Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.
The archive / Peak Forest Canal
Between Hyde Bank Tunnel West & Bridge 14
A navigation closure on the Peak Forest Canal, 19 November 2025 to 21 November 2025 — 2 days.
Source: this notice on canalrivertrust.org.uk
- Waterway
- Peak Forest Canal
- Region
- North West
- Started
- 19 November 2025
- Status
- Reopened 21 November 2025
- Days shut
- 2
- CRT reason
- Vegetation
- Cause
- Weather
- Asset
- Canal or river
Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.
What CRT said it was for
Following successful removal of the fallen tree, navigation has now been reopened.
Where
- Peak Forest Canal: Bridge 14, Hole House Fold Br to Hyde Bank Tunnel
Updates · 1
2 days with no update after the last one.
19 November 2025 · 0 days since the previous
A tree has fallen and is currently blocking navigation between Hyde Bank Tunnel West and Bridge 14, on the Peak Forest Canal. We have instructed our contractors, however, at present, we are unable to confirm when the contractor will be on site as adverse weather conditions from Storm Claudia are impacting our waterways across the North West and causing delays. We will provide a further update on or before Friday, 21 November
Cite this: Canal closures, “Between Hyde Bank Tunnel West & Bridge 14”, https://crt-stoppages.pages.dev/notice/019a9c5e-c168-7ed6-8482-e9cb08bb5141.
Every closure on Peak Forest Canal · Download the data · Method and limits