Coventry Canal

2.6 closure-days per kilometre (95% range 2.2–3.0) — 156 days across 14 closures of this 61km canal.

Lengths from CRT's ArcGIS open data, published under the strictest reading of its licence. A notice is attributed to the whole named waterway, not to a point.

Something was shut here on 26% of this cruising season — 59 of its 231 days — across 8 separate closures.

That means a closure somewhere on the canal, not that the whole canal was impassable. Every closure below names the locks or bridges it sat between.

2 closures are still shut now, and 2 of those have no reopening date. Filter to them.

Regions
West Midlands
On record
15 closures

The season, closure by closure

Each row is one closure. A bar starts and ends where the closure did, and its length is how long it ran; dashed bars have not started yet.

2026-03-15one bar is one closure2026-10-31

Every closure on record

Population

Status

Period

2025 season2026 seasonAll time

Duration

Cause

Asset affected

CRT reason

Region

Showing all 14 closures on the Coventry Canal.

14
closures
156
closure-days
82
in cruising season
2
no reopening date
What these figures mean
Population
Which closures a figure counts. All closures is everything; Unplanned, in season drops CRT's scheduled winter programme and any day outside the 15 March to 31 October cruising season; CRT winter programme is that maintenance alone.
Defensible duration
The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
Closure-days
One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals.
The season so farweeks with a closure in force
Closures in force each monthclosures active during the month
0
0
0
1
1
1
1
0
1
2
3
0
0
2
1
3
2
May 25Jun 25Jul 25Aug 25Sep 25Oct 25Nov 25Dec 25Jan 26Feb 26Mar 26Apr 26May 26Jun 26Jul 26Aug 26Sep 26
Whereclosure-days by region
West Midlands15614
14 results · every closure on the Coventry CanalJump to table
NoticeExtentStartedDays
Culvert 15A, near Sutton Road Bridge in the Bonehill area of Tamworth
Repair · Wear and tear
Sutton Road Bridge to A5 Road Bridge2026-01-1953
Atherstone Lock Flight
Low Water Levels · Weather · no reopening date
Lock 1, Atherstone Top Lock to Lock 112026-08-0449
Adjacent to Bridge 41, Coleshill Road Bridge
3rd Party Works · Nothing failed
Bridge 41, Coleshill Road Bridge to Bridge 40, Taverners Bridge2026-02-1620
Lock 13, Glascote Bottom Lock to Fradley Swing Bridge
Low Water Levels · Cause not stated
Lock 13, Glascote Bottom Lock to Fradley Swing Bridge2025-09-0215
Dunstall Farm Bridge, Coventry Canal
Vehicle Incident · Struck by boat or vehicle · no reopening date
Dunstall Bridge2026-09-1210
Bridge 91, near Fradley
Vegetation · Weather
Bridge 91, New Bridge2026-06-053
Near Tamhorn Park Bridge, Tamworth
Vegetation · Weather
Hopwas Wood Bridge to Tamhorn Park Bridge2026-03-172
Lock 1, Atherstone Top Lock
3rd Party Works · Nothing failed
Lock 1, Atherstone Top Lock2025-11-111
Bridge 49, Grendon Bridge
Vegetation · Weather
Bridge 49, Grendon Bridge2025-10-061
Between Bridge 13 and Hawkesbury Junction
Vegetation · Other cause
Winding Hole, Hawkesbury Junction to Bridge 13, Bedworth Hill Bridge2026-08-271
Between Bridge 15, Marston Lane Bridge and Bridge 16, Arbury Park Bridge
Vegetation · Weather
Bridge 15, Marston Lane Bridge to Bridge 16, Arbury Park Bridge2026-08-271
Atherstone Lock 9
Repair · Wear and tear
Lock 92025-08-01same day
Electric Wharf, near Sandy Lane, Coventry
Emergency Services Incident · Nothing failed
Coventry Basin to Bridge 1A2026-06-03same day
Glascote Lock 13
Repair · Wear and tear
Lock 13, Glascote Bottom Lock2026-07-22same day

Coming up

Scheduled but not yet started, so in no figure above.

1 scheduled.
ClosureFromPlanned
Weir 11, above Bridge 27, Wood Bridge, Nuneaton
Coventry Canal · Repair
16 November 202625 days

Not counted

Cancelled notices and ones whose dates cannot be right are in no figure on this page. They are kept here because CRT published them.

1 notices excluded from the figures.
NoticeStateStarted
Weir 11, above Bridge 27, Wood Bridge, NuneatonPublished16 November 2026

Download the data · Method and limits · The network