Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.
All closures / Regions / North West
North West
9.1 closure-days per mile in the 12 months to 26 September 2026 (could plausibly be 6.4–11.9) — 3,536 days across 209 closures on the 387 miles of waterway CRT looks after here.
Since 1 May 2025, the North West has lost 12.1 closure days per mile of waterway (could plausibly be 8.5–15.7), clearly more than the network's 8.3.
The range allows for luck. Lengths from CRT's ArcGIS open data, published under the strictest reading of its licence: non-commercial use, attribution to Canal & River Trust, and no warranty. Every region compared by length of waterway is on the Reliability page.
Unplanned closures in this region: 41 in June to August 2026 against 35 a year earlier, within what chance produces. How this is tested.
- On record
- 311 notices since May 2025: 274 closures, 2 restrictions and 35 not yet started
In force today
8 closures in this region are in force today, longest shut first. Filter the explorer to them.
| Canal | Where | Since | Days shut |
|---|---|---|---|
| Weaver Navigation, Trent & Mersey Canal | Anderton Boat Lift | 3 January 2025 | 631 |
| Rochdale Canal | Lock 81 Butler Street to Lock 83 Brownsfield | 31 March 2026 | 179 |
| Llangollen Canal | Lock 1, Swanley Lock to Lock 1, Baddiley Lock | 6 August 2026 | 51 |
| Macclesfield Canal | Bosley Lock 1 to Bosley Lock 12 | 11 August 2026 | 42 |
| Weaver Navigation | Marsh Lock | 16 July 2026 | 38 |
| Glasson Branch (Lancaster Canal) | Lock No.4 | 4 September 2026 | 22 |
| Rochdale Canal | Lock 56 | 9 September 2026 | 17 |
| Leeds & Liverpool Canal | Bridge 33, Glovers Swing Bridge | 24 September 2026 | 2 |
By canal
18 canals have had a closure in this region. A closure naming two canals counts on both.
| Canal | Closures |
|---|---|
| Leeds & Liverpool Canal | 45 |
| Lancaster Canal | 35 |
| Macclesfield Canal | 29 |
| Huddersfield Narrow Canal | 28 |
| Peak Forest Canal | 28 |
| Rochdale Canal | 26 |
| Trent & Mersey Canal | 26 |
| Shropshire Union Canal | 22 |
| Ashton Canal | 15 |
| Llangollen Canal | 15 |
| Glasson Branch (Lancaster Canal) | 11 |
| Weaver Navigation | 10 |
Show 6 moreShow fewer
| Canal | Closures |
|---|---|
| Rufford Branch (L&L Canal) | 9 |
| Leigh Branch (L&L Canal) | 7 |
| Liverpool Link | 5 |
| Middlewich Branch (Shrop Union) | 5 |
| Bugsworth Arm (Peak Forest Canal) | 2 |
| Ribble Link | 1 |
Every closure on record
Showing 274 closures and 2 restrictions in the North West region.
Rank by
Population
77 closures are in neither group: 77 unplanned with no day in the cruising season since May 2025.
Status
Duration
Cause
Asset affected
Lock part
Unplanned lock failures naming a part
Water problem
Unplanned failures naming one
CRT reason
Region
What these figures mean
- Population
- Which closures a figure counts. All closures is everything; Unplanned closure drops the works CRT flags as its winter programme and any day outside the cruising season (the Friday nearest 15 March to the Sunday before the first Monday in November). Scheduled work CRT does not flag as winter works still counts here. CRT Planned closure is the flagged winter programme alone.
- Defensible duration
- The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
- Closure-days
- One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals. They are counted from 1 May 2025, when this archive begins: a closure that started earlier adds only its days since then, though its own row shows its whole length. Every figure and chart counts only the days inside the Period chosen above them.
- In force
- A closure is in a Period, and a day is one a closure affected, if it was in force at any time that day, including the morning it reopened. Closure-days measure how long, so they count whole days and not the reopening day: a closure can be in a Period and add no closure-day to it.
Closures in force each month
closures active during the monthCanals ranked by the season's closures
share of the period's cruising-season days up to today — a closure somewhere on a long canal is likelier, and does not mean the canal was impassableclosures in force on the period's cruising-season days — a longer canal has more to go wrong onWhat causes them
closure-days by causeclosures by causeShow 6 moreShow fewer
Show 6 moreShow fewer
CRT's reason
closure-days by the reason CRT filedclosures by the reason CRT filedShow 8 moreShow fewer
Show 8 moreShow fewer
What fails
closure-days by assetclosures by assetShow 4 moreShow fewer
Show 4 moreShow fewer
What fails on a lock
closure-days by part — unplanned lock failures naming a partclosures by part — unplanned lock failures naming a partShow 1 moreShow fewer
Show 1 moreShow fewer
How long they last
closures by full length, including any days before May 2025 — the bands are not equal in widthClosures
Navigation Closure: Anderton Boat Lift
Weaver Navigation, Trent & Mersey CanalNorth West
631 days
From 3 January 2025
No reopening date
Still shut. Joins the Weaver Navigation and the Trent & Mersey Canal: it stops boats passing between them, not along either
513 of them since this archive began on 1 May 2025
- Where
- Anderton Boat Lift
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Other
We understand how much the Anderton Boat Lift means to boaters, visitors and the community. We're focussed on finding a solution to get the lift operational again while we look to secure the larger investment for its long-term future. We are still aiming to reopen one caisson in…
Latest of 7 CRT updates, 12 August 2026. 45 days without another.
Navigation Closure: Lock 11 West, Huddersfield Narrow Canal
Huddersfield Narrow CanalNorth West
212 days
From 1 January 2025
Reopened 1 August 2025
92 of them since this archive began on 1 May 2025
- Where
- Lock 12 West to Lock 10 West
- CRT reason
- Repair
- Cause
- Weather
- Asset
- Embankment
We are pleased we have completed works to Lock 11W, from the extreme damaged that occurred in January. We will continue to demobilise the area and we will carry landscaping with reinstalling of trees. Please note this lock and all locks on the Huddersfield Narrow Canal will…
Latest of 6 CRT updates, 30 July 2025.
Marsh Lock
Weaver NavigationNorth West
193 days
Fully shut 193 of CRT's 202 days
From 12 September 2025
Reopened 2 April 2026
- Where
- Marsh Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Our teams are currently awaiting the delivery of, and training on, the powered windlass, which will support future operations. Bookings are now open, and customers can reserve a slot online or by contacting our Customer Services team on 03030 404040. From 13 April, bookings will…
Latest of 11 CRT updates, 27 March 2026.
Lock 83 to Lock 81, Rochdale Canal
Rochdale CanalNorth West
179 days
From 31 March 2026
No reopening date
Still shut
- Where
- Lock 81 Butler Street to Lock 83 Brownsfield
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Culvert
Since out last update contractors have encountered some unforeseen ground conditions during the excavation works which requires additional engineering assessments to be carried out. Work has now been scheduled to continue on Monday 14 September. Despite this short delay, work on…
Latest of 16 CRT updates, 9 September 2026. 17 days without another.
Bridge 131, Knolles Bridge to Bridge 133, Backford Bridge
Shropshire Union CanalNorth West
127 days
From 17 July 2025
Reopened 21 November 2025
- Where
- Bridge 133, Backford to Bridge 131, Knolles
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Culvert
We are pleased to confirm that the refilling and testing, originally scheduled to begin during the week commencing 24th November, will now be brought forward and will start on Thursday this week. Subject to successful testing and no unforeseen issues, we expect to reopen the…
Latest of 13 CRT updates, 18 November 2025.
Lock Flights, Wigan to Leeds
Leeds & Liverpool CanalNorth West
119 days
Fully shut 119 of CRT's 140 days
From 22 May 2025
Reopened 9 October 2025
- Where
- Lock 85, Lock 21 to Lock 2, Office Lock
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
Yorkshire & North East Weed clearance commenced at Bingley on Thursday 2nd October 2025 following a delay in mobilisation due to a medical incident. The team are currently working on the pound between Bingley 5 rise and Bingley 3 rise. There has been insufficient weed clearance…
Latest of 15 CRT updates, 3 October 2025.
Lock 41 to Lock 80
Rochdale CanalNorth West
116 days
From 20 June 2025
Reopened 14 October 2025
- Where
- Lock 41 to Lock 80 Coal Pit Lower
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
Following a recent period of persistent inflows, we're pleased to confirm that the Rochdale Canal between locks 34 and 92 will be reopening from, Tuesday 14 October. Over the past few weeks, our teams have been working hard to prepare the locks so we could reopen the canal as…
Latest of 15 CRT updates, 10 October 2025.
Navigation Closure: Lock 7, Glasson Branch, Lancaster Canal
Glasson Branch (Lancaster Canal)North West
114 days
From 3 February 2025
Reopened 28 May 2025
27 of them since this archive began on 1 May 2025
- Where
- Lock No.7, Glasson Basin Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We are pleased to advise navigation is now open at Lock 7 on the Glasson Branch of the Lancaster Canal following a successful repair.
Latest of 4 CRT updates, 28 May 2025.
Culvert 16, between bridges 22 and 23, Strines
Peak Forest CanalNorth West
106 days
Fully shut 106 of CRT's 114 days
From 27 October 2025
Reopened 18 February 2026
- Where
- Bridge 22, Turf Lea Lift Bridge to Bridge 23, Stanley Hall Bridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Culvert
Due to time lost because of poor weather, this stoppage has been extended. Rewatering of the canal will take place on 12 and 13 February, followed by the removal of dams and the overpumping equipment. We currently expect the canal to reopen to boaters on 17 February, with the…
Latest of 7 CRT updates, 12 February 2026.
Navigation and Towpath Closure: Between Bridge 51, Cowley Bridge and Bosley Lock 12, Macclesfield Canal
Macclesfield CanalNorth West
89 days
From 28 March 2025
Reopened 25 June 2025
55 of them since this archive began on 1 May 2025
- Where
- Bridge 51, Cowley Bridge to Bosley Lock 12
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Canal or river
We are pleased to announce that works at the breach site have been completed. Our teams will be removing the stop planks and padlocks from the locks tomorrow morning and will carry out testing. The canal and towpath will reopen and navigation will resume at 12 midday tomorrow…
Latest of 5 CRT updates, 24 June 2025.
Quoisley Lock, near Marbury
Llangollen CanalNorth West
81 days
From 5 January 2026
Reopened 27 March 2026
- Where
- Quoisley Lock,
- CRT reason
- Repair
- Cause
- Worn out
- Asset
- Lock
We wanted to let you know that the works at Quoisley Lock will require additional time to complete. During the dewatering of the lock, it was identified that the lock gates were in significantly worse condition than expected, making repair unfeasible. New gates are therefore…
Latest of 2 CRT updates, 2 March 2026.
Poolstock Lock 1 to Bridge No.3, Bamfurlong Bridge
Leigh Branch (L&L Canal)North West
78 days
From 12 August 2025
Reopened 29 October 2025
- Where
- Lock 1, Top Lock, Leigh Branch to Bridge No.3, Bamfurlong bridge
- CRT reason
- 3rd Party Works
- Cause
- Other cause
- Asset
- Embankment
We are pleased to advise that the final checks have been completed to the washwall at Lock 1, Poolstock Lock and Bridge 3, Bamfurlong bridge on the Leigh branch on the Leeds & Liverpool canal and navigation is now back open.
Latest of 8 CRT updates, 29 October 2025.
Liverpool Link
Liverpool LinkNorth West
78 days
From 23 April 2026
Reopened 10 July 2026
- Where
- Bascule Bridge - Stanley to Mann Island Lock
- CRT reason
- Pollution Incident
- Cause
- Pollution
- Asset
- Canal or river
The Liverpool Link remains closed to navigation following the identification of a suspected blue-green algae bloom in Princes Dock. Additional water samples have been taken, and we are currently awaiting the results of laboratory testing. As a precaution, steps are being taken…
Latest of 2 CRT updates, 26 June 2026.
Marple & Bosley Lock Flights
Peak Forest Canal, Macclesfield CanalNorth West
76 days
Fully shut 76 of CRT's 119 days
From 4 July 2025
Reopened 31 October 2025
- Where
- Lock 1 to Lock 16
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
We are pleased to inform you that works have been successful at Lock 4, Bosley, on the Macclesfield Canal and the flight will be open from 10am, tomorrow 31 October. Our volunteers are on site to assist with any boaters wishing to travel on the flight. We would like to thank all…
Latest of 7 CRT updates, 30 October 2025.
Bridge 33, Greensdeep Bridge
Peak Forest CanalNorth West
70 days
From 14 November 2025
Reopened 23 January 2026
- Where
- Bridge 33, Greensdeep Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Please be advised that Navigation remains closed at Bridge 33, Greensdeep Bridge, due to the fallen tree. We apologise that this has taken longer to clear than originally expected. Specialist contractors will attend site at the end of this week, and we will provide an update on…
Latest of 11 CRT updates, 21 January 2026.
Ribble Link Passage
Ribble LinkNorth West
68 days
From 9 July 2026
Reopened 15 September 2026
- Where
- Lock No. 1 Top Lock to Tidal Stop Gate
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
Passages through the Ribble Link remain closed while works to remove aquatic weed take place. The works are scheduled to take place from Tuesday, 1 September until Tuesday, 15 September. Ribble Link bookings will resume as soon as the aquatic weed removal works are complete…
Latest of 7 CRT updates, 1 September 2026.
Lock 81 and Top Lock 65, Near Wigan
Leeds & Liverpool CanalNorth West
67 days
From 5 January 2026
Reopened 13 March 2026
- Where
- Lock 85, Lock 21 to Lock 65, Top Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please be advised that, in addition to the advertised works at Locks 81 and 65, we will also be carrying out repair works at Lock 75, which require the lock to be dewatered. The stoppage dates and closure location remain unchanged as originally communicated. Both teams have…
Latest of 2 CRT updates, 16 January 2026.
Lock 41 to Lock 71
Trent & Mersey CanalNorth West
66 days
From 25 July 2025
Reopened 29 September 2025
- Where
- Lock 71 to Lock 41, Plants Lock - Towpath Side
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
From 10:30am on Friday, the Trent & Mersey Canal will reopen between Locks 72 and 75, following the recent persistent inflows. This will allow boats to access the Trent & Mersey Canal northwards and the junction with the Shropshire Union Canal. Unfortunately, the current inflows…
Latest of 5 CRT updates, 25 September 2025.
Lock 1 to Lock 7 Glasson Flight
Glasson Branch (Lancaster Canal)North West
62 days
From 1 July 2026
Reopened 1 September 2026
- Where
- Lock No.1 to Bridge 2, Lock No2 Bridge
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
Despite the recent rainfall, water levels have not yet recovered enough to allow the Glasson Flight to reopen safely. While levels remain stable, they continue to be below those required for safe navigation. Our local team are closely monitoring the situation. To help improve…
Latest of 6 CRT updates, 28 August 2026.
Lock 4
Glasson Branch (Lancaster Canal)North West
59 days
From 5 January 2026
Reopened 5 March 2026
- Where
- Lock No.4
- CRT reason
- Repair
- Cause
- Worn out
- Asset
- Lock
We are pleased to confirm that work to replace the paddles at Lock 4 on the Glasson Branch is planned to commence on Monday 02 March, and is expected to take a few days to complete. Navigation remains closed until the work is completed. We will provide an update on or before…
Latest of 5 CRT updates, 20 February 2026.
Lock 1 to Lock 18
Ashton CanalNorth West
53 days
From 28 July 2025
Reopened 19 September 2025
- Where
- Lock 18 to Lock 1
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
Following the recent period of persistent wet weather, we are pleased to confirm that the Ashton Canal will reopen again on Friday 19 September, between Lock 1 and Lock 18. Boaters are welcome to resume their journeys along this stretch, though we kindly ask everyone to continue…
Latest of 6 CRT updates, 16 September 2025.
The Liverpool Link and Central Docks
Leeds & Liverpool Canal, Liverpool LinkNorth West
51 days
From 15 May 2026
Reopened 5 July 2026
- Where
- Mann Island Lock
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Canal or river
The Liverpool Link will be temporarily closed from 15 May to 5 July while Peel carries out essential construction and maintenance works in the Central Docks. We have worked to keep disruption to a minimum; however, as our rights are limited to permitting our customers to travel…
CRT's only update, 17 March 2026.
Lock 1 Baddiley Lock to Lock 1 Swanley lock on the Llangollen Canal
Llangollen CanalNorth West
51 days
From 6 August 2026
No reopening date
Still shut
- Where
- Lock 1, Swanley Lock to Lock 1, Baddiley Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Culvert
Since our last update the fallen tree has now been removed, and our contractors are carrying out excavation works to gain access to the culvert. This will enable the team to undertake detailed inspections and surveys, providing the information required for our design engineers…
Latest of 6 CRT updates, 18 September 2026. 8 days without another.
Bugsworth Basin
Bugsworth Arm (Peak Forest Canal)North West
49 days
From 1 August 2025
Reopened 19 September 2025
- Where
- Bridge 56 to Bridge 61, Chinley Road Bridge
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
Due to recent inflows into the Peak Forest Canal, we will be removing the stop planks from the entrance to the Bugsworth Basin by 4pm on Friday 19 September. Please note whilst the canal levels are still low, it may be difficult to moor close to the towpaths. Please take extra…
Latest of 5 CRT updates, 16 September 2025.
Lock 13, Tilstone
Shropshire Union CanalNorth West
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Lock 13 Tilstone Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigational closure is required for top and bottom gate repair works and ladder hoop modifications.
CRT's only update, 6 May 2025.
Locks 22, 26, 27 and 28 West, Diggle
Huddersfield Narrow CanalNorth West
46 days
From 3 November 2025
Reopened 19 December 2025
- Where
- Bridge66, Ward Lane Bridge to Bridge 71, Wool Road
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please be advised that the works at Lock 22W have been completed and the lock is now open. The stoppage now runs from Bridge 66, Ward Lane Bridge, to Bridge 71, Wool Road Bridge, while works continue at Locks 26W, 27W, and 28W.
Latest of 4 CRT updates, 26 November 2025.
Lock 81 and Miles Platting Bridge, Manchester
Rochdale CanalNorth West
46 days
From 5 January 2026
Reopened 20 February 2026
- Where
- Lock 66 Tannersfield Highest to Bridge 88, Red Hill Street Bridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
This navigational closure will encompass 2 pieces of work, the navigation will be closed from bridge 88 through to lock 66. We will be replacing the top & bottom gates of lock 81 along with masonry repairs, ladder & paddle works. We will also be doing leakage repairs to the…
CRT's only update, 8 May 2025.
Bridge 51, Ben Healey Bridge - Littleborough
Rochdale CanalNorth West
46 days
From 26 January 2026
Reopened 13 March 2026
- Where
- Bridge 51, Ben Healey Bridge to Bridge 52, Brown Bank Bridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Canal or river
Following the initial onsite investigation works, it has become clear that the repair required is more extensive than first anticipated. This stoppage will therefore be extended until 13 March to allow the investigation to be completed and for any necessary repairs to be carried…
Latest of 2 CRT updates, 12 February 2026.
Lock 87, Manchester
Rochdale CanalNorth West
44 days
From 2 February 2026
Reopened 18 March 2026
- Where
- Lock 84 Dale St to Lock 92 Castlefield
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We would like to make you aware that we are having to extend the closure at Lock 87 due to delays and additional work requirements. Planned crane lift dates had to be moved at short notice because they coincided with the Chinese New Year parade. Whilst on site with the lock…
Latest of 2 CRT updates, 27 February 2026.
Lock 18
Ashton CanalNorth West
44 days
From 1 October 2025
Reopened 14 November 2025
- Where
- Lock 18 to Lock 1
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We're pleased to confirm that the works at Lock 18 on the Ashton Canal have now been completed. We are currently awaiting the contractors to dismantle the scaffolding before navigation can be reopened. A further update will be provided on Friday, 14 November.
Latest of 5 CRT updates, 13 November 2025.
Bosley Flight
Macclesfield CanalNorth West
42 days
Fully shut 42 of CRT's 46 days
From 11 August 2026
No reopening date
Still shut
- Where
- Bosley Lock 1 to Bosley Lock 12
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Due to a paddle failure at Lock 3 over the weekend, we are extending the reopening of the Bosley Lock Flight by an additional day to allow boats currently travelling through this section of the Macclesfield Canal to complete their journey. The Bosley Flight will now remain open…
Latest of 5 CRT updates, 14 September 2026. 12 days without another.
lock 72, Scothmans
Rochdale CanalNorth West
41 days
From 6 June 2025
Reopened 17 July 2025
- Where
- Lock 72 Scothmans
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We're pleased to inform you that all works at Lock 72 on the Rochdale Canal are now complete. Our teams are currently in the process of demobilising equipment and removing dams from the lock. These works will be completed by 1pm, on Thursday 17 July. Please note this area has…
Latest of 5 CRT updates, 16 July 2025.
Glasson Branch - Lock 1, near Galgate
Glasson Branch (Lancaster Canal)North West
39 days
From 5 January 2026
Reopened 13 February 2026
- Where
- Lock No.1 to Lock No.6
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigational closure is required for top gate replacements and wood paddle replacement on the bottom gates. We will also be doing some lock wall grouting and paving repairs.
CRT's only update, 7 May 2025.
Marsh Lock
Weaver NavigationNorth West
38 days
Fully shut 38 of CRT's 72 days
From 16 July 2026
No reopening date
Still shut
- Where
- Marsh Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Since our last update, contractors have completed their inspections and mechanical parts have now been ordered; however, as these parts are being manufactured, delivery is expected to take up to five weeks. Unfortunately, due to a mechanical fault being found, we are currently…
Latest of 9 CRT updates, 18 September 2026. 8 days without another.
Between Lock 1 and Lock 6, Glasson Branch
Glasson Branch (Lancaster Canal)North West
36 days
From 4 August 2025
Reopened 9 September 2025
- Where
- Lock No.1 to Lock No.6
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
Navigation remains closed due to limited water resources, between Lock 1 and Lock 6 on the Glasson branch. Ours teams are continuing to monitor the water levels, and with the continuation of the dry weather, the water levels remain low. We will provide a further update on or…
Latest of 4 CRT updates, 2 September 2025.
Bridge 58b to Bridge 59, Moss Bridge
Rochdale CanalNorth West
35 days
From 17 November 2025
Reopened 22 December 2025
- Where
- Bridge 58B to Bridge 59, Moss Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Navigation remains closed due to fallen trees. Our specialist contractors are currently working to clear the site and we will provide a further update on or before Monday 22 December.
Latest of 7 CRT updates, 19 December 2025.
Lock 32 West to Lock 1 West
Huddersfield Narrow CanalNorth West
34 days
From 10 July 2026
Reopened 13 August 2026
- Where
- Lock 32 West to Lock 1 West
- CRT reason
- Repair
- Cause
- Weather
- Asset
- Canal or river
The broken paddle at Lock 11West has been successfully repaired but navigation will remain closed between Lock 1 West and Lock 32 West due to a leak between Lock 12 West and Lock 13 West. Further details about this can be found via the following link: Lock 1 West To Lock 32 West
Latest of 9 CRT updates, 13 August 2026.
Lock 10, Audlem
Shropshire Union CanalNorth West
32 days
From 26 January 2026
Reopened 27 February 2026
- Where
- Lock 10 Audlem
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Following a site review of the works, we're now confident that the works can be completed within a shorter stoppage window than originally planned. The revised stoppage dates are 26th January to 27th February, meaning the whole of the Shropshire Union Canal will be open for most…
Latest of 2 CRT updates, 28 November 2025.
Lock 76, near Dutton
Trent & Mersey CanalNorth West
32 days
From 19 January 2026
Reopened 20 February 2026
- Where
- Lock 76
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Following a recent review, we're now confident that the works can be completed within a shorter stoppage window. The revised stoppage dates are 19 January 2026 to 20 February 2026.
Latest of 2 CRT updates, 3 October 2025.
Lock 42, Near Thornton-in-Craven
Leeds & Liverpool CanalNorth West
32 days
From 5 January 2026
Reopened 6 February 2026
- Where
- Lock 44, Top Lock to Bridge 158, Changeline Bridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigational closure is required for bottom gate refurbishment and various repair works.
CRT's only update, 8 May 2025.
Bosley Lock 7
Macclesfield CanalNorth West
32 days
From 10 November 2025
Reopened 12 December 2025
- Where
- Bosley Lock 1 to Bosley Lock 12
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We're pleased to inform you that works on site have been completed ahead of schedule, and the navigation will be open from 4pm today.
Latest of 4 CRT updates, 12 December 2025.
Between Bridge 5 and Bridge 5A, Leeds & Liverpool Canal
Leeds & Liverpool CanalNorth West
31 days
From 21 November 2025
Reopened 22 December 2025
- Where
- Bridge 5, Swift's Bridge to Bridge 5A, Fleetwood's Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Navigation and towpath remain closed due to a fallen tree. Our specialist contractors are currently working to clear the site and we will provide a further update on or before Monday 22 December.
Latest of 6 CRT updates, 19 December 2025.
Lock 12W to Lock 13W
Huddersfield Narrow CanalNorth West
30 days
From 19 November 2025
Reopened 19 December 2025
- Where
- Lock 13 West, Wharf Cottage to Lock 12 West
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Navigation remains closed due to fallen trees. Unfortunately our specialist contractors have been delayed due to a back log from the high workload created from the adverse weather conditions we have currently experienced. We will provide a further update on or before Friday, 19…
Latest of 7 CRT updates, 17 December 2025.
Lock 1 to Lock 12, Bosley, Maccelesfield Canal
Macclesfield CanalNorth West
30 days
Fully shut 30 of CRT's 31 days
From 16 May 2026
Reopened 16 June 2026
- Where
- Bosley Lock 1 to Bosley Services
- CRT reason
- Boating Incident
- Cause
- Struck by boat or vehicle
- Asset
- Lock
Our contractors are now in the final stages of completing the repairs at Lock 12, Bosley, on the Macclesfield Canal. The welding is expected to be completed on the balance beam by 4:00 pm on Tuesday, 16 June, after which we hope to reopen the lock. We apologise for the continued…
Latest of 9 CRT updates, 12 June 2026.
Lock 2 Rufford Branch
Rufford Branch (L&L Canal)North West
29 days
From 9 February 2026
Reopened 10 March 2026
- Where
- Lock No.1, Rufford Branch to Lock 7, Rufford Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We're pleased to let you know that the works at Lock 2 Rufford Branch have been completed ahead of schedule, and the navigation is now open.
Latest of 2 CRT updates, 10 March 2026.
Lock 83 , Lock 19 near Wigan
Leeds & Liverpool CanalNorth West
28 days
From 19 January 2026
Reopened 16 February 2026
- Where
- Lock 83, Lock 19
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We are pleased to confirm that the works at Lock 83, Lock 19 have now been completed. Please note that the Wigan Flight remains closed due to the ongoing works at Lock 65.
Latest of 3 CRT updates, 16 February 2026.
Between Bridge 26 and 27
Lancaster CanalNorth West
27 days
From 27 February 2026
Reopened 26 March 2026
- Where
- Bridge 26, Salwick Bridge to Bridge 27, Six Mile Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
The navigation and towpath remains closed between Bridge 26, and Bridge 27 on the Lancaster Canal due to a fallen tree. We are currently awaiting confirmation of attendance from our contractors. We will provide an update on or before Friday 27 March.
Latest of 6 CRT updates, 25 March 2026.
Navigation Closure: Between Bridge 26 and Bridge 27, Bollington, Macclesfield Canal
Macclesfield CanalNorth West
26 days
Fully shut 26 of CRT's 28 days
From 28 May 2025
Reopened 25 June 2025
- Where
- Bridge 26, Sugar Lane Bridge to Bridge 27, Kerridge Road Bridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Canal or river
We are pleased to announce that our teams have successfully completed the canal bed repairs over the weekend. The canal section is now fully refilled with water, and our team will continue to monitor water levels overnight. The stop planks will be removed tomorrow morning, and…
Latest of 8 CRT updates, 24 June 2025.
Lock 42, Littlebrough
Rochdale CanalNorth West
25 days
From 5 January 2026
Reopened 30 January 2026
- Where
- Lock 37, West Summit to Lock 45
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigational closure is required for top and bottom gate refurbishment and various repair works.
CRT's only update, 8 May 2025.
Lock 5, near bridge 3, near Burscough
Rufford Branch (L&L Canal)North West
25 days
From 26 January 2026
Reopened 20 February 2026
- Where
- Lock No.1, Rufford Branch to Lock 5, German's Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
We want to advise that the works at Lock 5, Burscough will remain ongoing until Friday 20 February. The team is making good progress on site; however, the activity is taking slightly longer to complete than originally anticipated. There are no additional works causing delay — we…
Latest of 2 CRT updates, 17 February 2026.
Lock 63, Sandbach malkins bank, near bridge 151
Trent & Mersey CanalNorth West
25 days
From 3 November 2025
Reopened 28 November 2025
- Where
- Lk 63, Clear Water Lock - Towpath Side to Bridge 150
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
A navigational closure is required to repair the head and tail gates of both locks.
CRT's only update, 29 June 2025.
Iron Lock 11 in Beeston, Cheshire
Shropshire Union CanalNorth West
25 days
From 2 March 2026
Reopened 27 March 2026
- Where
- Lock 10, Wharton's Lock to Lock 12, Beeston Stone Lock
- CRT reason
- Repair
- Cause
- Worn out
- Asset
- Lock
Repairs at Beeston Lock 11 have been progressing well, and the planned works on the head gate have now been completed. However, some unexpected conditions on site are affecting the next stage of the programme. The team has been unable to achieve a full seal on one of our dams.…
Latest of 2 CRT updates, 19 March 2026.
Lock 76 Rochdale Canal
Rochdale CanalNorth West
25 days
From 30 March 2026
Reopened 24 April 2026
- Where
- Lock 54 to Lock 81 Butler Street
- CRT reason
- Repair
- Cause
- Worn out
- Asset
- Lock
Our team is now on site and has begun repairs to the lock gate at Lock 76. We expect the work to be completed by Friday, 24th April We will provide a further update on or before Friday, 24th April.
Latest of 3 CRT updates, 20 April 2026.
Lock 1 to lock 18
Ashton CanalNorth West
25 days
From 2 August 2026
Reopened 27 August 2026
- Where
- Lock 18 to Lock 1
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation remains closed between Lock 1 and Lock 18 on the Ashton Canal due to a head gate failure at Lock 18. Our team has now taken delivery of the brace for the head gate and has received the necessary permissions from the council. We anticipate that the team will be on site…
Latest of 5 CRT updates, 25 August 2026.
Between Bridge 24 & Bridge 26
Lancaster CanalNorth West
23 days
From 17 November 2025
Reopened 10 December 2025
- Where
- Bridge 24, Salwick Hall Bridge to Bridge 26, Salwick Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Yesterday our contractors were successful in removing the fallen trees between Bridges 24 and 26. However navigation remains closed due to another fallen tree within this area. Contractors have been instructed to reattend. A further update will be on or before Wednesday 10…
Latest of 5 CRT updates, 5 December 2025.
Hursleston locks to Poveys locks, Llangollen Canal
Llangollen CanalNorth West
23 days
From 22 December 2025
Reopened 14 January 2026
- Where
- Lock 4, Hurleston Locks to Poveys Lock,
- CRT reason
- Low Water Levels
- Cause
- Broke, cause not given
- Asset
- Canal or river
Due to a breach that occurred today at Bridge 31A on the Whitchurch By-Pass Bridge, Llangollen Canal, our teams need to close the lock flight between Povey's Lock and Hurleston Locks. This closure is necessary to allow our teams to manage and stabilise water levels safely and…
CRT's only update, 22 December 2025.
Lock 72 and Lock 75
Trent & Mersey CanalNorth West
23 days
Fully shut 23 of CRT's 36 days
From 21 July 2026
Reopened 26 August 2026
- Where
- Lock 75, Big Lock to Lock 72
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
Our contractors are now in the final stages of completing repairs to the lock gates and cills at Lock 72 to Lock 75 on the Trent & Mersey Canal. We are hoping for repairs to be completed on 25th August and once these works are finished, we will begin refilling the pounds, we…
Latest of 4 CRT updates, 18 August 2026.
Lock 2, Hack Green
Shropshire Union CanalNorth West
22 days
From 9 February 2026
Reopened 3 March 2026
- Where
- Lock 2, Hack Green Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Following our previous update, we would like to provide further information regarding the repairs at Lock 2, Hack Green. Our original team scheduled to undertake the balance beam replacement has been delayed while completing other emergency repair works elsewhere in the North…
Latest of 3 CRT updates, 19 February 2026.
Lock 65 to Lock 85, Wigan Flight
Leeds & Liverpool CanalNorth West
22 days
From 20 August 2026
Reopened 11 September 2026
- Where
- Lock 85, Lock 21 to Lock 65, Top Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation remains closed between Lock 65 and Lock 85 on the Wigan Flight of the Leeds & Liverpool Canal. Our team are looking to start the repairs to the detached head cill at Lock 69 week commencing Monday 7 September. Repairs are expected to take one week. A further update…
Latest of 3 CRT updates, 1 September 2026.
Lock 4
Glasson Branch (Lancaster Canal)North West
22 days
From 4 September 2026
No reopening date
Still shut
- Where
- Lock No.4
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Since our last update, our team has attended the site at Lock 4 on the Glasson Branch and identified a suitable method of repair. Our team is now awaiting delivery of the materials required to repair the damaged paddle. Once these materials have been received, a date for the…
Latest of 2 CRT updates, 10 September 2026. 16 days without another.
Lock 1, Lodge Hill - Lock 6, Glasson Branch, Lancaster Canal
Glasson Branch (Lancaster Canal)North West
21 days
From 16 May 2025
Reopened 6 June 2025
- Where
- Lock No.1 to Lock No.6
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
We are pleased to advise navigation is now open at Lock 1 - Lock 6 on the Glasson Branch on the Lancaster Canal.
Latest of 5 CRT updates, 6 June 2025.
Lock 11 West
Huddersfield Narrow CanalNorth West
21 days
From 19 September 2025
Reopened 10 October 2025
- Where
- Lock 11 West
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Our contractors have completed the grouting works at Lock 11 West ahead of schedule and plan for navigation to resume Friday 10 October from 5pm.
Latest of 2 CRT updates, 8 October 2025.
Lock 1 to Lock 16 Marple Flight
Peak Forest CanalNorth West
20 days
From 9 June 2026
Reopened 29 June 2026
- Where
- Lock 1 to Lock 16
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We have now established a method of repair for the damaged balance beam at Lock 10 on the Peak Forest Canal. The team will be on site from 8:00 am on Monday 29 June to carry out the replacement of the balance beam. We currently anticipate that the works will be completed on the…
Latest of 5 CRT updates, 23 June 2026.
Bridge 3, Well Bridge to Bridge 4, Newton Hall Bridge
Peak Forest CanalNorth West
19 days
From 15 November 2025
Reopened 4 December 2025
- Where
- Bridge 3, Well Bridge to Bridge 4, Newton Hall Br
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Our specialist team will be in attendance tomorrow to remove the fallen trees between bridge 3 and bridge 4 on the Peak Forest Canal. We will provide a further update on or before, Friday 5 December.
Latest of 5 CRT updates, 3 December 2025.
Lock 24 West
Huddersfield Narrow CanalNorth West
19 days
Fully shut 19 of CRT's 29 days
From 28 August 2026
Restriction from 16 September 2026
Now a restriction: boats can pass, with limits
- Where
- Lock 24 West
- CRT reason
- Repair
- Cause
- Worn out
- Asset
- Bridge
Following our previous update, our team is still awaiting delivery of the replacement footbridge and the scaffolding required to carry out the works. Once these have been delivered and the scaffolding erected, we will be able to confirm a date for the repair. In the meantime…
Latest of 5 CRT updates, 16 September 2026.
Lock 48, Barrowford
Leeds & Liverpool CanalNorth West
18 days
From 23 February 2026
Reopened 13 March 2026
- Where
- Lock 51, Bottom Lock to Lock 45, Top Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
This navigational closure will encompass 2 pieces of work, the navigation will be closed from Lock 45 through to lock 51. We will be refurbishing the top gates and paddles of locks 46 and 48, we will also be doing some repointing too.
CRT's only update, 8 May 2025.
Lock 46
Leeds & Liverpool CanalNorth West
18 days
From 2 February 2026
Reopened 20 February 2026
- Where
- Lock 51, Bottom Lock to Lock 45, Top Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
This navigational closure will encompass 2 pieces of work, the navigation will be closed from Lock 45 through to lock 51. We will be refurbishing the top gates and paddles of locks 46 and 48, we will also be doing some repointing too.
CRT's only update, 8 May 2025.
Lock 1, Rufford branch
Rufford Branch (L&L Canal)North West
18 days
From 18 August 2025
Reopened 5 September 2025
- Where
- Lock 1, Top Lock Swing Bridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We are pleased to advise the works to replace the paddles at Lock 1 on the Rufford Branch are now complete. Our contractors will be on site tomorrow to remove the dams and navigation is anticipated to resume tomorrow, Friday 5 September by 4pm.
Latest of 4 CRT updates, 4 September 2025.
Lock 4, Bosley
Macclesfield CanalNorth West
18 days
From 13 October 2025
Reopened 31 October 2025
- Where
- Bosley Lock 1 to Bosley Lock 12
- CRT reason
- Repair
- Cause
- Struck by boat or vehicle
- Asset
- Lock
We're pleased to confirm that works at Bosley Lock 4 are now nearing completion. The navigation will reopen from 10am on Friday 31st October.
Latest of 2 CRT updates, 30 October 2025.
Sluice 1 - Dukinfield, Tameside
Peak Forest CanalNorth West
18 days
From 9 February 2026
Reopened 27 February 2026
- Where
- Bridge 1B to Bridge 2, Dog Lane Bridge
- CRT reason
- Repair
- Cause
- Worn out
- Asset
- Sluice
Following a recent survey of the sluice, we have identified that the paddle has become detached and the existing chamber stop planks have deteriorated. To safely replace these components, a stoppage is required. While the canal is dewatered, we will also use a jet vac tanker to…
CRT's only update, 9 January 2026.
Bridge 18
Lancaster CanalNorth West
18 days
From 26 March 2026
Reopened 13 April 2026
- Where
- Bridge 18, Malt Kiln Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Navigation remains closed at Bridge 18 on the Lancaster Canal due to a dangerous leaning tree. Unfortunately our contractors have been delayed, and at present, we are unable to confirm when the contractor will be on site as they are currently dealing with a back log from the…
Latest of 3 CRT updates, 8 April 2026.
Lock 41 To Lock 71
Trent & Mersey CanalNorth West
17 days
From 25 July 2026
Reopened 11 August 2026
- Where
- Lock 71 to Lock 41, Plants Lock - Off Side
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
Due to the continuation of dry weather and persistently low water levels, navigation is closed between Lock 41 and Lock 71 on the Trent & Mersey Canal. We will continue to monitor the situation daily, and as soon as the water levels have recovered sufficiently to allow for safe…
Latest of 4 CRT updates, 28 July 2026.
Lock 56
Rochdale CanalNorth West
17 days
From 9 September 2026
No reopening date
Still shut
- Where
- Lock 56
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Since our last update repairs to the paddle mechanism at Lock 56 have been delayed whilst the necessary safety assessments are carried out. We anticipate repairs to start on Monday 21 September A further update will be provided on or before Tuesday 22 September.
Latest of 4 CRT updates, 18 September 2026. 8 days without another.
Between Bridge 2, Dog Lane Bridge and Bridge 3, Well Bridge
Peak Forest CanalNorth West
16 days
From 17 November 2025
Reopened 3 December 2025
- Where
- Bridge 2, Dog Lane Bridge to Bridge 3, Well Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Navigation remains closed due to the fallen tree. At present, we are unable to confirm when the contractor will be on site as they are currently dealing with a back log from the high workload created from Storm Claudia. We will provide a further update on or before Wednesday 3…
Latest of 3 CRT updates, 28 November 2025.
Bridge 11A
Lancaster CanalNorth West
16 days
From 10 February 2026
Reopened 26 February 2026
- Where
- Bridge 11A, Blackpool Road Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Navigation remains closed at Bridge 11a on the Lancaster Canal due to a fallen tree. Unfortunately, our specialist contractors have been delayed attending the site. We apologise that this has taken longer to clear than originally expected. A further update will be provided on or…
Latest of 3 CRT updates, 20 February 2026.
Lock 59 To Lock 64
Leeds & Liverpool CanalNorth West
16 days
From 11 May 2026
Reopened 27 May 2026
- Where
- Lock 64, Bottom Lock to Lock 59, Lock 2
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Due to other priority works our reactive team where delayed carrying out the repairs to Lock 60 on the Leeds & Liverpool Canal. The reactive team are currently now on site repairing the damaged tail gate cill. As a result navigation remains closed between Lock 59 and Lock 64…
Latest of 2 CRT updates, 20 May 2026.
Lock1-lock 4 Hurleston locks
Llangollen CanalNorth West
15 days
From 23 December 2025
Reopened 7 January 2026
- Where
- Lock 1, Hurleston Locks to Lock 4, Hurleston Locks
- CRT reason
- Low Water Levels
- Cause
- Broke, cause not given
- Asset
- Canal or river
Due to the locks being frozen as a result of recent weather conditions, we are unable to open Locks 1–4 on the Hurleston Lock Flight today. A further update will be provided tomorrow, Tuesday 6 January.
Latest of 3 CRT updates, 5 January 2026.
Lock 5, Rufford Branch, German's Lock
Rufford Branch (L&L Canal)North West
14 days
From 21 November 2025
Reopened 5 December 2025
- Where
- Lock 5, German's Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Please be aware: Following a further review of this stoppage, the navigation will remain closed for the entire duration to ensure all necessary work is completed within the stoppage window. It will not be open over the weekend as previously advertised. We apologise for any…
Latest of 3 CRT updates, 21 November 2025.
Bridge 91, Tram Road Bridge
Macclesfield CanalNorth West
14 days
From 17 November 2025
Reopened 1 December 2025
- Where
- Bridge 91, Tram Road Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Navigation remains closed due to the fallen tree. At present, we are unable to confirm when the contractor will be on site as they are currently dealing with a back log from the high workload created from Storm Claudia. We will provide a further update on or before Wednesday 3…
Latest of 3 CRT updates, 28 November 2025.
Between Lock 1 and Lock 18
Ashton CanalNorth West
14 days
From 16 April 2026
Reopened 30 April 2026
- Where
- Lock 18 to Lock 1
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation remains closed between Locks 1 and 18 on the Ashton Canal due to the cill on the tail gates at Lock 10 becoming dislodged. Repairs were initially scheduled to take place, but have been delayed while the team sourced the necessary water pumps to carry out the work. A…
Latest of 4 CRT updates, 29 April 2026.
Lock 26w
Huddersfield Narrow CanalNorth West
14 days
From 1 May 2026
Reopened 15 May 2026
- Where
- Lock 26 West
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation remains closed due to a damaged cill at Lock 26W on the Huddersfield Narrow Canal. This damage is preventing the lock from sealing, resulting in the lock being filled and operated safely. The local team have experienced delays in sourcing the necessary parts to carry…
Latest of 2 CRT updates, 5 May 2026.
Bridge 21, Rawton Walls Bridge
Peak Forest CanalNorth West
13 days
From 15 November 2025
Reopened 28 November 2025
- Where
- Bridge 21, Rawton Walls Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Our teams have been working throughout the week to remove the large number of fallen trees in the North West following Storm Claudia. We have not yet been able to reach all affected sites, but we are working through them as quickly as possible, and our teams remain focused on…
Latest of 3 CRT updates, 21 November 2025.
Bridge 51
Macclesfield CanalNorth West
13 days
From 15 November 2025
Reopened 28 November 2025
- Where
- Bridge 51, Cowley Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Our teams have been working throughout the week to remove the large number of fallen trees in the North West following Storm Claudia. We have not yet been able to reach all affected sites, but we are working through them as quickly as possible, and our teams remain focused on…
Latest of 3 CRT updates, 21 November 2025.
Lock 7 west Huddersfield Narrow Canal
Huddersfield Narrow CanalNorth West
13 days
From 20 June 2026
Reopened 3 July 2026
- Where
- Lock 7 West
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Due to a failed paddle, the lock is not operational at this time. An update will be provided by16:00 on Monday afternoon.
CRT's only update, 20 June 2026.
Lock 45
Rochdale CanalNorth West
13 days
From 28 July 2026
Reopened 10 August 2026
- Where
- Lock 45
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation remains closed at Lock 45 on the Rochdale Canal due to a damaged paddle, which is preventing the lock from filling. We are currently awaiting the availability of the necessary resources before the repair works can begin. Once these are in place, our team will arrange…
Latest of 3 CRT updates, 5 August 2026.
Lock 44, Greenberfield, near Bridge 157
Leeds & Liverpool CanalNorth West
12 days
From 8 January 2026
Reopened 20 January 2026
- Where
- Lock 44, Top Lock to Lock 43, Middle Lock
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
A navigational closure is required to replace the ground paddle on the off side of the lock.
CRT's only update, 29 June 2025.
Bridge 47
Lancaster CanalNorth West
12 days
From 14 November 2025
Reopened 26 November 2025
- Where
- Bridge 47, Green Man Bridge
- CRT reason
- Information
- Cause
- Weather
- Asset
- Canal or river
Navigation remains closed at Bridge 47 on the Lancaster Canal, following the large trees that have fallen. Unfortunately due to the contractors high volume of work from the recent Storm Claudia, we are currently still awaiting confirmation of their attendance. We will provide a…
Latest of 3 CRT updates, 21 November 2025.
Leeds & Liverpool Canal, Liverpool Link
Liverpool LinkNorth West
12 days
From 8 July 2026
Reopened 20 July 2026
- Where
- Great Howard St.- Stanley Dock Bridge to Bascule Bridge - Stanley
- CRT reason
- 3rd Party Works
- Cause
- Someone else's works
- Asset
- Canal or river
Following the successful completion of works in the central docks by Peel Ports, the Liverpool Link will reopen to boaters from Monday 20 July. Bookings are now open and available to book online, or you can contact us at…
Latest of 2 CRT updates, 17 July 2026.
Lock 1 and Lock 18
Ashton CanalNorth West
12 days
From 15 July 2026
Reopened 27 July 2026
- Where
- Lock 18 to Lock 1
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
Due to the current low water levels, navigation remains closed between Lock 1 and Lock 18 on the Ashton Canal. We will continue to monitor the situation daily, and as soon as the water levels have recovered sufficiently to allow for safe navigation, the closure will be lifted. A…
Latest of 3 CRT updates, 20 July 2026.
Lock 7, Bosley weir
Macclesfield CanalNorth West
11 days
From 6 October 2025
Reopened 17 October 2025
- Where
- Bosley Lock 1 to Bosley Lock 12
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Weir
With a shorter window for the lock gate works at Bosley Lock 7 to allow a window for boat passage – we will undertake improvements to the weir at Lock 7 from 6 October to 17 October while there are other closures in place. We were awaiting listed building consent but now have…
CRT's only update, 3 October 2025.
Bridge 11a - Bridge 11
Lancaster CanalNorth West
11 days
From 16 November 2025
Reopened 27 November 2025
- Where
- Bridge 11A, Blackpool Road Bridge to Bridge 11, Roebuck Street Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Our contractors have attended site to commence the necessary works to remove the windblown tree between Bridge 11 and Bridge 11A, however, due to the size they have only managed to clear the towpath and are looking to reattend to remove from the navigation on Wednesday 26…
Latest of 3 CRT updates, 21 November 2025.
Bridge 49, Royal Oak Swingbridge
Macclesfield CanalNorth West
11 days
From 17 November 2025
Reopened 28 November 2025
- Where
- Bridge 49, Royal Oak Swingbridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Our teams have been working throughout the week to remove the large number of fallen trees in the North West following Storm Claudia. We have not yet been able to reach all affected sites, but we are working through them as quickly as possible, and our teams remain focused on…
Latest of 2 CRT updates, 21 November 2025.
Between Bridge 127, Thwaite End Bridge and Bridge 128, Carnforth Bridge
Lancaster CanalNorth West
11 days
From 17 November 2025
Reopened 28 November 2025
- Where
- Bridge 127, Thwaite End Bridge to Bridge 128, Carnforth Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Our teams have been working throughout the week to remove the large number of fallen trees in the North West following Storm Claudia. We have not yet been able to reach all affected sites, but we are working through them as quickly as possible, and our teams remain focused on…
Latest of 2 CRT updates, 21 November 2025.
Culvert 16, between locks 2 & 3 Baddiley; near Nantwich
Llangollen CanalNorth West
11 days
From 2 March 2026
Reopened 13 March 2026
- Where
- Lock 2, Baddiley Lock to Lock 3, Baddiley Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Culvert
A stoppage is required to allow us to undertake repairs to Culvert 16. The closure will be in place between Locks 2 and 3 at Baddiley so that our teams can carry out the works safely. Thank you for your patience and understanding while we complete these essential repairs.
CRT's only update, 12 February 2026.
Lock 46 - Littleborough
Rochdale CanalNorth West
11 days
From 9 March 2026
Reopened 20 March 2026
- Where
- Lock 46
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Essential paddle works are required at Lock 46, and to complete this safely and effectively, a full navigation closure will be in place for the duration of the works. This stoppage is necessary to ensure the continued reliability and safe operation of the lock. We recognise the…
CRT's only update, 27 February 2026.
Lock 37 to Lock 48
Rochdale CanalNorth West
11 days
From 10 August 2026
Reopened 21 August 2026
- Where
- Lock 37, West Summit to Lock 48
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
Navigation remains closed between Lock 37 and Lock 48 due to low water levels. Water levels have increased following additional water being fed into the canal from Higher Chelburn Reservoir. However, levels remain too low to allow safe navigation at this time. Our team will…
Latest of 3 CRT updates, 20 August 2026.
Navigation and Towpath Closure; Between Bridge 30 and Bridge 32, Lancaster Canal
Lancaster CanalNorth West
10 days
From 1 July 2025
Reopened 11 July 2025
- Where
- Bridge 30, Roots Bridge to Bridge 32, Swillbrook Bridge
- CRT reason
- Vehicle Incident
- Cause
- Struck by boat or vehicle
- Asset
- Bridge
Navigation and towpath are back open between Bridge 30 and Bridge 32 on the Lancaster Canal. We ask all customers to proceed with caution on tick over through Bridge 31, due to some remnants of the bridge's masonry remaining in the water. Our specialist teams are currently…
Latest of 6 CRT updates, 9 July 2025.
Bridge 56, Turners Bridge
Lancaster CanalNorth West
10 days
From 14 November 2025
Reopened 24 November 2025
- Where
- Bridge 56, Turners Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Our teams have been working throughout the week to remove the large number of fallen trees in the North West following Storm Claudia. We have not yet been able to reach all affected sites, but we are working through them as quickly as possible, and our teams remain focused on…
Latest of 3 CRT updates, 21 November 2025.
Lock 14 West to Lock 12 West
Huddersfield Narrow CanalNorth West
10 days
From 17 November 2025
Reopened 27 November 2025
- Where
- Lock 14 West to Lock 12 West
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Unfortunately, due to further adverse weather conditions over the weekend, additional trees have fallen blocking navigation between Locks 14W & 12W. Due to the recent storm Claudia we have experienced, our contractors are experiencing high work loads across the network and…
Latest of 3 CRT updates, 24 November 2025.
Bridge 5, Swift's Bridge
Leeds & Liverpool CanalNorth West
10 days
From 23 December 2025
Reopened 2 January 2026
- Where
- Bridge 5, Swift's Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
A large tree has fallen and is currently blocking navigation and towpath at Bridge 5, Swifts Bridge, on the Leeds & Liverpool Canal. Due to the size and position of the tree, we have instructed our specialist contractor to assist with the removal. We will provide a further…
CRT's only update, 23 December 2025.
Bridge 33, Macclesfield Canal
Macclesfield CanalNorth West
10 days
From 23 January 2026
Reopened 2 February 2026
- Where
- Bridge 33, Higherfold Bridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Canal or river
The repairs have now been completed. Over the weekend, we'll be removing the stop planks and carrying out checks as the canals are refilled. Once the team has finished these final checks, we're hopeful that navigation will reopen on Monday. A further update will be provided on…
Latest of 2 CRT updates, 30 January 2026.
Lock 29W
Huddersfield Narrow CanalNorth West
10 days
From 5 May 2026
Reopened 15 May 2026
- Where
- Lock 32 West to Lock 24 West
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation is currently closed at Lock 29W on the Huddersfield Narrow Canal, due to a damaged cill which is preventing the lock being operated safely. Our specialist team are planning to attend site to carry out the emergency repairs. An update will be provided on or before…
CRT's only update, 5 May 2026.
Lock 1, Lodge Hill - Lock 6, Glasson Branch, Lancaster Canal
Glasson Branch (Lancaster Canal)North West
9 days
From 7 May 2025
Reopened 16 May 2025
- Where
- Lock No.1 to Lock No.6
- CRT reason
- Suspected Vandalism
- Cause
- Vandalism
- Asset
- Canal or river
We're pleased to confirm that our teams will have the water levels restored in time for the weekend, and the canal between Lock 1 and Lock 6 will reopen on Friday. Our teams have been working hard to get the navigation back open. Progress had been paused to resolve an issue with…
Latest of 4 CRT updates, 14 May 2025.
Lock 28 W, Huddersfield Narrow Canal
Huddersfield Narrow CanalNorth West
9 days
From 7 May 2025
Reopened 16 May 2025
- Where
- Lock 28 West
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We are pleased to advise navigation is back open at Lock 28W on the Huddersfield Narrow Canal following a successful repair.
Latest of 2 CRT updates, 16 May 2025.
Lock 2 , Rufford Branch , Burscough
Rufford Branch (L&L Canal)North West
9 days
Fully shut 9 of CRT's 11 days
From 10 November 2025
Reopened 21 November 2025
- Where
- Lock 2, 2Nd Lock Rufford Branch
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lock
Unfortunately, this stoppage has been extended until 21st November due to additional work identified on site. This change will affect the stoppage dates for the grouting work at Lock 5, Rufford Branch, which will now run from 21st November to 5th December.
Latest of 2 CRT updates, 18 November 2025.
Bridge 33, Higherfold bridge
Macclesfield CanalNorth West
9 days
From 17 November 2025
Reopened 26 November 2025
- Where
- Bridge 33, Higherfold Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Our teams have been working throughout the week to remove the large number of fallen trees in the North West following Storm Claudia. We have not yet been able to reach all affected sites, but we are working through them as quickly as possible, and our teams remain focused on…
Latest of 3 CRT updates, 21 November 2025.
Bridge 52, Crowholt Bridge
Macclesfield CanalNorth West
9 days
From 17 November 2025
Reopened 26 November 2025
- Where
- Bridge 52, Crowholt Br
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Our teams have been working throughout the week to remove the large number of fallen trees in the North West following Storm Claudia. We have not yet been able to reach all affected sites, but we are working through them as quickly as possible, and our teams remain focused on…
Latest of 4 CRT updates, 24 November 2025.
Between Bridge 46 Dane Moss Bridge and Bridge 47 Broadhursts Swing Bridge
Macclesfield CanalNorth West
9 days
From 17 November 2025
Reopened 26 November 2025
- Where
- Bridge 46, Dane Moss Bridge to Bridge 47, Broadhursts Swing Br
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Our teams have been working throughout the week to remove the large number of fallen trees in the North West following Storm Claudia. We have not yet been able to reach all affected sites, but we are working through them as quickly as possible, and our teams remain focused on…
Latest of 4 CRT updates, 24 November 2025.
Bridge 53, Locketts Bridge
Macclesfield CanalNorth West
9 days
From 17 November 2025
Reopened 26 November 2025
- Where
- Bridge 53, Locketts Br
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Our teams have been working throughout the week to remove the large number of fallen trees in the North West following Storm Claudia. We have not yet been able to reach all affected sites, but we are working through them as quickly as possible, and our teams remain focused on…
Latest of 2 CRT updates, 21 November 2025.
Between Bridge 76, Corless Bridge & Bridge 77, Smiths Bridge
Lancaster CanalNorth West
9 days
From 24 February 2026
Reopened 5 March 2026
- Where
- Bridge 76, Corless Bridge to Bridge 77, Smiths Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
The towpath and navigation remain closed between Bridge 76, Corless Bridge and Bridge 77, Smiths Bridge on the Lancaster Canal due to a fallen tree. Our specialist contractors will be attending site tomorrow to remove the obstruction. We apologise that the clearance is taking…
Latest of 5 CRT updates, 4 March 2026.
Bridge 10, Towpath Bridge to Bridge 19, Quaker's Bridge
Lancaster CanalNorth West
9 days
From 26 May 2026
Reopened 4 June 2026
- Where
- Bridge 10, Towpath Bridge to Bridge 19, Quakers Bridge
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
Navigation through the Glasson Flight on the Lancaster Canal is currently closed due to low water levels. The closure will remain in place until levels recover sufficiently for safe navigation. A further update will be provided on the morning of Friday, 5 June.
Latest of 2 CRT updates, 26 May 2026.
Bridge 31, Stone Chimney Bridge
Lancaster CanalNorth West
8 days
From 2 September 2025
Reopened 10 September 2025
- Where
- Bridge 31, Stone Chimney Bridge
- CRT reason
- Repair
- Cause
- Struck by boat or vehicle
- Asset
- Bridge
Our engineers have removed the overhanging masonry blocks from the top of the bridge and have installed concrete barriers on bridge to prevent vehicle access, allowing us to re-open our towpath. Navigation remains closed at Bridge 31 whilst our specialist team complete the…
Latest of 2 CRT updates, 5 September 2025.
Between Bridge 13B, School Brow Footbridge and Bridge 14, Hole House Fold Bridge
Peak Forest CanalNorth West
8 days
From 17 November 2025
Reopened 25 November 2025
- Where
- Bridge 13B, School Brow Footbridge to Bridge 14, Hole House Fold Br
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Our teams have been working throughout the week to remove the large number of fallen trees in the North West following Storm Claudia. We have not yet been able to reach all affected sites, but we are working through them as quickly as possible, and our teams remain focused on…
Latest of 2 CRT updates, 21 November 2025.
Lock 88, Oxford Street
Rochdale CanalNorth West
8 days
From 12 January 2026
Reopened 20 January 2026
- Where
- Lock 88 Oxford St
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
We are pleased to confirm that the works at Lock 88 have been completed and the navigation is now open.
Latest of 2 CRT updates, 20 January 2026.
Between Bridge 92 and Bridge 93
Lancaster CanalNorth West
8 days
From 27 January 2026
Reopened 4 February 2026
- Where
- Bridge 92, Burrow Beck Bridge to Bridge 93, Carr Lane Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Navigation remains closed between Bridge 92 and Bridge 93 on the Lancaster Canal due to a fallen tree. Unfortunately, our specialist contractors have been delayed attending the site. A further update will be provided on or by Thursday 5 February.
Latest of 3 CRT updates, 3 February 2026.
Lock 81, Butler Street To Lock 83, Brownsfield
Rochdale CanalNorth West
8 days
From 5 March 2026
Reopened 13 March 2026
- Where
- Lock 81 Butler Street to Lock 83 Brownsfield
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation remains closed between Lock 81 and Lock 83 on the Rochdale Canal due to a loose cill at Lock 82. Our local team attended site today to carry out an investigation and are now developing a repair plan for the cill. A further update will be provided on or before Friday…
Latest of 2 CRT updates, 9 March 2026.
Between Lock 65 and Lock 85
Leeds & Liverpool CanalNorth West
8 days
From 14 April 2026
Reopened 22 April 2026
- Where
- Lock 85, Lock 21 to Lock 65, Top Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation remains closed between Lock 65 and Lock 85 on the Leeds and Liverpool Canal due to a disconnected paddle at lock 70. The team have a successfully planned a method of repair and are currently waiting on parts to be manufactured. A further update will be provided on or…
Latest of 3 CRT updates, 17 April 2026.
Lock 1 To Lock 6, Glasson Branch
Glasson Branch (Lancaster Canal)North West
8 days
From 12 May 2026
Reopened 20 May 2026
- Where
- Lock No.1 to Lock No.6
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
Navigation remains closed between Lock 1 and Lock 6 on the Glasson Branch of the Lancaster Canal. Our teams continue to work to restore water levels so that navigation can safely resume. Boaters currently on the flight can contact the North West team on 03030 404040, the…
Latest of 2 CRT updates, 18 May 2026.
Bridge 21, Hibberts Brow Bridge
Macclesfield CanalNorth West
7 days
From 17 November 2025
Reopened 24 November 2025
- Where
- Bridge 21, Hibberts Brow Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Our teams have been working throughout the week to remove the large number of fallen trees in the North West following Storm Claudia. We have not yet been able to reach all affected sites, but we are working through them as quickly as possible, and our teams remain focused on…
Latest of 2 CRT updates, 21 November 2025.
Weaver Navigation
Weaver NavigationNorth West
7 days
From 15 December 2025
Reopened 22 December 2025
- Where
- Church Cut Bridge to Red Lion Visitor Moorings
- CRT reason
- High Water Levels
- Cause
- Weather
- Asset
- Canal or river
We are pleased to advise that navigation will reopen from 12:00 noon today as high water flows have now reduced. Please proceed with caution while navigating.
Latest of 4 CRT updates, 22 December 2025.
Bridge 93, Carr Lane Bridge
Lancaster CanalNorth West
7 days
From 6 February 2026
Reopened 13 February 2026
- Where
- Bridge 93, Carr Lane Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
A large tree has fallen and is currently blocking navigation at Bridge 93, Carr Lane Bridge on the Lancaster Canal. Due to the size and position of the tree, we have instructed our specialist contractors to assist with the removal. We will provide a further update on or before…
CRT's only update, 6 February 2026.
Lock 41 to Lock 71
Trent & Mersey CanalNorth West
7 days
From 15 July 2026
Reopened 22 July 2026
- Where
- Lock 71 to Lock 41, Plants Lock - Towpath Side
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
Our local team has been working to restore water levels between Lock 41 and Lock 71 on the Trent & Mersey Canal and are now completing the final stages of replenishment. As a result, the navigation is expected to reopen for safe passage from 12:00 noon on Wednesday 22 July. We…
Latest of 3 CRT updates, 21 July 2026.
Lock 2, Rufford Branch
Rufford Branch (L&L Canal)North West
6 days
From 4 June 2025
Reopened 10 June 2025
- Where
- Lock 2, 2Nd Lock Rufford Branch
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation remains closed at Lock 2 on the Rufford Branch of the Leeds & Liverpool Canal due to a blockage in the paddle mechanism. Works are scheduled to begin on Tuesday, when we hope to reopen navigation using one paddle by installing a temporary plate in the paddle chamber.…
Latest of 2 CRT updates, 6 June 2025.
Between Bridge 23 & 24
Lancaster CanalNorth West
6 days
From 7 July 2025
Reopened 13 July 2025
- Where
- Bridge 23, Ward's House Bridge to Bridge 24, Salwick Hall Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Navigation remains closed between Bridges 23 & 24 on the Lancaster Canal due to a windblown tree. Contractors will be onsite tomorrow and we aim to reopen navigation on Sunday 13 July or sooner.
Latest of 3 CRT updates, 11 July 2025.
Lock 15 to Lock 18
Ashton CanalNorth West
6 days
From 2 October 2025
Reopened 8 October 2025
- Where
- Bridge 18, Ashton Hill Lane Road Bridge to Lock 15
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
The faulty head paddle at Lock 17 has now been repaired. Navigation through lock 1 to 18 is also temporarily closed due to repairs at Lock 18. You can find more details and updates here.
Latest of 2 CRT updates, 8 October 2025.
Bridges 26 to 27
Lancaster CanalNorth West
6 days
From 7 October 2025
Reopened 13 October 2025
- Where
- Bridge 26, Salwick Bridge to Bridge 27, Six Mile Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
The navigation and towpath remains closed due to the large tree that has fallen between bridges 26 and 27 on the Lancaster Canal. Due to the recent Storm Amy our contractors are still experiencing a high volume of work and have unfortunately been delayed. We will provide a…
Latest of 4 CRT updates, 10 October 2025.
Bridge 123
Leeds & Liverpool CanalNorth West
6 days
From 20 November 2025
Reopened 26 November 2025
- Where
- Culvert 22, U/s Netherton S.Br. Sewer
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Our teams have been working throughout the week to remove the large number of fallen trees in the North West following Storm Claudia. We have not yet been able to reach all affected sites, but we are working through them as quickly as possible, and our teams remain focused on…
Latest of 2 CRT updates, 24 November 2025.
Bridge 78, Wrigley Head Bridge to Lock 65
Rochdale CanalNorth West
6 days
From 26 November 2025
Reopened 2 December 2025
- Where
- Bridge 78, Wrigley Head Bridge to Lock 65 Alfred Street
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
A large tree has fallen and is currently blocking navigation between Bridge 78 and Lock 65 on the Rochdale Canal. Due to the size and position of the tree, we have instructed our specialist contractor to assist with the removal. At present, we are unable to confirm when the…
CRT's only update, 26 November 2025.
Bridge 128, Carnforth Bridge
Lancaster CanalNorth West
6 days
From 18 December 2025
Reopened 24 December 2025
- Where
- Bridge 128, Carnforth Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Navigation remains closed due to the large tree that has fallen and is currently blocking navigation at Bridge 128 on the Lancaster Canal. Due to the size and position of the tree, we have instructed our specialist contractor to assist with the removal. We will provide a further…
Latest of 2 CRT updates, 22 December 2025.
Bridge 84, Ellel Grange Bridge
Lancaster CanalNorth West
6 days
From 27 January 2026
Reopened 2 February 2026
- Where
- Bridge 84, Ellel Grange Bridge to Culvert 49
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Contractors have attended the site and carried out a partial removal of the tree obstructing the towpath at Bridge 84, Ellel Grange Bridge on the Lancaster Canal. This has allowed for the towpath to be reopened. We are currently awaiting their return to complete the full removal…
Latest of 3 CRT updates, 30 January 2026.
Lock 3W
Huddersfield Narrow CanalNorth West
6 days
From 12 March 2026
Reopened 18 March 2026
- Where
- Lock 3 West
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Our local team is currently planning the necessary repair works at Lock 3W on the Huddersfield Narrow Canal. These works are expected to be completed by Friday, 20 March. We will provide a further update on Friday, 20 March, or sooner if the situation changes.
Latest of 3 CRT updates, 16 March 2026.
Bridge 67, Ford Green Bridge
Lancaster CanalNorth West
6 days
From 7 April 2026
Reopened 13 April 2026
- Where
- Bridge 67, Ford Green Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Navigation and towpath are currently closed at Bridge 67 on the Lancaster Canal due to a fallen tree. At present, we are unable to confirm when the contractor will be on site as they are currently dealing with a back log from the high workload created from Storm Dave. We will…
CRT's only update, 7 April 2026.
Lock 45 Rochdale canal
Rochdale CanalNorth West
6 days
From 18 July 2026
Reopened 24 July 2026
- Where
- Lock 34 to Lock 45
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Due to a failed paddle on lock 45, its not possible to operate the lock for boat passage. Works are currently being plan for repairs. Further update will be provided on monday afternoon
CRT's only update, 18 July 2026.
Bridge 29
Leeds & Liverpool CanalNorth West
5 days
From 28 November 2025
Reopened 3 December 2025
- Where
- Bridge 29, Gregsons bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
A large tree has fallen and is currently blocking navigation at Bridge 29 on the Leeds and Liverpool Canal. Due to the size and position of the tree, we have instructed our specialist contractor to assist with the removal. We will provide a further update on or before Wednesday…
CRT's only update, 28 November 2025.
Lock 57
Rochdale CanalNorth West
5 days
From 3 January 2026
Reopened 8 January 2026
- Where
- Lock 57
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation remains closed at lock 57 on the Rochdale Canal due to a paddle failure. The local team have attended site and are continuing to investigate a solution for a repair. A further update will be provided Tuesday 13 January 2026.
Latest of 3 CRT updates, 6 January 2026.
Frith Lift Bridge
Llangollen CanalNorth West
5 days
From 9 January 2026
Reopened 14 January 2026
- Where
- Bridge 21, Wrenbury Frith Bridge
- CRT reason
- 3rd Party Works
- Cause
- Broke, cause not given
- Asset
- Lift bridge
Navigation is currently closed at Wrenbury Frith Bridge on the Llangollen Canal while third‑party contractors carry out essential repairs to the damaged handle mechanism. We kindly ask all customers to approach the area with caution and to follow any instructions provided by the…
CRT's only update, 9 January 2026.
Bridge 8 Nanney's Bridge
Middlewich Branch (Shrop Union)North West
5 days
From 3 May 2026
Reopened 8 May 2026
- Where
- Bridge 8, Nanney's Bridge
- CRT reason
- Vehicle Incident
- Cause
- Struck by boat or vehicle
- Asset
- Bridge
Following a recent collision at Bridge 8 (Nanney's Bridge) on the Middlewich Branch of the Shropshire Union Canal, Cheshire East Highways closed the road as a precaution to help keep everyone safe. Although barriers were put in place, they have unfortunately been repeatedly…
Latest of 2 CRT updates, 8 May 2026.
Glasson Branch, Lancaster
Glasson Branch (Lancaster Canal)North West
5 days
From 30 May 2026
Reopened 4 June 2026
- Where
- Glasson Branch (Lancaster Canal) - 001 to Glasson Branch (Lancaster Canal) - 005
- CRT reason
- Low Water Levels
- Cause
- Other cause
- Asset
- Canal or river
Following paddles being left open on the Glasson Branch, the pounds have been run off and as such navigation is not possible, this may take a few days to recover. further update will be available on Monday 1st June.
CRT's only update, 30 May 2026.
Lock 1 West to Lock 32 West
Huddersfield Narrow CanalNorth West
5 days
From 13 August 2026
Reopened 18 August 2026
- Where
- Lock 32 West to Lock 1 West
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Culvert
Please be advised navigation is currently closed between Lock 1 West and Lock 32 West on the Huddersfield Narrow Canal due to a leak flowing into a culvert between Lock 12 West and Lock 13 West in Micklehurst causing low water levels. Our local team are on site investigating the…
CRT's only update, 13 August 2026.
Bridge 97 Huddersfield Narrow Canal
Huddersfield Narrow CanalNorth West
5 days
From 4 September 2026
Reopened 9 September 2026
- Where
- Lock 12 West to Lock 3 West
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
There is a large branch down leaning up against bridge 97 across the canal. The canal and tow path is closed until the branch as been removed.
CRT's only update, 4 September 2026.
Woodend Lift Bridge 24
Peak Forest CanalNorth West
4 days
From 17 November 2025
Reopened 21 November 2025
- Where
- Bridge 24, Wood End Lift Bridge
- CRT reason
- Repair
- Cause
- Planned works
- Asset
- Lift bridge
We are pleased to confirm that the works at Woodend Lift Bridge have been completed and the navigation is now open.
Latest of 3 CRT updates, 21 November 2025.
Between Lock 41 & Lock 71
Trent & Mersey CanalNorth West
4 days
From 19 May 2025
Reopened 23 May 2025
- Where
- Lock 71 to Lock 41, Plants Lock - Off Side
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
We're pleased to confirm that our teams will have the water levels restored in time for the weekend, and the canal between Lock 41 and Lock 71 on the Trent & Mersey Canal will reopen tomorrow, Friday 23rd May at 9am. We're sorry for any inconvenience this may have caused to your…
Latest of 3 CRT updates, 22 May 2025.
Bridge 42 and Lock 91
Leeds & Liverpool CanalNorth West
4 days
From 18 September 2025
Reopened 22 September 2025
- Where
- Weir, Appley Lock to Bridge 42, Appley Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
The navigation is closed between Bridge 42 and Lock 91 on the Leeds & Liverpool Canal due to a windblown tree. Contractors have been informed to remove the obstruction. An update will be provided tomorrow.
CRT's only update, 18 September 2025.
Bridge 70
Macclesfield CanalNorth West
4 days
From 6 October 2025
Reopened 10 October 2025
- Where
- Bridge 9A - Footbridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Towpath and navigation remains closed due to a large tree that has fallen by Bridge 70 on the Macclesfield Canal. Due to the recent Storm Amy our contractors are experiencing a high volume of work, and have scheduled the removal tomorrow. We will provide a further update on or…
Latest of 2 CRT updates, 8 October 2025.
Bridges 130 to 131
Lancaster CanalNorth West
4 days
From 6 October 2025
Reopened 10 October 2025
- Where
- Bridge 130, Kellet Lane Bridge to Bridge 131, Capernwray Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Towpath and navigation remains closed due to a large tree that has fallen between Bridge 130 & Bridge 131 on the Lancaster Canal. Due to the recent Storm Amy our contractors are experiencing a high volume of work, and have scheduled the removal tomorrow. We will provide a…
Latest of 2 CRT updates, 8 October 2025.
Bridge 75, Ratcliffe Bridge
Lancaster CanalNorth West
4 days
From 4 November 2025
Reopened 8 November 2025
- Where
- Bridge 75, Ratcliffe Bridge
- CRT reason
- Vehicle Incident
- Cause
- Struck by boat or vehicle
- Asset
- Bridge
The navigation and towpath remains closed at Bridge 75, Ratcliffe Bridge, on the Lancaster Canal. Our teams are currently on site removing the remaining blocks and railings that fell into the navigation following a vehicle impact with the bridge. These works are expected to be…
Latest of 2 CRT updates, 6 November 2025.
Between Bridge 92 - 94
Lancaster CanalNorth West
4 days
From 17 November 2025
Reopened 21 November 2025
- Where
- Bridge 92, Burrow Beck Bridge to Bridge 94, Ashton Lane Bridge
- CRT reason
- Information
- Cause
- Weather
- Asset
- Canal or river
Navigation and towpath remains closed between Bridge 92 and 94 on the Lancaster Canal, following a large tree that has fallen. Due to the recent Storm Claudia our contractors are experiencing a high volume of work and we are currently awaiting confirmation of their attendance.…
Latest of 2 CRT updates, 19 November 2025.
Sutton Weaver Swing Bridge
Weaver NavigationNorth West
4 days
From 8 December 2025
Reopened 12 December 2025
- Where
- Elsan, Sutton Weaver Swing Bridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Swing bridge
We're pleased to inform you that works on site have been completed ahead of schedule, and the navigation will be open from 4pm today. Please note, the restriction in the area remains ongoing.
Latest of 2 CRT updates, 12 December 2025.
Between Lock 24W and Lock 32W
Huddersfield Narrow CanalNorth West
4 days
From 17 April 2026
Reopened 21 April 2026
- Where
- Lock 32 West to Lock 24 West
- CRT reason
- Low Water Levels
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation remains closed due to low water levels between Lock 24W and Lock 32W on the Huddersfield Narrow Canal. Following further investigation, damage was found to the lock cill at Lock 29W, which is preventing the lock from sealing properly and being filled. The team will be…
Latest of 2 CRT updates, 20 April 2026.
Lock 12
Ashton CanalNorth West
4 days
From 1 May 2026
Reopened 5 May 2026
- Where
- Lock 12
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation has been temporarily reopened following repairs to the tailgate paddle. During these works, additional defects were identified with the lock mechanism. As a result, our local team will need to return to site to complete full repairs to the lock. Further details can be…
Latest of 2 CRT updates, 5 May 2026.
Bridge 8 Nanney's Bridge
Middlewich Branch (Shrop Union)North West
4 days
From 18 May 2026
Reopened 22 May 2026
- Where
- Hollingshead Winding Hole to Winding Hole - Cholmondeston
- CRT reason
- Vehicle Incident
- Cause
- Struck by boat or vehicle
- Asset
- Bridge
Our teams have reinstalled the barriers at Bridge 8, Nanney's Bridge, to prevent road traffic from using the bridge and have put diversion routes in place. Initial inspections have now been completed, and the team are now on site carrying out repairs to the damaged bridge. A…
Latest of 2 CRT updates, 20 May 2026.
Bridge 19 to Bridge 21
Llangollen CanalNorth West
4 days
From 4 June 2026
Reopened 8 June 2026
- Where
- Bridge 19, Wrenbury Church Bridge to Bridge 21, Wrenbury Frith Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Navigation remains closed between Bridge 19 and Bridge 21 on the Llangollen Canal due to a fallen tree. Our contractors have attended the site and, due to the location and complexity of the obstruction, work is ongoing to safely remove the tree. We apologise for the…
Latest of 2 CRT updates, 5 June 2026.
Lock 90, Deans Lock
Leeds & Liverpool CanalNorth West
4 days
From 10 September 2026
Reopened 14 September 2026
- Where
- Dean Lock - Nearside
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Since our last update our engineers have been to site and assessed the damage. Our team are onsite today to start the removal of the old collar and replace it with a new one. It is anticipated that repairs will take a few days. A further update will be provided on or before…
Latest of 2 CRT updates, 14 September 2026.
Navigation Closure: Between Bridge 24, Wood End Lift Bridge and Bridge 25, Higgins Clough Swingbridge, Peak Forest Canal
Peak Forest CanalNorth West
3 days
From 3 June 2025
Reopened 6 June 2025
- Where
- Bridge 24, Wood End Lift Bridge to Bridge 25, Higgins Clough Swingbridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Navigation remains closed between Bridge 24, Wood End Lift Bridge and Bridge 25, Higgins Clough Swingbridge on the Peak Forest Canal due to a windblown tree. Due to recent weather conditions, our contractors are dealing with an increase in emergency works across the North West.…
Latest of 3 CRT updates, 5 June 2025.
Bridge 75A, Grimshaws lane
Rochdale CanalNorth West
3 days
From 4 July 2025
Reopened 7 July 2025
- Where
- Bridge 75A, Grimshaw Lane Bridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Bridge
Navigation is currently closed at Bridge 75A, Grimshaw's Lane on the Rochdale Canal due to an electrical fault with a failed sensor. Our specialist team are sourcing a replacement part and we expect it to be on site and repaired on Sunday 5 July. An update will be provided…
CRT's only update, 4 July 2025.
Bridge 20, Wrenbury Swing Bridge
Llangollen CanalNorth West
3 days
From 5 September 2025
Reopened 8 September 2025
- Where
- Bridge 20, Wrenbury Bridge
- CRT reason
- Vehicle Incident
- Cause
- Struck by boat or vehicle
- Asset
- Swing bridge
The navigation is currently closed at Wrenbury Swing Bridge, Bridge 20 on the Llangollen Canal due to a vehicle strike. Our local team have been informed and are in attendance. An update will be provided Monday, 8 September.
CRT's only update, 5 September 2025.
Lock 84 to Lock 92
Rochdale CanalNorth West
3 days
From 3 October 2025
Reopened 6 October 2025
- Where
- Lock 84 Dale St to Lock 92 Castlefield
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation is closed between Locks 84 and 92 on the Rochdale Canal due to both paddles that have failed at Lock 86. Our local team have tried to carry out a temporary repair, which unfortunately wasn't successful. We have instructed our specialist contractors to attend on Monday…
CRT's only update, 3 October 2025.
Audlem Lock 1, Head Gates
Shropshire Union CanalNorth West
3 days
From 3 October 2025
Reopened 6 October 2025
- Where
- Audlem Lock 1
- CRT reason
- Underwater Obstruction
- Cause
- Other cause
- Asset
- Lock
There is an underwater obstruction on the head gate at Audlem Lock 1 which is restricting the gates from closing fully to enable seal, allowing the lock to empty. An operations team has been on site this afternoon and into the evening but the cause of the blockage is still…
CRT's only update, 3 October 2025.
Bridges 118 to 119
Lancaster CanalNorth West
3 days
From 7 October 2025
Reopened 10 October 2025
- Where
- Bridge 118, Hest Bank Bridge to Bridge 119, Hatlex Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Navigation remains closed due to the large tree that has fallen between bridges 118 and 119 on the Lancaster Canal. Due to the recent Storm Amy our contractors are experiencing a high volume of work and we are currently awaiting confirmation of their attendance. We will provide…
Latest of 2 CRT updates, 9 October 2025.
Bridge 134
Lancaster CanalNorth West
3 days
From 7 October 2025
Reopened 10 October 2025
- Where
- Bridge 134, Hodgesons Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Navigation remains closed due to a large tree that has fallen at Bridge 134 on the Lancaster Canal. Due to the recent Storm Amy our contractors are experiencing a high volume of work, and have scheduled the removal tomorrow. We will provide a further update on Friday, 10 October.
Latest of 2 CRT updates, 9 October 2025.
Between Bridge 23 and 24
Peak Forest CanalNorth West
3 days
From 14 November 2025
Reopened 17 November 2025
- Where
- Bridge 23, Stanley Hall Bridge to Bridge 24, Wood End Lift Bridge
- CRT reason
- Information
- Cause
- Weather
- Asset
- Canal or river
A large tree has fallen and is blocking the navigation and towpath, between Bridges 23 Stanley Hall Bridge and Bridge 24, Wood End Lift Bridge on the Peak Forest Canal. We have instructed specialist contractors to assist with the removal, however due to adverse weather…
CRT's only update, 14 November 2025.
Bridge 53, Catterall Bridge
Lancaster CanalNorth West
3 days
From 14 November 2025
Reopened 17 November 2025
- Where
- Bridge 53, Catterall Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
A large tree has fallen and is currently blocking navigation at Bridge 53, Catterall Bridge on the Lancaster Canal. Due to the size and position of the tree we need to instruct our specialist contractor to assist with the removal. At present, we are unable to confirm when the…
CRT's only update, 14 November 2025.
Lock 88
Rochdale CanalNorth West
3 days
From 7 December 2025
Reopened 10 December 2025
- Where
- Lock 88 Oxford St
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Repairs to Lock 88 has been successfully completed, our local team are onsite replenishing the effected pound. The lock will reopen from 8am tomorrow, Wednesday 10 December.
Latest of 3 CRT updates, 9 December 2025.
Shropshire Union Canal
Shropshire Union CanalNorth West
3 days
From 27 December 2025
Reopened 30 December 2025
- Where
- Foxey Wood Winding Hole to Winding Hole - Bunbury Bottom Lock
- CRT reason
- Low Water Levels
- Cause
- Broke, cause not given
- Asset
- Canal or river
The water levels are still not sufficent enough for us to reopen navigation. The local team will be monitoring the levels on a daily basis. There will be a further update on 31/12/25 at 5pm.
Latest of 2 CRT updates, 28 December 2025.
Between Bridge 64, Pearsons Bridge and Bridge 65 Stanleys Bridge
Macclesfield CanalNorth West
3 days
From 30 January 2026
Reopened 2 February 2026
- Where
- Bridge 64, Pearsons Bridge to Bridge 65, Stanleys Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
A large tree has fallen and is currently blocking navigation between Bridge 64 and Bridge 65 on the Macclesfield Canal. Due to the size and position of the tree, we have instructed our specialist contractors to assist with the removal. We will provide a further update on or…
CRT's only update, 30 January 2026.
Between Lock 2 and Lock 3
Shropshire Union CanalNorth West
3 days
From 10 March 2026
Reopened 13 March 2026
- Where
- Lock 2, Wide Lock to Top Wide Lock
- CRT reason
- 3rd Party Works
- Cause
- Nothing failed
- Asset
- Canal or river
Please be advised navigation will be closed and the moorings suspended between Lock 2, Wide Lock and Lock 3 on the Shropshire Union Canal from 8:00am on Tuesday 10 March until 8:00am on Friday 13 March for third party filming to take place. Access to the Manchester Ship Canal…
CRT's only update, 25 February 2026.
Between Lock 24 W and Lock 32W
Huddersfield Narrow CanalNorth West
3 days
From 17 March 2026
Reopened 20 March 2026
- Where
- Lock 32 West to Lock 24 West
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation is currently closed between Lock 24W and 32W on the Huddersfield Narrow Canal, due to a damaged cill at Lock 29W which is preventing the lock being operated safely. Our local team are planning a method of repair. An update will be provided on or before, Friday 20…
CRT's only update, 17 March 2026.
Bridge 29 Peak Forest Canal, near New Mills
Peak Forest CanalNorth West
3 days
From 5 April 2026
Reopened 8 April 2026
- Where
- Bridge 29, Bank End Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Navigation and towpath remains closed due to the fallen tree. We are awaiting attendance by our contractors who are currently dealing with a back log from the high workload created from Storm Dave. We will provide a further update tomorrow, Wednesday 8th April 2026.
Latest of 2 CRT updates, 7 April 2026.
Bridge 91, Brantbeck Bridge
Lancaster CanalNorth West
3 days
From 5 April 2026
Reopened 8 April 2026
- Where
- Bridge 91, Brantbeck Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Navigation is currently closed at Bridge 91 on the Lancaster Canal due to a fallen tree. Contractors have been instructed to remove. We will provide an update on Monday 13 April.
CRT's only update, 7 April 2026.
Lock 35
Rochdale CanalNorth West
3 days
From 28 April 2026
Reopened 1 May 2026
- Where
- Lock 35
- CRT reason
- Repair
- Cause
- Ground moved
- Asset
- Canal or river
Navigation is currently closed between lock 35 and lock 36 on Rochdale Canal due to a sinkhole which has appeared in the canal bed. Our local team and engineers are currently on site assessing and planning a method of repair. An update will be provided on or before Friday 1st…
CRT's only update, 28 April 2026.
Lock 9 To Lock 12
Ashton CanalNorth West
3 days
From 13 May 2026
Reopened 16 May 2026
- Where
- Lock 18 to Lock 2
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Repairs to Lock 9 and Lock 12 on the Ashton Canal have been successfully completed, our local team are onsite replenishing the effected pounds. Navigation will reopen from 8am tomorrow, Saturday 16, May.
Latest of 2 CRT updates, 15 May 2026.
Lock 89 to Lock 87
Leeds & Liverpool CanalNorth West
3 days
From 12 May 2026
Reopened 15 May 2026
- Where
- Lock 89 to Lock 87
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
We are pleased to advise that water levels between Lock 87 and Lock 89 on the Leeds & Liverpool Canal are replenishing well. Our local team will continue allowing levels to recover throughout today, with navigation expected to resume tomorrow. Our next update will be provided on…
Latest of 3 CRT updates, 14 May 2026.
Baddiley Flight
Llangollen CanalNorth West
3 days
From 14 July 2026
Reopened 17 July 2026
- Where
- Lock 3, Baddiley Lock to Lock 1, Baddiley Lock
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
Navigation between Lock 1 and Lock 3 on the Baddiley Flight of the Llangollen Canal will reopen from 4:00pm today. Our team is currently on site removing the stop planks that were installed to help stabilise water levels and maintain safe navigation conditions. We will continue…
Latest of 2 CRT updates, 17 July 2026.
Lock 1 - 4, Ashton Canal
Ashton CanalNorth West
2 days
From 13 May 2025
Reopened 15 May 2025
- Where
- Lock 4, Broming Street to Lock 1
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation will be closed between Lock 1 and Lock 4 on the Ashton Canal to allow our teams to carry out emergency repairs to ground paddles and replace structural wall fixings. The locks will remain open until Tuesday 13 May, and our teams will continue to monitor them. If you…
CRT's only update, 2 May 2025.
Navigation Closure; Bridge 1 Stanley Lift Bridge, Peak Forest Canal
Peak Forest CanalNorth West
2 days
From 13 May 2025
Reopened 15 May 2025
- Where
- Bridge 1, Stanley Lift Bridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lift bridge
Navigation remains closed at Stanley Lift Bridge, Bridge 1, on the Peak Forest Canal due to a mechanical fault that is currently preventing the bridge from being safely operated. Our engineers attended the site yesterday and have returned the bridge to its closed position.…
Latest of 2 CRT updates, 14 May 2025.
Navigation Closure; Between Lock 18 and Lock 10, Ashton Canal
Ashton CanalNorth West
2 days
From 10 June 2025
Reopened 12 June 2025
- Where
- Lock 18 to Lock 10
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Bridge
Please be advised that navigation remains closed between Lock 10 and Lock 18 on the Ashton Canal due to a mechanical fault at Bridge 15. Our teams attended the site again today and will return tomorrow. We are currently sourcing the necessary materials and are hopeful that…
Latest of 2 CRT updates, 11 June 2025.
Navigation Closure; Bridge 31, New Lane Swing Bridge, Leeds & Liverpool Canal
Leeds & Liverpool CanalNorth West
2 days
From 10 June 2025
Reopened 12 June 2025
- Where
- Bridge 31, New Lane Swing Bridge
- CRT reason
- Vehicle Incident
- Cause
- Struck by boat or vehicle
- Asset
- Swing bridge
Navigation remains closed at Bridge 31 on the Leeds & Liverpool Canal due to a vehicle strike. Our engineering team have attended site and are currently sourcing a new barrier from the manufacturers. A further update will be provided Thursday 12 June.
Latest of 2 CRT updates, 11 June 2025.
Lock 11 Beeston Iron
Shropshire Union CanalNorth West
2 days
From 15 June 2025
Reopened 17 June 2025
- Where
- Lock 11, Beeston Iron Lock to Lock 12, Beeston Stone Lock
- CRT reason
- Low Water Levels
- Cause
- Broke, cause not given
- Asset
- Lock
Our local engineering team has investigated the leak at Beeston Iron Lock on the Shropshire Union Canal and identified the need for a temporary repair to the cill. Arrangements are being made for a work boat to carry out these temporary repairs until a permanent repair can take…
Latest of 2 CRT updates, 16 June 2025.
Lock 85-Lock 86 - Leeds & Liverpool Canal Lock 1 - Leigh Branch
Leeds & Liverpool Canal, Leigh Branch (L&L Canal)North West
2 days
From 28 July 2025
Reopened 30 July 2025
- Where
- Lock 1, Top Lock, Leigh Branch
- CRT reason
- Low Water Levels
- Cause
- Vandalism
- Asset
- Canal or river
Navigation will remain closed between Lock 85 and Lock 86 on the Leeds and Liverpool Canal and Lock 1 on the Leigh Branch due to vandalism with paddles having been left open. The local team is working to restore the levels by feeding water down to the area, but it's taking…
Latest of 2 CRT updates, 29 July 2025.
Saltersford Lock
Weaver NavigationNorth West
2 days
From 13 August 2025
Reopened 15 August 2025
- Where
- Saltersford Large Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Due to a problem with the paddle at Saltersford Lock, our team is currently unable to operate the lock safely. We'll need the help of specialist divers to fix the issue, and we're already working hard to arrange for them to attend as soon as possible. We'll share an update with…
Latest of 2 CRT updates, 13 August 2025.
Between Bridge 33 and Bridge 34, Whaley Bridge
Peak Forest CanalNorth West
2 days
From 21 September 2025
Reopened 23 September 2025
- Where
- Bridge 33, Greensdeep Bridge to Bridge 34, Botholmes Hall Footbridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
The navigation is closed between Bridge 33 and Bridge 34 on the Peak Forest Canal due to a windblown tree. Contractors have been informed to remove the obstruction. An update will be provided tomorrow, Tuesday 23 September.
CRT's only update, 22 September 2025.
Bridge 134 Caughall, Backford, Chester
Shropshire Union CanalNorth West
2 days
From 5 October 2025
Reopened 7 October 2025
- Where
- Bridge 134, Caughall
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
There is a windblown tree down blocking navigation at bridge 134 Caughall rd, Backford, near Chester. Our contractors have been made aware but they will not be able to attend until Monday morning, due to the number of trees they are already dealing with. The notice will be…
CRT's only update, 5 October 2025.
Lock 63, Clear Water Lock - Towpath Side
Trent & Mersey CanalNorth West
2 days
From 19 October 2025
Reopened 21 October 2025
- Where
- Lk 64, Saw Pit Lock - Towpath Side to Lock 62, Pavilion Lock (Off Side)
- CRT reason
- Boating Incident
- Cause
- Other cause
- Asset
- Lock
Please be advised navigation is currently closed at Lock No. 63 (Malkins Bank) on the Trent & Mersey Canal due to a boat getting stuck in the towpath side lock chamber and preventing the tail gates from being closed. This combined with leakage through the head gate has created a…
CRT's only update, 19 October 2025.
South of Bridge 36 offside moorings
Lancaster CanalNorth West
2 days
From 15 November 2025
Reopened 17 November 2025
- Where
- Bridge 36, Moons Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Please be advised navigation is closed between South of Bridge 36 and Bridge 35 Offside on The Lancaster Canal due to a windblown tree. Contractors have been informed, and we anticipate they will be on site today to remove the obstruction. An update will be provided tomorrow.
CRT's only update, 15 November 2025.
Weaver Navigation - High Flows - Storm Claudia
Weaver NavigationNorth West
2 days
From 15 November 2025
Reopened 17 November 2025
- Where
- Church Cut Bridge to Red Lion Visitor Moorings
- CRT reason
- High Water Levels
- Cause
- Weather
- Asset
- Canal or river
We are pleased to advise navigation is now back open on the Weaver Navigation as flows have now reduced.
Latest of 2 CRT updates, 17 November 2025.
Bridge 21
Ashton CanalNorth West
2 days
From 15 November 2025
Reopened 17 November 2025
- Where
- Bridge 21, Lumb Lane Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Due to the number of fallen trees in the North West following Storm Claudia, our teams are working hard to reopen our navigations and towpaths. However, we do not yet have an update on when the canal will be fully open, as we are still dealing with a significant number of fallen…
Latest of 2 CRT updates, 17 November 2025.
Lock 13 West
Huddersfield Narrow CanalNorth West
2 days
From 15 November 2025
Reopened 17 November 2025
- Where
- Lock 13 West, Wharf Cottage
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
A large tree has fallen and is currently blocking navigation and towpath, near Lock 13 West, Wharf Cottage on the Huddersfield Narrow Canal. Our teams have attended the site, however due to the size and position of the tree we need to instruct our specialist contractor to assist…
CRT's only update, 15 November 2025.
Lock 8 West
Huddersfield Narrow CanalNorth West
2 days
From 15 November 2025
Reopened 17 November 2025
- Where
- Lock 8 West
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
A large tree has fallen and is currently blocking navigation and towpath, near Lock 8 West on the Huddersfield Narrow Canal. Our teams have attended the site, however due to the size and position of the tree we need to instruct our specialist contractor to assist with the…
CRT's only update, 15 November 2025.
Between Hyde Bank Tunnel West & Bridge 14
Peak Forest CanalNorth West
2 days
From 19 November 2025
Reopened 21 November 2025
- Where
- Bridge 14, Hole House Fold Br to Hyde Bank Tunnel
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
A tree has fallen and is currently blocking navigation between Hyde Bank Tunnel West and Bridge 14, on the Peak Forest Canal. We have instructed our contractors, however, at present, we are unable to confirm when the contractor will be on site as adverse weather conditions from…
CRT's only update, 19 November 2025.
Clarence Mill Footbridge, Bollington, Macclesfield canal
Macclesfield CanalNorth West
2 days
From 6 December 2025
Reopened 8 December 2025
- Where
- Bridge 26A Clarence Mill Footbridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
A tree has fallen and is currently blocking navigation at Clarence Mill in Bollington on the Macclesfield canal. Our teams have attended the site, however due to the size of the tree we need to instruct our specialist contractor to assist with the removal. At present, we are…
CRT's only update, 6 December 2025.
Lock 13 West
Huddersfield Narrow CanalNorth West
2 days
From 4 February 2026
Reopened 6 February 2026
- Where
- Lock 14 West to Lock 12 West
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation remains closed at Lock 13 W on the Huddersfield Narrow Canal due to the failure of the offside head gate paddle. Our local team have attended site and they have inspected the paddle and are now working on a method of repair. A further update will be provided on or…
Latest of 2 CRT updates, 5 February 2026.
Bridge 94, Ashton Lane Bridge
Lancaster CanalNorth West
2 days
From 25 March 2026
Reopened 27 March 2026
- Where
- Bridge 94, Ashton Lane Bridge to CULVERT - Sewer
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
The navigation and towpath are currently closed at Bridge 94 on the Lancaster Canal due to a large fallen tree. Our contractors have been instructed to attend to site to remove the obstruction. An update will be provided on or before, Friday 27 March.
CRT's only update, 25 March 2026.
Bosley Lock Flight
Macclesfield CanalNorth West
2 days
From 30 March 2026
Reopened 1 April 2026
- Where
- Bosley Lock 1 to Bosley Lock 12
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation is currently closed between Lock 1 to Lock 12 on the Bosley flight, Macclesfield Canal, this is due to paddle failure at Lock 11 preventing the lock from holding water. Our teams are investigating the cause of the issue and planning the necessary repairs. A further…
CRT's only update, 30 March 2026.
Lock 12, Beeston Stone Lock, SU-033-006
Shropshire Union CanalNorth West
2 days
From 5 April 2026
Reopened 7 April 2026
- Where
- Lock 11, Beeston Iron Lock to Lock 13 Tilstone Lock
- CRT reason
- Repair
- Cause
- Struck by boat or vehicle
- Asset
- Lock
A lock gate has lifted out of position by a boat as the lock was filling.
CRT's only update, 5 April 2026.
Bridge 1, Stanley Lift Bridge, near Dukinfield
Peak Forest CanalNorth West
2 days
From 8 April 2026
Reopened 10 April 2026
- Where
- Bridge 1, Stanley Lift Bridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lift bridge
Please be advised navigation is currently closed at Bridge 1, Stanley Lift Bridge on the Peak Forest canal due to an operating fault. Our local team have been informed and will attend site tomorrow morning. An update will be provided tomorrow 9th April 2026.
CRT's only update, 8 April 2026.
Bridge 74a
Leeds & Liverpool CanalNorth West
2 days
From 14 April 2026
Reopened 16 April 2026
- Where
- Bridge 74A, Railway Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Navigation is currently closed at Bridge 74a on the Leeds and Liverpool Canal due to a fallen tree. Contractors have been instructed for removal. An update will be provided on or before, Thursday 16 April.
CRT's only update, 14 April 2026.
Lune Aqueduct
Lancaster CanalNorth West
2 days
From 1 June 2026
Reopened 3 June 2026
- Where
- Aqueduct B.107, Lune Aqueduct
- CRT reason
- Underwater Obstruction
- Cause
- Vandalism
- Asset
- Canal or river
Navigation is currently closed at Lune Aqueduct on the Lancaster Canal due to metal fencing that has been thrown into the canal, causing an underwater obstruction. Our teams are aware and are working to remove the obstruction this week. We will provide a further update on or…
CRT's only update, 1 June 2026.
Lock 24 to Lock 32 West
Huddersfield Narrow CanalNorth West
2 days
From 1 June 2026
Reopened 3 June 2026
- Where
- Lock 32 West to Lock 24 West
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
Unfortunately, navigation remains closed between Lock 24 and Lock 32 West Diggle on the Huddersfield Narrow Canal due to low water levels. Our team are continuing to work to restore water levels in the affected area and has been feeding additional water into the canal to help…
Latest of 2 CRT updates, 2 June 2026.
Bridge 49aa Scot Lane Bridge
Leeds & Liverpool CanalNorth West
2 days
From 1 June 2026
Reopened 3 June 2026
- Where
- Bridge 49aa Scot Lane Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Navigation and Towpath are currently closed near Bridge 49aa, Scot Lane Bridge, on the Leeds & Liverpool Canal due to a fallen tree. Contractors have been instructed to remove it. We will provide an update on or before Wednesday, 3 June.
CRT's only update, 1 June 2026.
Lock 24W to Lock 32W
Huddersfield Narrow CanalNorth West
2 days
From 3 June 2026
Reopened 5 June 2026
- Where
- Lock 32 West to Lock 24 West
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation is currently closed at between Lock 24 West and Lock 32 West, Diggle, on the Huddersfield Narrow Canal due to a broken paddle at Lock 24 West. The team attended site today to investigate the issue and develop a method of repair. They will return tomorrow to commence…
CRT's only update, 3 June 2026.
Between Bridge 93 and 94, Lancaster Canal
Lancaster CanalNorth West
2 days
From 3 June 2026
Reopened 5 June 2026
- Where
- Bridge 93, Carr Lane Bridge to Bridge 94, Ashton Lane Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
The towpath and Canal are closed due to a large fallen tree blocking the navigation. Contractors will be mobilised to remove the obstruction, further update will be posted tomorrow 4pm
CRT's only update, 3 June 2026.
Locks 65 to Lock 85
Leeds & Liverpool CanalNorth West
2 days
From 24 June 2026
Reopened 26 June 2026
- Where
- Lock 85, Lock 21 to Lock 65, Top Lock
- CRT reason
- Low Water Levels
- Cause
- Vandalism
- Asset
- Canal or river
Navigation remains closed between Lock 65 and Lock 85 on the Wigan Flight of the Leeds & Liverpool Canal due to vandalism, which has resulted in severely low water levels, where the paddles have been left open. Our team are continuing to replenish the pounds however, this may…
Latest of 2 CRT updates, 25 June 2026.
Lock 9 to Lock 18.
Ashton CanalNorth West
2 days
From 6 July 2026
Reopened 8 July 2026
- Where
- Lock 18 to Lock 9
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation is currently closed between Lock 9 & Lock 18 on the Ashton Canal due to a damaged paddle at Lock 13 which is preventing the lock from filling. Our team has attended the site to inspect the paddle and are currently planning a method of repair. A further update will be…
CRT's only update, 6 July 2026.
Lock 68 (Booth Lane)
Trent & Mersey CanalNorth West
2 days
From 6 July 2026
Reopened 8 July 2026
- Where
- Lock 68
- CRT reason
- Boating Incident
- Cause
- Other cause
- Asset
- Lock
Navigation remains closed at Lock 68 on the Trent & Mersey Canal due to a boat that is currently stuck inside the lock chamber. River Rescue is on site and working to safely recover the vessel. Navigation will reopen once the boat has been removed and it is safe to do so. We…
Latest of 2 CRT updates, 7 July 2026.
Lock 67 and Lock 70
Trent & Mersey CanalNorth West
2 days
From 17 August 2026
Reopened 19 August 2026
- Where
- Lock 70 to Lock 67 Booth Lane Top Lock
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
Navigation is closed between Lock 67 and Lock 70 on the Trent & Mersey Canal due to low water levels. Our team is working to restore water levels in the affected area and is feeding additional water from Hardings Wood in our neighbouring region. If you note that water levels are…
CRT's only update, 17 August 2026.
Bridge 33, Glovers Bridge, Rufford
Leeds & Liverpool CanalNorth West
2 days
From 24 September 2026
No reopening date
Still shut
- Where
- Bridge 33, Glovers Swing Bridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Bridge
Navigation is currently closed at Bridge 33 Glovers Bridge, Rufford on the Leeds & Liverpool Canal due to a hydraulic leak making the bridge inoperable. Our engineers have attended site today to carry out inspections and have ordered the parts required to carry out the repairs.…
CRT's only update, 24 September 2026. 2 days without another.
Between Lock 69 & Lock 70
Trent & Mersey CanalNorth West
1 day
From 8 May 2025
Reopened 9 May 2025
- Where
- Lock 70 to Lock 69
- CRT reason
- Vehicle Incident
- Cause
- Struck by boat or vehicle
- Asset
- Canal or river
The Navigation and towpath between Lock 69 and Lock 70 on the Trent & Mersey Canal are currently closed due to a police incident involving an articulated vehicle that has entered the canal near Bridge 165a. Our teams are working closely with the vehicle owners and emergency…
CRT's only update, 8 May 2025.
Navigation Closure; Between Bridge 93 and Bridge 94, Lancaster Canal
Lancaster CanalNorth West
1 day
From 13 May 2025
Reopened 14 May 2025
- Where
- Bridge 93, Carr Lane Bridge to Bridge 94, Ashton Lane Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
The navigation is closed between Bridge 93 and Bridge 94 on the Lancaster Canal due to a windblown tree. Contractors have been informed to remove the obstruction. An update will be provided Wednesday 14 May.
CRT's only update, 13 May 2025.
Navigation Closure; Between Lock 1 and Lock 2, Leigh Branch (L&L Canal)
Leigh Branch (L&L Canal)North West
1 day
From 27 May 2025
Reopened 28 May 2025
- Where
- Lock 1, Top Lock, Leigh Branch to Lock 2, Bottom Lock
- CRT reason
- Low Water Levels
- Cause
- Other cause
- Asset
- Canal or river
We are pleased to advise, navigation is now open between Lock 1 and Lock 2 on the Leigh Branch of the Leeds & Liverpool Canal.
Latest of 2 CRT updates, 28 May 2025.
Between Bridge 47 and Bridge 48
Leeds & Liverpool CanalNorth West
1 day
From 2 June 2025
Reopened 3 June 2025
- Where
- Bridge 47, Crooke bridge to Bridge 48, Lower Road bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
The navigation and towpath is closed between Bridge 47 and Bridge 48 on the Leeds & Liverpool Canal due to a windblown tree. Contractors have been informed to remove the obstruction. An update will be provided on or before Friday 6 June.
CRT's only update, 2 June 2025.
Navigation Closure; Between Lock 85 and 86, Leeds & Liverpool, and Lock 1, Leigh Branch (L&L Canal)
Leeds & Liverpool Canal, Leigh Branch (L&L Canal)North West
1 day
From 3 June 2025
Reopened 4 June 2025
- Where
- Lock 1, Top Lock, Leigh Branch
- CRT reason
- Low Water Levels
- Cause
- Vandalism
- Asset
- Canal or river
Navigation is currently closed between Lock 85 and Lock 86 on the Leeds and Liverpool Canal and Lock 1 on the Leigh Branch due to vandalism with paddles having been left open. The local team are aware and onsite feeding water down to the affected area. A further update will be…
CRT's only update, 3 June 2025.
Navigation Closure: Between Bridge 120, Rowton Bridge and Bridge 121, Quarry Bridge, Christleton, Shopshire Union Canal
Shropshire Union CanalNorth West
1 day
From 5 June 2025
Reopened 6 June 2025
- Where
- Bridge 121, Quarry Bridge to Bridge 120, Rowton Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Navigation is closed between Bridge 120, Rowton Bridge and Bridge 121, Quarry Bridge in the Christleton area of the Shopshire Union Canal due to a windblown tree. Our contractors have been informed, and we await their attendance. An update will be provided by Monday 9 June.
CRT's only update, 5 June 2025.
Navigation Closure; Between Lock 85 and 86, Leeds & Liverpool, and Lock 1, Leigh Branch (L&L Canal)
Leeds & Liverpool Canal, Leigh Branch (L&L Canal)North West
1 day
From 10 June 2025
Reopened 11 June 2025
- Where
- Lock 1, Top Lock, Leigh Branch
- CRT reason
- Low Water Levels
- Cause
- Vandalism
- Asset
- Canal or river
Navigation is currently closed between Lock 85 and Lock 86 on the Leeds and Liverpool Canal and Lock 1 on the Leigh Branch due to vandalism with paddles having been left open. The local team are aware and onsite feeding water down to the affected area. A further update will be…
CRT's only update, 10 June 2025.
Between Bridge 205 & Bridge 206
Trent & Mersey CanalNorth West
1 day
From 16 June 2025
Reopened 17 June 2025
- Where
- Bridge 206, Bradley Meadow Bridge to Aqueduct, Bridge 205 Little Leigh
- CRT reason
- Information
- Cause
- Weather
- Asset
- Canal or river
Navigation is closed between Bridge 205 and Bridge 206, Bradley Meadow Bridge, on the Trent & Mersey Canal due to a windblown tree. Our contractors have been informed, and we await their attendance. An update will be provided by Wednesday 18 June.
CRT's only update, 16 June 2025.
LA-007-004
Llangollen CanalNorth West
1 day
From 22 June 2025
Reopened 23 June 2025
- Where
- Stoneley Green Winding Hole to Thomasons Winding Hole
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Culvert
Due to a possible culvert collapse concern on culvert 16 LA-007-004 Llangollen canal, the canal is being close off to stop any further impact damage from the boats that are travelling over it. We will have a further update on 23/6/25.
CRT's only update, 22 June 2025.
Navigation Closure; Between Lock 86, Leeds & Liverpool, and Lock 1, Leigh Branch (L&L Canal)
Leeds & Liverpool Canal, Leigh Branch (L&L Canal)North West
1 day
From 24 June 2025
Reopened 25 June 2025
- Where
- Lock 1, Top Lock, Leigh Branch
- CRT reason
- Low Water Levels
- Cause
- Vandalism
- Asset
- Canal or river
Navigation is currently closed between Lock 86 on the Leeds and Liverpool Canal and Lock 1 on the Leigh Branch due to vandalism with paddles been left open. The local team are aware and onsite feeding water down to the affected area. A further update will be provided Wednesday…
CRT's only update, 24 June 2025.
Bridge 16, Bells Lane
Leeds & Liverpool CanalNorth West
1 day
From 2 July 2025
Reopened 3 July 2025
- Where
- Bridge 16, Bells Lane Swing Bridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Bridge
Navigation is currently closed at Bridge 16, Bells Lane on the Leeds & Liverpool due to an electrical fault with the bridge. Our contractors have been informed and are on their way to site. An update will be provided Thursday 3 July.
CRT's only update, 2 July 2025.
Bridge 91,Marsh Lane to Bridge 92, Nantwich Junction Bridge
Shropshire Union CanalNorth West
1 day
From 1 August 2025
Reopened 2 August 2025
- Where
- Bridge 92, Nantwich Junction Bridge to Bridge 91, Marsh Lane
- CRT reason
- Emergency Services Incident
- Cause
- Nothing failed
- Asset
- Canal or river
Please be advised navigation and towpath is closed between Bridge 91,Marsh Lane and Bridge 92, Nantwich Junction Bridge on the Shropshire Union Canal due to a police incident. A further update will be provided later this afternoon.
CRT's only update, 1 August 2025.
Lock 11 Audlem
Shropshire Union CanalNorth West
1 day
From 13 August 2025
Reopened 14 August 2025
- Where
- Shropshire Union Canal - 057
- CRT reason
- Underwater Obstruction
- Cause
- Other cause
- Asset
- Lock
Bottom end gates won't open due to an obstruction behind the gates.
CRT's only update, 13 August 2025.
Handcocks Swing Bridge
Leeds & Liverpool CanalNorth West
1 day
From 27 August 2025
Reopened 28 August 2025
- Where
- Bridge 9, Handcocks Swing Bridge
- CRT reason
- Repair
- Cause
- Struck by boat or vehicle
- Asset
- Swing bridge
Following today's road traffic incident, the canal remains closed to boats. Our contractors are already on site and are in the process of sourcing and installing a replacement barrier. We understand this closure may cause inconvenience and appreciate your patience and…
Latest of 2 CRT updates, 27 August 2025.
Northgate Locks, Chester
Shropshire Union CanalNorth West
1 day
From 4 September 2025
Reopened 5 September 2025
- Where
- Lock 1, Northgate Bottom Lock to Lock 3, Northgate Top Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation is currently closed through Northgate Locks, Chester on the Shropshire Union Canal due to a broken paddle gearing on Lock 2, Northgate Middle Lock. Our team have been to site today to carry out a repair, however this was unsuccessful. The team will be back onsite…
CRT's only update, 4 September 2025.
Bridge 26A Macclesfield Canal
Macclesfield CanalNorth West
1 day
From 3 October 2025
Reopened 4 October 2025
- Where
- Bridge 26A Clarence Mill Footbridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
A large tree has fallen and is currently blocking navigation at Bridge 26a in Bollington. Our teams have attended the site, however due to the size of the tree we need to instruct our specialist contractor to assist with the removal. At present, we are unable to confirm when the…
CRT's only update, 3 October 2025.
Hyde Bank Tunnel
Peak Forest CanalNorth West
1 day
From 4 October 2025
Reopened 5 October 2025
- Where
- Hyde Bank Tunnel
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
A large tree has fallen and is currently blocking navigation at Hyde Bank Tunnel near Romiley. Our teams have attended the site, however due to the size of the tree we need to instruct our specialist contractor to assist with the removal. At present, we are unable to confirm…
CRT's only update, 4 October 2025.
Lock 11 West
Huddersfield Narrow CanalNorth West
1 day
From 13 November 2025
Reopened 14 November 2025
- Where
- Lock 11 West
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Our teams will need to close navigation at Lock 11W on the Huddersfield Narrow Canal from 3pm today, to safely investigate an issue with one of the paddles. Our local team anticipates that repairs can be completed within 24hours, with navigation expected to resume by tomorrow at…
CRT's only update, 13 November 2025.
Bridge 20, Wrenbury Bridge
Llangollen CanalNorth West
1 day
From 18 November 2025
Reopened 19 November 2025
- Where
- Bridge 20, Wrenbury Bridge
- CRT reason
- Vehicle Incident
- Cause
- Struck by boat or vehicle
- Asset
- Swing bridge
Navigation is currently closed at Wrenbury Swing Bridge, Bridge 20 on the Llangollen Canal due to a vehicle strike causing damage to the barriers. Our local team have been informed and are in attendance. An update will be provided tomorrow, Wednesday, 19 November.
CRT's only update, 18 November 2025.
Weaver Navigation
Weaver NavigationNorth West
1 day
From 1 December 2025
Reopened 2 December 2025
- Where
- Church Cut Bridge to Red Lion Visitor Moorings
- CRT reason
- High Water Levels
- Cause
- Weather
- Asset
- Canal or river
Due to adverse weather conditions resulting in strong flows, navigation is currently closed on the Weaver Navigation. Our local team are aware and are onsite to help with water management. An update will be provided on or before, Tuesday 2 December.
CRT's only update, 1 December 2025.
Bridge 49, Royal Oak Swing Bridge
Macclesfield CanalNorth West
1 day
From 2 December 2025
Reopened 3 December 2025
- Where
- Bridge 49, Royal Oak Swingbridge
- CRT reason
- Suspected Vandalism
- Cause
- Vandalism
- Asset
- Swing bridge
Due to suspected vandalism on the lock mechanism at Bridge 49, Royal Oak Swing bridge on the Macclesfield Canal, we've had to temporarily close navigation. Contractors have been instructed to attend. A further update will be provided Wednesday 3 December.
CRT's only update, 2 December 2025.
Pipe Crossing near lock 4 Ashton canal
Ashton CanalNorth West
1 day
From 6 December 2025
Reopened 7 December 2025
- Where
- Pipe Crossing
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
A tree has fallen and is currently blocking navigation at Pipe Crossing near lock 4 on the Ashton canal. Our teams have attended the site, however due to the size of the tree we need to instruct our specialist contractor to assist with the removal. At present, we are unable to…
CRT's only update, 6 December 2025.
Bridges 13B School Brow Footbridge and 14 Hole House Fold Bridge
Peak Forest CanalNorth West
1 day
From 6 December 2025
Reopened 7 December 2025
- Where
- Bridge 13B, School Brow Footbridge to Bridge 14, Hole House Fold Br
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
A tree has fallen and is currently blocking navigation between bridge 13B and 14 on the Peak Forest canal. Our teams have attended the site, however due to the size of the tree we need to instruct our specialist contractor to assist with the removal. At present, we are unable to…
CRT's only update, 6 December 2025.
Bridge 128, Carnforth Bridge
Lancaster CanalNorth West
1 day
From 17 December 2025
Reopened 18 December 2025
- Where
- Bridge 128, Carnforth Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
A large tree has fallen and is currently blocking navigation and towpath near Bridge 128 on the Lancaster Canal. Due to the size and position of the tree, we have instructed our specialist contractor to assist with the removal. We will provide a further update on or before…
CRT's only update, 17 December 2025.
Bosley Lock Flight, Lock 1 to Lock 12
Macclesfield CanalNorth West
1 day
From 23 December 2025
Reopened 24 December 2025
- Where
- Bosley Lock 1 to Bosley Lock 12
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation is currently closed through the Bosley lock flight, on the Macclesfield Canal, following a recent inspection where damage was identified to the gate at Lock 12. Our local team are on site carrying out the repairs to the gate. An update will be provided on 24 December
Latest of 2 CRT updates, 23 December 2025.
Bridge 31, New Lane Swing Bridge
Leeds & Liverpool CanalNorth West
1 day
From 15 January 2026
Reopened 16 January 2026
- Where
- Bridge 31, New Lane Swing Bridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Swing bridge
Navigation is currently closed at Bridge 31, New Lane Swing Bridge on the Leeds & Liverpool Canal due to an electrical fault. Our specialist team have been instructed to attend. An update will be provided tomorrow, Friday 16 January.
CRT's only update, 15 January 2026.
Bridge 9, Handcocks Swing Bridge
Leeds & Liverpool CanalNorth West
1 day
From 26 January 2026
Reopened 27 January 2026
- Where
- Bridge 9, Handcocks Swing Bridge
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Swing bridge
Navigation is currently closed at Bridge 9, Handcocks Swing Bridge on the Leeds & Liverpool Canal due to a fault with the hydraulic hose that operates the swing bridge. Our contractors have been informed and will be attending site tomorrow to assess the issue and plan a method…
CRT's only update, 26 January 2026.
Bridge 116, Rakes Head Bridge
Lancaster CanalNorth West
1 day
From 27 January 2026
Reopened 28 January 2026
- Where
- Bridge 116, Rakes Head Bridge
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
The navigation is closed at Bridge 116, Rakes Head Bridge on the Lancaster Canal due to a windblown tree. Our local team will be attending site tomorrow to remove the obstruction. An update will be provided on Wednesday, 28 January.
CRT's only update, 27 January 2026.
Between Lock 1 and Lock 16
Peak Forest CanalNorth West
1 day
From 29 January 2026
Reopened 30 January 2026
- Where
- Lock 1 to Lock 16
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Unfortunately, we were unable to complete the emergency repairs to the gate seals at Lock 4 on the Marple Flight today, and our local team will need to re-attend the site tomorrow. As a result, the lock flight between Locks 1 and 16 will remain closed while the works are carried…
CRT's only update, 29 January 2026.
Between Lock 57 and Lock 62
Trent & Mersey CanalNorth West
1 day
From 3 February 2026
Reopened 4 February 2026
- Where
- Weired Lock 62, Pavilion Lk Towpathside to Lk 57, Top Lock
- CRT reason
- Low Water Levels
- Cause
- Other cause
- Asset
- Canal or river
The navigation is closed between Lock 57 and Lock 62 on the Trent and Mersey Canal due to low water levels as a result of the paddles being left open. We are currently increasing the water levels, but this will take some time to recover. An update will be provided Wednesday 4…
CRT's only update, 3 February 2026.
Marsh Lock to Winsford Flash
Weaver NavigationNorth West
1 day
From 9 February 2026
Reopened 10 February 2026
- Where
- Marsh Lock to Vale Royal Small Lock
- CRT reason
- High Water Levels
- Cause
- Weather
- Asset
- Canal or river
Weaver navigation closure Navigation is closed from Marsh Lock to Winsford Flash on the Weaver Navigation due to the adverse weather conditions resulting in high water levels. An update will be provided once normal levels have resumed.
CRT's only update, 9 February 2026.
Bridge 49, Royal Oak Swing Bridge on the Macclesfield Canal
Macclesfield CanalNorth West
1 day
From 18 February 2026
Reopened 19 February 2026
- Where
- Bridge 49, Royal Oak Swingbridge
- CRT reason
- Vehicle Incident
- Cause
- Struck by boat or vehicle
- Asset
- Swing bridge
Navigation is currently closed at Bridge 49, Royal Oak Swing Bridge, Macclesfield Canal due to a technical fault caused from recent vehicle strike. Specialist contractors will be in attendance tomorrow to assess and repair. An update will be provided on Thursday 19 February.
CRT's only update, 18 February 2026.
Audlem Lock 5
Shropshire Union CanalNorth West
1 day
From 9 March 2026
Reopened 10 March 2026
- Where
- Bridge 78, Audlem Town Bridge to Bridge 76, Bagley Lane Bridge
- CRT reason
- Repair
- Cause
- Worn out
- Asset
- Lock
Unfortunately, the condition of Audlem Lock 5 has deteriorated, and an emergency closure is now required to complete the necessary repairs. Work is needed on the bottom gates, as the lock is currently unable to hold water. To ensure these repairs can be completed safely and…
CRT's only update, 5 March 2026.
Bridge 22a Railway bridge Middlewich branch
Middlewich Branch (Shrop Union)North West
1 day
From 5 April 2026
Reopened 6 April 2026
- Where
- Railway Bridge No 22A
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Fallen tree blocking navigation near to Bridge 22A Railway bridge.
CRT's only update, 5 April 2026.
Between Lock 85, 86 and Lock 1 (Leigh Branch)
Leeds & Liverpool Canal, Leigh Branch (L&L Canal)North West
1 day
From 7 April 2026
Reopened 8 April 2026
- Where
- Lock 1, Top Lock, Leigh Branch
- CRT reason
- Low Water Levels
- Cause
- Weather
- Asset
- Canal or river
Navigation is currently closed between Lock 85 and Lock 86 on the Leeds and Liverpool Canal, and Lock 1 on the Leigh Branch, due to low water levels. Our teams are working to restore water levels to allow navigation to resume. A further update will be provided on or before…
CRT's only update, 7 April 2026.
Between Lock 9 and Lock 12
Ashton CanalNorth West
1 day
From 14 April 2026
Reopened 15 April 2026
- Where
- Lock 12 to Lock 9
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation is currently closed between Lock 9 and Lock 12 on the Ashton Canal due to broken paddles. Our local team will attend site to assess the paddles and plan a method of repair. A further update will be provided on or before Wednesday 15 April.
CRT's only update, 14 April 2026.
Lock 43 (Red Bull)
Trent & Mersey CanalNorth West
1 day
From 21 April 2026
Reopened 22 April 2026
- Where
- Lock 43, Red Bull Lock
- CRT reason
- Low Water Levels
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation is currently closed at Lock 43 on the Trent & Mersey Canal due to low water levels following an earlier issue today with a paddle at the lock. Our team attended the site today and has successfully repaired the paddle. However, the lock will remain closed overnight to…
CRT's only update, 21 April 2026.
Lock 43, Red Bull Lock
Trent & Mersey CanalNorth West
1 day
From 27 April 2026
Reopened 28 April 2026
- Where
- Lock 43, Red Bull Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation is currently closed at Lock 43 on the Trent & Mersey Canal due to damage to the offside paddle. Our local team will be attending site to start works to repair the paddle on Thursday, 30 April. An update will be provided on of before Friday, 1 May.
CRT's only update, 27 April 2026.
Bridge 8 Nanney's Bridge
Middlewich Branch (Shrop Union)North West
1 day
From 14 May 2026
Reopened 15 May 2026
- Where
- Hollingshead Winding Hole to Winding Hole - Cholmondeston
- CRT reason
- Vehicle Incident
- Cause
- Struck by boat or vehicle
- Asset
- Bridge
Following a vehicle strike on Bridge 8, Nanney's Bridge, robust barriers were installed to prevent road traffic from accessing the bridge, and diversion routes were put in place. These have since been moved. Until these barriers are reinstated, the towpath and navigation will…
CRT's only update, 14 May 2026.
Bridges 134 & 135 at Red Bull
Trent & Mersey CanalNorth West
1 day
From 2 June 2026
Reopened 3 June 2026
- Where
- Bridge 135 to Bridge 134
- CRT reason
- 3rd Party Works
- Cause
- Other cause
- Asset
- Canal or river
The navigation and towpath between Bridge 134 and Bridge 135 at Red Bull on the Trent & Mersey Canal remain closed. This is to allow the safe removal of a sunken boat near Lock 45 (Kent's Lock). The work is scheduled to take place Wednesday, 3 June between 7:00 am and 5:00 pm. A…
Latest of 3 CRT updates, 2 June 2026.
Wrenbury Bridge, Bridge 20
Llangollen CanalNorth West
1 day
From 1 June 2026
Reopened 2 June 2026
- Where
- Bridge 20, Wrenbury Bridge
- CRT reason
- Vehicle Incident
- Cause
- Struck by boat or vehicle
- Asset
- Swing bridge
Navigation is currently closed at Wrenbury Swing Bridge, Bridge 20 on the Llangollen Canal due to a vehicle strike. Our local team have been informed and are in attendance. An update will be provided on or before Wednesday, 3 June.
CRT's only update, 1 June 2026.
Lock 65 to Lock 85, Wigan flight
Leeds & Liverpool CanalNorth West
1 day
From 3 June 2026
Reopened 4 June 2026
- Where
- Lock 85, Lock 21 to Lock 65, Top Lock
- CRT reason
- Repair
- Cause
- Broke, cause not given
- Asset
- Lock
Navigation is currently closed along the Wigan flight, Lock 65 to Lock 85, on the Leeds & Liverpool Canal due to damaged cills at Lock 70 and Lock 75 on the Leeds & Liverpool Canal. Our team needs to dewater the affected locks to allow us to investigate and create a method of…
Latest of 2 CRT updates, 3 June 2026.
Lock 4 West
Huddersfield Narrow CanalNorth West
1 day
From 20 June 2026
Reopened 21 June 2026
- Where
- Lock 4 West
- CRT reason
- Low Water Levels
- Cause
- Other cause
- Asset
- Canal or river
Due to paddles being left open on this lock, the pound has run off leaving no water for navigation. Water is being supplied from further up the network and it is expected the pound will be full again by 10:00 tomorrow morning.
CRT's only update, 20 June 2026.
Lock 57 hassall green to Lock 66
Trent & Mersey CanalNorth West
1 day
From 30 June 2026
Reopened 1 July 2026
- Where
- Lk 66, Bottom Lock - Off Side to Lk 57, Top Lock
- CRT reason
- Low Water Levels
- Cause
- Vandalism
- Asset
- Canal or river
Navigation is closed between Lock 57 and Lock 66 on the Trent & Mersey Canal due to vandalism, which has resulted in severely low water levels, where the paddles have been left open. To allow the water levels to recover, navigation will remain closed until further notice. A…
CRT's only update, 30 June 2026.
Showing the 250 longest of 276. Every row links to the notice CRT published.
Coming up
Scheduled but not yet started, so in no figure above.
Not counted
Notices in no closure figure on this page: cancelled, duplicates, and ones whose dates cannot be right. They are kept here because CRT published them.
Regions · Canals · Reliability · Trends · Download data