CRT Stoppages Archive

Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.

All closures / What fails / Bridge

Bridge

Unplanned closures of this kind: 7 in June to August 2026 against 10 a year earlier, within what chance produces. How this is tested.

On record
62 notices since May 2025: 44 closures, 6 restrictions and 12 not yet started

In force today

2 closures of this kind are in force today, longest shut first. Filter the explorer to them.

Shut today, counted to today.
CanalWhereSinceDays shut
Coventry CanalDunstall Bridge12 September 202614
Leeds & Liverpool CanalBridge 33, Glovers Swing Bridge24 September 20262

By canal

32 canals have had a closure of this kind. A closure naming two canals counts on both.

Closures of this kind on each canal since May 2025, most first.
CanalClosures
Leeds & Liverpool Canal6
Lancaster Canal5
Huddersfield Narrow Canal4
New Junction Canal4
Grand Union Canal3
Middlewich Branch (Shrop Union)3
Oxford Canal3
Waterworks River3
Ashton Canal2
Birmingham & Warwick Junction Cnl2
Digbeth Branch (Birm'm & Fazeley)2
Dudley No 1 Canal2
Show 20 moreShow fewer
CanalClosures
Rochdale Canal2
South Dock2
Staffordshire & Worcestershire Cnl2
Trent & Mersey Canal2
Ashby Canal1
Birmingham & Fazeley Canal1
Calder & Hebble Navigation1
Coventry Canal1
Dewsbury Arm (Calder & Hebble Nav)1
Erewash Canal1
Gloucester & Sharpness Canal1
Hertford Union Canal1
Huddersfield Broad Canal1
Lee Navigation1
Limehouse Cut1
Liverpool Link1
Monmouthshire & Brecon Canal1
Regent's Canal1
River Trent1
Titford Canal1

Every closure on record

Showing 44 closures and 6 restrictions involving a bridge.

Period

Rank by

Population

8 closures are in neither group: 6 unplanned with no day in the cruising season since May 2025, and 2 not started yet.

Status

Duration

Cause

Asset affected

CRT reason

Region

44
closures
532
closure-days since May 2025
299
in cruising season
2
no reopening date
What these figures mean
Population
Which closures a figure counts. All closures is everything; Unplanned closure drops the works CRT flags as its winter programme and any day outside the cruising season (the Friday nearest 15 March to the Sunday before the first Monday in November). Scheduled work CRT does not flag as winter works still counts here. CRT Planned closure is the flagged winter programme alone.
Defensible duration
The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
Closure-days
One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals. They are counted from 1 May 2025, when this archive begins: a closure that started earlier adds only its days since then, though its own row shows its whole length. Every figure and chart counts only the days inside the Period chosen above them.
In force
A closure is in a Period, and a day is one a closure affected, if it was in force at any time that day, including the morning it reopened. Closure-days measure how long, so they count whole days and not the reopening day: a closure can be in a Period and add no closure-day to it.

Closures in force each month

closures active during the month
1
4
6
3
3
1
8
5
1
5
3
1
3
1
2
5
5
May 25Jun 25Jul 25Aug 25Sep 25Oct 25Nov 25Dec 25Jan 26Feb 26Mar 26Apr 26May 26Jun 26Jul 26Aug 26Sep 26

Canals ranked by the season's closures

share of the period's cruising-season days up to today — a closure somewhere on a long canal is likelier, and does not mean the canal was impassableclosures in force on the period's cruising-season days — a longer canal has more to go wrong on

Where

closure-days by regionclosures by region

A region with more canal has more to go wrong on, so these totals partly measure its size. Regions compared by length of canal are on the Reliability page.

What causes them

closure-days by causeclosures by cause

CRT's reason

closure-days by the reason CRT filedclosures by the reason CRT filed

What fails on a lock

closure-days by part — unplanned lock failures naming a partclosures by part — unplanned lock failures naming a part

How long they last

closures by full length, including any days before May 2025 — the bands are not equal in width
17
11
10
6
0
0
<=1d2-7d8-30d31-90d91-365d>365d
50 results · every closure involving a bridgeJump to list

Closures

  1. Bridge 165, Newton Grange bridge (Changeline bridge) - Closure

    Leeds & Liverpool CanalYorkshire and North East

    88 days

    From 5 May 2025

    Reopened 1 August 2025

    Where
    Bridge 165, Changeline Bridge
    CRT reason
    3rd Party Works
    Cause
    Someone else's works
    Asset
    Bridge

    Navigation will be restricted due to bridge works carried out by 3rd party contractors, this has been scheduled because the navigation is already closed as a result of drought conditions and low water levels.

    CRT's only update, 24 June 2025.

  2. Cable Bridge East of Salford Junction

    Birmingham & Fazeley CanalWest Midlands

    56 days

    From 8 August 2025

    Reopened 3 October 2025

    Where
    Cable Bridge East of Salford Junction
    CRT reason
    3rd Party Works
    Cause
    Other cause
    Asset
    Bridge

    We have received a further update from National Grid regarding the collapsed bridge. Scaffolding installation within the canal is scheduled to begin tomorrow. This will facilitate the safe dismantling and removal of the bridge structure. The installation is expected to take…

    Latest of 5 CRT updates, 15 September 2025.

  3. Bridge 108, Saltley Viaduct, Birmingham & Warwick Junction Canal

    Birmingham & Warwick Junction CnlWest Midlands

    51 days

    From 14 July 2026

    Reopened 3 September 2026

    Where
    Bridge 97, Roving Bridge Bordesley Junc to M6 Viaduct, Salford Junction
    CRT reason
    Low Water Levels
    Cause
    Someone else's works
    Asset
    Bridge

    Although the planned HS2 works affecting the Saltley Flight have now been completed, the flight will remain closed to navigation until further notice to help protect water resources and maintain water levels across the wider network during the current period of dry weather.…

    Latest of 2 CRT updates, 17 August 2026.

  4. Bridge 62, High Bridge, Mamhilad

    Monmouthshire & Brecon CanalWales and South West

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Bridge 62, High Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Bridge

    Please note the towpath will no longer be closed during these works.

    Latest of 2 CRT updates, 29 June 2025.

  5. Bridge 11, Dratley's Bridge - Near Burton Hastings

    Ashby CanalEast Midlands

    46 days

    From 3 November 2025

    Reopened 19 December 2025

    Where
    Bridge 11, Dratley's Bridge
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Bridge

    Following a review of the works and customer feedback, this stoppage will now commence on 03/11/2025 to align with the start of the Intensive Maintenance Period.

    Latest of 3 CRT updates, 19 September 2025.

  6. Belmont Row Bridge, Birmingham

    Digbeth Branch (Birm'm & Fazeley)West Midlands

    33 days

    From 4 December 2025

    Reopened 6 January 2026

    Where
    Belmont Row Bridge
    CRT reason
    3rd Party Works
    Cause
    Struck by boat or vehicle
    Asset
    Bridge

    Navigation and the towpath remain closed at Belmont Road Bridge while we await confirmation of a repair plan from third-party contractors. A further update will be issued as soon as additional information becomes available.

    Latest of 3 CRT updates, 17 December 2025.

  7. Tat bank Rd Bridge, Oldbury (Stoney lane bridge)

    Titford CanalWest Midlands

    25 days

    From 3 November 2025

    Reopened 28 November 2025

    Where
    Tat Bank Bridge
    CRT reason
    3rd Party Works
    Cause
    Someone else's works
    Asset
    Bridge

    A navigational closure is required for third party contractors to carry out routine maintenance to Tat Bank Road Bridge on behalf of Sandwell MBC. The maintenance will require scaffolding to be in place throughout the works which will reduce the bridges headroom.

    CRT's only update, 6 May 2025.

  8. Schenectady Works Pipe Bridge No 2, Schenectady Works Pipe Bridge No 1 & Schenectady Works Road Bridge, Four Ashes, Calf Heath, Wolverhampton

    Staffordshire & Worcestershire CnlWest Midlands

    25 days

    From 24 November 2025

    Reopened 19 December 2025

    Where
    Bridge 77 Calf Heath Bridge to Four Ashes Bridge No. 78A
    CRT reason
    3rd Party Works
    Cause
    Someone else's works
    Asset
    Bridge

    Unfortunately, the third-party contractors carrying out the towpath refresh as part of the West Midlands Interchange Scheme between Four Ashes Bridge (78a) and Calf Heath Bridge (77) have informed us that they are not in a position to complete these works. The originally…

    Latest of 3 CRT updates, 6 November 2025.

  9. Bridge 22, Burntacres Bridge

    Rochdale CanalYorkshire and North East

    25 days

    From 2 February 2026

    Reopened 27 February 2026

    Where
    Lock 13 to Lock 14
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Bridge

    Following a recent review, we're now confident that the works can be completed within a shorter stoppage window. The revised stoppage dates are 2nd February to 27th February.

    Latest of 3 CRT updates, 3 November 2025.

  10. Lock 24 West

    Huddersfield Narrow CanalNorth West

    19 days

    Fully shut 19 of CRT's 29 days

    From 28 August 2026

    Restriction from 16 September 2026

    Now a restriction: boats can pass, with limits

    Where
    Lock 24 West
    CRT reason
    Repair
    Cause
    Worn out
    Asset
    Bridge

    Following our previous update, our team is still awaiting delivery of the replacement footbridge and the scaffolding required to carry out the works. Once these have been delivered and the scaffolding erected, we will be able to confirm a date for the repair. In the meantime…

    Latest of 5 CRT updates, 16 September 2026.

  11. West Park Bridge 5. Multi-use footbridge connecting West Park to Broad Street in Long Eaton.

    Erewash CanalEast Midlands

    14 days

    From 27 February 2026

    Reopened 13 March 2026

    Where
    Lock 61 - Long Eaton to Fixed Weir 5A
    CRT reason
    3rd Party Works
    Cause
    Someone else's works
    Asset
    Bridge

    A navigation and towpath closure is required to facilitate the removal of the existing footbridge, in preparation for its replacement with a modern, curving footbridge which will open up and enhance the canal and local area. This is a government-funded, local authority delivered…

    CRT's only update, 16 September 2025.

  12. Bridge 23 Cooper Bridge Viaduct on the River Calder. Between Battye Cut and Lk16 Cooper Bridge - Removed and reopened

    Calder & Hebble NavigationYorkshire and North East

    14 days

    From 11 June 2026

    Reopened 25 June 2026

    CRT's title says reopened

    Where
    Lock 16, Cooper Bridge to Flood Gates, Battyeford
    CRT reason
    Underwater Obstruction
    Cause
    Broke, cause not given
    Asset
    Bridge

    Network Rail have completed the repairs and the removal of the stonework from the river. The navigation has been reopened for passage.

    Latest of 7 CRT updates, 25 June 2026.

  13. Dunstall Farm Bridge, Coventry Canal

    Coventry CanalWest Midlands

    14 days

    From 12 September 2026

    No reopening date

    Still shut

    Where
    Dunstall Bridge
    CRT reason
    Vehicle Incident
    Cause
    Struck by boat or vehicle
    Asset
    Bridge

    Please be advised that the navigation is currently closed following a bridge strike. The offside parapet of the bridge has been damaged and is now leaning towards the canal. Due to the condition of the structure and the potential risk to passing boats and customers, the…

    CRT's only update, 12 September 2026. 14 days without another.

  14. Railway Bridge 2 next to Colne Bridge Lock, Colne Bridge

    Huddersfield Broad CanalYorkshire and North East

    12 days

    From 22 July 2025

    Reopened 3 August 2025

    Where
    Lock 2, Colne Bridge Lock to Lock 1
    CRT reason
    3rd Party Works
    Cause
    Someone else's works
    Asset
    Bridge

    A navigation and towpath closure are required to allow Third Party Contractors working on behalf of Network Rail to install a new bridge deck. A pontoon crash deck is required over the canal to prevent debris falling into the watercourse or onto public on the towpath. These…

    CRT's only update, 1 May 2025.

  15. Navigation and Towpath Closure; Between Bridge 30 and Bridge 32, Lancaster Canal

    Lancaster CanalNorth West

    10 days

    From 1 July 2025

    Reopened 11 July 2025

    Where
    Bridge 30, Roots Bridge to Bridge 32, Swillbrook Bridge
    CRT reason
    Vehicle Incident
    Cause
    Struck by boat or vehicle
    Asset
    Bridge

    Navigation and towpath are back open between Bridge 30 and Bridge 32 on the Lancaster Canal. We ask all customers to proceed with caution on tick over through Bridge 31, due to some remnants of the bridge's masonry remaining in the water. Our specialist teams are currently…

    Latest of 6 CRT updates, 9 July 2025.

  16. Bridge 31, Stone Chimney Bridge

    Lancaster CanalNorth West

    8 days

    From 2 September 2025

    Reopened 10 September 2025

    Where
    Bridge 31, Stone Chimney Bridge
    CRT reason
    Repair
    Cause
    Struck by boat or vehicle
    Asset
    Bridge

    Our engineers have removed the overhanging masonry blocks from the top of the bridge and have installed concrete barriers on bridge to prevent vehicle access, allowing us to re-open our towpath. Navigation remains closed at Bridge 31 whilst our specialist team complete the…

    Latest of 2 CRT updates, 5 September 2025.

  17. Dimmingsdale Bridge, Bridge 53

    Staffordshire & Worcestershire CnlWest Midlands

    5 days

    From 22 June 2025

    Reopened 27 June 2025

    Where
    Lock 28 Dimmingsdale Lock to Lock 29 Wightwick Lock
    CRT reason
    Vehicle Incident
    Cause
    Struck by boat or vehicle
    Asset
    Bridge

    Due to a road traffic accident at Dimmingsdale Bridge on 22.06.2025, there is significant debris in the canal, preventing boat passage. Sections of one bridge parapet are unstable and the towpath is also closed under the bridge as a result. The remaining brickwork of the bridge…

    CRT's only update, 22 June 2025.

  18. Bridge 8 Nanney's Bridge

    Middlewich Branch (Shrop Union)North West

    5 days

    From 3 May 2026

    Reopened 8 May 2026

    Where
    Bridge 8, Nanney's Bridge
    CRT reason
    Vehicle Incident
    Cause
    Struck by boat or vehicle
    Asset
    Bridge

    Following a recent collision at Bridge 8 (Nanney's Bridge) on the Middlewich Branch of the Shropshire Union Canal, Cheshire East Highways closed the road as a precaution to help keep everyone safe. Although barriers were put in place, they have unfortunately been repeatedly…

    Latest of 2 CRT updates, 8 May 2026.

  19. HS2 Oxford Canal Viaduct, nearest structure is OX-057-002, Wormleighton, Warwickshire

    Oxford CanalWest Midlands

    4 days

    From 9 March 2026

    Reopened 13 March 2026

    Where
    Bridge 127, Stoneton Bridge to Bridge 128, Willisons Bridge
    CRT reason
    3rd Party Works
    Cause
    Someone else's works
    Asset
    Bridge

    After completing a further on site review, the HS2 contractor has advised that the works can be delivered during a one‑week stoppage. As a result, the revised dates are 9 March to 13 March 2026.

    Latest of 3 CRT updates, 27 February 2026.

  20. Bridge 1, Manchester Road Bridge

    South DockLondon and South East

    4 days

    From 16 February 2026

    Reopened 20 February 2026

    Where
    Bridge 1, Manchester Road Bridge to West India Dock Entrance Lock
    CRT reason
    Repair
    Cause
    Planned works
    Asset
    Bridge

    Following an on-site review, we are pleased to confirm that these works can now be completed within a shorter timeframe. The works will take place over two week-long stoppages, scheduled for 16–20 February and 2–6 March.

    Latest of 2 CRT updates, 9 January 2026.

  21. Bridge 75, Ratcliffe Bridge

    Lancaster CanalNorth West

    4 days

    From 4 November 2025

    Reopened 8 November 2025

    Where
    Bridge 75, Ratcliffe Bridge
    CRT reason
    Vehicle Incident
    Cause
    Struck by boat or vehicle
    Asset
    Bridge

    The navigation and towpath remains closed at Bridge 75, Ratcliffe Bridge, on the Lancaster Canal. Our teams are currently on site removing the remaining blocks and railings that fell into the navigation following a vehicle impact with the bridge. These works are expected to be…

    Latest of 2 CRT updates, 6 November 2025.

  22. Bridge 8 Nanney's Bridge

    Middlewich Branch (Shrop Union)North West

    4 days

    From 18 May 2026

    Reopened 22 May 2026

    Where
    Hollingshead Winding Hole to Winding Hole - Cholmondeston
    CRT reason
    Vehicle Incident
    Cause
    Struck by boat or vehicle
    Asset
    Bridge

    Our teams have reinstalled the barriers at Bridge 8, Nanney's Bridge, to prevent road traffic from using the bridge and have put diversion routes in place. Initial inspections have now been completed, and the team are now on site carrying out repairs to the damaged bridge. A…

    Latest of 2 CRT updates, 20 May 2026.

  23. Bridge 75A, Grimshaws lane

    Rochdale CanalNorth West

    3 days

    From 4 July 2025

    Reopened 7 July 2025

    Where
    Bridge 75A, Grimshaw Lane Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Bridge

    Navigation is currently closed at Bridge 75A, Grimshaw's Lane on the Rochdale Canal due to an electrical fault with a failed sensor. Our specialist team are sourcing a replacement part and we expect it to be on site and repaired on Sunday 5 July. An update will be provided…

    CRT's only update, 4 July 2025.

  24. HS2 Oxford Canal Viaduct, nearest structure is OX-057-002, Wormleighton, Warwickshire

    Oxford CanalWest Midlands

    2 days

    From 12 November 2025

    Reopened 14 November 2025

    Where
    Bridge 127, Stoneton Bridge to Bridge 128, Willisons Bridge
    CRT reason
    3rd Party Works
    Cause
    Someone else's works
    Asset
    Bridge

    The contractor building the HS2 viaduct over the Oxford Canal no longer requires the full duration of the November 2025 navigation stoppage to undertake their planned works. The works will start on 12 November 2025 instead of 3 November 2025. Post Christmas stoppage of the canal…

    Latest of 2 CRT updates, 31 October 2025.

  25. HS2 Longhole Viaduct, Ufton, Warwickshire

    Grand Union CanalWest Midlands

    2 days

    From 4 March 2026

    Reopened 6 March 2026

    Where
    Bridge 30, Welsh Road to Lock 19, Wood Lock
    CRT reason
    3rd Party Works
    Cause
    Someone else's works
    Asset
    Bridge

    We're pleased to let you know that the works at HS2 Longhole Viaduct have been completed ahead of schedule, and the navigation is now open.

    Latest of 3 CRT updates, 6 March 2026.

  26. Navigation Closure; Between Lock 18 and Lock 10, Ashton Canal

    Ashton CanalNorth West

    2 days

    From 10 June 2025

    Reopened 12 June 2025

    Where
    Lock 18 to Lock 10
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Bridge

    Please be advised that navigation remains closed between Lock 10 and Lock 18 on the Ashton Canal due to a mechanical fault at Bridge 15. Our teams attended the site again today and will return tomorrow. We are currently sourcing the necessary materials and are hopeful that…

    Latest of 2 CRT updates, 11 June 2025.

  27. Bridge 33, Glovers Bridge, Rufford

    Leeds & Liverpool CanalNorth West

    2 days

    From 24 September 2026

    No reopening date

    Still shut

    Where
    Bridge 33, Glovers Swing Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Bridge

    Navigation is currently closed at Bridge 33 Glovers Bridge, Rufford on the Leeds & Liverpool Canal due to a hydraulic leak making the bridge inoperable. Our engineers have attended site today to carry out inspections and have ordered the parts required to carry out the repairs.…

    CRT's only update, 24 September 2026. 2 days without another.

  28. Bridgewater Road Bridge, Stratford Marsh

    Waterworks RiverLondon and South East

    1 day

    From 17 June 2025

    Reopened 18 June 2025

    Where
    Northern Outfall Sewer Bridge to Railway Bridge Over Waterworks River
    CRT reason
    3rd Party Works
    Cause
    Someone else's works
    Asset
    Bridge

    We have been informed by the Third party that after reviewing their method of work, they need to complete phases 3 and 4 of these works as daytime closures rather than nighttime closures. The new dates for this closure are the 17 and 18 June 2025.

    Latest of 2 CRT updates, 1 May 2025.

  29. Proposed bridge location is near the Trent Basin (North Bank - Easting 458870, Northing 338836, South Bank, Easting 458863, Northing 338741)

    River TrentEast Midlands

    1 day

    From 10 November 2025

    Reopened 11 November 2025

    Where
    Bridge 13, Lady Bay Bridge to Bridge 13A, Sailing Club Continuation
    CRT reason
    3rd Party Works
    Cause
    Someone else's works
    Asset
    Bridge

    We're pleased to announce that the third-party works at this location have been completed ahead of schedule. Both the navigation and towpath are now open.

    Latest of 2 CRT updates, 11 November 2025.

  30. Bridge 16, Bells Lane

    Leeds & Liverpool CanalNorth West

    1 day

    From 2 July 2025

    Reopened 3 July 2025

    Where
    Bridge 16, Bells Lane Swing Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Bridge

    Navigation is currently closed at Bridge 16, Bells Lane on the Leeds & Liverpool due to an electrical fault with the bridge. Our contractors have been informed and are on their way to site. An update will be provided Thursday 3 July.

    CRT's only update, 2 July 2025.

  31. Leeds & Liverpool Canal, Gallows Bridge, Skipton, Skipton - removal of bridge

    Leeds & Liverpool CanalYorkshire and North East

    1 day

    From 3 November 2025

    Reopened 4 November 2025

    Where
    Bridge 179, Gallows Footbridge
    CRT reason
    3rd Party Works
    Cause
    Planned works
    Asset
    Bridge

    This section of navigation will be closed whilst the bridge is removed to be taken away and upgraded. This will be done overnight, so will no cause no inconvenience to boaters.

    CRT's only update, 28 October 2025.

  32. Gallows Bridge, Skipton

    Leeds & Liverpool CanalYorkshire and North East

    1 day

    From 15 December 2025

    Reopened 16 December 2025

    Where
    Bridge 179, Gallows Footbridge
    CRT reason
    3rd Party Works
    Cause
    Planned works
    Asset
    Bridge

    The new Gallows bridge is to be lifted into place overnight on Monday, 15th December, into the morning of Tuesday, 16th December. The canal will be closed in the location of the bridge from approximately 16.00 until the bridge lift is completed. The canal will be open from 06.00…

    CRT's only update, 9 December 2025.

  33. Sykehouse Lock Road Bridge- Out of Action

    New Junction CanalYorkshire and North East

    1 day

    Fully shut 1 of CRT's 3 days

    From 28 April 2026

    Reopened 1 May 2026

    Where
    Sykehouse Lock
    CRT reason
    Repair
    Cause
    Worn out
    Asset
    Bridge

    Sykehouse Lock has been repaired and it is back to boater operation.

    Latest of 5 CRT updates, 1 May 2026.

  34. Bridge 8 Nanney's Bridge

    Middlewich Branch (Shrop Union)North West

    1 day

    From 14 May 2026

    Reopened 15 May 2026

    Where
    Hollingshead Winding Hole to Winding Hole - Cholmondeston
    CRT reason
    Vehicle Incident
    Cause
    Struck by boat or vehicle
    Asset
    Bridge

    Following a vehicle strike on Bridge 8, Nanney's Bridge, robust barriers were installed to prevent road traffic from accessing the bridge, and diversion routes were put in place. These have since been moved. Until these barriers are reinstated, the towpath and navigation will…

    CRT's only update, 14 May 2026.

  35. Loose electric cables at Bridge 6, Commercial Road

    Limehouse CutLondon and South East

    1 day

    From 20 July 2026

    Reopened 21 July 2026

    Where
    Bridge 6, Commercial Road (A13)
    CRT reason
    3rd Party Works
    Cause
    Other cause
    Asset
    Bridge

    Following a report that electric cables have come loose from the bridge and are hanging across the navigation, we have placed a closure at this bridge to ensure the safety of boaters. The bridge belongs to a third party and they will be fixing the issue. Please avoid passage…

    CRT's only update, 20 July 2026.

  36. Liverpool Link At Jesse Hartley Way, Central Docks, Channel Bridge

    Liverpool LinkNorth West

    1 day

    From 2 September 2026

    Reopened 3 September 2026

    Where
    Central Docks Channel New Bridge
    CRT reason
    3rd Party Works
    Cause
    Someone else's works
    Asset
    Bridge

    Third party contractors will be on site at the Liverpool Link, at Jesse Hartley Way, Central Docks, Channel Bridge on Wednesday 2 September from 8.00am to Thursday 3 September 6pm, The works involves lifting and positioning bridge support beams onto the abutments, this will take…

    CRT's only update, 20 August 2026.

  37. Bridgewater Road Bridge, Stratford Marsh

    Waterworks RiverLondon and South East

    same day

    From 19 September 2025

    Reopened 19 September 2025

    Where
    Northern Outfall Sewer Bridge to Railway Bridge Over Waterworks River
    CRT reason
    3rd Party Works
    Cause
    Someone else's works
    Asset
    Bridge

    We have been informed by the Third party that after reviewing their method of work, phase 4 of 4, removal of the temporary bridge, will now take place on the 19 September between 6:00 and 21:00. The navigation and towpath will be closed between these times.

    Latest of 3 CRT updates, 23 June 2025.

  38. Accommodation bridge 10

    Hertford Union CanalLondon and South East

    2 days

    From 28 May 2025

    Ended 30 May 2025

    Restriction, not a full closure

    Where
    Accommodation Bridge 10
    CRT reason
    3rd Party Works
    Cause
    Someone else's works
    Asset
    Bridge

    To improve local pedestrian and cycle infrastructure over the canal in Hackney Wick. The existing footbridge at the junction of the Hertford Union Canal and the River Lea has been removed and is due to be replaced with a higher capacity structure. The works will involve closing…

    CRT's only update, 6 May 2025.

  39. Navigation Closure , Tunnel End rail bridge, Huddersfield Narrow Canal - Overnight coring works

    Huddersfield Narrow CanalYorkshire and North East

    5 days

    From 18 May 2025

    Ended 23 May 2025

    Restriction, not a full closure

    Where
    Bridge 61,Tunnel End Railway Bridge.
    CRT reason
    3rd Party Works
    Cause
    Planned works
    Asset
    Bridge

    The navigation will be closed between 20.00 and 06.00 each night between 19 May and 23 May due to coring works taking place.

    CRT's only update, 9 May 2025.

  40. Bridgewater Road Bridge, Stratford Marsh

    Waterworks RiverLondon and South East

    same day

    From 1 August 2025

    Reopened 1 August 2025

    Where
    Northern Outfall Sewer Bridge to Railway Bridge Over Waterworks River
    CRT reason
    3rd Party Works
    Cause
    Someone else's works
    Asset
    Bridge

    Phase 3 of 4 - Installation of a new road bridge. Following on from the phase 1 and 2 works that were completed last winter, Phase 3, which is the installation of the new road bridge will be taking place on the 1st August 2025 between the hours on 6:00 and 21:00. The navigation…

    CRT's only update, 20 June 2025.

  41. Bridge 31

    Lancaster CanalNorth West

    same day

    From 16 July 2025

    Reopened 16 July 2025

    Where
    Bridge 31, Stone Chimney Bridge
    CRT reason
    Inspections
    Cause
    Struck by boat or vehicle
    Asset
    Bridge

    Navigation will be closed at Bridge 31 on the Lancaster Canal on Wednesday 16 July between 08.00 and 16.00 for our specialist teams to complete the removal of the remaining masonry blocks from the navigation, following on from the previous vehicle strike.

    CRT's only update, 14 July 2025.

  42. Navigation Closure - Huddersfield Narrow Canal, HN-013-001 Rail bridge (rail bridge outside Standedge Visitor Centre), Standedge

    Huddersfield Narrow CanalYorkshire and North East

    4 days

    From 15 September 2025

    Ended 19 September 2025

    Restriction, not a full closure

    Where
    Bridge 61,Tunnel End Railway Bridge.
    CRT reason
    3rd Party Works
    Cause
    Someone else's works
    Asset
    Bridge

    Network Rail be carrying out core sampling to the bridge on a night time closure work shift. This will be on Monday 15th September, Tuesday 16th September, Wednesday 16th September and Thursday 17th September from the hours of 11pm to 7am the following day.

    CRT's only update, 20 August 2025.

  43. Tunnel End Rail Bridge - Huddersfield Narrow

    Huddersfield Narrow CanalYorkshire and North East

    14 days

    From 15 September 2025

    Ended 29 September 2025

    Restriction, not a full closure

    Where
    Bridge 61,Tunnel End Railway Bridge.
    CRT reason
    3rd Party Works
    Cause
    Someone else's works
    Asset
    Bridge

    Network rail contractors are carrying out coring works on the rail bridge. This will mean the canal is closed each night 22.00 to 06.00

    CRT's only update, 11 September 2025.

  44. Between Chalk Bridge 27 and Bleak Hall Bridge (A406) 28

    Lee NavigationLondon and South East

    9 days

    From 11 November 2025

    Ended 20 November 2025

    Restriction, not a full closure

    Where
    Bridge 27, Chalk Bridge to Bridge 28, Bleak Hall Bridge (A406)
    CRT reason
    3rd Party Works
    Cause
    Someone else's works
    Asset
    Bridge

    Construction of new Road Bridge over Lee Navigation (Phase 1 - Install Steel beams/Decking). During crane lifting operations the works will be carried out under night-time navigation & Towpath closures between 11pm – 6am. Advanced warning signage positioned either side of works…

    CRT's only update, 7 October 2025.

  45. Manchester Road Bridge

    South DockLondon and South East

    same day

    From 14 February 2026

    Reopened 14 February 2026

    Where
    Bridge 1, Manchester Road Bridge
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Bridge

    A one-day stoppage is required to carry out an upgrade to the bridge's electrical supply.

    CRT's only update, 9 October 2025.

  46. Between Bridge 30 to Bridge 32

    Lancaster CanalNorth West

    same day

    From 3 February 2026

    Reopened 3 February 2026

    Where
    Bridge 30, Roots Bridge to Bridge 32, Swillbrook Bridge
    CRT reason
    Vehicle Incident
    Cause
    Struck by boat or vehicle
    Asset
    Bridge

    The towpath and navigation are currently closed between Bridge 30 and Bridge 32 on the Lancaster Canal due to a vehicle strike at Bridge 31. Our local operations team and engineers have been notified and are on way to site to assess the damage. An update will be provided on…

    CRT's only update, 3 February 2026.

  47. Woodside Bridge to Round Oak (2) Bridge, Dudley, Brierley Hill

    Dudley No 1 CanalWest Midlands

    33 days

    From 4 June 2026

    Ended 7 July 2026

    Restriction, not a full closure

    Where
    Round Oak (2) Bridge to Woodside Bridge
    CRT reason
    3rd Party Works
    Cause
    Someone else's works
    Asset
    Bridge

    Third-party contractors working on the Wednesbury to Brierley Hill Metro extension will be carrying out night-time works to install a new bridge over the canal as part of the new Metro line. To facilitate these works, the canal will be closed at night only from: 04/06/26 at…

    CRT's only update, 12 May 2026.

  48. Northern Powergrid planned outage at Kirkhouse Green Bridge on the Wednesday 19th August from 08:30hrs to 16:30hrs

    New Junction CanalYorkshire and North East

    same day

    From 19 August 2026

    Reopened 19 August 2026

    Where
    Kirkhouse Green Lift Bridge 4
    CRT reason
    Information
    Cause
    Someone else's works
    Asset
    Bridge

    Northern Powergrid have got a planned outage to carry out works. Kirkhouse Green Bridge will not be able to operate on the Wednesday 19th August from 08:30hrs to 16:30hrs.

    CRT's only update, 6 August 2026.

  49. Northern Powergrid Planned outage at Low Lane Bridge on Wed 19th August from 08:30 - 16:30hrs

    New Junction CanalYorkshire and North East

    same day

    From 19 August 2026

    Reopened 19 August 2026

    Where
    Low Lane Swing Bridge 2
    CRT reason
    Information
    Cause
    Someone else's works
    Asset
    Bridge

    Northern Powergrid have got a planned outage to carry out works. Low Lane Bridge will not be able to operate on the Wednesday 19th August from 08:30hrs to 16:30hrs.

    CRT's only update, 6 August 2026.

  50. Northern Powergrid planned outage to Top Lane Bridge on the Wednesday 19th August from 08:30hrs - 16:30hrs

    New Junction CanalYorkshire and North East

    same day

    From 19 August 2026

    Reopened 19 August 2026

    Where
    Top Lane Lift Bridge 3
    CRT reason
    Information
    Cause
    Someone else's works
    Asset
    Bridge

    Northern Powergrid have got a planned outage to carry out works. Top Lane Bridge will not be able to operate on the Wednesday 19th August from 08:30hrs to 16:30hrs.

    CRT's only update, 6 August 2026.

Coming up

Scheduled but not yet started, so in no figure above.

12 scheduled.
ClosureFromPlanned
Navigation Closure - Dudley No 1 Canal, Canal and Towpath from Round Oak (2) Bridge to Woodside Bridge , Dudley DY5 1LJ
Dudley No 1 Canal · 3rd Party Works
5 October 20265 days
Bridge 179C, Union Footbridge, Skipton
Leeds & Liverpool Canal · 3rd Party Works
2 November 202646 days
Bridge 108F Saltley Underbridge ( High Speed 2 )
Birmingham & Warwick Junction Cnl · 3rd Party Works
2 November 2026130 days
Bridge 128 Willison's Bridge, Wormleighton
Oxford Canal · 3rd Party Works
2 November 2026130 days
Curzon Viaduct (High Speed 2) Curzon Street Birmingham
Digbeth Branch (Birm'm & Fazeley), Grand Union Canal · 3rd Party Works
25 November 2026107 days
Bridge 61, White Bridge near Rowington
Grand Union Canal · Repair
4 January 202767 days
Bridge 70, Wolseley Bridge
Trent & Mersey Canal · 3rd Party Works
4 January 202767 days
High Orchard Bridge, St Annes Way, Gloucester
Gloucester & Sharpness Canal · Repair
18 January 202718 days
Bridge 31, Oblique Bridge, St Pancras, London
Regent's Canal · 3rd Party Works
29 January 202742 days
Bridge 11A - Manchester City
Ashton Canal · 3rd Party Works
1 February 20276 days
Between Lock 8, Branston Lock & Bridge 33E, Ordish Bridge
Trent & Mersey Canal · 3rd Party Works
1 March 20274 days
Bridge 37, Railway Bridge replacement, Dewsbury Arm - Calder & Hebble Canal
Dewsbury Arm (Calder & Hebble Nav) · 3rd Party Works
17 April 2027—