Canal closures

Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.

The archive / River Trent

Proposed bridge location is near the Trent Basin (North Bank - Easting 458870, Northing 338836, South Bank, Easting 458863, Northing 338741)

A navigation closure on the River Trent, 10 November 2025 to 11 November 2025 — 1 days.

Source: this notice on canalrivertrust.org.uk

Waterway
River Trent
Region
East Midlands
Started
10 November 2025
Status
Reopened 11 November 2025
Days shut
1
CRT reason
3rd Party Works
Cause
Nothing failed
Asset
Bridge

Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.

Where

Updates · 2

0 days with no update after the last one.

11 November 2025 · 187 days since the previous

We're pleased to announce that the third-party works at this location have been completed ahead of schedule. Both the navigation and towpath are now open.

8 May 2025 · 0 days since the previous

A navigation and towpath closure are required for the construction of a new bridge across the River Basin and a small bridge across the Trent Basin, we will also be constructing ramps, stairs, an amphitheatre on the North Bank and doing some associated landscaping, drainage and lighting.

Cite this: Canal closures, “Proposed bridge location is near the Trent Basin (North Bank - Easting 458870, Northing 338836, South Bank, Easting 458863, Northing 338741)”, https://crt-stoppages.pages.dev/notice/0196b1a1-0337-7914-ad68-524010b2e08b.

Every closure on River Trent · Download the data · Method and limits