Canal closures

Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.

The archive / River Stort

River Stort

4.6 closure-days per kilometre (95% range 3.7–5.5) — 101 days across 17 closures of this 22km canal.

Lengths from CRT's ArcGIS open data, published under the strictest reading of its licence. A notice is attributed to the whole named waterway, not to a point.

Something was shut here on 33% of this cruising season — 77 of its 231 days — across 10 separate closures.

That means a closure somewhere on the canal, not that the whole canal was impassable. Every closure below names the locks or bridges it sat between.

1 closure is still shut now, and 1 of those has no reopening date. Filter to it.

Regions
London and South East
On record
18 closures

The season, closure by closure

Each row is one closure. A bar starts and ends where the closure did, and its length is how long it ran; dashed bars have not started yet.

2026-03-15one bar is one closure2026-10-31

Every closure on record

Population

Status

Period

2025 season2026 seasonAll time

Duration

Cause

Asset affected

CRT reason

Region

Showing all 17 closures on the River Stort.

17
closures
101
closure-days
99
in cruising season
1
no reopening date
What these figures mean
Population
Which closures a figure counts. All closures is everything; Unplanned, in season drops CRT's scheduled winter programme and any day outside the 15 March to 31 October cruising season; CRT winter programme is that maintenance alone.
Defensible duration
The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
Closure-days
One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals.
The season so farweeks with a closure in force
Closures in force each monthclosures active during the month
2
0
2
1
0
1
0
0
2
0
1
0
2
1
3
4
2
May 25Jun 25Jul 25Aug 25Sep 25Oct 25Nov 25Dec 25Jan 26Feb 26Mar 26Apr 26May 26Jun 26Jul 26Aug 26Sep 26
Whereclosure-days by region
London and South East10117
17 results · every closure on the River StortJump to table
NoticeExtentStartedDays
Navigation Closure River Stort – From Harlow Mill Lock 8 To Lower Lock 15, Roydon
Low Water Levels · Weather · no reopening date
Lock 15, Lower Lock to Lock 8, Harlow Mill Lock2026-08-0350
Below Hunsdon Lock on the River Stort
Low Water Levels · Other cause
Lock 13, Roydon Lock to Lock 12, Hunsdon Mill Lock2025-05-199
Low water levels between Lock 6 Sheering Mill Lock and Lock 7, Feakes Lock.
Low Water Levels · Cause not stated
Lock 7, Feakes Lock to Lock 6, Sheering Mill Lock2026-05-188
Navigation Closure - Lee Navigation, Parndon Mill Lock, Parndon
Repair · Wear and tear
Lock 11, Parndon Mill Lock to Lock 10, Burnt Mill Lock2025-07-165
Navigation Closure - River Stort, SR-001-001 Lower Lock 15, Hoddesdon
Low Water Levels · Cause not stated
Lock 15, Lower Lock to Lock 14, Brick Lock2025-07-305
Navigation Closure - River Stort, Between Bridge 31 Sawbridgeworth and and bridge 30, Sawbridgeworth
Vegetation · Weather
Fixed Weir 12 2m NE of Bridge 30 to Bridge 31, Sawbridgeworth Towpath2026-06-254
Navigation Closure - River Stort, Lock 11, Parndon Mill Lock, Harlow Town
Repair · Struck by boat or vehicle
Lock 11, Parndon Mill Lock2026-07-204
Upstream of Moorhen marina and between Moorhen and Bailey bridge
Vegetation · Weather
Moorhen Marina Lift Bridge to Bridge 18, Bailey Bridge2026-08-304
River Stort Temporary Lock Closures Lock 12 Hunsdon Mill Lock to Lock 15, Lower Lock
Low Water Levels · Weather
Lock 15, Lower Lock to Lock 12, Hunsdon Mill Lock2026-07-313
Lock 11, Parndon Mill Lock
Low Water Levels · Weather
Lock 11, Parndon Mill Lock2026-08-013
SR-001-001 Lock 15, Lower Lock, River Stort
Low Water Levels · Other cause
Lock 15, Lower Lock2025-10-112
Navigation Closure - River Stort, Lock 15 Roydon Lower Lock and Lock 14 Brick Lock, Roydon
Low Water Levels · Cause not stated
Lock 15, Lower Lock to Lock 14, Brick Lock2026-07-292
Lock 10 burnt mill
Repair · Wear and tear
Lock 10, Burnt Mill Lock2026-01-081
Fixed Weir 9 66m W of Bridge 21
Boating Incident · Other cause
Lock 9, Latton Lock to Bridge 21, Harlow Footbridge2026-01-161
Bishops Stortford - above Bridge 50, A11 London Road
Maintenance · Wear and tear
Bridge 50, A11 London Road2025-05-09same day
Navigation Closure - River Stort, Lock 9 Latton , Harlow
Repair · Wear and tear
Lock 9, Latton Lock2026-03-30same day
Low water between locks 14 and 15
Low Water Levels · Cause not stated
Lock 15, Lower Lock to Lock 14, Brick Lock2026-05-29same day

Coming up

Scheduled but not yet started, so in no figure above.

1 scheduled.
ClosureFromPlanned
Sawbridgeworth Lock 5
River Stort · Repair
2 November 202646 days

Not counted

Cancelled notices and ones whose dates cannot be right are in no figure on this page. They are kept here because CRT published them.

1 notices excluded from the figures.
NoticeStateStarted
Sawbridgeworth Lock 5Published2 November 2026

Download the data · Method and limits · The network