
Reopened 13 March 2026
- Where
- Littleton Colliery Railway Bridge 80A to Bridge 83 Lyne Hill Bridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
The gates are composite and after further investigations are going to require off-site refurbishment. We require additional time at this stoppage to complete the works to the necessary standard. Starting the works a bit earlier will allow us to complete by the original 13 March…
Latest of 2 CRT updates, 12 September 2025.
Lock 37, Penkridge
Staffordshire & Worcestershire CnlWest Midlands
67 days
From 5 January 2026
Reopened 13 March 2026
- Where
- Bridge 84, Filance Bridge to Bridge 85, Princefield Bridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for top and bottom gate replacements and quoin repairs.
CRT's only update, 8 May 2025.
Lock 48, Worksop Stret Lock - Near Worksop
Chesterfield CanalYorkshire and North East
60 days
From 12 January 2026
Reopened 13 March 2026
- Where
- Lock 48, Worksop Stret Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for a full lock gate replacement & general repairs
CRT's only update, 7 May 2025.
Lock 4, Adderley
Shropshire Union CanalWest Midlands
60 days
From 12 January 2026
Reopened 13 March 2026
- Where
- Adderley Lock 5 to Adderley Lock 1
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for top and bottom gate replacements and brickwork repairs. We will also be doing lock landing repairs below lock 4.
CRT's only update, 8 May 2025.
Lock 21 East - Closed in preparation for repairs to the stop plank grooves
Huddersfield Narrow CanalYorkshire and North East
58 days
From 22 October 2025
Reopened 19 December 2025
- Where
- Lock 21 East, Waterside Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Lock 21 East will be locked up due to preparation work that is needed for the repairs to the stop plank grooves, taking place under the Winter Stoppages Works. This is to ensure that the team are working in the conditions needed to undertake the preparation work for the Winter…
CRT's only update, 21 October 2025.
Lock 5, Camp Hill
Grand Union CanalWest Midlands
53 days
From 5 January 2026
Reopened 27 February 2026
- Where
- Lock 6, Camp Hill (Lock 57) to Lock 1, Camp Hill Top Lock (Lock 52)
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Due to additional work identified while on site, this stoppage will be extended and is now planned to complete on 27 February. During the course of the project, our team identified further brickwork repairs that were not included in the original scope. In addition, we found that…
Latest of 2 CRT updates, 12 February 2026.
Lock 21 - Pywells Lock - near Kibworth Harcourt
Leicester Line (Grand Union Canal)East Midlands
53 days
From 12 January 2026
Reopened 6 March 2026
- Where
- Lock 21 - Pywells Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We'd like to clarify the nature of the upcoming works at Pywells Lock. The project has always been intended for gate repairs rather than a full gate replacement. The schedule remains unchanged, as other essential works are also planned during this 8-week stoppage. These repairs…
Latest of 2 CRT updates, 5 December 2025.
Lock 20, Dowley Gap Bottom Lock - Near Bingley
Leeds & Liverpool CanalYorkshire and North East
53 days
From 5 January 2026
Reopened 27 February 2026
- Where
- Lock 21, Dowley Gap Top Lock to Bridge 206, Dowley Gap Changeline Bridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please note the towpath will no longer be closed during these works.
Latest of 2 CRT updates, 29 June 2025.
Lock 8, Mayroyd - Near Hebden Bridge
Rochdale CanalYorkshire and North East
53 days
From 5 January 2026
Reopened 27 February 2026
- Where
- Bridge 14, Fallingroyd Tunnel to Lock 8, Mayroyd
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Following a detailed inspection after the canal was dewatered, we have identified that the repairs required are more extensive than originally anticipated. These works will now require specialist contractor involvement. To ensure the repairs are completed safely and to the…
Latest of 2 CRT updates, 5 February 2026.
Kegworth Flood Lock 57
River SoarEast Midlands
53 days
From 1 September 2025
Reopened 24 October 2025
- Where
- Lock 57 - Kegworth Shallow Flood Lock
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
Over the last two years, planned work on the River Soar over the winter period has been severely impacted by flooding. To give us the best chance of completing the planned double lock gate replacement at Kegworth Lock we are moving this work forward to start on 1st September…
CRT's only update, 24 July 2025.
Lock 12, Napton on the Hill
Oxford CanalWest Midlands
52 days
From 26 January 2026
Reopened 19 March 2026
- Where
- Lock 8, Napton Bottom Lock to Lock 14, Adkins Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We would like to offer our sincere apologies, as we require an extension of up to 6 days to complete the remaining works on site. During the removal and installation of the gates this week, our team identified several unforeseen issues that could not have been detected before…
Latest of 4 CRT updates, 13 March 2026.
York street lock - Stourport on Severn
Staffordshire & Worcestershire CnlWest Midlands
51 days
From 5 January 2026
Reopened 25 February 2026
- Where
- York Street Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We're pleased to let you know that the works at York Street Lock have been completed ahead of schedule, and the navigation is now open.
Latest of 4 CRT updates, 25 February 2026.
Lock 81, Hamstead Lock, near Hamstead Marshall
Kennet & Avon CanalWales and South West
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Lock 81, Hamstead Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please note the towpath will no longer be closed during these works.
Latest of 2 CRT updates, 29 June 2025.
Bridge 62, High Bridge, Mamhilad
Monmouthshire & Brecon CanalWales and South West
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Bridge 62, High Bridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Bridge
Please note the towpath will no longer be closed during these works.
Latest of 2 CRT updates, 29 June 2025.
Canal bed inspections near Goytre
Monmouthshire & Brecon CanalWales and South West
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Bridge 75, Jenkin Rosser to Bridge.76 Lapstone
- CRT reason
- Inspections
- Cause
- Planned works
- Asset
- Canal or river
A navigational closure to allow inspection and repairs of the canal bed
CRT's only update, 6 May 2025.
Llanfoist Safety Gates (upstream and downstream), Embankment 8A, Llanfoist.
Monmouthshire & Brecon CanalWales and South West
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Tod's Bridge to Bridge 96, Govilon Turn
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Other
Due to additional work identified on site, the safety gate replacement will not be completed by the advertised stoppage end date of 19th December. During installation of the new gates, it was discovered that the quoins had shifted. Our team will carry out the necessary remedial…
Latest of 2 CRT updates, 12 December 2025.
Lock 13, Tilstone
Shropshire Union CanalNorth West
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Lock 13 Tilstone Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigational closure is required for top and bottom gate repair works and ladder hoop modifications.
CRT's only update, 6 May 2025.
Locks 22, 26, 27 and 28 West, Diggle
Huddersfield Narrow CanalNorth West
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Bridge66, Ward Lane Bridge to Bridge 71, Wool Road
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please be advised that the works at Lock 22W have been completed and the lock is now open. The stoppage now runs from Bridge 66, Ward Lane Bridge, to Bridge 71, Wool Road Bridge, while works continue at Locks 26W, 27W, and 28W.
Latest of 4 CRT updates, 26 November 2025.
Lock 2, Camp Hill
Grand Union CanalWest Midlands
46 days
From 5 January 2026
Reopened 20 February 2026
- Where
- Lock 6, Camp Hill (Lock 57) to Lock 1, Camp Hill Top Lock (Lock 52)
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for top and bottom lock gate replacements. We will also be doing lock chamber brickwork repairs.
CRT's only update, 7 May 2025.
Bank Dole Lock (5) in Knottingley
Bank Dole CutYorkshire and North East
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Trundles Lane Bridge to Bank Dole Lock (Lock 5)
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for downstream gate replacements & upstream lock gate repairs.
CRT's only update, 7 May 2025.
Bridge 11, Dratley's Bridge - Near Burton Hastings
Ashby CanalEast Midlands
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Bridge 11, Dratley's Bridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Bridge
Following a review of the works and customer feedback, this stoppage will now commence on 03/11/2025 to align with the start of the Intensive Maintenance Period.
Latest of 3 CRT updates, 19 September 2025.
Lock 7, Top Lock - Near Long Buckby Wharf
Grand Union CanalEast Midlands
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Lock 7, Top Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Following a review of the works and customer feedback, this stoppage will now commence on 03/11/2025 to align with the start of the Intensive Maintenance Period.
Latest of 3 CRT updates, 17 September 2025.
Lock 81 and Miles Platting Bridge, Manchester
Rochdale CanalNorth West
46 days
From 5 January 2026
Reopened 20 February 2026
- Where
- Lock 66 Tannersfield Highest to Bridge 88, Red Hill Street Bridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
This navigational closure will encompass 2 pieces of work, the navigation will be closed from bridge 88 through to lock 66. We will be replacing the top & bottom gates of lock 81 along with masonry repairs, ladder & paddle works. We will also be doing leakage repairs to the…
CRT's only update, 8 May 2025.
Lock 20, Kingswood
North Stratford CanalWest Midlands
46 days
From 5 January 2026
Reopened 20 February 2026
- Where
- Lock 20
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We're pleased to confirm that the works at Kingswood Lock 20 will be completed ahead of schedule, and navigation will reopen on 20 February. Some works will continue on the lockside after navigation has reopened, but these will not affect boat movements. Thank you for your…
Latest of 2 CRT updates, 17 February 2026.
Lock 1 - Near Mirfield
Huddersfield Broad CanalYorkshire and North East
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Bridge 3b, Pipebridge 2 to Lock 1
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for a full lock gate replacement and wash wall repairs.
CRT's only update, 8 May 2025.
Lock 15 East, Golcar Brook Lock and Lock 18 East, Can Lock - Near Huddersfield
Huddersfield Narrow CanalYorkshire and North East
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Lock 9 East, Isis Lock to Lock 31 East
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
This closure now encompasses two pieces of work. We will be doing top gate replacement and bottom gate repairs to Lock 15 East and a full lock gate replacement (upstream and downstream) to Lock 18 East along with general repairs.
Latest of 2 CRT updates, 29 June 2025.
Sykehouse Lock - Near Thorne
New Junction CanalYorkshire and North East
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Don Aqueduct to New Junction End Culvert
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for bottom and top gate repairs. We will also be working on the upstream cill and doing sluice and ladder repair works.
CRT's only update, 8 May 2025.
Lock 56 - Kegworth New Lock - Near Kegworth
River SoarEast Midlands
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Lock 56 - Kegworth New Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for top gate replacement and general lock repairs.
CRT's only update, 8 May 2025.
Lock 34, Somerton deep lock
Oxford CanalLondon and South East
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Lock 34, Somerton Deep Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for top lock gate replacement.
CRT's only update, 11 May 2025.
Lock 7, Worcester
Worcester & Birmingham CanalWest Midlands
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Lock 7, Bilford
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please note the towpath will no longer be closed during these works.
Latest of 2 CRT updates, 29 June 2025.
Lock 87, Manchester
Rochdale CanalNorth West
44 days
From 2 February 2026
Reopened 18 March 2026
- Where
- Lock 84 Dale St to Lock 92 Castlefield
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We would like to make you aware that we are having to extend the closure at Lock 87 due to delays and additional work requirements. Planned crane lift dates had to be moved at short notice because they coincided with the Chinese New Year parade. Whilst on site with the lock…
Latest of 2 CRT updates, 27 February 2026.
Star Lock 27, Stone
Trent & Mersey CanalWest Midlands
42 days
From 3 November 2025
Reopened 15 December 2025
- Where
- Lock 28, Yard Lock to Bridge 93, Stafford Road Bridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We're pleased to inform you that works on site have been completed ahead of schedule, and the navigation is open.
Latest of 3 CRT updates, 15 December 2025.
Kegworth New Lock 56
River SoarEast Midlands
42 days
From 2 February 2026
Reopened 16 March 2026
- Where
- Lock 56 - Kegworth New Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Ongoing flooding on the River Soar continues to prevent works at Kegworth from being carried out safely. As a result, the works cannot be completed by the original end date of Friday 6th March. The navigation closure has therefore been extended until 20th March to allow river…
Latest of 3 CRT updates, 4 March 2026.
Navigation Closure - Oxford Canal, Ayhno lock 33 , Adderbury
Oxford CanalLondon and South East
40 days
From 17 August 2026
Due to reopen 2 October 2026
Still shut
- Where
- Lock 33, Aynho Weir Lock
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
Lock 33 is being closed due to drought conditions, whilst this is in place we will be completely a 2027 stoppage to change both top and bottom lock gates and stop plank groves. There will be review points throughout the works if conditions change and they canal is to re-open.…
CRT's only update, 10 August 2026. 47 days without another.
Glasson Branch - Lock 1, near Galgate
Glasson Branch (Lancaster Canal)North West
39 days
From 5 January 2026
Reopened 13 February 2026
- Where
- Lock No.1 to Lock No.6
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigational closure is required for top gate replacements and wood paddle replacement on the bottom gates. We will also be doing some lock wall grouting and paving repairs.
CRT's only update, 7 May 2025.
Lock 35, Hatton
Grand Union CanalWest Midlands
39 days
From 3 November 2025
Reopened 12 December 2025
- Where
- Lock 46, Hatton Top Lock to Lock 26, Hatton Bottom Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We're pleased to inform you that works on site are due to complete ahead of schedule. The navigation will be open from 4pm on Friday 12th December.
Latest of 2 CRT updates, 10 December 2025.
Brades Locks, Lock 1 to Lock 3
Gower Branch (New Main Line)West Midlands
39 days
From 15 September 2025
Reopened 24 October 2025
- Where
- Lock 1 Brades Double to Lock 3, Brades Locks, Gower Branch
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We will be undertaking works at Brades Lock 3, including the replacement of both the top and bottom gates, as well as the installation of a new lock ladder. To carry out these works safely, the navigation will be closed from Lock 1 (Brades Top Lock) through to Lock 3 from 15…
CRT's only update, 21 July 2025.
Don Aqueduct
New Junction CanalYorkshire and North East
39 days
From 3 November 2025
Reopened 12 December 2025
- Where
- Don Aqueduct
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
Essential maintenance work will be taking place on both guillotine locks at Don Aqueduct. As part of these works, our engineering teams will be replacing the steel lifting cables which operate the guillotine lock gates. This maintenance is critical to ensuring the continued safe…
CRT's only update, 17 September 2025.
Lock 3, Calcutt
Grand Union CanalWest Midlands
37 days
From 3 November 2025
Reopened 10 December 2025
- Where
- Lock 1 to Lock 3
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We're pleased to inform you that works on site have been completed ahead of schedule, and the navigation is now open.
Latest of 2 CRT updates, 10 December 2025.
Lock 10, Audlem
Shropshire Union CanalNorth West
32 days
From 26 January 2026
Reopened 27 February 2026
- Where
- Lock 10 Audlem
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Following a site review of the works, we're now confident that the works can be completed within a shorter stoppage window than originally planned. The revised stoppage dates are 26th January to 27th February, meaning the whole of the Shropshire Union Canal will be open for most…
Latest of 2 CRT updates, 28 November 2025.
Lock 76, near Dutton
Trent & Mersey CanalNorth West
32 days
From 19 January 2026
Reopened 20 February 2026
- Where
- Lock 76
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Following a recent review, we're now confident that the works can be completed within a shorter stoppage window. The revised stoppage dates are 19 January 2026 to 20 February 2026.
Latest of 2 CRT updates, 3 October 2025.
Lock 42, Near Thornton-in-Craven
Leeds & Liverpool CanalNorth West
32 days
From 5 January 2026
Reopened 6 February 2026
- Where
- Lock 44, Top Lock to Bridge 158, Changeline Bridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigational closure is required for bottom gate refurbishment and various repair works.
CRT's only update, 8 May 2025.
Lock 37, Dashwood Lock
Oxford CanalLondon and South East
32 days
From 3 November 2025
Reopened 5 December 2025
- Where
- Lock 37, Dashwood Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We're pleased to inform you that works on site have been completed ahead of schedule, and the navigation is now open. Please note: Our team is still carrying out some minor remedial work onsite, but this will not affect navigation.
Latest of 2 CRT updates, 5 December 2025.
Lock 13, Stewponey Lock
Staffordshire & Worcestershire CnlWest Midlands
32 days
From 5 January 2026
Reopened 6 February 2026
- Where
- Lock 13 Stewponey Lock to Bridge 32 Stewponey Old Bridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We are pleased to confirm that works at Lock 13 have been completed and the lock is now open.
Latest of 2 CRT updates, 6 February 2026.
Stamp End Lock 1
River WithamEast Midlands
31 days
From 17 October 2025
Reopened 17 November 2025
- Where
- Lock 1, Stamp End Lock
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
Unfortunately, a delay with the supply of material needed for the work to Stamp End Lock has meant that work will not be finished on Monday 3rd November as originally planned. We will update this notice by Monday 17th November or sooner if we have more information.
Latest of 3 CRT updates, 31 October 2025.
Lock 2 Rufford Branch
Rufford Branch (L&L Canal)North West
29 days
From 9 February 2026
Reopened 10 March 2026
- Where
- Lock No.1, Rufford Branch to Lock 7, Rufford Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We're pleased to let you know that the works at Lock 2 Rufford Branch have been completed ahead of schedule, and the navigation is now open.
Latest of 2 CRT updates, 10 March 2026.
Lock 83 , Lock 19 near Wigan
Leeds & Liverpool CanalNorth West
28 days
From 19 January 2026
Reopened 16 February 2026
- Where
- Lock 83, Lock 19
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We are pleased to confirm that the works at Lock 83, Lock 19 have now been completed. Please note that the Wigan Flight remains closed due to the ongoing works at Lock 65.
Latest of 3 CRT updates, 16 February 2026.
Lock 77, Brunsden, near Kintbury
Kennet & Avon CanalWales and South West
25 days
From 12 January 2026
Reopened 6 February 2026
- Where
- Lock 77, Brunsden Lock to Lock 76, Wire Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please note the towpath will no longer be closed during these works.
Latest of 2 CRT updates, 29 June 2025.
Lock 42, Littlebrough
Rochdale CanalNorth West
25 days
From 5 January 2026
Reopened 30 January 2026
- Where
- Lock 37, West Summit to Lock 45
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigational closure is required for top and bottom gate refurbishment and various repair works.
CRT's only update, 8 May 2025.
Bridge 22, Burntacres Bridge
Rochdale CanalYorkshire and North East
25 days
From 2 February 2026
Reopened 27 February 2026
- Where
- Lock 13 to Lock 14
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Bridge
Following a recent review, we're now confident that the works can be completed within a shorter stoppage window. The revised stoppage dates are 2nd February to 27th February.
Latest of 3 CRT updates, 3 November 2025.
Lock 1, Wolverhampton
Old Main LineWest Midlands
25 days
From 24 November 2025
Reopened 19 December 2025
- Where
- Lock 21, Wolverhampton to Lock 1, Top Lock, Wolverhampton
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Following the emergency works we have done this summer; there are still elements of the planned works left to undertake. During this closure we will be checking the fitting of the gate and replacing the cill, we will also be replacing the brickwork between locks 1 and 2 and…
Latest of 2 CRT updates, 29 June 2025.
Lock 5, near bridge 3, near Burscough
Rufford Branch (L&L Canal)North West
25 days
From 26 January 2026
Reopened 20 February 2026
- Where
- Lock No.1, Rufford Branch to Lock 5, German's Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We want to advise that the works at Lock 5, Burscough will remain ongoing until Friday 20 February. The team is making good progress on site; however, the activity is taking slightly longer to complete than originally anticipated. There are no additional works causing delay — we…
Latest of 2 CRT updates, 17 February 2026.
Rushall Lock Flight
Rushall CanalWest Midlands
23 days
From 28 April 2026
Reopened 21 May 2026
- Where
- Lock 1, Top Lock Rushall to Rushall Junction Bridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Canal or river
Our team remains on site carrying out the canal wall repair works. In order to safely complete these works, it is necessary to maintain a reduced water level in the pound, and as such, navigation remains closed. We are currently aiming to complete the repairs and reopen the…
Latest of 4 CRT updates, 7 May 2026.
Cossington Lock 48
River SoarEast Midlands
19 days
From 7 September 2026
Due to reopen 23 October 2026
Still shut
- Where
- Lock 48 - Cossington Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We're carrying out essential improvements at Cossington Lock 48, including the replacement of the top and bottom lock gates. To complete this work safely, a stoppage will be in place from 7th September to 23rd October 2026. Previous stoppages on the River Soar have been…
CRT's only update, 30 March 2026. 180 days without another.
Lock 3 Factory, Tipton
New MainlineWest Midlands
18 days
From 3 November 2025
Reopened 21 November 2025
- Where
- Lock 3, Factory Locks, Tipton
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for top side lock gate replacement.
CRT's only update, 7 May 2025.
Lock 9 Aston
Birmingham & Fazeley CanalWest Midlands
18 days
From 23 February 2026
Reopened 13 March 2026
- Where
- Lock 1, Aston Top Lock to Aston Lock 11
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for top side lock gate replacements. We will also be replacing some lock chamber brickwork.
CRT's only update, 7 May 2025.
Lock 8, Curdworth
Birmingham & Fazeley CanalWest Midlands
18 days
From 5 January 2026
Reopened 23 January 2026
- Where
- Lock 1, Curdworth Top Lock to Lock 11, Curdworth
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for top side lock gate replacements. We will also be doing forebay sandstone repairs and trash screen repairs.
CRT's only update, 7 May 2025.
Lock 80
Grand Union CanalLondon and South East
18 days
From 23 February 2026
Reopened 13 March 2026
- Where
- Lock 80, Lot Mead
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please note the towpath is now open for the duration of these works.
Latest of 2 CRT updates, 29 June 2025.
Lock 48, Barrowford
Leeds & Liverpool CanalNorth West
18 days
From 23 February 2026
Reopened 13 March 2026
- Where
- Lock 51, Bottom Lock to Lock 45, Top Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
This navigational closure will encompass 2 pieces of work, the navigation will be closed from Lock 45 through to lock 51. We will be refurbishing the top gates and paddles of locks 46 and 48, we will also be doing some repointing too.
CRT's only update, 8 May 2025.
Lock 1 Aston, West Felton
Montgomery CanalWest Midlands
18 days
From 3 November 2025
Reopened 21 November 2025
- Where
- Lock 1, Aston Locks
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigational closure is required for lock gate replacement.
CRT's only update, 8 May 2025.
Lock 13, Stourbridge
Stourbridge CanalWest Midlands
18 days
From 23 February 2026
Reopened 13 March 2026
- Where
- Lock 16, Stourbridge Bottom Lock to Lock 1, Stourbridge Top Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for top gate replacement and lock ladder repair.
CRT's only update, 8 May 2025.
Lock 46
Leeds & Liverpool CanalNorth West
18 days
From 2 February 2026
Reopened 20 February 2026
- Where
- Lock 51, Bottom Lock to Lock 45, Top Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
This navigational closure will encompass 2 pieces of work, the navigation will be closed from Lock 45 through to lock 51. We will be refurbishing the top gates and paddles of locks 46 and 48, we will also be doing some repointing too.
CRT's only update, 8 May 2025.
Lock 7, Actons
Regent's CanalLondon and South East
18 days
From 1 December 2025
Reopened 19 December 2025
- Where
- Lock 7, Actons Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please be advised that, due to delays at City Road Lock, this stoppage will now commence on Monday, 1st December. This later start will provide time for travel through the area and onward to winter moorings over the coming weekend.
Latest of 5 CRT updates, 27 November 2025.
Lock 5, Rufford Branch, German's Lock
Rufford Branch (L&L Canal)North West
14 days
From 21 November 2025
Reopened 5 December 2025
- Where
- Lock 5, German's Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please be aware: Following a further review of this stoppage, the navigation will remain closed for the entire duration to ensure all necessary work is completed within the stoppage window. It will not be open over the weekend as previously advertised. We apologise for any…
Latest of 3 CRT updates, 21 November 2025.
Marsh Lane Lock 27
Kennet & Avon CanalWales and South West
14 days
From 16 February 2026
Reopened 2 March 2026
- Where
- Lock 44, Sir Hugh Stockwell to Lock 26, Devizes Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We're pleased to let you know that the works at Marsh Lane Lock 27 have been completed ahead of schedule, and the navigation is now open.
Latest of 3 CRT updates, 2 March 2026.
Lock 44, Greenberfield, near Bridge 157
Leeds & Liverpool CanalNorth West
12 days
From 8 January 2026
Reopened 20 January 2026
- Where
- Lock 44, Top Lock to Lock 43, Middle Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigational closure is required to replace the ground paddle on the off side of the lock.
CRT's only update, 29 June 2025.
Long Buckby, Lock 12 – 13
Grand Union CanalLondon and South East
11 days
From 26 January 2026
Reopened 6 February 2026
- Where
- Lock 12 to Lock 13
- CRT reason
- 3rd Party Works
- Cause
- Planned works
- Asset
- Canal or river
Following an on-site review, it has been determined that the length of canal required for surveying to collect the necessary data is shorter than originally planned. The stoppage will now take place between Lock 12 and 13.
Latest of 2 CRT updates, 7 January 2026.
Lock 47, Dudswell lock
Grand Union CanalLondon and South East
11 days
From 12 January 2026
Reopened 23 January 2026
- Where
- Lock 47, Dudswell Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please note the towpath will no longer be closed during these works.
Latest of 2 CRT updates, 29 June 2025.
Lock 69, Nash Mills
Grand Union CanalLondon and South East
11 days
From 2 February 2026
Reopened 13 February 2026
- Where
- Lock 69, Nash Mills
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
The works at Lock 68 have been deferred to a later date. However, the works at Lock 69 will proceed as planned, with revised dates.
Latest of 3 CRT updates, 7 August 2025.
Lock 14, Fradley
Trent & Mersey CanalWest Midlands
11 days
From 8 December 2025
Reopened 19 December 2025
- Where
- Lock 14, Common Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigation and towpath closure are required for top end gate replacement as well as cill and anchor plate repairs.
CRT's only update, 8 May 2025.
Lock 7, Bosley weir
Macclesfield CanalNorth West
11 days
From 6 October 2025
Reopened 17 October 2025
- Where
- Bosley Lock 1 to Bosley Lock 12
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Weir
With a shorter window for the lock gate works at Bosley Lock 7 to allow a window for boat passage – we will undertake improvements to the weir at Lock 7 from 6 October to 17 October while there are other closures in place. We were awaiting listed building consent but now have…
CRT's only update, 3 October 2025.
Lock 46 - Littleborough
Rochdale CanalNorth West
11 days
From 9 March 2026
Reopened 20 March 2026
- Where
- Lock 46
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Essential paddle works are required at Lock 46, and to complete this safely and effectively, a full navigation closure will be in place for the duration of the works. This stoppage is necessary to ensure the continued reliability and safe operation of the lock. We recognise the…
CRT's only update, 27 February 2026.
Lock 2, Stourbridge
Stourbridge CanalWest Midlands
10 days
From 16 February 2026
Reopened 26 February 2026
- Where
- Lock 2, Stourbridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We're pleased to let you know that the works at Stourbridge Lock 2 have been completed ahead of schedule, and the navigation is now open.
Latest of 2 CRT updates, 26 February 2026.
Lock 2 , Rufford Branch , Burscough
Rufford Branch (L&L Canal)North West
9 days
Fully shut 9 of CRT's 11 days
From 10 November 2025
Reopened 21 November 2025
- Where
- Lock 2, 2Nd Lock Rufford Branch
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Unfortunately, this stoppage has been extended until 21st November due to additional work identified on site. This change will affect the stoppage dates for the grouting work at Lock 5, Rufford Branch, which will now run from 21st November to 5th December.
Latest of 2 CRT updates, 18 November 2025.
Ellesmere Tunnel, Ellesmere
Llangollen CanalWest Midlands
7 days
From 3 November 2025
Reopened 10 November 2025
- Where
- Ellesmere Tunnel
- CRT reason
- Inspections
- Cause
- Planned works
- Asset
- Tunnel
We are pleased to announce that the dive survey has been completed ahead of schedule, and both the navigation and towpath are now open at Ellesmere Tunnel.
Latest of 3 CRT updates, 10 November 2025.
Lock 6 - Castle Lock
Nottingham & Beeston CanalEast Midlands
7 days
From 16 February 2026
Reopened 23 February 2026
- Where
- Lock 6 - Castle Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We're pleased to let you know that the works at Castle Lock 6 have been completed ahead of schedule, and the navigation is now open.
Latest of 2 CRT updates, 23 February 2026.
Bridge 59A, Armitage
Trent & Mersey CanalWest Midlands
4 days
From 8 December 2025
Reopened 12 December 2025
- Where
- Bridge 59A
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Canal or river
We have now received the necessary approvals from Network Rail. The works will take place from Monday, 8th December to Friday, 12th December 2025, with our contractor providing additional resources to ensure the work is completed as originally planned.
Latest of 3 CRT updates, 25 November 2025.
Stoke Hammond, Locks 22 – 26
Grand Union CanalLondon and South East
4 days
From 16 February 2026
Reopened 20 February 2026
- Where
- Lock 22, Fenny Stratford Lock to Lock 26, Three Locks top
- CRT reason
- 3rd Party Works
- Cause
- Planned works
- Asset
- Canal or river
We wanted to update you on the planned stoppage. Due to the current high water levels, our teams have been unable to begin works on site as scheduled, so the navigation will remain open for the time being. The stoppage has now been rescheduled and will run from 16 February to 20…
Latest of 4 CRT updates, 12 February 2026.
Stoke Bruerne Lock Flight
Grand Union CanalEast Midlands
4 days
From 26 January 2026
Reopened 30 January 2026
- Where
- Lock 14, Top Lock to Lock 20
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigational closure is required to remove invasive non native fish species.
CRT's only update, 7 May 2025.
Wheaton Aston Stop Gate near Bridge 21, Shushions Bridge
Shropshire Union CanalWest Midlands
4 days
From 9 March 2026
Reopened 13 March 2026
- Where
- Bridge 22, Rye Hill Bridge to Bridge 21, Shushions Bridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Other
A navigation and towpath closure are required for stop gate replacement.
CRT's only update, 8 May 2025.
Woodend Lift Bridge 24
Peak Forest CanalNorth West
4 days
From 17 November 2025
Reopened 21 November 2025
- Where
- Bridge 24, Wood End Lift Bridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lift bridge
We are pleased to confirm that the works at Woodend Lift Bridge have been completed and the navigation is now open.
Latest of 3 CRT updates, 21 November 2025.
Bridge 1, Manchester Road Bridge
South DockLondon and South East
4 days
From 16 February 2026
Reopened 20 February 2026
- Where
- Bridge 1, Manchester Road Bridge to West India Dock Entrance Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Bridge
Following an on-site review, we are pleased to confirm that these works can now be completed within a shorter timeframe. The works will take place over two week-long stoppages, scheduled for 16–20 February and 2–6 March.
Latest of 2 CRT updates, 9 January 2026.
Bridge 188, Grange Swing Bridge - Planned Closure
Leeds & Liverpool CanalYorkshire and North East
4 days
From 23 June 2025
Reopened 27 June 2025
- Where
- Bridge 188, Grange Swing Bridge
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Swing bridge
Works commencing 23.06.2025 for 5 days. Bridge will be in canal closed position but the footpath over the bridge is also closed. Works are being carried out due to some additional funding as part of the Silsden to Kildwick towpath works, these works needed to be carried out…
CRT's only update, 13 June 2025.
Between Catshill Junction and Rushall Lock 1
Daw End Canal, Rushall CanalWest Midlands
3 days
From 11 February 2026
Reopened 14 February 2026
- Where
- Lock 1, Top Lock Rushall
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Canal or river
Please be advised that navigation will be closed for four days from Wednesday 11 February between Catshill Junction and Rushall Lock 1. This stoppage is required to allow for the inspection of safety gates and the installation of a coffer dam. Thank you for your patience while…
CRT's only update, 20 January 2026.
Knowle Lock Flight, Knowle, Solihull
Grand Union CanalWest Midlands
2 days
From 2 February 2026
Reopened 4 February 2026
- Where
- Lock 51, Knowle Top Lock to Lock 47, Knowle Bottom Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigational closure is required to allow us to dewater the lock flight to remove non native species.
CRT's only update, 7 May 2025.
Tottenham Lock Eastern & Western Side, Lee Navigation
Lee NavigationLondon and South East
2 days
Fully shut 2 of CRT's 3 days
From 22 June 2026
Reopened 25 June 2026
- Where
- Lock 17, Tottenham Lock, Eastern Side to Lock 17, Tottenham Lock, Western Side
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
We're pleased to let you know that the essential maintenance works have now been successfully completed, and the lock is fully open to navigation once again. Thank you for your patience, understanding, and cooperation while our team carried out these important works.
Latest of 6 CRT updates, 25 June 2026.
Lock19 - 24 Rochdale - Navigable
Rochdale CanalYorkshire and North East
2 days
From 30 June 2026
Reopened 2 July 2026
- Where
- Lock 19 to Lock 24
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Our team have attended site and the water levels have recovered enough for the section to be navigable. The closure has been removed.
Latest of 3 CRT updates, 2 July 2026.
Near Fosters Bridge 27
Ashby CanalEast Midlands
1 day
From 1 July 2025
Reopened 2 July 2025
- Where
- Ashby Canal - 016
- CRT reason
- Vegetation
- Cause
- Planned works
- Asset
- Canal or river
We will be on site from 8:30am tomorrow, felling a large tree near Fosters Bridge 27, on the Ashby Canal. Due to the size of the tree, both the navigation and towpath will be closed while this work takes place. The W3W is what3words /// The simplest way to talk about location We…
CRT's only update, 1 July 2025.
Lock 7 (Dallow Lock) to Bridge 33 (Shobnall Road Bridge)
Trent & Mersey CanalWest Midlands
1 day
From 4 November 2025
Reopened 5 November 2025
- Where
- Bridge 33, Shobnall Road Bridge to Lock 7, Dallow Lock
- CRT reason
- Vegetation
- Cause
- Planned works
- Asset
- Canal or river
Two trees along this section have been identified as unsafe and will need to be removed by our contractors. To ensure the safety of boaters, the public, and our contractors, it will be necessary to close sections of both the navigation and the towpath while these works are…
CRT's only update, 28 October 2025.
Leeds & Liverpool Canal, Gallows Bridge, Skipton, Skipton - removal of bridge
Leeds & Liverpool CanalYorkshire and North East
1 day
From 3 November 2025
Reopened 4 November 2025
- Where
- Bridge 179, Gallows Footbridge
- CRT reason
- 3rd Party Works
- Cause
- Planned works
- Asset
- Bridge
This section of navigation will be closed whilst the bridge is removed to be taken away and upgraded. This will be done overnight, so will no cause no inconvenience to boaters.
CRT's only update, 28 October 2025.
Gallows Bridge, Skipton
Leeds & Liverpool CanalYorkshire and North East
1 day
From 15 December 2025
Reopened 16 December 2025
- Where
- Bridge 179, Gallows Footbridge
- CRT reason
- 3rd Party Works
- Cause
- Planned works
- Asset
- Bridge
The new Gallows bridge is to be lifted into place overnight on Monday, 15th December, into the morning of Tuesday, 16th December. The canal will be closed in the location of the bridge from approximately 16.00 until the bridge lift is completed. The canal will be open from 06.00…
CRT's only update, 9 December 2025.
Marston Safety Gate, Bedworth
Ashby CanalEast Midlands
1 day
From 10 February 2026
Reopened 11 February 2026
- Where
- Bridge 1, Orton's Bridge to Bridge 15A, Marston Junction Bridge
- CRT reason
- Inspections
- Cause
- Planned works
- Asset
- Other
The Engineering Team will be draining Marston Junction stop gate on the Ashby Canal to undertake a principal Inspection of the Safety Gate between Tuesday 10th February at 10am and Wednesday 11st February at 5pm. The navigation will be closed during these times.
CRT's only update, 26 January 2026.
Between Wilford Bridge and Boots Bridge including Castle Lock on the Nott's Beeston Canal
Nottingham & Beeston CanalEast Midlands
1 day
From 25 February 2026
Reopened 26 February 2026
- Where
- Bridge 11, Boots to Bridge 10 - Wilford Street
- CRT reason
- Vegetation
- Cause
- Planned works
- Asset
- Canal or river
Please be advised that the navigation and towpath at the above location will be closed to all users to facilitate essential, high-priority tree safety works. These works are necessary to address diseased trees that could pose an immediate risk to public safety and vessel passage.
CRT's only update, 24 February 2026.
Navigation Closure - Grand Union Canal, Hanwell flight from lock 90 to lock 97, Norwood/Hanwell
Grand Union CanalLondon and South East
1 day
From 25 March 2026
Reopened 26 March 2026
- Where
- Lock 90, Norwood Top Lock to Lock 97, Hanwell Bottom Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
The Hanwell flight will be closed from 4pm until the next morning so that the side ponds can be sufficiently drained to allow a team scaffolders to install their structures to aid the side pond restoration project. Avoid travelling through the flight after 4pm today.
CRT's only update, 25 March 2026.
Woodlesford Lock
Aire & Calder Navigation Main LineYorkshire and North East
1 day
From 30 March 2026
Reopened 31 March 2026
- Where
- Lock 5, Woodlesford Lock
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
Woodlesford Lock will be closed for passage from 08:00 on Monday 30th until 18:00 on Tuesday 31st March. This is to allow the Operations Team to fit replacement anchors.
CRT's only update, 27 March 2026.
Navigation Closure - Grand Union Canal, Hanwell Flight between lock 90 and 97 , Hanwell
Grand Union CanalLondon and South East
1 day
From 8 April 2026
Reopened 9 April 2026
- Where
- Lock 90, Norwood Top Lock to Lock 97, Hanwell Bottom Lock
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
To aid the Hanwell side pond restoration project, the Hanwell Flight will be closed off from 4pm Wednesday 8th until 2pm Thursday 9th. Moor up before or after the flight and wait for it to be reopened. If within the flight at time of closure, moor up on the long pound between 91…
CRT's only update, 8 April 2026.
Lock 42E to Lock 41E - closed due to Silt removal.
Huddersfield Narrow CanalYorkshire and North East
1 day
From 22 April 2026
Reopened 23 April 2026
- Where
- Lock 41 East to Lock 42 East
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Canal or river
The local team are undertaking silt removal from Lock 41E to Lock 42E so a navigation closure is needed to be in place. This will also impact pedestrian access on the towpath between these two locks as the towpath will be worked upon to act as a platform to retrieve the silt…
CRT's only update, 22 April 2026.
Long Buckby, Between Lock 8 and Lock 13
Grand Union CanalEast Midlands
1 day
From 16 June 2026
Reopened 17 June 2026
- Where
- Lock 8 to Lock 13
- CRT reason
- Inspections
- Cause
- Planned works
- Asset
- Canal or river
The navigation will be closed between Lock 8 and Lock 13 on the Long Buckby Lock Flight to allow pound water seepage testing as part of the Grand Union Canal Transfer Project. Navigation will close at 4:00pm, with the last boat into the lock flight at 2:00pm, on Tuesday 16th…
CRT's only update, 26 May 2026.
Navigation Closure - Limehouse Basin, Limehouse Lock and Narrow Street Swing Bridge, London
Limehouse BasinLondon and South East
1 day
From 24 June 2026
Reopened 25 June 2026
- Where
- Bridge,Narrow St Swingbridge to Lock 1, Limehouse Ship Lock
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
Limehouse Lock will be closed for essential maintenance on these dates Please plan your passage for an alternate date via the Licensing Portal.
CRT's only update, 16 June 2026.
Navigation Closure - Limehouse Basin, Limehouse Lock,
Limehouse BasinLondon and South East
1 day
From 16 July 2026
Reopened 17 July 2026
- Where
- Lock 1, Limehouse Ship Lock
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
Essential maintenance flushing hydraulic systems on Limehouse Lock. Lock will be closed for two days for essential maintenance
CRT's only update, 1 July 2026.
Woodlesford Lock - Divers on Site
Aire & Calder Navigation Main LineYorkshire and North East
1 day
From 14 July 2026
Reopened 15 July 2026
- Where
- Lock 5, Woodlesford Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
The closure at Woodlesford Lock will be extended into Wednesday morning, until 8:00am. This is to allow the concrete more time to fully set.
Latest of 2 CRT updates, 14 July 2026.
Kings Road Lock - Closure
Wakefield Branch (Aire & Calder)Yorkshire and North East
1 day
From 13 July 2026
Reopened 14 July 2026
- Where
- Lock 3, Kings Road Lock
- CRT reason
- Information
- Cause
- Planned works
- Asset
- Lock
Due to divers being on site at Birkwood Lock today, Kings Road Lock will be closed until tomorrow morning, Tuesday 14th July. This is to maintain water levels in the short pound between Kings Road and Birkwood Locks. The lock will reopen at 08:00 tomorrow.
CRT's only update, 13 July 2026.
Birkwood Lock - Divers on Site
Wakefield Branch (Aire & Calder)Yorkshire and North East
1 day
From 13 July 2026
Reopened 14 July 2026
- Where
- Lock 2, Birkwood Lock to Lock 6, Woodnook Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Reissued due to administrative issue regarding the date tomorrow. The lock will remain closed until 08:00 tomorrow, Tuesday 14th July, to ensure that the concrete used to repair the cill has set. As part of our continued commitment to the Better Boating Plan, we will be carrying…
Latest of 2 CRT updates, 13 July 2026.
Sykehouse Lock
New Junction CanalYorkshire and North East
1 day
From 19 July 2026
Reopened 20 July 2026
- Where
- Sykehouse Lock
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Swing bridge
Sykhouse Lock Closure Notice Date: Sunday, 19 July 2026 From 3:00 pm on Sunday, 19 July 2026, Sykhouse Lock will be temporarily closed to allow essential maintenance to be carried out on the swing bridge crossing the lock. A member of the Canal & River Trust will be on site from…
CRT's only update, 19 July 2026.
Bishops Stortford - above Bridge 50, A11 London Road
River StortLondon and South East
same day
From 9 May 2025
Reopened 9 May 2025
- Where
- Bridge 50, A11 London Road
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Canal or river
Please be advised that there is a navigation closure in place to enable bank protection works on the 9th of May. There will also be a towpath restriction in place to enable Banksmen to undertake the necessary works between the Bishops Stortford facilities and Bridge 50.
CRT's only update, 7 May 2025.
Navigation Closure , Tunnel End rail bridge, Huddersfield Narrow Canal - Overnight coring works
Huddersfield Narrow CanalYorkshire and North East
5 days
From 18 May 2025
Ended 23 May 2025
Restriction, not a full closure
- Where
- Bridge 61,Tunnel End Railway Bridge.
- CRT reason
- 3rd Party Works
- Cause
- Planned works
- Asset
- Bridge
The navigation will be closed between 20.00 and 06.00 each night between 19 May and 23 May due to coring works taking place.
CRT's only update, 9 May 2025.
Lock 80 Lot Mead - Lock 81 Batchworth Lock
Grand Union CanalLondon and South East
same day
From 5 June 2025
Reopened 5 June 2025
- Where
- Lock 80, Lot Mead to Lock 81, Batchworth Lock
- CRT reason
- Inspections
- Cause
- Planned works
- Asset
- Lock
To enable a safe inspection of the Towpath approach wall of the Lock Landing using Divers, there is a need to stop any boat movement during the hours of 0800-1600.
CRT's only update, 27 May 2025.
Long Sandall - Visitor Moorings CLOSED
Sheffield & South Yorkshire NavYorkshire and North East
7 days
From 4 July 2025
Ended 11 July 2025
Restriction, not a full closure
- Where
- Long Sandal Lock - Visitor Moorings
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Moorings
The Visitor Moorings at Long Sandall are temporarily closed as the CRT workboat is carrying out some work on a sluice. The work will take place between Friday 4th July up to and including Thursday, 11th July. Please can all currently moored boats be removed from the area to…
CRT's only update, 4 July 2025.
Lock 26 Three Locks Top to Lock 38
Grand Union CanalLondon and South East
same day
From 16 July 2025
Reopened 16 July 2025
- Where
- Lock 26, Three Locks top to Lock 38
- CRT reason
- Low Water Levels
- Cause
- Planned works
- Asset
- Canal or river
Our Operations team will be running water from Lock 38 to Lock 26 and movement will be stopped during this time. This will take approximately 2-3 hours. Once this has been completed the notice will be updated.
CRT's only update, 16 July 2025.
Between Grindley Brook Lock 5 & Lock 6
Llangollen CanalWest Midlands
same day
From 3 August 2025
Reopened 3 August 2025
- Where
- Lock 5, Grindley Brook Locks to Lock 6, Grindley Brook Locks
- CRT reason
- Vegetation
- Cause
- Planned works
- Asset
- Canal or river
Please be advised that contractors will be carrying out essential tree felling works to safely remove a large, dangerous tree between Grindley Brook Locks 5 & 6 on Sunday 3rd August, between 8:30am and 1pm. For the safety of all users, both the navigation and towpath will be…
CRT's only update, 30 July 2025.
Navigation Closure - Regent's Canal, Islington Tunnel, Central London
Regent's CanalLondon and South East
2 days
From 8 September 2025
Ended 10 September 2025
Restriction, not a full closure
- Where
- Islington Tunnel
- CRT reason
- Inspections
- Cause
- Planned works
- Asset
- Tunnel
Islington Tunnel overnight stoppages on Monday 8th and Tuesday 9th September, between 7pm and 7am each day. We will have contractors working overnight within the tunnel on Monday 8th and Tuesday 9th September, undertaking a detailed scan of the tunnel lining. During this time it…
CRT's only update, 19 August 2025.
Farmers Bridge lock flight
Birmingham & Fazeley CanalWest Midlands
same day
From 30 September 2025
Reopened 30 September 2025
- Where
- Farmers Bridge Lock 1, Top Lock to Farmers Bridge Lock 13, Bottom Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please be aware we will be closing the Farmers Bridge lock flight on Tuesday 30th September, from 8:00am to 16:00. We need to dewater Lock 7 and the pounds above/below to investigate the offside bottom end ground paddle culvert for potential failure.
CRT's only update, 16 September 2025.
Manchester Road Bridge
South DockLondon and South East
same day
From 14 February 2026
Reopened 14 February 2026
- Where
- Bridge 1, Manchester Road Bridge
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Bridge
A one-day stoppage is required to carry out an upgrade to the bridge's electrical supply.
CRT's only update, 9 October 2025.
Bosley Lock Flight, Locks 1 to 12, Macclesfield Canal
Macclesfield CanalNorth West
same day
From 5 February 2026
Reopened 5 February 2026
- Where
- Bosley Lock 1 to Bosley Lock 12
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
Bosley Lock Flight, Locks 1 to 12, will be closed to navigation between 08:00 and 16:00 on 05 February 2026. Our local team will be onsite at Lock 12 carrying out essential paddle maintenance. We expect the work to be completed by 16:00 on 05 February and, once complete, normal…
CRT's only update, 4 February 2026.
Lock 28, Stoke Prior
Worcester & Birmingham CanalWest Midlands
same day
From 26 February 2026
Reopened 26 February 2026
- Where
- Lock 23
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
Maintenance work is being carried out to felt and board top end gate for water conservation this summer. The local team will be undertaking the works and will be on site to keep customers up to date with the works as they progress. The towpath will remain open.
CRT's only update, 12 February 2026.
Jarvis Bridge, Sandwell
Titford CanalWest Midlands
same day
From 25 February 2026
Reopened 25 February 2026
- Where
- Jarvis Bridge
- CRT reason
- Vegetation
- Cause
- Planned works
- Asset
- Canal or river
Following a high‑priority tree survey at Jarvis Bridge on the Titford Canal in Sandwell, it has been determined that a dead sycamore tree must be felled for safety reasons. To facilitate this work, a temporary closure of the towpath and navigation in this area will be…
CRT's only update, 23 February 2026.
Navigation Closure - Grand Union Canal, Hanwell flight - Lock 90 to lock 97, Hanwell
Grand Union CanalLondon and South East
2 days
From 30 March 2026
Ended 1 April 2026
Restriction, not a full closure
- Where
- Lock 90, Norwood Top Lock to Lock 97, Hanwell Bottom Lock
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
To assist with the restoration of the side ponds along the Hanwell flight, the flight will be closed off at 4pm and reopened at 8am next day on both Monday and Tuesday. This is to ensure the side ponds do not fill with water overnight. Travel during the day through the flight or…
CRT's only update, 30 March 2026.
Gloucester Lock 2.
River Severn Navigation, Gloucester & Sharpness CanalWales and South West
18 days
From 29 June 2026
Ended 17 July 2026
Restriction, not a full closure
- Where
- Lock 2 Gloucester Lock
- CRT reason
- Information
- Cause
- Planned works
- Asset
- Lock
Please be advised that the essential maintenance works currently taking place at Gloucester Lock 2 are taking longer than originally planned to complete. During the installation of the refurbished stop plank channels, several unforeseen issues were encountered which have delayed…
Latest of 2 CRT updates, 10 July 2026.
Autherley Junction Stop Lock
Shropshire Union CanalWest Midlands
same day
From 1 May 2026
Reopened 1 May 2026
- Where
- Autherley Junction Stop Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Works will be taking place at Autherley Junction Stop Lock tomorrow (01/05/26) to install a new laminated balance beam. The works are expected to take place between 8am and 1pm, during which time navigation through the lock will be closed. If we are able to reopen navigation…
CRT's only update, 30 April 2026.
Don Aqueduct - Essential Works Required w3w ///pint.motorist.bulbs
New Junction CanalYorkshire and North East
same day
From 7 May 2026
Reopened 7 May 2026
- Where
- Don Aqueduct
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Aqueduct
An inspection of essential works at the Don Aqueduct will be carried out on Thursday, 7th May 2026. Following the inspection, further closure dates will be required to allow works to take place. These dates will be confirmed as soon as possible.
CRT's only update, 5 May 2026.
Planned Closure - Don Aqueduct (Cancelled)
New Junction CanalYorkshire and North East
same day
From 18 May 2026
Ended 18 May 2026
Restriction, not a full closure
- Where
- Don Aqueduct
- CRT reason
- Inspections
- Cause
- Planned works
- Asset
- Lock
Please note that the planned closure for the essential maintenance inspections at Don Aqueduct has now been cancelled due to unforeseen circumstances. At present, both guillotine locks will remain open and navigation will continue as normal. We will provide a further update once…
Latest of 2 CRT updates, 18 May 2026.
Between Bridge 72 and 73, Adderley
Shropshire Union CanalWest Midlands
same day
From 8 June 2026
Reopened 8 June 2026
- Where
- Bridge 73, Kemps Bridge to Bridge 72, Hawksmoor Bridge
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Canal or river
Please be advised that the navigation between Bridge 72 and Bridge 73 on the Shropshire Union Canal is temporarily closed for health and safety reasons. This is to allow contractors to safely remove a dam within the channel. We expect to reopen by 13:00 today. We apologise for…
CRT's only update, 8 June 2026.
Woodnook Lock - Divers on Site
Wakefield Branch (Aire & Calder)Yorkshire and North East
same day
From 15 July 2026
Reopened 15 July 2026
- Where
- Lock 6, Woodnook Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
As part of our continued commitment to the Better Boating Plan, we will be carrying out essential underwater repair works at Woodnook Lock on Wednesday to improve the reliability and performance of the lock gates. Specialist commercial divers will be undertaking repairs to the…
CRT's only update, 10 July 2026.
Woodnook Lock
Wakefield Branch (Aire & Calder)Yorkshire and North East
same day
From 14 August 2026
Reopened 14 August 2026
- Where
- Lock 6, Woodnook Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
As part of our continued commitment to the Better Boating Plan, we will be carrying out essential underwater repair works at Woodnook Lock on Friday, 14th August, to improve the reliability and performance of the lock gates. Specialist commercial divers will be undertaking…
CRT's only update, 30 July 2026.
Lemonroyd Lock - Divers on Site 10th August
Aire & Calder Navigation Main LineYorkshire and North East
same day
From 10 August 2026
Reopened 10 August 2026
- Where
- Lock 7, Lemonroyd Lock
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
As part of our continued commitment to the Better Boating Plan, we will be carrying out essential underwater repair works at Lemonroyd Lock on Monday 10th August, to improve the reliability and performance of the lock gates. Specialist commercial divers will be undertaking…
CRT's only update, 30 July 2026.
Lemonroyd Lock - Divers on Site 12th August
Aire & Calder Navigation Main LineYorkshire and North East
same day
From 12 August 2026
Reopened 12 August 2026
- Where
- Lock 7, Lemonroyd Lock
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
As part of our continued commitment to the Better Boating Plan, we will be carrying out essential underwater repair works at Lemonroyd Lock on Wednesday, 12th August, to improve the reliability and performance of the lock gates. Specialist commercial divers will be undertaking…
CRT's only update, 30 July 2026.
Figure of Three Locks - Divers on Site 11th August
Calder & Hebble NavigationYorkshire and North East
same day
From 11 August 2026
Reopened 11 August 2026
- Where
- Lock 23, Figure Of Three Top
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
As part of our continued commitment to the Better Boating Plan, we will be carrying out essential underwater repair works at Figure of Three on Tuesday 11th August, to improve the reliability and performance of the lock gates. Specialist commercial divers will be undertaking…
CRT's only update, 30 July 2026.
Figure of Three Locks - Divers On Site 14th August
Calder & Hebble NavigationYorkshire and North East
same day
From 14 August 2026
Reopened 14 August 2026
- Where
- Lock 23, Figure Of Three Top
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
As part of our continued commitment to the Better Boating Plan, we will be carrying out essential underwater repair works at Figure of Three on Friday 14th August, to improve the reliability and performance of the lock gates. Specialist commercial divers will be undertaking…
CRT's only update, 30 July 2026.
Lock 23 - work to replace the head paddles
Rochdale CanalYorkshire and North East
same day
From 6 August 2026
Reopened 6 August 2026
- Where
- Lock 23
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
Lock 23 will be closed on Thursday August 6th to replace the old head paddles that are needing to be replaced with new paddles. Please do not move in this area and follow any instructions given should your craft be close to the maintenance works. The notice will be update and…
CRT's only update, 5 August 2026.
Thorne Lock - CLOSURE
Stainforth & Keadby CanalYorkshire and North East
same day
From 24 September 2026
Reopened 24 September 2026
- Where
- Thorne Lock
- CRT reason
- Maintenance
- Cause
- Planned works
- Asset
- Lock
Thorne Lock will be closed to navigation today while essential grouting work is carried out, the electricity supply will be switched off during the works. The lock will reopen as usual at 5 pm. We apologise for any inconvenience this causes.
CRT's only update, 24 September 2026.
Showing the 143 longest of 143. Every row links to the notice CRT published.
Coming up
Scheduled but not yet started, so in no figure above.
Why they close · Canals · Reliability · Trends · Download data