Balance beam
Unplanned closures of this kind: 9 in June to August 2026 against 6 a year earlier, within what chance produces. How this is tested.
- On record
- 23 closures since May 2025
In force today
No closure of this kind is in force today.
By canal
15 canals have had a closure of this kind. A closure naming two canals counts on both.
| Canal | Closures |
|---|---|
| Grand Union Canal | 3 |
| North Stratford Canal | 3 |
| Trent & Mersey Canal | 3 |
| Kennet & Avon Canal | 2 |
| Shropshire Union Canal | 2 |
| Ashton Canal | 1 |
| Birmingham & Fazeley Canal | 1 |
| Huddersfield Broad Canal | 1 |
| Huddersfield Narrow Canal | 1 |
| Oxford Canal | 1 |
| Peak Forest Canal | 1 |
| Regent's Canal | 1 |
Show 3 moreShow fewer
| Canal | Closures |
|---|---|
| Staffordshire & Worcestershire Cnl | 1 |
| Stourbridge Canal | 1 |
| Worcester & Birmingham Canal | 1 |
Every closure on record
Showing 23 closures involving a lock balance beam.
Rank by
Population
2 closures are in neither group: 2 unplanned with no day in the cruising season since May 2025.
Status
Duration
Cause
Asset affected
Lock part
Unplanned lock failures naming a part
CRT reason
Region
What these figures mean
- Population
- Which closures a figure counts. All closures is everything; Unplanned closure drops the works CRT flags as its winter programme and any day outside the cruising season (the Friday nearest 15 March to the Sunday before the first Monday in November). Scheduled work CRT does not flag as winter works still counts here. CRT Planned closure is the flagged winter programme alone.
- Defensible duration
- The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
- Closure-days
- One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals. They are counted from 1 May 2025, when this archive begins: a closure that started earlier adds only its days since then, though its own row shows its whole length. Every figure and chart counts only the days inside the Period chosen above them.
- In force
- A closure is in a Period, and a day is one a closure affected, if it was in force at any time that day, including the morning it reopened. Closure-days measure how long, so they count whole days and not the reopening day: a closure can be in a Period and add no closure-day to it.
Closures in force each month
closures active during the monthCanals ranked by the season's closures
share of the period's cruising-season days up to today — a closure somewhere on a long canal is likelier, and does not mean the canal was impassableclosures in force on the period's cruising-season days — a longer canal has more to go wrong onWhere
closure-days by regionclosures by regionA region with more canal has more to go wrong on, so these totals partly measure its size. Regions compared by length of canal are on the Reliability page.
What causes them
closure-days by causeclosures by causeCRT's reason
closure-days by the reason CRT filedclosures by the reason CRT filedHow long they last
closures by full length, including any days before May 2025 — the bands are not equal in widthClosures
Lock 18
Ashton CanalNorth West
44 days
From 1 October 2025
Reopened 14 November 2025
- Where
- Lock 18 to Lock 1
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We're pleased to confirm that the works at Lock 18 on the Ashton Canal have now been completed. We are currently awaiting the contractors to dismantle the scaffolding before navigation can be reopened. A further update will be provided on Friday, 14 November.
Latest of 5 CRT updates, 13 November 2025.
Lock 2, Colne Bridge Lock - Broken Mechanism, Balance Beam Dropped - Repaired and operational
Huddersfield Broad CanalYorkshire and North East
42 days
From 24 July 2026
Reopened 4 September 2026
CRT's title says reopened
- Where
- Lock 2, Colne Bridge Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The repairs to the balance beam have been successfully completed and Lock 2 is operational.
Latest of 5 CRT updates, 4 September 2026.
Lock 100 Sulhamstead Lock, Kennet & Avon Canal
Kennet & Avon CanalWales and South West
38 days
Fully shut 38 of CRT's 40 days
From 1 August 2026
Reopened 10 September 2026
- Where
- Lock 100, Sulhamstead Lock
- CRT reason
- Boating Incident
- Cause
- Broke, cause not given
- Asset
- Lock
Further to the notice below, we are pleased to advise that the repair to Sulhamstead Lock has now been completed and the navigation is open. Thank you for your patience.
Latest of 9 CRT updates, 10 September 2026.
Lock 2, Hack Green
Shropshire Union CanalNorth West
22 days
From 9 February 2026
Reopened 3 March 2026
- Where
- Lock 2, Hack Green Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Following our previous update, we would like to provide further information regarding the repairs at Lock 2, Hack Green. Our original team scheduled to undertake the balance beam replacement has been delayed while completing other emergency repair works elsewhere in the North…
Latest of 3 CRT updates, 19 February 2026.
Lock 9, Mile end Regents Canal
Regent's CanalLondon and South East
22 days
From 24 July 2026
Reopened 15 August 2026
- Where
- Lock 9, Mile End Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please be advised all repair works are complete at Mile End Lock, and the area is being cleared. The lock will reopen at 9am tomorrow morning.
Latest of 5 CRT updates, 14 August 2026.
Lock 1 to Lock 16 Marple Flight
Peak Forest CanalNorth West
20 days
From 9 June 2026
Reopened 29 June 2026
- Where
- Lock 1 to Lock 16
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We have now established a method of repair for the damaged balance beam at Lock 10 on the Peak Forest Canal. The team will be on site from 8:00 am on Monday 29 June to carry out the replacement of the balance beam. We currently anticipate that the works will be completed on the…
Latest of 5 CRT updates, 23 June 2026.
Lock 52 Heathy Lock.
Kennet & Avon CanalWales and South West
15 days
From 30 December 2025
Reopened 14 January 2026
- Where
- Lock 52, Heathy Close Lock
- CRT reason
- Repair
- Cause
- Worn out
- Asset
- Lock
Please be advised that repairs to the lock beam will take place as soon as we can safely mobilize to site. We anticipate this being towards the end of this week, or start of the following week once access via work boat is possible. We apologies for any inconvenience caused and…
Latest of 2 CRT updates, 5 January 2026.
Lock 28 W, Huddersfield Narrow Canal
Huddersfield Narrow CanalNorth West
9 days
From 7 May 2025
Reopened 16 May 2025
- Where
- Lock 28 West
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We are pleased to advise navigation is back open at Lock 28W on the Huddersfield Narrow Canal following a successful repair.
Latest of 2 CRT updates, 16 May 2025.
Aston Lock 10
Birmingham & Fazeley CanalWest Midlands
6 days
From 2 July 2025
Reopened 8 July 2025
- Where
- Aston Lock 10
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please be advised our reactive response team is now scheduled to attend tomorrow (Tuesday 8th July) to assess the situation and develop a suitable repair plan for the failed lock beam at Lock 10 on the Aston Flight. In the meantime, navigation remains possible via the…
Latest of 3 CRT updates, 7 July 2025.
Navigation Closure - Oxford Canal, Grants Lock; Lock 30, Bodicote
Oxford CanalLondon and South East
4 days
Fully shut 4 of CRT's 14 days
From 10 June 2025
Reopened 24 June 2025
- Where
- Lock 30, Grants Lock
- CRT reason
- Boating Incident
- Cause
- Struck by boat or vehicle
- Asset
- Lock
We are pleased to share that work on Grant's Lock has been completed ahead of schedule. The lock will reopen and be fully operational from 12:00 PM on 24th June 2025
Latest of 4 CRT updates, 24 June 2025.
Stourbridge Locks 1-16
Stourbridge CanalWest Midlands
3 days
From 14 August 2026
Reopened 17 August 2026
- Where
- Lock 16, Stourbridge Bottom Lock to Lock 1, Stourbridge Top Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Our Reactive Team are hoping to attend this lock on Monday 17th Aug to make a repair and brace the beam. We will provide an update as soon as we have further information.
Latest of 2 CRT updates, 14 August 2026.
Lock 34 Boggs Lock, Penkridge, Stafford ST19 5PR
Staffordshire & Worcestershire CnlWest Midlands
3 days
From 31 August 2026
Reopened 3 September 2026
- Where
- Lock 34 Boggs Lock
- CRT reason
- Boating Incident
- Cause
- Broke, cause not given
- Asset
- Lock
Our Reactive Response Team have been out to assess the broken beam and repairs needed today, and will be returning tomorrow, 2nd September, to carry out the repairs. They are hopeful that they will complete these repairs tomorrow. Further update will be posted as soon as works…
Latest of 2 CRT updates, 1 September 2026.
Lock 43 Grand Union
Grand Union CanalLondon and South East
1 day
From 3 June 2025
Reopened 4 June 2025
- Where
- Lock 43
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Due to an issue with the bottom offside gate the lock has been closed for repair and passage is not available for all craft.
CRT's only update, 3 June 2025.
Autherley Junction Stop Lock
Shropshire Union CanalWest Midlands
1 day
From 23 March 2026
Reopened 24 March 2026
- Where
- Autherley Junction Stop Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We expect a temporary repair to be completed by the end of today. Once we have received confirmation that the lock is operational and navigation can resume, we will provide a further update.
Latest of 2 CRT updates, 24 March 2026.
Lock 23 Stoke Hammond
Grand Union CanalLondon and South East
1 day
From 13 July 2026
Reopened 14 July 2026
- Where
- Lock 23, Stoke Hammond Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please be advised the lock is not currently operational due to a broken balance beam. Updates will be shared as soon as further information comes in. Thank you for your patience whilst this issue is being addressed. w3w ///kite.tuck.aura
CRT's only update, 13 July 2026.
Lock 61, Winkwell Locks
Grand Union CanalLondon and South East
1 day
From 24 August 2026
Reopened 25 August 2026
- Where
- Lock 61, Winkwell Locks
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We are pleased to share that our team has now completed the remedial repair to the balance beam, allowing us to safely reopen the navigation. Thank you very much for your patience and understanding while these works were being carried out.
Latest of 2 CRT updates, 25 August 2026.
Lock 16, Lapworth
North Stratford CanalWest Midlands
same day
From 8 August 2025
Reopened 8 August 2025
- Where
- Lock 16
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please be advised that navigation at Lock 16 on the North Stratford Canal will be closed on Friday 8th August from 9am to 2pm to allow for essential works to replace both the top and bottom lock beams. If we are able to reopen navigation earlier than 2pm, we will update this…
CRT's only update, 6 August 2025.
Lock 14, Lapworth
North Stratford CanalWest Midlands
same day
From 12 August 2025
Reopened 12 August 2025
- Where
- Lock 14
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please note the navigation closure for Lock 14 will now take place on Tuesday 12th August.
Latest of 2 CRT updates, 8 August 2025.
Lock 11, Lapworth
North Stratford CanalWest Midlands
same day
From 13 August 2025
Reopened 13 August 2025
- Where
- Lock 11
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please be advised that navigation at Lock 11 on the North Stratford Canal will be closed on Wednesday 13th August from 9am to 2pm to allow for essential works to replace both the top and bottom lock beams. If we're able to open navigation any earlier than 2pm, we will update…
CRT's only update, 6 August 2025.
Lock 20
Worcester & Birmingham CanalWest Midlands
same day
From 16 March 2026
Reopened 16 March 2026
- Where
- Lock 20
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please be advised that the bottom‑end lock beam at Lock 20 has failed. To enable the necessary repair works, a navigation closure will be required. On Monday 16 March, navigation through Lock 20 will be closed between 9:00am and 2:00pm while our team carries out the repairs. If…
CRT's only update, 13 March 2026.
Lock 30, Lime Kiln Lock, Stone
Trent & Mersey CanalWest Midlands
same day
From 14 May 2026
Reopened 14 May 2026
- Where
- Lock 30, Lime Kiln Lock
- CRT reason
- Repair
- Cause
- Worn out
- Asset
- Lock
A repair is being carried out at Lime Kiln Lock 30, in Stone, which will require a temporary closure of the navigation between 09:00 and 13:00 on Thursday 14 May. Our team need to weld a brace onto the end of the lock beam where the head post has rotted away. We thank you for…
CRT's only update, 12 May 2026.
Lock 75 Big lock
Trent & Mersey CanalNorth West
same day
From 15 June 2026
Reopened 15 June 2026
- Where
- Lock 75, Big Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We apologise for the previous notice and any confusion caused. Navigation at Lock 75 Big Lock remains open for narrowboats only, with the lock continuing to be operable. Our regular volunteers will be on site to assist boats through the lock where required. The lock will be…
Latest of 2 CRT updates, 2 June 2026.
Lock 21, Colwich Lock
Trent & Mersey CanalWest Midlands
same day
From 4 September 2026
Reopened 4 September 2026
- Where
- Lock 21, Colwich Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Please be advised that repair works will take place at Colwich Lock 21 on the Trent & Mersey Canal on Friday 4 September. A lock beam has failed, and water is currently escaping from the lock, creating a potentially hazardous situation. Our Reactive Response Team will attend the…
CRT's only update, 3 September 2026.
Showing the 23 longest of 23. Every row links to the notice CRT published.