Independent. Built from Canal & River Trust's own published notices, with no affiliation to or endorsement by the Trust.
Between Bridge 30 to Bridge 32
A navigation closure on the Lancaster Canal, 3 February 2026 to 3 February 2026 — 0 days.
Source: this notice on canalrivertrust.org.uk
- Waterway
- Lancaster Canal
- Region
- North West
- Started
- 3 February 2026
- Status
- Reopened 3 February 2026
- Days shut
- same day
- CRT reason
- Vehicle Incident
- Cause
- Struck by boat or vehicle
- Asset
- Bridge
Cause and asset are read from the notice prose, not CRT fields; the reason above is CRT's own.
What CRT said it was for
Following the earlier vehicle strike at Bridge 32 on the Lancaster Canal our team and engineers have attended site and assessed the bridge and confirmed there is minimal damage therefore we are now opening navigation and towpath, following this inspection.
Where
- Lancaster Canal: Bridge 30, Roots Bridge to Bridge 32, Swillbrook Bridge
Updates · 1
0 days with no update after the last one.
3 February 2026 · 0 days since the previous
The towpath and navigation are currently closed between Bridge 30 and Bridge 32 on the Lancaster Canal due to a vehicle strike at Bridge 31. Our local operations team and engineers have been notified and are on way to site to assess the damage. An update will be provided on Friday 6 February, following a full inspection of the bridge and a method of repair.
Cite this: Canal closures, “Between Bridge 30 to Bridge 32”, https://crt-stoppages.pages.dev/notice/019c23d2-f15a-7c45-a808-000993a29477.
Every closure on Lancaster Canal · Download the data · Method and limits