Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.
The archive / Shropshire Union Canal
Lock 12, Beeston Stone Lock, SU-033-006
A navigation closure on the Shropshire Union Canal, 5 April 2026 to 7 April 2026 — 2 days.
Source: this notice on canalrivertrust.org.uk
- Waterway
- Shropshire Union Canal
- Region
- North West
- Started
- 5 April 2026
- Status
- Reopened 7 April 2026
- Days shut
- 2
- CRT reason
- Repair
- Cause
- Struck by boat or vehicle
- Asset
- Lock
Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.
What CRT said it was for
The repair to Beeston Stone Lock 12 has been successful and is back open to navigation.
Where
- Shropshire Union Canal: Lock 11, Beeston Iron Lock to Lock 13 Tilstone Lock
Updates · 1
2 days with no update after the last one.
5 April 2026 · 0 days since the previous
A lock gate has lifted out of position by a boat as the lock was filling.
Cite this: Canal closures, “Lock 12, Beeston Stone Lock, SU-033-006”, https://crt-stoppages.pages.dev/notice/019d5d8f-2dd6-7a46-978f-c77feaf573a8.
Every closure on Shropshire Union Canal · Download the data · Method and limits