Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.
The archive / Peak Forest Canal
Hyde Bank Tunnel
A navigation closure on the Peak Forest Canal, 4 October 2025 to 5 October 2025 — 1 days.
Source: this notice on canalrivertrust.org.uk
- Waterway
- Peak Forest Canal
- Region
- North West
- Started
- 4 October 2025
- Status
- Reopened 5 October 2025
- Days shut
- 1
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.
What CRT said it was for
The tree has now been removed and the navigation is now open.
Where
- Peak Forest Canal: Hyde Bank Tunnel to Hyde Bank Tunnel
Updates · 1
1 days with no update after the last one.
4 October 2025 · 0 days since the previous
A large tree has fallen and is currently blocking navigation at Hyde Bank Tunnel near Romiley. Our teams have attended the site, however due to the size of the tree we need to instruct our specialist contractor to assist with the removal. At present, we are unable to confirm when the contractor will be on site as adverse weather conditions from Storm Amy are impacting our waterways across the North West and causing delays. We will provide a further update during the weekend.
Cite this: Canal closures, “Hyde Bank Tunnel”, https://crt-stoppages.pages.dev/notice/0199af26-2507-7108-b5e8-975f56de6a4c.
Every closure on Peak Forest Canal · Download the data · Method and limits