Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.
The archive / Shropshire Union Canal
Audlem Lock 5
A navigation closure on the Shropshire Union Canal, 9 March 2026 to 10 March 2026 — 1 days.
Source: this notice on canalrivertrust.org.uk
- Waterway
- Shropshire Union Canal
- Region
- North West
- Started
- 9 March 2026
- Status
- Reopened 10 March 2026
- Days shut
- 1
- CRT reason
- Repair
- Cause
- Wear and tear
- Asset
- Lock
Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.
Where
- Shropshire Union Canal: Bridge 78, Audlem Town Bridge to Bridge 76, Bagley Lane Bridge
Updates · 1
5 days with no update after the last one.
5 March 2026 · 0 days since the previous
Unfortunately, the condition of Audlem Lock 5 has deteriorated, and an emergency closure is now required to complete the necessary repairs. Work is needed on the bottom gates, as the lock is currently unable to hold water. To ensure these repairs can be completed safely and effectively, a full navigation closure will be in place for the duration of the works. This stoppage is essential to maintain the ongoing reliability and safe operation of the lock. We're sorry for the short notice but we're keen to get it done before 13 March, and we appreciate your patience and cooperation while this vital work is carried out.
Cite this: Canal closures, “Audlem Lock 5”, https://crt-stoppages.pages.dev/notice/019cbd68-4e87-70d0-ae20-7e074ef1f66d.
Every closure on Shropshire Union Canal · Download the data · Method and limits