Lock 1 Rhodesfield, Top lock, in Ripon
A navigation closure on the Ripon Canal, 23 March 2026 to 27 March 2026 — 4 days.
Source: this notice on canalrivertrust.org.uk
- Waterway
- Ripon Canal
- Region
- Yorkshire and North East
- Started
- 23 March 2026
- Status
- Reopened 27 March 2026
- Days shut
- 4
- CRT reason
- Repair
- Cause
- Wear and tear
- Asset
- Lock
Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.
Where
- Ripon Canal: Lock 1 / Rhodesfield Lock to Lock 1 / Rhodesfield Lock
Updates · 1
38 days with no update after the last one.
17 February 2026 · 0 days since the previous
Unfortunately, the condition of Rhodesfield lock has deteriorated and we need to bring forward our works planned for next winter, therefore repairs are required to the lock gates and cill at Lock 1, Rhodesfield, due to timber decay that is affecting the structural condition of the gates. To ensure the repairs can be carried out safely and effectively, a full navigation closure will be in place for the duration of the works. This stoppage is essential to maintain the continued reliability and safe operation of the lock. We understand that closures can be disruptive, and we appreciate your patience and cooperation while this essential work is completed.