Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.
The archive / Llangollen Canal
Bridge 20, Wrenbury Swing Bridge
A navigation closure on the Llangollen Canal, 5 September 2025 to 8 September 2025 — 3 days.
Source: this notice on canalrivertrust.org.uk
- Waterway
- Llangollen Canal
- Region
- North West
- Started
- 5 September 2025
- Status
- Reopened 8 September 2025
- Days shut
- 3
- CRT reason
- Vehicle Incident
- Cause
- Struck by boat or vehicle
- Asset
- Swing bridge
Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.
What CRT said it was for
We are pleased to advise the repair to Wrenbury Bridge, Bridge 20, on the Llangollen Canal has been successful and navigation has resumed.
Where
- Llangollen Canal: Bridge 20, Wrenbury Bridge to Bridge 20, Wrenbury Bridge
Updates · 1
3 days with no update after the last one.
5 September 2025 · 0 days since the previous
The navigation is currently closed at Wrenbury Swing Bridge, Bridge 20 on the Llangollen Canal due to a vehicle strike. Our local team have been informed and are in attendance. An update will be provided Monday, 8 September.
Cite this: Canal closures, “Bridge 20, Wrenbury Swing Bridge”, https://crt-stoppages.pages.dev/notice/01991a75-e2ac-73f0-b8fb-6f9992fa9f9c.
Every closure on Llangollen Canal · Download the data · Method and limits