Canal closures

Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.

The archive / Oxford Canal

HS2 Oxford Canal Viaduct, nearest structure is OX-057-002, Wormleighton, Warwickshire

A navigation closure on the Oxford Canal, 9 March 2026 to 13 March 2026 — 4 days.

Source: this notice on canalrivertrust.org.uk

Waterway
Oxford Canal
Region
West Midlands
Started
9 March 2026
Status
Reopened 13 March 2026
Days shut
4
CRT reason
3rd Party Works
Cause
Nothing failed
Asset
Other

Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.

Where

Updates · 3

14 days with no update after the last one.

27 February 2026 · 105 days since the previous

After completing a further on site review, the HS2 contractor has advised that the works can be delivered during a one‑week stoppage. As a result, the revised dates are 9 March to 13 March 2026.

14 November 2025 · 191 days since the previous

The contractor responsible for constructing the HS2 viaduct over the Oxford Canal has informed us that the works can no longer be carried out on the previously advertised dates.  This is due to delays in the manufacture and delivery of parapet components. As a result, the stoppage is now rescheduled to take place from 2nd March to 13th March 2026.

7 May 2025 · 0 days since the previous

A navigation and towpath closure are required for construction works for a new high speed 2 railway viaduct.

Cite this: Canal closures, “HS2 Oxford Canal Viaduct, nearest structure is OX-057-002, Wormleighton, Warwickshire”, https://crt-stoppages.pages.dev/notice/0196ab21-0549-789a-8204-1f1c915b001e.

Every closure on Oxford Canal · Download the data · Method and limits