Canal closures

Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.

The archive / Macclesfield Canal

Bridge 49, Royal Oak Swing Bridge

A navigation closure on the Macclesfield Canal, 2 December 2025 to 3 December 2025 — 1 days.

Source: this notice on canalrivertrust.org.uk

Waterway
Macclesfield Canal
Region
North West
Started
2 December 2025
Status
Reopened 3 December 2025
Days shut
1
CRT reason
Suspected Vandalism
Cause
Vandalism
Asset
Swing bridge

Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.

What CRT said it was for

Following the successful repair to the lock mechanism, navigation has now reopened.

Where

Updates · 1

1 days with no update after the last one.

2 December 2025 · 0 days since the previous

Due to suspected vandalism on the lock mechanism at Bridge 49, Royal Oak Swing bridge on the Macclesfield Canal, we've had to temporarily close navigation. Contractors have been instructed to attend. A further update will be provided Wednesday 3 December.

Cite this: Canal closures, “Bridge 49, Royal Oak Swing Bridge”, https://crt-stoppages.pages.dev/notice/019adf9c-f051-7d93-a758-2cc3e0e0780e.

Every closure on Macclesfield Canal · Download the data · Method and limits