Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.
Lee Navigation, Between Bridge 27 - Chalk Bridge and Bridge 28 - Bleak Hall Bridge (A406), Enfield, N18 3QQ.
A navigation closure on the Lee Navigation, 1 September 2025 to 26 September 2025 — 25 days.
Source: this notice on canalrivertrust.org.uk
- Waterway
- Lee Navigation
- Region
- London and South East
- Started
- 1 September 2025
- Status
- Reopened 26 September 2025
- Days shut
- 25
- CRT reason
- 3rd Party Works
- Cause
- Nothing failed
- Asset
- Bridge
Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.
Where
- Lee Navigation: Bridge 27, Chalk Bridge to Bridge 28, Bleak Hall Bridge (A406)
Updates · 1
98 days with no update after the last one.
20 June 2025 · 0 days since the previous
Construction of new Road Bridge over Lee Navigation (Phase 1 - Install Steel beams/Permanent Formwork). For Health & Safety reasons during crane lifting operations the works will be carried out under night-time navigation & Towpath closures between 11pm – 6am. Advanced warning signage positioned either side of works and area isolated off during night-time closure, with Towpath diversion route in place. Lifesaving PPE available on site while working over River. Night-time navigation & Towpath closures between 11pm – 6am.
Cite this: Canal closures, “Lee Navigation, Between Bridge 27 - Chalk Bridge and Bridge 28 - Bleak Hall Bridge (A406), Enfield, N18 3QQ.”, https://crt-stoppages.pages.dev/notice/01978dd0-b5d6-72e4-8305-7d1a5387db0d.
Every closure on Lee Navigation · Download the data · Method and limits