Canal closures

Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.

The archive / North Stratford Canal

North Stratford Canal

3.7 closure-days per kilometre (95% range 2.8–4.5) — 74 days across 23 closures of this 20km canal.

Lengths from CRT's ArcGIS open data, published under the strictest reading of its licence. A notice is attributed to the whole named waterway, not to a point.

Something was shut here on 9% of this cruising season — 21 of its 231 days — across 12 separate closures.

That means a closure somewhere on the canal, not that the whole canal was impassable. Every closure below names the locks or bridges it sat between.

Nothing is shut on this canal today.

Regions
West Midlands
On record
25 closures

The season, closure by closure

Each row is one closure. A bar starts and ends where the closure did, and its length is how long it ran; dashed bars have not started yet.

2026-03-15one bar is one closure2026-10-31

Every closure on record

Population

Status

Period

2025 season2026 seasonAll time

Duration

Cause

Asset affected

CRT reason

Region

Showing all 23 closures on the North Stratford Canal.

23
closures
74
closure-days
16
in cruising season
0
no reopening date
What these figures mean
Population
Which closures a figure counts. All closures is everything; Unplanned, in season drops CRT's scheduled winter programme and any day outside the 15 March to 31 October cruising season; CRT winter programme is that maintenance alone.
Defensible duration
The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
Closure-days
One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals.
The season so farweeks with a closure in force
Closures in force each monthclosures active during the month
0
0
1
4
1
2
0
1
2
1
0
1
1
2
3
3
3
May 25Jun 25Jul 25Aug 25Sep 25Oct 25Nov 25Dec 25Jan 26Feb 26Mar 26Apr 26May 26Jun 26Jul 26Aug 26Sep 26
Whereclosure-days by region
West Midlands7423
23 results · every closure on the North Stratford CanalJump to table
NoticeExtentStartedDays
Lock 20, Kingswood
Repair · Wear and tear
Lock 202026-01-0546
Lapworth Lock 9
Repair · Wear and tear
Lock 92025-12-0811
Near Bridge 25, Stratford Road
Vegetation · Weather
Bridge 25, Stratford Road2026-09-013
Bridge 7
Vegetation · Weather
Bridge 7, Solihull High Street2025-09-152
SN-020-013-02 - Lock 17 Bottom Gate
Repair · Wear and tear
Lock 172026-07-182
Shirley Drawbridge
Suspected Vandalism · Struck by boat or vehicle
Bridge 8, Shirley Drawbridge2025-08-271
Bridge 9, Haslucks Green Road
Vegetation · Weather
Bridge 9, Haslucks Green Road2025-10-041
Lock 12, Lapworth
Repair · Cause not stated
Lock 122025-10-071
Shirley Drawbridge
Vegetation · Weather
Bridge 8, Shirley Drawbridge2026-01-121
Shirley Drawbridge
Vehicle Incident · Struck by boat or vehicle
Bridge 8, Shirley Drawbridge2026-04-231
Bridge 8, Shirley Drawbridge.
Vehicle Incident · Struck by boat or vehicle
Bridge 8, Shirley Drawbridge2026-05-311
Shirley Drawbridge
Repair · Cause not stated
Bridge 8, Shirley Drawbridge2026-06-111
Lock 2, Lapworth Top Lock
Repair · Wear and tear
Lock 2, Lapworth Top Lock2026-08-201
Bridge 8 Shirley Drawbridge
Vehicle Incident · Struck by boat or vehicle
Bridge 8, Shirley Drawbridge2026-09-031
Near Bridge 14, Dickens Heath
Vegetation · Cause not stated
Bridge 142026-09-211
Bridge 8, Shirley Drawbridge
Suspected Vandalism · Struck by boat or vehicle
Bridge 8, Shirley Drawbridge2025-07-21same day
Lock 16, Lapworth
Repair · Wear and tear
Lock 162025-08-08same day
Lock 14, Lapworth
Repair · Wear and tear
Lock 142025-08-12same day
Lock 11, Lapworth
Repair · Wear and tear
Lock 112025-08-13same day
Bridge 23, Ashford Lane
Vegetation · Weather
Bridge 23, Ashford Lane2026-07-25same day
Bridge 8, Shirley Drawbridge
Suspected Vandalism · Struck by boat or vehicle
Bridge 8, Shirley Drawbridge2026-07-27same day
Bridge 8, Shirley Drawbridge
Vehicle Incident · Struck by boat or vehicle
Bridge 8, Shirley Drawbridge2026-08-25same day
North Stratford Canal, Bridge 8, Shirley Drawbridge
Repair · Wear and tear
Bridge 8, Shirley Drawbridge2026-08-29same day

Coming up

Scheduled but not yet started, so in no figure above.

2 scheduled.
ClosureFromPlanned
Lock 11, near Kingswood, Warwickshire
North Stratford Canal · Repair
2 November 202646 days
Lock 14, near kingswood, Warwickshire
North Stratford Canal · Repair
2 November 202646 days

Not counted

Cancelled notices and ones whose dates cannot be right are in no figure on this page. They are kept here because CRT published them.

2 notices excluded from the figures.
NoticeStateStarted
Lock 11, near Kingswood, WarwickshirePublished2 November 2026
Lock 14, near kingswood, WarwickshirePublished2 November 2026