Gringley Shaw, Lock 62, Gringley on the Hill
Scheduled: 2 November 2026 to 18 December 2026 (46 days planned), on the Chesterfield Canal. It has not started, so it is in no figure — see the archive's Coming up list.
Source: this notice on canalrivertrust.org.uk
- Waterway
- Chesterfield Canal
- Region
- Yorkshire and North East
- Started
- 2 November 2026
- Status
- Scheduled
- Days planned
- 46
- CRT reason
- Repair
- Cause
- Wear and tear
- Asset
- Lock
Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.
Where
- Chesterfield Canal: Lock 62, Gringley Shaw Lock to Lock 62, Gringley Shaw Lock
Updates · 1
98 days with no update after the last one.
16 June 2026 · 0 days since the previous
A navigation and towpath closure are required for topside & low side lock gate repairs, re-planking, heel & breast post works, relining, low side lock gate quoin works, lock chamber brickwork repointing, dam groove repairs and lock chamber ladder works.