CRT Stoppages Archive

Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.

All closures / Why they close / Planned works

Planned works

Cruising-season closures outside CRT's winter programme, with this cause: 18 in June to August 2026 against 7 a year earlier, up by more than chance would produce; tested on its own, not among the trends page's findings. How a change is tested.

On record
211 notices since May 2025: 137 closures, 6 restrictions and 68 not yet started

In force today

2 closures with this cause are in force today, longest shut first. Filter the explorer to them.

Shut today, counted to today.
CanalWhereSinceDays shut
Oxford CanalLock 33, Aynho Weir Lock17 August 202640
River SoarLock 48 - Cossington Lock7 September 202619

By canal

53 canals have had a closure with this cause. A closure naming two canals counts on both.

Closures with this cause on each canal since May 2025, most first.
CanalClosures
Grand Union Canal30
Leeds & Liverpool Canal17
Rochdale Canal11
Monmouthshire & Brecon Canal10
Shropshire Union Canal10
Trent & Mersey Canal10
Staffordshire & Worcestershire Cnl9
Huddersfield Narrow Canal8
Calder & Hebble Navigation6
Kennet & Avon Canal6
New Junction Canal5
Oxford Canal5
Show 41 moreShow fewer
CanalClosures
Rufford Branch (L&L Canal)5
Stourbridge Canal5
Aire & Calder Navigation Main Line4
Birmingham & Fazeley Canal4
River Soar4
Wakefield Branch (Aire & Calder)4
Ashby Canal3
Chesterfield Canal3
Gloucester & Sharpness Canal3
Leicester Line (Grand Union Canal)3
North Stratford Canal3
Regent's Canal3
Worcester & Birmingham Canal3
Glasson Branch (Lancaster Canal)2
Huddersfield Broad Canal2
Limehouse Basin2
Llangollen Canal2
Macclesfield Canal2
Nottingham & Beeston Canal2
Peak Forest Canal2
River Stort2
Rushall Canal2
South Dock2
Tame Valley Canal2
Aylesbury Arm (Grand Union Canal)1
Bank Dole Cut1
Caldon Canal1
Daw End Canal1
Erewash Canal1
Gower Branch (New Main Line)1
Lee Navigation1
Montgomery Canal1
New Mainline1
Old Main Line1
Ripon Canal1
River Severn Navigation1
River Witham1
Sheffield & South Yorkshire Nav1
South Stratford Canal1
Stainforth & Keadby Canal1
Titford Canal1

Every closure on record

Showing 137 closures and 6 restrictions whose cause reads “Planned works”.

Period

Rank by

Population

11 closures are in neither group: 10 unplanned with no day in the cruising season since May 2025, and 1 not started yet.

Status

Duration

Cause

Asset affected

CRT reason

Region

137
closures
3,807
closure-days since May 2025
559
in cruising season
0
no reopening date
What these figures mean
Population
Which closures a figure counts. All closures is everything; Unplanned closure drops the works CRT flags as its winter programme and any day outside the cruising season (the Friday nearest 15 March to the Sunday before the first Monday in November). Scheduled work CRT does not flag as winter works still counts here. CRT Planned closure is the flagged winter programme alone.
Defensible duration
The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
Closure-days
One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals. They are counted from 1 May 2025, when this archive begins: a closure that started earlier adds only its days since then, though its own row shows its whole length. Every figure and chart counts only the days inside the Period chosen above them.
In force
A closure is in a Period, and a day is one a closure affected, if it was in force at any time that day, including the morning it reopened. Closure-days measure how long, so they count whole days and not the reopening day: a closure can be in a Period and add no closure-day to it.

Closures in force each month

closures active during the month
1
4
4
3
5
7
34
30
39
55
28
4
3
5
7
7
3
May 25Jun 25Jul 25Aug 25Sep 25Oct 25Nov 25Dec 25Jan 26Feb 26Mar 26Apr 26May 26Jun 26Jul 26Aug 26Sep 26

Canals ranked by the season's closures

share of the period's cruising-season days up to today — a closure somewhere on a long canal is likelier, and does not mean the canal was impassableclosures in force on the period's cruising-season days — a longer canal has more to go wrong on

Where

closure-days by regionclosures by region

A region with more canal has more to go wrong on, so these totals partly measure its size. Regions compared by length of canal are on the Reliability page.

CRT's reason

closure-days by the reason CRT filedclosures by the reason CRT filed

What fails

closure-days by assetclosures by asset
Lock2,953100
Bridge1237
Other513
Weir111
Show 4 moreShow fewer
Lock1002,953
Bridge7123
Other351
Show 4 moreShow fewer

What fails on a lock

closure-days by part — unplanned lock failures naming a partclosures by part — unplanned lock failures naming a part

How long they last

closures by full length, including any days before May 2025 — the bands are not equal in width
37
13
29
55
3
0
<=1d2-7d8-30d31-90d91-365d>365d
143 results · every closure whose cause reads “Planned works”Jump to list

Closures

  1. Lock 1 to the Aylesbury Arm Basin

    Aylesbury Arm (Grand Union Canal)London and South East

    226 days

    From 16 June 2025

    Reopened 28 January 2026

    Where
    Lock 1 to Lock 16
    CRT reason
    Low Water Levels
    Cause
    Planned works
    Asset
    Canal or river

    We are pleased to advise the Aylesbury Arm will re-open fully tomorrow 28th January 2026 at 10:00 am. Thank you for your patience whilst the arm was closed.

    Latest of 8 CRT updates, 27 January 2026.

  2. Spouthouse Embankment, Perry Barr, Birmingham

    Tame Valley CanalWest Midlands

    130 days

    From 3 November 2025

    Reopened 13 March 2026

    Where
    Culvert 3, Hampstead to Perry Barr Lock 1, Top Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Embankment

    A navigation and towpath closure are required for significant canal bed replacement works to two areas of the canal over the length of Spouthouse Embankment. The canal will be drained between Gorse Farm Bridge and Tower Hill and works will also include canal wall rebuild and…

    CRT's only update, 8 May 2025.

  3. Perry Barr Lock Flight

    Tame Valley CanalWest Midlands

    123 days

    From 9 June 2025

    Reopened 10 October 2025

    Where
    Perry Barr Lock 1, Top Lock to Perry Barr Lock 13, Bottom Lock
    CRT reason
    Low Water Levels
    Cause
    Planned works
    Asset
    Lock

    This section is still closed due to low water levels. Whilst the closure is in place engineers are investigating the locks for any potential damage, so some maybe empty. We will continue to monitor the situation closely and will provide further updates.

    Latest of 4 CRT updates, 3 October 2025.

  4. Lock 19 Gas Pipe Lock - near Kibworth Harcourt

    Leicester Line (Grand Union Canal)East Midlands

    74 days

    From 12 January 2026

    Reopened 27 March 2026

    Where
    Lock 19 - Gas Pipe Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Work at Gas Pipe Lock has been delayed by severe weather and flooding in early January, which held up the start of the planned stoppage by two weeks. The project includes full replacement of both lock gates, repairs, and lock ladder renewal. Because the original programme…

    Latest of 2 CRT updates, 13 February 2026.

  5. Lock 36 - Gees Lock - Near Whetstone

    Leicester Line (Grand Union Canal)East Midlands

    73 days

    From 19 January 2026

    Reopened 2 April 2026

    Where
    Lock 36 - Gees Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Works at Gees Lock 36 are running behind schedule due to operational challenges, including low water levels affecting access to the site. Progress has also been slowed by limited lifting capacity, as only one crane boat is currently available. Flooding elsewhere on the network…

    Latest of 4 CRT updates, 20 March 2026.

  6. Locks 42, 43 and 44 - Marsworth Flight

    Grand Union CanalLondon and South East

    73 days

    From 6 January 2026

    Reopened 20 March 2026

    Where
    Lock 42 to Lock 44
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Work on the Marsworth Flight has been delayed by severe weather throughout the project. As a result, the team has been unable to complete all required repairs within the original stoppage window. To allow the remaining work to be completed safely and to the required standard, we…

    Latest of 4 CRT updates, 4 March 2026.

  7. Lock 87, Ham lock, near Thatcham

    Kennet & Avon CanalWales and South West

    67 days

    From 3 November 2025

    Reopened 9 January 2026

    Where
    Lock 87, Ham Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Unfortunately, we now require additional time on site to complete these works to the required standard. The stoppage will now end on 9th January. We have experienced challenges with effectively damming the lock, which has caused delays in replacing the bottom gates. To ensure…

    Latest of 3 CRT updates, 12 December 2025.

  8. Canal bed inspections, Glan Usk

    Monmouthshire & Brecon CanalWales and South West

    67 days

    From 5 January 2026

    Reopened 13 March 2026

    Where
    Bridge 120, Baylis Bridge to Bridge 125, Dyfnant Bridge
    CRT reason
    Inspections
    Cause
    Planned works
    Asset
    Canal or river

    A navigational closure to allow inspection and repairs of the canal bed.

    CRT's only update, 6 May 2025.

  9. Canal bed inspections, Lower Llangynidr

    Monmouthshire & Brecon CanalWales and South West

    67 days

    From 5 January 2026

    Reopened 13 March 2026

    Where
    Bridge 125, Dyfnant Bridge to Bridge 129, Panteague
    CRT reason
    Inspections
    Cause
    Planned works
    Asset
    Canal or river

    A navigational closure to allow inspection and repairs of the canal bed.

    CRT's only update, 6 May 2025.

  10. Canal bed inspections, Cross Oak, Nr Talybont-on-Usk

    Monmouthshire & Brecon CanalWales and South West

    67 days

    From 5 January 2026

    Reopened 13 March 2026

    Where
    Bridge 146, Chilson Bridge to Bridge 152, Castle Bridge
    CRT reason
    Inspections
    Cause
    Planned works
    Asset
    Canal or river

    A navigational closure to allow inspection and repairs of the canal bed

    CRT's only update, 6 May 2025.

  11. Lock 81 and Top Lock 65, Near Wigan

    Leeds & Liverpool CanalNorth West

    67 days

    From 5 January 2026

    Reopened 13 March 2026

    Where
    Lock 85, Lock 21 to Lock 65, Top Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Please be advised that, in addition to the advertised works at Locks 81 and 65, we will also be carrying out repair works at Lock 75, which require the lock to be dewatered. The stoppage dates and closure location remain unchanged as originally communicated. Both teams have…

    Latest of 2 CRT updates, 16 January 2026.

  12. Lock 12, Brighouse Bottom

    Calder & Hebble NavigationYorkshire and North East

    67 days

    From 5 January 2026

    Reopened 13 March 2026

    Where
    Bridge 2, Elland to Lock 15, Kirklees Low Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for a full lock gate replacement & general repairs

    CRT's only update, 7 May 2025.

  13. Lock 5, Woodside Mills - Near Elland

    Calder & Hebble NavigationYorkshire and North East

    67 days

    From 5 January 2026

    Reopened 13 March 2026

    Where
    Lock 3, Salterhebble Bottom to Lock 5, Woodside Mills
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for a full lock gate replacement & general repairs

    CRT's only update, 7 May 2025.

  14. Lock 36 Otherton, Penkridge

    Staffordshire & Worcestershire CnlWest Midlands

    67 days

    From 5 January 2026

    Reopened 13 March 2026

    Where
    Littleton Colliery Railway Bridge 80A to Bridge 83 Lyne Hill Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    The gates are composite and after further investigations are going to require off-site refurbishment. We require additional time at this stoppage to complete the works to the necessary standard. Starting the works a bit earlier will allow us to complete by the original 13 March…

    Latest of 2 CRT updates, 12 September 2025.

  15. Lock 37, Penkridge

    Staffordshire & Worcestershire CnlWest Midlands

    67 days

    From 5 January 2026

    Reopened 13 March 2026

    Where
    Bridge 84, Filance Bridge to Bridge 85, Princefield Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for top and bottom gate replacements and quoin repairs.

    CRT's only update, 8 May 2025.

  16. Lock 48, Worksop Stret Lock - Near Worksop

    Chesterfield CanalYorkshire and North East

    60 days

    From 12 January 2026

    Reopened 13 March 2026

    Where
    Lock 48, Worksop Stret Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for a full lock gate replacement & general repairs

    CRT's only update, 7 May 2025.

  17. Lock 4, Adderley

    Shropshire Union CanalWest Midlands

    60 days

    From 12 January 2026

    Reopened 13 March 2026

    Where
    Adderley Lock 5 to Adderley Lock 1
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for top and bottom gate replacements and brickwork repairs. We will also be doing lock landing repairs below lock 4.

    CRT's only update, 8 May 2025.

  18. Lock 21 East - Closed in preparation for repairs to the stop plank grooves

    Huddersfield Narrow CanalYorkshire and North East

    58 days

    From 22 October 2025

    Reopened 19 December 2025

    Where
    Lock 21 East, Waterside Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Lock 21 East will be locked up due to preparation work that is needed for the repairs to the stop plank grooves, taking place under the Winter Stoppages Works. This is to ensure that the team are working in the conditions needed to undertake the preparation work for the Winter…

    CRT's only update, 21 October 2025.

  19. Lock 5, Camp Hill

    Grand Union CanalWest Midlands

    53 days

    From 5 January 2026

    Reopened 27 February 2026

    Where
    Lock 6, Camp Hill (Lock 57) to Lock 1, Camp Hill Top Lock (Lock 52)
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Due to additional work identified while on site, this stoppage will be extended and is now planned to complete on 27 February. During the course of the project, our team identified further brickwork repairs that were not included in the original scope. In addition, we found that…

    Latest of 2 CRT updates, 12 February 2026.

  20. Lock 21 - Pywells Lock - near Kibworth Harcourt

    Leicester Line (Grand Union Canal)East Midlands

    53 days

    From 12 January 2026

    Reopened 6 March 2026

    Where
    Lock 21 - Pywells Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We'd like to clarify the nature of the upcoming works at Pywells Lock. The project has always been intended for gate repairs rather than a full gate replacement. The schedule remains unchanged, as other essential works are also planned during this 8-week stoppage. These repairs…

    Latest of 2 CRT updates, 5 December 2025.

  21. Lock 20, Dowley Gap Bottom Lock - Near Bingley

    Leeds & Liverpool CanalYorkshire and North East

    53 days

    From 5 January 2026

    Reopened 27 February 2026

    Where
    Lock 21, Dowley Gap Top Lock to Bridge 206, Dowley Gap Changeline Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Please note the towpath will no longer be closed during these works.

    Latest of 2 CRT updates, 29 June 2025.

  22. Lock 8, Mayroyd - Near Hebden Bridge

    Rochdale CanalYorkshire and North East

    53 days

    From 5 January 2026

    Reopened 27 February 2026

    Where
    Bridge 14, Fallingroyd Tunnel to Lock 8, Mayroyd
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Following a detailed inspection after the canal was dewatered, we have identified that the repairs required are more extensive than originally anticipated. These works will now require specialist contractor involvement. To ensure the repairs are completed safely and to the…

    Latest of 2 CRT updates, 5 February 2026.

  23. Kegworth Flood Lock 57

    River SoarEast Midlands

    53 days

    From 1 September 2025

    Reopened 24 October 2025

    Where
    Lock 57 - Kegworth Shallow Flood Lock
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Lock

    Over the last two years, planned work on the River Soar over the winter period has been severely impacted by flooding. To give us the best chance of completing the planned double lock gate replacement at Kegworth Lock we are moving this work forward to start on 1st September…

    CRT's only update, 24 July 2025.

  24. Lock 12, Napton on the Hill

    Oxford CanalWest Midlands

    52 days

    From 26 January 2026

    Reopened 19 March 2026

    Where
    Lock 8, Napton Bottom Lock to Lock 14, Adkins Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We would like to offer our sincere apologies, as we require an extension of up to 6 days to complete the remaining works on site. During the removal and installation of the gates this week, our team identified several unforeseen issues that could not have been detected before…

    Latest of 4 CRT updates, 13 March 2026.

  25. York street lock - Stourport on Severn

    Staffordshire & Worcestershire CnlWest Midlands

    51 days

    From 5 January 2026

    Reopened 25 February 2026

    Where
    York Street Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We're pleased to let you know that the works at York Street Lock have been completed ahead of schedule, and the navigation is now open.

    Latest of 4 CRT updates, 25 February 2026.

  26. Lock 81, Hamstead Lock, near Hamstead Marshall

    Kennet & Avon CanalWales and South West

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Lock 81, Hamstead Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Please note the towpath will no longer be closed during these works.

    Latest of 2 CRT updates, 29 June 2025.

  27. Bridge 62, High Bridge, Mamhilad

    Monmouthshire & Brecon CanalWales and South West

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Bridge 62, High Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Bridge

    Please note the towpath will no longer be closed during these works.

    Latest of 2 CRT updates, 29 June 2025.

  28. Canal bed inspections near Goytre

    Monmouthshire & Brecon CanalWales and South West

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Bridge 75, Jenkin Rosser to Bridge.76 Lapstone
    CRT reason
    Inspections
    Cause
    Planned works
    Asset
    Canal or river

    A navigational closure to allow inspection and repairs of the canal bed

    CRT's only update, 6 May 2025.

  29. Llanfoist Safety Gates (upstream and downstream), Embankment 8A, Llanfoist.

    Monmouthshire & Brecon CanalWales and South West

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Tod's Bridge to Bridge 96, Govilon Turn
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Other

    Due to additional work identified on site, the safety gate replacement will not be completed by the advertised stoppage end date of 19th December. During installation of the new gates, it was discovered that the quoins had shifted. Our team will carry out the necessary remedial…

    Latest of 2 CRT updates, 12 December 2025.

  30. Lock 13, Tilstone

    Shropshire Union CanalNorth West

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Lock 13 Tilstone Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigational closure is required for top and bottom gate repair works and ladder hoop modifications.

    CRT's only update, 6 May 2025.

  31. Locks 22, 26, 27 and 28 West, Diggle

    Huddersfield Narrow CanalNorth West

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Bridge66, Ward Lane Bridge to Bridge 71, Wool Road
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Please be advised that the works at Lock 22W have been completed and the lock is now open. The stoppage now runs from Bridge 66, Ward Lane Bridge, to Bridge 71, Wool Road Bridge, while works continue at Locks 26W, 27W, and 28W.

    Latest of 4 CRT updates, 26 November 2025.

  32. Lock 2, Camp Hill

    Grand Union CanalWest Midlands

    46 days

    From 5 January 2026

    Reopened 20 February 2026

    Where
    Lock 6, Camp Hill (Lock 57) to Lock 1, Camp Hill Top Lock (Lock 52)
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for top and bottom lock gate replacements. We will also be doing lock chamber brickwork repairs.

    CRT's only update, 7 May 2025.

  33. Bank Dole Lock (5) in Knottingley

    Bank Dole CutYorkshire and North East

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Trundles Lane Bridge to Bank Dole Lock (Lock 5)
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for downstream gate replacements & upstream lock gate repairs.

    CRT's only update, 7 May 2025.

  34. Bridge 11, Dratley's Bridge - Near Burton Hastings

    Ashby CanalEast Midlands

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Bridge 11, Dratley's Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Bridge

    Following a review of the works and customer feedback, this stoppage will now commence on 03/11/2025 to align with the start of the Intensive Maintenance Period.

    Latest of 3 CRT updates, 19 September 2025.

  35. Lock 7, Top Lock - Near Long Buckby Wharf

    Grand Union CanalEast Midlands

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Lock 7, Top Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Following a review of the works and customer feedback, this stoppage will now commence on 03/11/2025 to align with the start of the Intensive Maintenance Period.

    Latest of 3 CRT updates, 17 September 2025.

  36. Lock 81 and Miles Platting Bridge, Manchester

    Rochdale CanalNorth West

    46 days

    From 5 January 2026

    Reopened 20 February 2026

    Where
    Lock 66 Tannersfield Highest to Bridge 88, Red Hill Street Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    This navigational closure will encompass 2 pieces of work, the navigation will be closed from bridge 88 through to lock 66. We will be replacing the top & bottom gates of lock 81 along with masonry repairs, ladder & paddle works. We will also be doing leakage repairs to the…

    CRT's only update, 8 May 2025.

  37. Lock 20, Kingswood

    North Stratford CanalWest Midlands

    46 days

    From 5 January 2026

    Reopened 20 February 2026

    Where
    Lock 20
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We're pleased to confirm that the works at Kingswood Lock 20 will be completed ahead of schedule, and navigation will reopen on 20 February. Some works will continue on the lockside after navigation has reopened, but these will not affect boat movements. Thank you for your…

    Latest of 2 CRT updates, 17 February 2026.

  38. Lock 1 - Near Mirfield

    Huddersfield Broad CanalYorkshire and North East

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Bridge 3b, Pipebridge 2 to Lock 1
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for a full lock gate replacement and wash wall repairs.

    CRT's only update, 8 May 2025.

  39. Lock 15 East, Golcar Brook Lock and Lock 18 East, Can Lock - Near Huddersfield

    Huddersfield Narrow CanalYorkshire and North East

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Lock 9 East, Isis Lock to Lock 31 East
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    This closure now encompasses two pieces of work. We will be doing top gate replacement and bottom gate repairs to Lock 15 East and a full lock gate replacement (upstream and downstream) to Lock 18 East along with general repairs.

    Latest of 2 CRT updates, 29 June 2025.

  40. Sykehouse Lock - Near Thorne

    New Junction CanalYorkshire and North East

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Don Aqueduct to New Junction End Culvert
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for bottom and top gate repairs. We will also be working on the upstream cill and doing sluice and ladder repair works.

    CRT's only update, 8 May 2025.

  41. Lock 56 - Kegworth New Lock - Near Kegworth

    River SoarEast Midlands

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Lock 56 - Kegworth New Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for top gate replacement and general lock repairs.

    CRT's only update, 8 May 2025.

  42. Lock 34, Somerton deep lock

    Oxford CanalLondon and South East

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Lock 34, Somerton Deep Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for top lock gate replacement.

    CRT's only update, 11 May 2025.

  43. Lock 7, Worcester

    Worcester & Birmingham CanalWest Midlands

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Lock 7, Bilford
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Please note the towpath will no longer be closed during these works.

    Latest of 2 CRT updates, 29 June 2025.

  44. Lock 87, Manchester

    Rochdale CanalNorth West

    44 days

    From 2 February 2026

    Reopened 18 March 2026

    Where
    Lock 84 Dale St to Lock 92 Castlefield
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We would like to make you aware that we are having to extend the closure at Lock 87 due to delays and additional work requirements. Planned crane lift dates had to be moved at short notice because they coincided with the Chinese New Year parade. Whilst on site with the lock…

    Latest of 2 CRT updates, 27 February 2026.

  45. Star Lock 27, Stone

    Trent & Mersey CanalWest Midlands

    42 days

    From 3 November 2025

    Reopened 15 December 2025

    Where
    Lock 28, Yard Lock to Bridge 93, Stafford Road Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We're pleased to inform you that works on site have been completed ahead of schedule, and the navigation is open.

    Latest of 3 CRT updates, 15 December 2025.

  46. Kegworth New Lock 56

    River SoarEast Midlands

    42 days

    From 2 February 2026

    Reopened 16 March 2026

    Where
    Lock 56 - Kegworth New Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Ongoing flooding on the River Soar continues to prevent works at Kegworth from being carried out safely. As a result, the works cannot be completed by the original end date of Friday 6th March. The navigation closure has therefore been extended until 20th March to allow river…

    Latest of 3 CRT updates, 4 March 2026.

  47. Navigation Closure - Oxford Canal, Ayhno lock 33 , Adderbury

    Oxford CanalLondon and South East

    40 days

    From 17 August 2026

    Due to reopen 2 October 2026

    Still shut

    Where
    Lock 33, Aynho Weir Lock
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Lock

    Lock 33 is being closed due to drought conditions, whilst this is in place we will be completely a 2027 stoppage to change both top and bottom lock gates and stop plank groves. There will be review points throughout the works if conditions change and they canal is to re-open.…

    CRT's only update, 10 August 2026. 47 days without another.

  48. Glasson Branch - Lock 1, near Galgate

    Glasson Branch (Lancaster Canal)North West

    39 days

    From 5 January 2026

    Reopened 13 February 2026

    Where
    Lock No.1 to Lock No.6
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigational closure is required for top gate replacements and wood paddle replacement on the bottom gates. We will also be doing some lock wall grouting and paving repairs.

    CRT's only update, 7 May 2025.

  49. Lock 35, Hatton

    Grand Union CanalWest Midlands

    39 days

    From 3 November 2025

    Reopened 12 December 2025

    Where
    Lock 46, Hatton Top Lock to Lock 26, Hatton Bottom Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We're pleased to inform you that works on site are due to complete ahead of schedule. The navigation will be open from 4pm on Friday 12th December.

    Latest of 2 CRT updates, 10 December 2025.

  50. Brades Locks, Lock 1 to Lock 3

    Gower Branch (New Main Line)West Midlands

    39 days

    From 15 September 2025

    Reopened 24 October 2025

    Where
    Lock 1 Brades Double to Lock 3, Brades Locks, Gower Branch
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We will be undertaking works at Brades Lock 3, including the replacement of both the top and bottom gates, as well as the installation of a new lock ladder. To carry out these works safely, the navigation will be closed from Lock 1 (Brades Top Lock) through to Lock 3 from 15…

    CRT's only update, 21 July 2025.

  51. Don Aqueduct

    New Junction CanalYorkshire and North East

    39 days

    From 3 November 2025

    Reopened 12 December 2025

    Where
    Don Aqueduct
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Lock

    Essential maintenance work will be taking place on both guillotine locks at Don Aqueduct. As part of these works, our engineering teams will be replacing the steel lifting cables which operate the guillotine lock gates. This maintenance is critical to ensuring the continued safe…

    CRT's only update, 17 September 2025.

  52. Lock 3, Calcutt

    Grand Union CanalWest Midlands

    37 days

    From 3 November 2025

    Reopened 10 December 2025

    Where
    Lock 1 to Lock 3
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We're pleased to inform you that works on site have been completed ahead of schedule, and the navigation is now open.

    Latest of 2 CRT updates, 10 December 2025.

  53. Lock 10, Audlem

    Shropshire Union CanalNorth West

    32 days

    From 26 January 2026

    Reopened 27 February 2026

    Where
    Lock 10 Audlem
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Following a site review of the works, we're now confident that the works can be completed within a shorter stoppage window than originally planned. The revised stoppage dates are 26th January to 27th February, meaning the whole of the Shropshire Union Canal will be open for most…

    Latest of 2 CRT updates, 28 November 2025.

  54. Lock 76, near Dutton

    Trent & Mersey CanalNorth West

    32 days

    From 19 January 2026

    Reopened 20 February 2026

    Where
    Lock 76
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Following a recent review, we're now confident that the works can be completed within a shorter stoppage window. The revised stoppage dates are 19 January 2026 to 20 February 2026.

    Latest of 2 CRT updates, 3 October 2025.

  55. Lock 42, Near Thornton-in-Craven

    Leeds & Liverpool CanalNorth West

    32 days

    From 5 January 2026

    Reopened 6 February 2026

    Where
    Lock 44, Top Lock to Bridge 158, Changeline Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigational closure is required for bottom gate refurbishment and various repair works.

    CRT's only update, 8 May 2025.

  56. Lock 37, Dashwood Lock

    Oxford CanalLondon and South East

    32 days

    From 3 November 2025

    Reopened 5 December 2025

    Where
    Lock 37, Dashwood Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We're pleased to inform you that works on site have been completed ahead of schedule, and the navigation is now open. Please note: Our team is still carrying out some minor remedial work onsite, but this will not affect navigation.

    Latest of 2 CRT updates, 5 December 2025.

  57. Lock 13, Stewponey Lock

    Staffordshire & Worcestershire CnlWest Midlands

    32 days

    From 5 January 2026

    Reopened 6 February 2026

    Where
    Lock 13 Stewponey Lock to Bridge 32 Stewponey Old Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We are pleased to confirm that works at Lock 13 have been completed and the lock is now open.

    Latest of 2 CRT updates, 6 February 2026.

  58. Stamp End Lock 1

    River WithamEast Midlands

    31 days

    From 17 October 2025

    Reopened 17 November 2025

    Where
    Lock 1, Stamp End Lock
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Lock

    Unfortunately, a delay with the supply of material needed for the work to Stamp End Lock has meant that work will not be finished on Monday 3rd November as originally planned. We will update this notice by Monday 17th November or sooner if we have more information.

    Latest of 3 CRT updates, 31 October 2025.

  59. Lock 2 Rufford Branch

    Rufford Branch (L&L Canal)North West

    29 days

    From 9 February 2026

    Reopened 10 March 2026

    Where
    Lock No.1, Rufford Branch to Lock 7, Rufford Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We're pleased to let you know that the works at Lock 2 Rufford Branch have been completed ahead of schedule, and the navigation is now open.

    Latest of 2 CRT updates, 10 March 2026.

  60. Lock 83 , Lock 19 near Wigan

    Leeds & Liverpool CanalNorth West

    28 days

    From 19 January 2026

    Reopened 16 February 2026

    Where
    Lock 83, Lock 19
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We are pleased to confirm that the works at Lock 83, Lock 19 have now been completed. Please note that the Wigan Flight remains closed due to the ongoing works at Lock 65.

    Latest of 3 CRT updates, 16 February 2026.

  61. Lock 77, Brunsden, near Kintbury

    Kennet & Avon CanalWales and South West

    25 days

    From 12 January 2026

    Reopened 6 February 2026

    Where
    Lock 77, Brunsden Lock to Lock 76, Wire Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Please note the towpath will no longer be closed during these works.

    Latest of 2 CRT updates, 29 June 2025.

  62. Lock 42, Littlebrough

    Rochdale CanalNorth West

    25 days

    From 5 January 2026

    Reopened 30 January 2026

    Where
    Lock 37, West Summit to Lock 45
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigational closure is required for top and bottom gate refurbishment and various repair works.

    CRT's only update, 8 May 2025.

  63. Bridge 22, Burntacres Bridge

    Rochdale CanalYorkshire and North East

    25 days

    From 2 February 2026

    Reopened 27 February 2026

    Where
    Lock 13 to Lock 14
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Bridge

    Following a recent review, we're now confident that the works can be completed within a shorter stoppage window. The revised stoppage dates are 2nd February to 27th February.

    Latest of 3 CRT updates, 3 November 2025.

  64. Lock 1, Wolverhampton

    Old Main LineWest Midlands

    25 days

    From 24 November 2025

    Reopened 19 December 2025

    Where
    Lock 21, Wolverhampton to Lock 1, Top Lock, Wolverhampton
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Following the emergency works we have done this summer; there are still elements of the planned works left to undertake. During this closure we will be checking the fitting of the gate and replacing the cill, we will also be replacing the brickwork between locks 1 and 2 and…

    Latest of 2 CRT updates, 29 June 2025.

  65. Lock 5, near bridge 3, near Burscough

    Rufford Branch (L&L Canal)North West

    25 days

    From 26 January 2026

    Reopened 20 February 2026

    Where
    Lock No.1, Rufford Branch to Lock 5, German's Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We want to advise that the works at Lock 5, Burscough will remain ongoing until Friday 20 February. The team is making good progress on site; however, the activity is taking slightly longer to complete than originally anticipated. There are no additional works causing delay — we…

    Latest of 2 CRT updates, 17 February 2026.

  66. Rushall Lock Flight

    Rushall CanalWest Midlands

    23 days

    From 28 April 2026

    Reopened 21 May 2026

    Where
    Lock 1, Top Lock Rushall to Rushall Junction Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Canal or river

    Our team remains on site carrying out the canal wall repair works. In order to safely complete these works, it is necessary to maintain a reduced water level in the pound, and as such, navigation remains closed. We are currently aiming to complete the repairs and reopen the…

    Latest of 4 CRT updates, 7 May 2026.

  67. Cossington Lock 48

    River SoarEast Midlands

    19 days

    From 7 September 2026

    Due to reopen 23 October 2026

    Still shut

    Where
    Lock 48 - Cossington Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We're carrying out essential improvements at Cossington Lock 48, including the replacement of the top and bottom lock gates. To complete this work safely, a stoppage will be in place from 7th September to 23rd October 2026. Previous stoppages on the River Soar have been…

    CRT's only update, 30 March 2026. 180 days without another.

  68. Lock 3 Factory, Tipton

    New MainlineWest Midlands

    18 days

    From 3 November 2025

    Reopened 21 November 2025

    Where
    Lock 3, Factory Locks, Tipton
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for top side lock gate replacement.

    CRT's only update, 7 May 2025.

  69. Lock 9 Aston

    Birmingham & Fazeley CanalWest Midlands

    18 days

    From 23 February 2026

    Reopened 13 March 2026

    Where
    Lock 1, Aston Top Lock to Aston Lock 11
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for top side lock gate replacements. We will also be replacing some lock chamber brickwork.

    CRT's only update, 7 May 2025.

  70. Lock 8, Curdworth

    Birmingham & Fazeley CanalWest Midlands

    18 days

    From 5 January 2026

    Reopened 23 January 2026

    Where
    Lock 1, Curdworth Top Lock to Lock 11, Curdworth
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for top side lock gate replacements. We will also be doing forebay sandstone repairs and trash screen repairs.

    CRT's only update, 7 May 2025.

  71. Lock 80

    Grand Union CanalLondon and South East

    18 days

    From 23 February 2026

    Reopened 13 March 2026

    Where
    Lock 80, Lot Mead
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Please note the towpath is now open for the duration of these works.

    Latest of 2 CRT updates, 29 June 2025.

  72. Lock 48, Barrowford

    Leeds & Liverpool CanalNorth West

    18 days

    From 23 February 2026

    Reopened 13 March 2026

    Where
    Lock 51, Bottom Lock to Lock 45, Top Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    This navigational closure will encompass 2 pieces of work, the navigation will be closed from Lock 45 through to lock 51. We will be refurbishing the top gates and paddles of locks 46 and 48, we will also be doing some repointing too.

    CRT's only update, 8 May 2025.

  73. Lock 1 Aston, West Felton

    Montgomery CanalWest Midlands

    18 days

    From 3 November 2025

    Reopened 21 November 2025

    Where
    Lock 1, Aston Locks
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigational closure is required for lock gate replacement.

    CRT's only update, 8 May 2025.

  74. Lock 13, Stourbridge

    Stourbridge CanalWest Midlands

    18 days

    From 23 February 2026

    Reopened 13 March 2026

    Where
    Lock 16, Stourbridge Bottom Lock to Lock 1, Stourbridge Top Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for top gate replacement and lock ladder repair.

    CRT's only update, 8 May 2025.

  75. Lock 46

    Leeds & Liverpool CanalNorth West

    18 days

    From 2 February 2026

    Reopened 20 February 2026

    Where
    Lock 51, Bottom Lock to Lock 45, Top Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    This navigational closure will encompass 2 pieces of work, the navigation will be closed from Lock 45 through to lock 51. We will be refurbishing the top gates and paddles of locks 46 and 48, we will also be doing some repointing too.

    CRT's only update, 8 May 2025.

  76. Lock 7, Actons

    Regent's CanalLondon and South East

    18 days

    From 1 December 2025

    Reopened 19 December 2025

    Where
    Lock 7, Actons Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Please be advised that, due to delays at City Road Lock, this stoppage will now commence on Monday, 1st December. This later start will provide time for travel through the area and onward to winter moorings over the coming weekend.

    Latest of 5 CRT updates, 27 November 2025.

  77. Lock 5, Rufford Branch, German's Lock

    Rufford Branch (L&L Canal)North West

    14 days

    From 21 November 2025

    Reopened 5 December 2025

    Where
    Lock 5, German's Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Please be aware: Following a further review of this stoppage, the navigation will remain closed for the entire duration to ensure all necessary work is completed within the stoppage window. It will not be open over the weekend as previously advertised. We apologise for any…

    Latest of 3 CRT updates, 21 November 2025.

  78. Marsh Lane Lock 27

    Kennet & Avon CanalWales and South West

    14 days

    From 16 February 2026

    Reopened 2 March 2026

    Where
    Lock 44, Sir Hugh Stockwell to Lock 26, Devizes Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We're pleased to let you know that the works at Marsh Lane Lock 27 have been completed ahead of schedule, and the navigation is now open.

    Latest of 3 CRT updates, 2 March 2026.

  79. Lock 44, Greenberfield, near Bridge 157

    Leeds & Liverpool CanalNorth West

    12 days

    From 8 January 2026

    Reopened 20 January 2026

    Where
    Lock 44, Top Lock to Lock 43, Middle Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigational closure is required to replace the ground paddle on the off side of the lock.

    CRT's only update, 29 June 2025.

  80. Long Buckby, Lock 12 – 13

    Grand Union CanalLondon and South East

    11 days

    From 26 January 2026

    Reopened 6 February 2026

    Where
    Lock 12 to Lock 13
    CRT reason
    3rd Party Works
    Cause
    Planned works
    Asset
    Canal or river

    Following an on-site review, it has been determined that the length of canal required for surveying to collect the necessary data is shorter than originally planned. The stoppage will now take place between Lock 12 and 13.

    Latest of 2 CRT updates, 7 January 2026.

  81. Lock 47, Dudswell lock

    Grand Union CanalLondon and South East

    11 days

    From 12 January 2026

    Reopened 23 January 2026

    Where
    Lock 47, Dudswell Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Please note the towpath will no longer be closed during these works.

    Latest of 2 CRT updates, 29 June 2025.

  82. Lock 69, Nash Mills

    Grand Union CanalLondon and South East

    11 days

    From 2 February 2026

    Reopened 13 February 2026

    Where
    Lock 69, Nash Mills
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    The works at Lock 68 have been deferred to a later date. However, the works at Lock 69 will proceed as planned, with revised dates.

    Latest of 3 CRT updates, 7 August 2025.

  83. Lock 14, Fradley

    Trent & Mersey CanalWest Midlands

    11 days

    From 8 December 2025

    Reopened 19 December 2025

    Where
    Lock 14, Common Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigation and towpath closure are required for top end gate replacement as well as cill and anchor plate repairs.

    CRT's only update, 8 May 2025.

  84. Lock 7, Bosley weir

    Macclesfield CanalNorth West

    11 days

    From 6 October 2025

    Reopened 17 October 2025

    Where
    Bosley Lock 1 to Bosley Lock 12
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Weir

    With a shorter window for the lock gate works at Bosley Lock 7 to allow a window for boat passage – we will undertake improvements to the weir at Lock 7 from 6 October to 17 October while there are other closures in place. We were awaiting listed building consent but now have…

    CRT's only update, 3 October 2025.

  85. Lock 46 - Littleborough

    Rochdale CanalNorth West

    11 days

    From 9 March 2026

    Reopened 20 March 2026

    Where
    Lock 46
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Essential paddle works are required at Lock 46, and to complete this safely and effectively, a full navigation closure will be in place for the duration of the works. This stoppage is necessary to ensure the continued reliability and safe operation of the lock. We recognise the…

    CRT's only update, 27 February 2026.

  86. Lock 2, Stourbridge

    Stourbridge CanalWest Midlands

    10 days

    From 16 February 2026

    Reopened 26 February 2026

    Where
    Lock 2, Stourbridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We're pleased to let you know that the works at Stourbridge Lock 2 have been completed ahead of schedule, and the navigation is now open.

    Latest of 2 CRT updates, 26 February 2026.

  87. Lock 2 , Rufford Branch , Burscough

    Rufford Branch (L&L Canal)North West

    9 days

    Fully shut 9 of CRT's 11 days

    From 10 November 2025

    Reopened 21 November 2025

    Where
    Lock 2, 2Nd Lock Rufford Branch
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Unfortunately, this stoppage has been extended until 21st November due to additional work identified on site. This change will affect the stoppage dates for the grouting work at Lock 5, Rufford Branch, which will now run from 21st November to 5th December.

    Latest of 2 CRT updates, 18 November 2025.

  88. Ellesmere Tunnel, Ellesmere

    Llangollen CanalWest Midlands

    7 days

    From 3 November 2025

    Reopened 10 November 2025

    Where
    Ellesmere Tunnel
    CRT reason
    Inspections
    Cause
    Planned works
    Asset
    Tunnel

    We are pleased to announce that the dive survey has been completed ahead of schedule, and both the navigation and towpath are now open at Ellesmere Tunnel.

    Latest of 3 CRT updates, 10 November 2025.

  89. Lock 6 - Castle Lock

    Nottingham & Beeston CanalEast Midlands

    7 days

    From 16 February 2026

    Reopened 23 February 2026

    Where
    Lock 6 - Castle Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    We're pleased to let you know that the works at Castle Lock 6 have been completed ahead of schedule, and the navigation is now open.

    Latest of 2 CRT updates, 23 February 2026.

  90. Bridge 59A, Armitage

    Trent & Mersey CanalWest Midlands

    4 days

    From 8 December 2025

    Reopened 12 December 2025

    Where
    Bridge 59A
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Canal or river

    We have now received the necessary approvals from Network Rail. The works will take place from Monday, 8th December to Friday, 12th December 2025, with our contractor providing additional resources to ensure the work is completed as originally planned.

    Latest of 3 CRT updates, 25 November 2025.

  91. Stoke Hammond, Locks 22 – 26

    Grand Union CanalLondon and South East

    4 days

    From 16 February 2026

    Reopened 20 February 2026

    Where
    Lock 22, Fenny Stratford Lock to Lock 26, Three Locks top
    CRT reason
    3rd Party Works
    Cause
    Planned works
    Asset
    Canal or river

    We wanted to update you on the planned stoppage. Due to the current high water levels, our teams have been unable to begin works on site as scheduled, so the navigation will remain open for the time being. The stoppage has now been rescheduled and will run from 16 February to 20…

    Latest of 4 CRT updates, 12 February 2026.

  92. Stoke Bruerne Lock Flight

    Grand Union CanalEast Midlands

    4 days

    From 26 January 2026

    Reopened 30 January 2026

    Where
    Lock 14, Top Lock to Lock 20
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigational closure is required to remove invasive non native fish species.

    CRT's only update, 7 May 2025.

  93. Wheaton Aston Stop Gate near Bridge 21, Shushions Bridge

    Shropshire Union CanalWest Midlands

    4 days

    From 9 March 2026

    Reopened 13 March 2026

    Where
    Bridge 22, Rye Hill Bridge to Bridge 21, Shushions Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Other

    A navigation and towpath closure are required for stop gate replacement.

    CRT's only update, 8 May 2025.

  94. Woodend Lift Bridge 24

    Peak Forest CanalNorth West

    4 days

    From 17 November 2025

    Reopened 21 November 2025

    Where
    Bridge 24, Wood End Lift Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lift bridge

    We are pleased to confirm that the works at Woodend Lift Bridge have been completed and the navigation is now open.

    Latest of 3 CRT updates, 21 November 2025.

  95. Bridge 1, Manchester Road Bridge

    South DockLondon and South East

    4 days

    From 16 February 2026

    Reopened 20 February 2026

    Where
    Bridge 1, Manchester Road Bridge to West India Dock Entrance Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Bridge

    Following an on-site review, we are pleased to confirm that these works can now be completed within a shorter timeframe. The works will take place over two week-long stoppages, scheduled for 16–20 February and 2–6 March.

    Latest of 2 CRT updates, 9 January 2026.

  96. Bridge 188, Grange Swing Bridge - Planned Closure

    Leeds & Liverpool CanalYorkshire and North East

    4 days

    From 23 June 2025

    Reopened 27 June 2025

    Where
    Bridge 188, Grange Swing Bridge
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Swing bridge

    Works commencing 23.06.2025 for 5 days. Bridge will be in canal closed position but the footpath over the bridge is also closed. Works are being carried out due to some additional funding as part of the Silsden to Kildwick towpath works, these works needed to be carried out…

    CRT's only update, 13 June 2025.

  97. Between Catshill Junction and Rushall Lock 1

    Daw End Canal, Rushall CanalWest Midlands

    3 days

    From 11 February 2026

    Reopened 14 February 2026

    Where
    Lock 1, Top Lock Rushall
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Canal or river

    Please be advised that navigation will be closed for four days from Wednesday 11 February between Catshill Junction and Rushall Lock 1. This stoppage is required to allow for the inspection of safety gates and the installation of a coffer dam. Thank you for your patience while…

    CRT's only update, 20 January 2026.

  98. Knowle Lock Flight, Knowle, Solihull

    Grand Union CanalWest Midlands

    2 days

    From 2 February 2026

    Reopened 4 February 2026

    Where
    Lock 51, Knowle Top Lock to Lock 47, Knowle Bottom Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    A navigational closure is required to allow us to dewater the lock flight to remove non native species.

    CRT's only update, 7 May 2025.

  99. Tottenham Lock Eastern & Western Side, Lee Navigation

    Lee NavigationLondon and South East

    2 days

    Fully shut 2 of CRT's 3 days

    From 22 June 2026

    Reopened 25 June 2026

    Where
    Lock 17, Tottenham Lock, Eastern Side to Lock 17, Tottenham Lock, Western Side
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Lock

    We're pleased to let you know that the essential maintenance works have now been successfully completed, and the lock is fully open to navigation once again. Thank you for your patience, understanding, and cooperation while our team carried out these important works.

    Latest of 6 CRT updates, 25 June 2026.

  100. Lock19 - 24 Rochdale - Navigable

    Rochdale CanalYorkshire and North East

    2 days

    From 30 June 2026

    Reopened 2 July 2026

    Where
    Lock 19 to Lock 24
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Our team have attended site and the water levels have recovered enough for the section to be navigable. The closure has been removed.

    Latest of 3 CRT updates, 2 July 2026.

  101. Near Fosters Bridge 27

    Ashby CanalEast Midlands

    1 day

    From 1 July 2025

    Reopened 2 July 2025

    Where
    Ashby Canal - 016
    CRT reason
    Vegetation
    Cause
    Planned works
    Asset
    Canal or river

    We will be on site from 8:30am tomorrow, felling a large tree near Fosters Bridge 27, on the Ashby Canal. Due to the size of the tree, both the navigation and towpath will be closed while this work takes place. The W3W is what3words /// The simplest way to talk about location We…

    CRT's only update, 1 July 2025.

  102. Lock 7 (Dallow Lock) to Bridge 33 (Shobnall Road Bridge)

    Trent & Mersey CanalWest Midlands

    1 day

    From 4 November 2025

    Reopened 5 November 2025

    Where
    Bridge 33, Shobnall Road Bridge to Lock 7, Dallow Lock
    CRT reason
    Vegetation
    Cause
    Planned works
    Asset
    Canal or river

    Two trees along this section have been identified as unsafe and will need to be removed by our contractors. To ensure the safety of boaters, the public, and our contractors, it will be necessary to close sections of both the navigation and the towpath while these works are…

    CRT's only update, 28 October 2025.

  103. Leeds & Liverpool Canal, Gallows Bridge, Skipton, Skipton - removal of bridge

    Leeds & Liverpool CanalYorkshire and North East

    1 day

    From 3 November 2025

    Reopened 4 November 2025

    Where
    Bridge 179, Gallows Footbridge
    CRT reason
    3rd Party Works
    Cause
    Planned works
    Asset
    Bridge

    This section of navigation will be closed whilst the bridge is removed to be taken away and upgraded. This will be done overnight, so will no cause no inconvenience to boaters.

    CRT's only update, 28 October 2025.

  104. Gallows Bridge, Skipton

    Leeds & Liverpool CanalYorkshire and North East

    1 day

    From 15 December 2025

    Reopened 16 December 2025

    Where
    Bridge 179, Gallows Footbridge
    CRT reason
    3rd Party Works
    Cause
    Planned works
    Asset
    Bridge

    The new Gallows bridge is to be lifted into place overnight on Monday, 15th December, into the morning of Tuesday, 16th December. The canal will be closed in the location of the bridge from approximately 16.00 until the bridge lift is completed. The canal will be open from 06.00…

    CRT's only update, 9 December 2025.

  105. Marston Safety Gate, Bedworth

    Ashby CanalEast Midlands

    1 day

    From 10 February 2026

    Reopened 11 February 2026

    Where
    Bridge 1, Orton's Bridge to Bridge 15A, Marston Junction Bridge
    CRT reason
    Inspections
    Cause
    Planned works
    Asset
    Other

    The Engineering Team will be draining Marston Junction stop gate on the Ashby Canal to undertake a principal Inspection of the Safety Gate between Tuesday 10th February at 10am and Wednesday 11st February at 5pm. The navigation will be closed during these times.

    CRT's only update, 26 January 2026.

  106. Between Wilford Bridge and Boots Bridge including Castle Lock on the Nott's Beeston Canal

    Nottingham & Beeston CanalEast Midlands

    1 day

    From 25 February 2026

    Reopened 26 February 2026

    Where
    Bridge 11, Boots to Bridge 10 - Wilford Street
    CRT reason
    Vegetation
    Cause
    Planned works
    Asset
    Canal or river

    Please be advised that the navigation and towpath at the above location will be closed to all users to facilitate essential, high-priority tree safety works. These works are necessary to address diseased trees that could pose an immediate risk to public safety and vessel passage.

    CRT's only update, 24 February 2026.

  107. Navigation Closure - Grand Union Canal, Hanwell flight from lock 90 to lock 97, Norwood/Hanwell

    Grand Union CanalLondon and South East

    1 day

    From 25 March 2026

    Reopened 26 March 2026

    Where
    Lock 90, Norwood Top Lock to Lock 97, Hanwell Bottom Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    The Hanwell flight will be closed from 4pm until the next morning so that the side ponds can be sufficiently drained to allow a team scaffolders to install their structures to aid the side pond restoration project. Avoid travelling through the flight after 4pm today.

    CRT's only update, 25 March 2026.

  108. Woodlesford Lock

    Aire & Calder Navigation Main LineYorkshire and North East

    1 day

    From 30 March 2026

    Reopened 31 March 2026

    Where
    Lock 5, Woodlesford Lock
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Lock

    Woodlesford Lock will be closed for passage from 08:00 on Monday 30th until 18:00 on Tuesday 31st March. This is to allow the Operations Team to fit replacement anchors.

    CRT's only update, 27 March 2026.

  109. Navigation Closure - Grand Union Canal, Hanwell Flight between lock 90 and 97 , Hanwell

    Grand Union CanalLondon and South East

    1 day

    From 8 April 2026

    Reopened 9 April 2026

    Where
    Lock 90, Norwood Top Lock to Lock 97, Hanwell Bottom Lock
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Lock

    To aid the Hanwell side pond restoration project, the Hanwell Flight will be closed off from 4pm Wednesday 8th until 2pm Thursday 9th. Moor up before or after the flight and wait for it to be reopened. If within the flight at time of closure, moor up on the long pound between 91…

    CRT's only update, 8 April 2026.

  110. Lock 42E to Lock 41E - closed due to Silt removal.

    Huddersfield Narrow CanalYorkshire and North East

    1 day

    From 22 April 2026

    Reopened 23 April 2026

    Where
    Lock 41 East to Lock 42 East
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Canal or river

    The local team are undertaking silt removal from Lock 41E to Lock 42E so a navigation closure is needed to be in place. This will also impact pedestrian access on the towpath between these two locks as the towpath will be worked upon to act as a platform to retrieve the silt…

    CRT's only update, 22 April 2026.

  111. Long Buckby, Between Lock 8 and Lock 13

    Grand Union CanalEast Midlands

    1 day

    From 16 June 2026

    Reopened 17 June 2026

    Where
    Lock 8 to Lock 13
    CRT reason
    Inspections
    Cause
    Planned works
    Asset
    Canal or river

    The navigation will be closed between Lock 8 and Lock 13 on the Long Buckby Lock Flight to allow pound water seepage testing as part of the Grand Union Canal Transfer Project. Navigation will close at 4:00pm, with the last boat into the lock flight at 2:00pm, on Tuesday 16th…

    CRT's only update, 26 May 2026.

  112. Navigation Closure - Limehouse Basin, Limehouse Lock and Narrow Street Swing Bridge, London

    Limehouse BasinLondon and South East

    1 day

    From 24 June 2026

    Reopened 25 June 2026

    Where
    Bridge,Narrow St Swingbridge to Lock 1, Limehouse Ship Lock
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Lock

    Limehouse Lock will be closed for essential maintenance on these dates Please plan your passage for an alternate date via the Licensing Portal.

    CRT's only update, 16 June 2026.

  113. Navigation Closure - Limehouse Basin, Limehouse Lock,

    Limehouse BasinLondon and South East

    1 day

    From 16 July 2026

    Reopened 17 July 2026

    Where
    Lock 1, Limehouse Ship Lock
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Lock

    Essential maintenance flushing hydraulic systems on Limehouse Lock. Lock will be closed for two days for essential maintenance

    CRT's only update, 1 July 2026.

  114. Woodlesford Lock - Divers on Site

    Aire & Calder Navigation Main LineYorkshire and North East

    1 day

    From 14 July 2026

    Reopened 15 July 2026

    Where
    Lock 5, Woodlesford Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    The closure at Woodlesford Lock will be extended into Wednesday morning, until 8:00am. This is to allow the concrete more time to fully set.

    Latest of 2 CRT updates, 14 July 2026.

  115. Kings Road Lock - Closure

    Wakefield Branch (Aire & Calder)Yorkshire and North East

    1 day

    From 13 July 2026

    Reopened 14 July 2026

    Where
    Lock 3, Kings Road Lock
    CRT reason
    Information
    Cause
    Planned works
    Asset
    Lock

    Due to divers being on site at Birkwood Lock today, Kings Road Lock will be closed until tomorrow morning, Tuesday 14th July. This is to maintain water levels in the short pound between Kings Road and Birkwood Locks. The lock will reopen at 08:00 tomorrow.

    CRT's only update, 13 July 2026.

  116. Birkwood Lock - Divers on Site

    Wakefield Branch (Aire & Calder)Yorkshire and North East

    1 day

    From 13 July 2026

    Reopened 14 July 2026

    Where
    Lock 2, Birkwood Lock to Lock 6, Woodnook Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Reissued due to administrative issue regarding the date tomorrow. The lock will remain closed until 08:00 tomorrow, Tuesday 14th July, to ensure that the concrete used to repair the cill has set. As part of our continued commitment to the Better Boating Plan, we will be carrying…

    Latest of 2 CRT updates, 13 July 2026.

  117. Sykehouse Lock

    New Junction CanalYorkshire and North East

    1 day

    From 19 July 2026

    Reopened 20 July 2026

    Where
    Sykehouse Lock
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Swing bridge

    Sykhouse Lock Closure Notice Date: Sunday, 19 July 2026 From 3:00 pm on Sunday, 19 July 2026, Sykhouse Lock will be temporarily closed to allow essential maintenance to be carried out on the swing bridge crossing the lock. A member of the Canal & River Trust will be on site from…

    CRT's only update, 19 July 2026.

  118. Bishops Stortford - above Bridge 50, A11 London Road

    River StortLondon and South East

    same day

    From 9 May 2025

    Reopened 9 May 2025

    Where
    Bridge 50, A11 London Road
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Canal or river

    Please be advised that there is a navigation closure in place to enable bank protection works on the 9th of May. There will also be a towpath restriction in place to enable Banksmen to undertake the necessary works between the Bishops Stortford facilities and Bridge 50.

    CRT's only update, 7 May 2025.

  119. Navigation Closure , Tunnel End rail bridge, Huddersfield Narrow Canal - Overnight coring works

    Huddersfield Narrow CanalYorkshire and North East

    5 days

    From 18 May 2025

    Ended 23 May 2025

    Restriction, not a full closure

    Where
    Bridge 61,Tunnel End Railway Bridge.
    CRT reason
    3rd Party Works
    Cause
    Planned works
    Asset
    Bridge

    The navigation will be closed between 20.00 and 06.00 each night between 19 May and 23 May due to coring works taking place.

    CRT's only update, 9 May 2025.

  120. Lock 80 Lot Mead - Lock 81 Batchworth Lock

    Grand Union CanalLondon and South East

    same day

    From 5 June 2025

    Reopened 5 June 2025

    Where
    Lock 80, Lot Mead to Lock 81, Batchworth Lock
    CRT reason
    Inspections
    Cause
    Planned works
    Asset
    Lock

    To enable a safe inspection of the Towpath approach wall of the Lock Landing using Divers, there is a need to stop any boat movement during the hours of 0800-1600.

    CRT's only update, 27 May 2025.

  121. Long Sandall - Visitor Moorings CLOSED

    Sheffield & South Yorkshire NavYorkshire and North East

    7 days

    From 4 July 2025

    Ended 11 July 2025

    Restriction, not a full closure

    Where
    Long Sandal Lock - Visitor Moorings
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Moorings

    The Visitor Moorings at Long Sandall are temporarily closed as the CRT workboat is carrying out some work on a sluice. The work will take place between Friday 4th July up to and including Thursday, 11th July. Please can all currently moored boats be removed from the area to…

    CRT's only update, 4 July 2025.

  122. Lock 26 Three Locks Top to Lock 38

    Grand Union CanalLondon and South East

    same day

    From 16 July 2025

    Reopened 16 July 2025

    Where
    Lock 26, Three Locks top to Lock 38
    CRT reason
    Low Water Levels
    Cause
    Planned works
    Asset
    Canal or river

    Our Operations team will be running water from Lock 38 to Lock 26 and movement will be stopped during this time. This will take approximately 2-3 hours. Once this has been completed the notice will be updated.

    CRT's only update, 16 July 2025.

  123. Between Grindley Brook Lock 5 & Lock 6

    Llangollen CanalWest Midlands

    same day

    From 3 August 2025

    Reopened 3 August 2025

    Where
    Lock 5, Grindley Brook Locks to Lock 6, Grindley Brook Locks
    CRT reason
    Vegetation
    Cause
    Planned works
    Asset
    Canal or river

    Please be advised that contractors will be carrying out essential tree felling works to safely remove a large, dangerous tree between Grindley Brook Locks 5 & 6 on Sunday 3rd August, between 8:30am and 1pm. For the safety of all users, both the navigation and towpath will be…

    CRT's only update, 30 July 2025.

  124. Navigation Closure - Regent's Canal, Islington Tunnel, Central London

    Regent's CanalLondon and South East

    2 days

    From 8 September 2025

    Ended 10 September 2025

    Restriction, not a full closure

    Where
    Islington Tunnel
    CRT reason
    Inspections
    Cause
    Planned works
    Asset
    Tunnel

    Islington Tunnel overnight stoppages on Monday 8th and Tuesday 9th September, between 7pm and 7am each day. We will have contractors working overnight within the tunnel on Monday 8th and Tuesday 9th September, undertaking a detailed scan of the tunnel lining. During this time it…

    CRT's only update, 19 August 2025.

  125. Farmers Bridge lock flight

    Birmingham & Fazeley CanalWest Midlands

    same day

    From 30 September 2025

    Reopened 30 September 2025

    Where
    Farmers Bridge Lock 1, Top Lock to Farmers Bridge Lock 13, Bottom Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Please be aware we will be closing the Farmers Bridge lock flight on Tuesday 30th September, from 8:00am to 16:00. We need to dewater Lock 7 and the pounds above/below to investigate the offside bottom end ground paddle culvert for potential failure.

    CRT's only update, 16 September 2025.

  126. Manchester Road Bridge

    South DockLondon and South East

    same day

    From 14 February 2026

    Reopened 14 February 2026

    Where
    Bridge 1, Manchester Road Bridge
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Bridge

    A one-day stoppage is required to carry out an upgrade to the bridge's electrical supply.

    CRT's only update, 9 October 2025.

  127. Bosley Lock Flight, Locks 1 to 12, Macclesfield Canal

    Macclesfield CanalNorth West

    same day

    From 5 February 2026

    Reopened 5 February 2026

    Where
    Bosley Lock 1 to Bosley Lock 12
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Lock

    Bosley Lock Flight, Locks 1 to 12, will be closed to navigation between 08:00 and 16:00 on 05 February 2026. Our local team will be onsite at Lock 12 carrying out essential paddle maintenance. We expect the work to be completed by 16:00 on 05 February and, once complete, normal…

    CRT's only update, 4 February 2026.

  128. Lock 28, Stoke Prior

    Worcester & Birmingham CanalWest Midlands

    same day

    From 26 February 2026

    Reopened 26 February 2026

    Where
    Lock 23
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Lock

    Maintenance work is being carried out to felt and board top end gate for water conservation this summer. The local team will be undertaking the works and will be on site to keep customers up to date with the works as they progress. The towpath will remain open.

    CRT's only update, 12 February 2026.

  129. Jarvis Bridge, Sandwell

    Titford CanalWest Midlands

    same day

    From 25 February 2026

    Reopened 25 February 2026

    Where
    Jarvis Bridge
    CRT reason
    Vegetation
    Cause
    Planned works
    Asset
    Canal or river

    Following a high‑priority tree survey at Jarvis Bridge on the Titford Canal in Sandwell, it has been determined that a dead sycamore tree must be felled for safety reasons. To facilitate this work, a temporary closure of the towpath and navigation in this area will be…

    CRT's only update, 23 February 2026.

  130. Navigation Closure - Grand Union Canal, Hanwell flight - Lock 90 to lock 97, Hanwell

    Grand Union CanalLondon and South East

    2 days

    From 30 March 2026

    Ended 1 April 2026

    Restriction, not a full closure

    Where
    Lock 90, Norwood Top Lock to Lock 97, Hanwell Bottom Lock
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Lock

    To assist with the restoration of the side ponds along the Hanwell flight, the flight will be closed off at 4pm and reopened at 8am next day on both Monday and Tuesday. This is to ensure the side ponds do not fill with water overnight. Travel during the day through the flight or…

    CRT's only update, 30 March 2026.

  131. Gloucester Lock 2.

    River Severn Navigation, Gloucester & Sharpness CanalWales and South West

    18 days

    From 29 June 2026

    Ended 17 July 2026

    Restriction, not a full closure

    Where
    Lock 2 Gloucester Lock
    CRT reason
    Information
    Cause
    Planned works
    Asset
    Lock

    Please be advised that the essential maintenance works currently taking place at Gloucester Lock 2 are taking longer than originally planned to complete. During the installation of the refurbished stop plank channels, several unforeseen issues were encountered which have delayed…

    Latest of 2 CRT updates, 10 July 2026.

  132. Autherley Junction Stop Lock

    Shropshire Union CanalWest Midlands

    same day

    From 1 May 2026

    Reopened 1 May 2026

    Where
    Autherley Junction Stop Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    Works will be taking place at Autherley Junction Stop Lock tomorrow (01/05/26) to install a new laminated balance beam. The works are expected to take place between 8am and 1pm, during which time navigation through the lock will be closed. If we are able to reopen navigation…

    CRT's only update, 30 April 2026.

  133. Don Aqueduct - Essential Works Required w3w ///pint.motorist.bulbs

    New Junction CanalYorkshire and North East

    same day

    From 7 May 2026

    Reopened 7 May 2026

    Where
    Don Aqueduct
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Aqueduct

    An inspection of essential works at the Don Aqueduct will be carried out on Thursday, 7th May 2026. Following the inspection, further closure dates will be required to allow works to take place. These dates will be confirmed as soon as possible.

    CRT's only update, 5 May 2026.

  134. Planned Closure - Don Aqueduct (Cancelled)

    New Junction CanalYorkshire and North East

    same day

    From 18 May 2026

    Ended 18 May 2026

    Restriction, not a full closure

    Where
    Don Aqueduct
    CRT reason
    Inspections
    Cause
    Planned works
    Asset
    Lock

    Please note that the planned closure for the essential maintenance inspections at Don Aqueduct has now been cancelled due to unforeseen circumstances. At present, both guillotine locks will remain open and navigation will continue as normal. We will provide a further update once…

    Latest of 2 CRT updates, 18 May 2026.

  135. Between Bridge 72 and 73, Adderley

    Shropshire Union CanalWest Midlands

    same day

    From 8 June 2026

    Reopened 8 June 2026

    Where
    Bridge 73, Kemps Bridge to Bridge 72, Hawksmoor Bridge
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Canal or river

    Please be advised that the navigation between Bridge 72 and Bridge 73 on the Shropshire Union Canal is temporarily closed for health and safety reasons. This is to allow contractors to safely remove a dam within the channel. We expect to reopen by 13:00 today. We apologise for…

    CRT's only update, 8 June 2026.

  136. Woodnook Lock - Divers on Site

    Wakefield Branch (Aire & Calder)Yorkshire and North East

    same day

    From 15 July 2026

    Reopened 15 July 2026

    Where
    Lock 6, Woodnook Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    As part of our continued commitment to the Better Boating Plan, we will be carrying out essential underwater repair works at Woodnook Lock on Wednesday to improve the reliability and performance of the lock gates. Specialist commercial divers will be undertaking repairs to the…

    CRT's only update, 10 July 2026.

  137. Woodnook Lock

    Wakefield Branch (Aire & Calder)Yorkshire and North East

    same day

    From 14 August 2026

    Reopened 14 August 2026

    Where
    Lock 6, Woodnook Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Lock

    As part of our continued commitment to the Better Boating Plan, we will be carrying out essential underwater repair works at Woodnook Lock on Friday, 14th August, to improve the reliability and performance of the lock gates. Specialist commercial divers will be undertaking…

    CRT's only update, 30 July 2026.

  138. Lemonroyd Lock - Divers on Site 10th August

    Aire & Calder Navigation Main LineYorkshire and North East

    same day

    From 10 August 2026

    Reopened 10 August 2026

    Where
    Lock 7, Lemonroyd Lock
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Lock

    As part of our continued commitment to the Better Boating Plan, we will be carrying out essential underwater repair works at Lemonroyd Lock on Monday 10th August, to improve the reliability and performance of the lock gates. Specialist commercial divers will be undertaking…

    CRT's only update, 30 July 2026.

  139. Lemonroyd Lock - Divers on Site 12th August

    Aire & Calder Navigation Main LineYorkshire and North East

    same day

    From 12 August 2026

    Reopened 12 August 2026

    Where
    Lock 7, Lemonroyd Lock
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Lock

    As part of our continued commitment to the Better Boating Plan, we will be carrying out essential underwater repair works at Lemonroyd Lock on Wednesday, 12th August, to improve the reliability and performance of the lock gates. Specialist commercial divers will be undertaking…

    CRT's only update, 30 July 2026.

  140. Figure of Three Locks - Divers on Site 11th August

    Calder & Hebble NavigationYorkshire and North East

    same day

    From 11 August 2026

    Reopened 11 August 2026

    Where
    Lock 23, Figure Of Three Top
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Lock

    As part of our continued commitment to the Better Boating Plan, we will be carrying out essential underwater repair works at Figure of Three on Tuesday 11th August, to improve the reliability and performance of the lock gates. Specialist commercial divers will be undertaking…

    CRT's only update, 30 July 2026.

  141. Figure of Three Locks - Divers On Site 14th August

    Calder & Hebble NavigationYorkshire and North East

    same day

    From 14 August 2026

    Reopened 14 August 2026

    Where
    Lock 23, Figure Of Three Top
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Lock

    As part of our continued commitment to the Better Boating Plan, we will be carrying out essential underwater repair works at Figure of Three on Friday 14th August, to improve the reliability and performance of the lock gates. Specialist commercial divers will be undertaking…

    CRT's only update, 30 July 2026.

  142. Lock 23 - work to replace the head paddles

    Rochdale CanalYorkshire and North East

    same day

    From 6 August 2026

    Reopened 6 August 2026

    Where
    Lock 23
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Lock

    Lock 23 will be closed on Thursday August 6th to replace the old head paddles that are needing to be replaced with new paddles. Please do not move in this area and follow any instructions given should your craft be close to the maintenance works. The notice will be update and…

    CRT's only update, 5 August 2026.

  143. Thorne Lock - CLOSURE

    Stainforth & Keadby CanalYorkshire and North East

    same day

    From 24 September 2026

    Reopened 24 September 2026

    Where
    Thorne Lock
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Lock

    Thorne Lock will be closed to navigation today while essential grouting work is carried out, the electricity supply will be switched off during the works. The lock will reopen as usual at 5 pm. We apologise for any inconvenience this causes.

    CRT's only update, 24 September 2026.

Coming up

Scheduled but not yet started, so in no figure above.

68 scheduled.
ClosureFromPlanned
Lock 93 Heales Lock.
Kennet & Avon Canal · Repair
5 October 202646 days
Lock 4, Curdworth
Birmingham & Fazeley Canal · Repair
2 November 202646 days
Lock 10, Ganny Lock, Nearest town Brighouse
Calder & Hebble Navigation · Repair
2 November 202646 days
Lock 18 Shepley - Shepley Bridge, Mirfield
Calder & Hebble Navigation · Repair
2 November 202646 days
Road Lock 8, Stockton Brook
Caldon Canal · Repair
2 November 202646 days
Stensons Lock 71, Ilkeston
Erewash Canal · Repair
2 November 202646 days
Lock 79, Coal Pit Middle, Miles Platting, Manchester
Rochdale Canal · Repair
2 November 202646 days
Lock 4, Galgate
Glasson Branch (Lancaster Canal) · Repair
2 November 202646 days
Lock 80, Coal Pit Lower, Miles Platting, Manchester
Rochdale Canal · Repair
2 November 202646 days
Lock 27, Little Bourton
Oxford Canal · Repair
2 November 202646 days
Lock 11, near Kingswood, Warwickshire
North Stratford Canal · Repair
2 November 202646 days
Lock 14, near kingswood, Warwickshire
North Stratford Canal · Repair
2 November 202646 days
Stourton Lock 4 (Bottom Lock)
Stourbridge Canal · Repair
2 November 202646 days
Lock 5, Stourbridge
Stourbridge Canal · Repair
2 November 202646 days
Lock 29, Wightwick
Staffordshire & Worcestershire Cnl · Repair
2 November 202646 days
Lock 24, Bratch Middle lock
Staffordshire & Worcestershire Cnl · Repair
2 November 202646 days
Lock 18, Swindon lock, Swindon
Staffordshire & Worcestershire Cnl · Repair
2 November 202611 days
Lock 1, Stourbridge, Top lock
Stourbridge Canal · Repair
2 November 202646 days
Gringley Shaw, Lock 62, Gringley on the Hill
Chesterfield Canal · Repair
2 November 202646 days
Lock 38, Penkridge Lock
Staffordshire & Worcestershire Cnl · Repair
2 November 202646 days
Sawbridgeworth Lock 5
River Stort · Repair
2 November 202646 days
Lock 35
Staffordshire & Worcestershire Cnl · Repair
2 November 202646 days
Weir 2A, Llanfrynach weir
Monmouthshire & Brecon Canal · Repair
2 November 202646 days
Lock 68 -Lock 4
Leeds & Liverpool Canal · Repair
2 November 202611 days
River Skell Feeder
Ripon Canal · Repair
16 November 20264 days
Lock 25, Bottom Lock
Leeds & Liverpool Canal · Repair
16 November 202611 days
Lock 14, Bascote
Grand Union Canal · Repair
4 January 202767 days
Lock 23, Stoke Hammond Lock
Grand Union Canal · Repair
4 January 202725 days
Lock 22E, Slaithewaite, Huddersfield
Huddersfield Narrow Canal · Repair
4 January 202767 days
Lock 6 west, Stalybridge
Huddersfield Narrow Canal · Repair
4 January 202739 days
Lock 10, Marple (lock flight)
Peak Forest Canal · Repair
4 January 202767 days
Lock 15, Bascote
Grand Union Canal · Repair
4 January 202767 days
Lock 17, Bascote
Grand Union Canal · Repair
4 January 202767 days
Lock 51 Rode Heath
Trent & Mersey Canal · Repair
4 January 202767 days
Lock 43, Worcestershire
Worcester & Birmingham Canal · Repair
4 January 202746 days
Fosse Middle Lock 21, Near Royal Leamington Spa
Grand Union Canal · Repair
4 January 202767 days
Lock 17, Junction Lock
Trent & Mersey Canal · Repair
4 January 202746 days
Wychnor Lock 11
Trent & Mersey Canal · Repair
4 January 202767 days
Lock 51, Bottom gate, Near Stratford-Upon- Avon
South Stratford Canal · Repair
4 January 202711 days
Lock 17, Stoke Bruerne lock flight, Towcester
Grand Union Canal · Inspections
4 January 20271 day
Lock 13. Audlem Lock Flight
Shropshire Union Canal · Repair
4 January 202746 days
Lock 7. Audlem Lock Flight
Shropshire Union Canal · Repair
4 January 202746 days
Bridge 61, White Bridge near Rowington
Grand Union Canal · Repair
4 January 202767 days
Crabtree Swing Bridge 32, New Lane
Leeds & Liverpool Canal · Repair
4 January 202767 days
Glanusk. Between bridges 119 and 125
Monmouthshire & Brecon Canal · Repair
4 January 202767 days
Culvert 49, near Bridge 92, Nantwich Junction Bridge
Shropshire Union Canal · Repair
4 January 202767 days
Lock 12, Rawden Mill
Rochdale Canal · Repair
4 January 202747 days
Peirpoints lock 55 Hassall Green
Trent & Mersey Canal · Repair
4 January 202767 days
Autherley Junction Stop Lock , Wolverhampton
Shropshire Union Canal · Repair
4 January 202767 days
Lock 2, Hawley Lock
Regent's Canal · Repair
4 January 202739 days
Dean Lock, Shevington, Wigan
Leeds & Liverpool Canal · Repair
4 January 202718 days
Worksop Town, Lock 50, Worksop
Chesterfield Canal · Repair
11 January 202760 days
Lock 17, Stoke Bruerne
Grand Union Canal · Repair
11 January 202760 days
Lock 20, Stoke Bruerne
Grand Union Canal · Repair
11 January 202760 days
Lock 19, Stoke Bruerne
Grand Union Canal · Repair
11 January 202760 days
Lock 72 Cobblers lock, near Hungerford
Kennet & Avon Canal · Repair
11 January 202721 days
Lock 16, West Huddersfield Narrow Canal, Mossley
Huddersfield Narrow Canal · Repair
11 January 202732 days
Lock 65, Coombes Lock
Monmouthshire & Brecon Canal · Repair
11 January 202732 days
Lock 69, Brynich Lock
Monmouthshire & Brecon Canal · Repair
11 January 202732 days
Bridge 17, Loco Lift bridge, located Quay Street, Huddersfield
Huddersfield Broad Canal · Repair
11 January 202728 days
High Orchard Bridge, St Annes Way, Gloucester
Gloucester & Sharpness Canal · Repair
18 January 202718 days
Lock 75 of the Wigan Flight
Leeds & Liverpool Canal · Repair
25 January 202716 days
Lock 1 Rufford Branch
Rufford Branch (L&L Canal) · Repair
25 January 202711 days
Lock 68, Near Sandbach
Trent & Mersey Canal · Repair
27 January 202716 days
Lock 87 Wigan
Leeds & Liverpool Canal · Repair
1 February 202725 days
Lock 74 of the Wigan Flight
Leeds & Liverpool Canal · Repair
10 February 202716 days
Lock 59, Winkwell Locks
Grand Union Canal · Repair
22 February 202718 days
Purton Upstream Safety Gates, Purton, Berkeley
Gloucester & Sharpness Canal · Repair
1 March 202710 days

Why they close · Canals · Reliability · Trends · Download data