Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.
The archive / Grand Union Canal
Navigation Closure - Grand Union Canal, Lk 44 top gate balance Beam replacement, Tring
Scheduled: 28 September 2026 to 29 September 2026 (1 days planned), on the Grand Union Canal. It has not started, so it is in no figure — see the archive's Coming up list.
Source: this notice on canalrivertrust.org.uk
- Waterway
- Grand Union Canal
- Region
- London and South East
- Started
- 28 September 2026
- Status
- Scheduled
- Days planned
- 1
- CRT reason
- Repair
- Cause
- Cause not stated
- Asset
- Unspecified
Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.
Where
- Grand Union Canal: Lock 43 to Lock 45
Updates · 1
0 days with no update after the last one.
23 September 2026 · 0 days since the previous
A navigation closure is required to replace the temporary repaired top gate, tow path balance beam with new at lock 44 the temporary repair to the beam has now began to fail and will require new beam fitted, this will require our onsite team to close navigation for lifting purposes. Navigation will be closed from lock 45 to 43 for the works to be safely carried out. The notice will be updated on the 28th Sept at 16:00 by the onsite team with progress updates.
Cite this: Canal closures, “Navigation Closure - Grand Union Canal, Lk 44 top gate balance Beam replacement, Tring”, https://crt-stoppages.pages.dev/notice/01a0cd63-f432-72a3-ae0b-ed03d971083e.
Every closure on Grand Union Canal · Download the data · Method and limits