Canal closures

Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.

The archive / Caldon Canal

Caldon Canal

12.1 closure-days per kilometre (95% range 10.8–13.4) — 329 days across 14 closures of this 27km canal.

Lengths from CRT's ArcGIS open data, published under the strictest reading of its licence. A notice is attributed to the whole named waterway, not to a point.

Something was shut here on 26% of this cruising season — 60 of its 231 days — across 8 separate closures.

That means a closure somewhere on the canal, not that the whole canal was impassable. Every closure below names the locks or bridges it sat between.

2 closures are still shut now, and 1 of those has no reopening date. Filter to them.

Regions
West Midlands
On record
15 closures

The season, closure by closure

Each row is one closure. A bar starts and ends where the closure did, and its length is how long it ran; dashed bars have not started yet.

2026-03-15one bar is one closure2026-10-31

Every closure on record

Population

Status

Period

2025 season2026 seasonAll time

Duration

Cause

Asset affected

CRT reason

Region

Showing all 14 closures on the Caldon Canal.

14
closures
329
closure-days
349
in cruising season
1
no reopening date
What these figures mean
Population
Which closures a figure counts. All closures is everything; Unplanned, in season drops CRT's scheduled winter programme and any day outside the 15 March to 31 October cruising season; CRT winter programme is that maintenance alone.
Defensible duration
The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
Closure-days
One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals.
The season so farweeks with a closure in force
Closures in force each monthclosures active during the month
1
2
2
3
2
2
1
1
0
0
1
0
4
0
1
3
2
May 25Jun 25Jul 25Aug 25Sep 25Oct 25Nov 25Dec 25Jan 26Feb 26Mar 26Apr 26May 26Jun 26Jul 26Aug 26Sep 26
Whereclosure-days by region
West Midlands32914
14 results · every closure on the Caldon CanalJump to table
NoticeExtentStartedDays
Caldon Canal - Hazlehurst Top Lock to Froghall
Low Water Levels · Weather
Lock 10 Hazelhurst Top Lock to Froghall Basin Lock2025-08-1192
Hazelhurst Top Lock to Froghall
Low Water Levels · Weather
Lock 10 Hazelhurst Top Lock to Froghall Basin Lock2025-05-2677
Froghall Basin Lock
Repair · Wear and tear
Froghall Basin Lock2026-07-3054
Hazelhurst to Froghall Basin
Low Water Levels · Weather · no reopening date
Lock 10 Hazelhurst Top Lock to Froghall Basin Lock2026-08-0152
Cheddleton Top Lock to Cheddleton Bottom Lock
Low Water Levels · Cause not stated
Lock 14 Cheddleton Bottom Lock to Lock 13 Cheddleton Top Lock2025-07-1626
Lock 7, Railway Lock
Maintenance · Wear and tear
Lock 7 Railway Lock2025-09-2924
Lock 16 (Oakmeadowford Lock)
Repair · Wear and tear
Lock 16 Oakmeadowford Lock2026-08-032
Between Bedford Street Lock 1 and Lock 9
Low Water Levels · Weather
Lock 1 Bedford Street to Lock 9 Top Lock2025-06-191
Bridge 49, Black Lion Footbridge, Consall
Vegetation · Weather
Bridge 49, Black Lion Footbridge2025-12-161
Bedford Street Staircase Locks
Repair · Wear and tear
Lock 1 Bedford Street to Lock 2 Bedford St Top Lock2026-03-18same day
Caldon Canal Bridge 11, Ivyhouse Road Lift Bridge
Repair · Cause not stated
Bridge 11, Ivyhouse Road Lift Bridge2026-05-10same day
Lock 13 Cheddleton Top Lock, Stoke
Repair · Wear and tear
Lock 13 Cheddleton Top Lock2026-05-25same day
Lock 13 Cheddleton Top Lock, Stoke
Repair · Wear and tear
Lock 13 Cheddleton Top Lock2026-05-26same day
Between Lock 13 (Cheddleton Top Lock) and Bridge 44 (Basford Lane Bridge)
Pollution Incident · Other cause
Lock 13 Cheddleton Top Lock to Bridge 44, Basford Lane Bridge2026-05-20same day

Coming up

Scheduled but not yet started, so in no figure above.

1 scheduled.
ClosureFromPlanned
Road Lock 8, Stockton Brook
Caldon Canal · Repair
2 November 202646 days

Not counted

Cancelled notices and ones whose dates cannot be right are in no figure on this page. They are kept here because CRT published them.

1 notices excluded from the figures.
NoticeStateStarted
Road Lock 8, Stockton BrookPublished2 November 2026

Download the data · Method and limits · The network