Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.
Proposed bridge location is near the Trent Basin (North Bank - Easting 458870, Northing 338836, South Bank, Easting 458863, Northing 338741)
A navigation closure on the River Trent, 10 November 2025 to 11 November 2025 — 1 days.
Source: this notice on canalrivertrust.org.uk
- Waterway
- River Trent
- Region
- East Midlands
- Started
- 10 November 2025
- Status
- Reopened 11 November 2025
- Days shut
- 1
- CRT reason
- 3rd Party Works
- Cause
- Nothing failed
- Asset
- Bridge
Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.
Where
- River Trent: Bridge 13, Lady Bay Bridge to Bridge 13A, Sailing Club Continuation
Updates · 2
0 days with no update after the last one.
11 November 2025 · 187 days since the previous
We're pleased to announce that the third-party works at this location have been completed ahead of schedule. Both the navigation and towpath are now open.
8 May 2025 · 0 days since the previous
A navigation and towpath closure are required for the construction of a new bridge across the River Basin and a small bridge across the Trent Basin, we will also be constructing ramps, stairs, an amphitheatre on the North Bank and doing some associated landscaping, drainage and lighting.
Cite this: Canal closures, “Proposed bridge location is near the Trent Basin (North Bank - Easting 458870, Northing 338836, South Bank, Easting 458863, Northing 338741)”, https://crt-stoppages.pages.dev/notice/0196b1a1-0337-7914-ad68-524010b2e08b.
Every closure on River Trent · Download the data · Method and limits