On record
49 notices since May 2025: 47 closures, 1 restriction and 1 not yet started

In force today

1 closure of this kind is in force today, longest shut first. Filter the explorer to them.

Shut today, counted to today.
CanalWhereSinceDays shut
Stainforth & Keadby CanalGodnow Swing Bridge25 September 20261

By canal

14 canals have had a closure of this kind. A closure naming two canals counts on both.

Closures of this kind on each canal since May 2025, most first.
CanalClosures
Leeds & Liverpool Canal15
Kennet & Avon Canal6
Stainforth & Keadby Canal5
Grand Union Canal4
Llangollen Canal4
Market Harborough Arm (GU Cnl)3
Gloucester & Sharpness Canal2
Macclesfield Canal2
New Junction Canal2
Selby Canal2
Pocklington Canal1
River Ouse1
Show 2 moreShow fewer
CanalClosures
Rochdale Canal1
Weaver Navigation1

Every closure on record

Showing 47 closures and 1 restriction involving a swing bridge.

Period

Rank by

Population

10 closures are in neither group: 10 unplanned with no day in the cruising season since May 2025.

Status

Duration

Cause

Asset affected

CRT reason

Region

47
closures
114
closure-days since May 2025
95
in cruising season
1
no reopening date
What these figures mean
Population
Which closures a figure counts. All closures is everything; Unplanned closure drops the works CRT flags as its winter programme and any day outside the cruising season (the Friday nearest 15 March to the Sunday before the first Monday in November). Scheduled work CRT does not flag as winter works still counts here. CRT Planned closure is the flagged winter programme alone.
Defensible duration
The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
Closure-days
One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals. They are counted from 1 May 2025, when this archive begins: a closure that started earlier adds only its days since then, though its own row shows its whole length. Every figure and chart counts only the days inside the Period chosen above them.
In force
A closure is in a Period, and a day is one a closure affected, if it was in force at any time that day, including the morning it reopened. Closure-days measure how long, so they count whole days and not the reopening day: a closure can be in a Period and add no closure-day to it.

Closures in force each month

closures active during the month
2
6
5
5
1
1
2
4
3
2
2
1
6
3
3
1
1
May 25Jun 25Jul 25Aug 25Sep 25Oct 25Nov 25Dec 25Jan 26Feb 26Mar 26Apr 26May 26Jun 26Jul 26Aug 26Sep 26

Canals ranked by the season's closures

share of the period's cruising-season days up to today — a closure somewhere on a long canal is likelier, and does not mean the canal was impassableclosures in force on the period's cruising-season days — a longer canal has more to go wrong on

Where

closure-days by regionclosures by region

A region with more canal has more to go wrong on, so these totals partly measure its size. Regions compared by length of canal are on the Reliability page.

What causes them

closure-days by causeclosures by cause

CRT's reason

closure-days by the reason CRT filedclosures by the reason CRT filed

What fails on a lock

closure-days by part — unplanned lock failures naming a partclosures by part — unplanned lock failures naming a part

How long they last

closures by full length, including any days before May 2025 — the bands are not equal in width
28
17
2
0
0
0
<=1d2-7d8-30d31-90d91-365d>365d
48 results · every closure involving a swing bridgeJump to list

Closures

  1. Swingbridge 7 - Closed (Unable to swing)

    Pocklington CanalYorkshire and North East

    19 days

    From 26 June 2025

    Reopened 15 July 2025

    Where
    Swingbridge 7
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Swingbridge 7 is unable to swing due to a fault with the pintle and is currently inoperable. Mechanical & Electrical team have notified us that they will be attending site to start work on Thursday, 3rd July. They anticipate that works will last 2-3 weeks. We will update this…

    Latest of 2 CRT updates, 30 June 2025.

  2. PLANNED CLOSURE - Bridge 181 Snaygill Swing Bridge

    Leeds & Liverpool CanalYorkshire and North East

    16 days

    From 5 May 2026

    Reopened 21 May 2026

    Where
    Bridge 181, Snaygill Swing Bridge
    CRT reason
    Maintenance
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Notice – Bridge 181 (Snaygill Swing Bridge) Please be advised that Bridge 181, Snaygill Swing Bridge, will be closed from Tuesday 5th May to Friday 22nd May. Essential works have been scheduled during this period, including pintle refurbishment and bearing replacement, due to…

    CRT's only update, 27 April 2026.

  3. Selby Swingbridge - Assisted passage daily 9am to 12 noon - Update: Closure

    Selby CanalYorkshire and North East

    7 days

    Fully shut 7 of CRT's 9 days

    From 12 August 2025

    Reopened 21 August 2025

    Where
    Selby Swingbridge 1
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Unfortunately no further information has been received, so the status of Selby Swingbridge is still closed. On receiving any further information, the notice will be updated.

    Latest of 3 CRT updates, 20 August 2025.

  4. Out of Service - Bridge 147, Wink Well Swing bridge, Bourne End

    Grand Union CanalLondon and South East

    6 days

    From 7 August 2026

    Reopened 13 August 2026

    Where
    Bridge 147, W'Well Swingbridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    We are pleased to advise a repair has been completed and the bridge is now operational. Thank you for your patience whilst the work was undertaken.

    Latest of 4 CRT updates, 13 August 2026.

  5. Winkwell Swing Bridge 147

    Grand Union CanalLondon and South East

    5 days

    From 23 May 2025

    Reopened 28 May 2025

    Where
    Bridge 147, W'Well Swingbridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Winkwell Swing Bridge has failed and a repair is not possible until Wednesday 28th May. Unfortunately the Bridge is inoperable until this repair is made

    CRT's only update, 23 May 2025.

  6. Bridge 188, Grange Swing Bridge - Planned Closure

    Leeds & Liverpool CanalYorkshire and North East

    4 days

    From 23 June 2025

    Reopened 27 June 2025

    Where
    Bridge 188, Grange Swing Bridge
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Swing bridge

    Works commencing 23.06.2025 for 5 days. Bridge will be in canal closed position but the footpath over the bridge is also closed. Works are being carried out due to some additional funding as part of the Silsden to Kildwick towpath works, these works needed to be carried out…

    CRT's only update, 13 June 2025.

  7. Victoria Bridge, Gloucester Docks

    Gloucester & Sharpness CanalWales and South West

    4 days

    From 10 July 2025

    Reopened 14 July 2025

    Where
    Victoria Basin Swing Bridge
    CRT reason
    Repair
    Cause
    Weather
    Asset
    Swing bridge

    Due to hot weather, Victoria Swing bridge will be closed until temperatures drop low enough to reopen it. We have already carried out maintenance works on this bridge to reduce the impact of hot weather on this heritage structure and continue to work on a long term solution. We…

    CRT's only update, 10 July 2025.

  8. Keadby Rail Bridge

    Stainforth & Keadby CanalYorkshire and North East

    4 days

    From 13 November 2025

    Reopened 17 November 2025

    Where
    Bridge 83, Keadby Rail Drawbridge
    CRT reason
    Information
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Network Rail has advised us that Keadby Canal Swing Bridge cannot be opened for boats to pass until further notice due to ongoing signalling issues. The Signalling Team is due to attend site today. This notice will be updated as soon as we receive confirmation from Network Rail…

    CRT's only update, 13 November 2025.

  9. Sutton Weaver Swing Bridge

    Weaver NavigationNorth West

    4 days

    From 8 December 2025

    Reopened 12 December 2025

    Where
    Elsan, Sutton Weaver Swing Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    We're pleased to inform you that works on site have been completed ahead of schedule, and the navigation will be open from 4pm today. Please note, the restriction in the area remains ongoing.

    Latest of 2 CRT updates, 12 December 2025.

  10. Bridge 31 (Woolhampton Swing bridge), Kennet and Avon Canal

    Kennet & Avon CanalWales and South West

    3 days

    From 23 June 2025

    Reopened 26 June 2025

    Where
    Bridge 31,Woolhampton Swingbridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Please be advised that due to an electrical fault, Bridge 31 (Woolhampton Swing Bridge) is currently closed to navigation. Our M and E technicians are aware and will be on site the morning of Tuesday 24th June to carry out repairs. In the meantime, we apologise for any…

    CRT's only update, 23 June 2025.

  11. Bridge 20, Wrenbury Swing Bridge

    Llangollen CanalNorth West

    3 days

    From 5 September 2025

    Reopened 8 September 2025

    Where
    Bridge 20, Wrenbury Bridge
    CRT reason
    Vehicle Incident
    Cause
    Struck by boat or vehicle
    Asset
    Swing bridge

    The navigation is currently closed at Wrenbury Swing Bridge, Bridge 20 on the Llangollen Canal due to a vehicle strike. Our local team have been informed and are in attendance. An update will be provided Monday, 8 September.

    CRT's only update, 5 September 2025.

  12. Winkwell swing bridge

    Grand Union CanalLondon and South East

    3 days

    From 19 December 2025

    Reopened 22 December 2025

    Where
    Bridge 147, W'Well Swingbridge
    CRT reason
    Repair
    Cause
    Other cause
    Asset
    Swing bridge

    The power issue in the local area has been resolved and Winkwell swing bridge is now operational.

    Latest of 3 CRT updates, 22 December 2025.

  13. CLOSED -Selby Toll Road Bridge - Unable to swing

    River OuseYorkshire and North East

    3 days

    From 8 June 2026

    Reopened 11 June 2026

    Where
    Selby Toll Road Bridge
    CRT reason
    Maintenance
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    We have been advised by North Yorkshire County Council that Selby Toll Road Bridge has developed a mechanical fault and is currently unable to swing. As a result, the bridge is closed to all navigation traffic until further notice while the issue is investigated and repaired. We…

    CRT's only update, 8 June 2026.

  14. Low Lane Swing Bridge - Fault on Pedestal

    New Junction CanalYorkshire and North East

    3 days

    From 17 July 2026

    Reopened 20 July 2026

    Where
    Low Lane Swing Bridge 2
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Low Lane Swing Bridge is currently out of order as the close button has broken. Contractors have been appointed and it is hoped that the problem will be rectified as soon as possible. This notice will be updated, once the repair has been completed.

    CRT's only update, 17 July 2026.

  15. Navigation Closure; Bridge 31, New Lane Swing Bridge, Leeds & Liverpool Canal

    Leeds & Liverpool CanalNorth West

    2 days

    From 10 June 2025

    Reopened 12 June 2025

    Where
    Bridge 31, New Lane Swing Bridge
    CRT reason
    Vehicle Incident
    Cause
    Struck by boat or vehicle
    Asset
    Swing bridge

    Navigation remains closed at Bridge 31 on the Leeds & Liverpool Canal due to a vehicle strike. Our engineering team have attended site and are currently sourcing a new barrier from the manufacturers. A further update will be provided Thursday 12 June.

    Latest of 2 CRT updates, 11 June 2025.

  16. Navigation Closure - Stainforth & Keadby Canal, Medge Hall swing bridge, Crowle

    Stainforth & Keadby CanalYorkshire and North East

    2 days

    From 20 August 2025

    Reopened 22 August 2025

    Where
    Medgehall Swing Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Our mechanical Engineers have not been able to attend to site today due to other breakdowns. They will be in attendance on Friday 22nd August.

    Latest of 2 CRT updates, 21 August 2025.

  17. OPENED - Milman Swing Bridge -

    Leeds & Liverpool CanalYorkshire and North East

    2 days

    From 21 March 2026

    Reopened 23 March 2026

    Where
    Bridge 214, Milman Swing Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    The bridge has now been repaired, and power has been restored. The issue is fully resolved, and the bridge is open for passage.

    Latest of 2 CRT updates, 23 March 2026.

  18. CLOSED - Bridge 199, Micklethwaite Swing Bridge, Leeds & Liverpool

    Leeds & Liverpool CanalYorkshire and North East

    2 days

    From 25 May 2026

    Reopened 27 May 2026

    Where
    Bridge 199, Micklethwaite Swing Bridge
    CRT reason
    Information
    Cause
    Weather
    Asset
    Swing bridge

    Now that temperatures have dropped the issue has been resolved and the swing bridge is back open for use as normal.

    Latest of 3 CRT updates, 27 May 2026.

  19. Godnow Swnigbridge

    Stainforth & Keadby CanalYorkshire and North East

    2 days

    From 30 May 2026

    Reopened 1 June 2026

    Where
    Godnow Swing Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Due to an issue with the Hydraulic system at Godnow Swingbridge, Please be advised that the bridge is not operational at this time, We have booked in our contractors for Monday morning to attempt to resolve this issue, Apologies for any inconvenience.

    CRT's only update, 30 May 2026.

  20. Bridge 182A, Bradley Swing Bridge

    Leeds & Liverpool CanalYorkshire and North East

    1 day

    From 30 May 2025

    Reopened 31 May 2025

    Where
    Bridge 182A, Bradley Swing Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    A fault has developed with Bradley Swingbridge, passage through the bridge is not possible at this time. Engineers will be attending on 31/5/25 AM to undertake repairs. We will update this notice by 12:30 on 31/5/25 or when works have been completed.

    CRT's only update, 30 May 2025.

  21. Bridge 31 (Woolhampton Swing bridge). Kennet And Avon

    Kennet & Avon CanalWales and South West

    1 day

    From 4 June 2025

    Reopened 5 June 2025

    Where
    Bridge 31,Woolhampton Swingbridge
    CRT reason
    Vehicle Incident
    Cause
    Struck by boat or vehicle
    Asset
    Swing bridge

    Please be advised that due to Vehicle damage, Bridge 31 (Woolhampton Swing Bridge) is currently closed to navigation. Our M and E technicians are aware and will be on site Thursday 5th June to carry out repairs. In the meantime, we apologise for any inconvenience & invite…

    CRT's only update, 4 June 2025.

  22. Selby Swing Bridge

    Selby CanalYorkshire and North East

    1 day

    From 6 June 2025

    Reopened 7 June 2025

    Where
    Selby Swingbridge 1
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Selby Swing Bridge is currently out of action due to a mechanical fault. Staff are on site. An update will be provided as soon as possible

    CRT's only update, 6 June 2025.

  23. Victoria Bridge.

    Gloucester & Sharpness CanalWales and South West

    1 day

    From 1 July 2025

    Reopened 2 July 2025

    Where
    Victoria Basin Swing Bridge
    CRT reason
    Information
    Cause
    Weather
    Asset
    Swing bridge

    Due to the current hot weather, Victoria Swing Bridge will be closed today. We apologise for any inconvenience this may cause and appreciate your understanding. The bridge will reopen once temperatures have dropped to a safe level. You are welcome to contact us at…

    CRT's only update, 1 July 2025.

  24. Foxton Swing-Bridge

    Market Harborough Arm (GU Cnl)East Midlands

    1 day

    From 7 July 2025

    Reopened 8 July 2025

    Where
    Bridge 4, Foxton Swingbridge
    CRT reason
    Suspected Vandalism
    Cause
    Struck by boat or vehicle
    Asset
    Swing bridge

    We have had to close Foxton Swing Bridge due to a collision which has damaged the barriers. We will be on site tomorrow morning to assess the damage and determine what repairs are required. Please do not use the bridge until the repairs have been completed. We will update this…

    CRT's only update, 7 July 2025.

  25. Bridge 187, Warehouse Swingbridge

    Leeds & Liverpool CanalYorkshire and North East

    1 day

    From 26 July 2025

    Reopened 27 July 2025

    Where
    Bridge 187, Warehouse Swing Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Contractors have attended site and discovered that the issue with the bridge is that the locking mechanism is bent. This locking mechanism needs to be repaired or replaced for the bridge to be reopened. The locking mechanism has been sent off to attempt to repair this, but it is…

    Latest of 2 CRT updates, 26 July 2025.

  26. Bulls Swing Bridge 48

    Kennet & Avon CanalWales and South West

    1 day

    From 6 August 2025

    Reopened 7 August 2025

    Where
    Bridge 48, Bulls Swingbridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Please be advised that the pintel a critical component supporting the swing bridge and enabling its movement—has suffered a mechanical failure. Consequently, the bridge is currently inoperable. The bridge is now positioned at an angle across the navigation, obstructing passage…

    CRT's only update, 6 August 2025.

  27. Handcocks Swing Bridge

    Leeds & Liverpool CanalNorth West

    1 day

    From 27 August 2025

    Reopened 28 August 2025

    Where
    Bridge 9, Handcocks Swing Bridge
    CRT reason
    Repair
    Cause
    Struck by boat or vehicle
    Asset
    Swing bridge

    Following today's road traffic incident, the canal remains closed to boats. Our contractors are already on site and are in the process of sourcing and installing a replacement barrier. We understand this closure may cause inconvenience and appreciate your patience and…

    Latest of 2 CRT updates, 27 August 2025.

  28. Bridge 20, Wrenbury Bridge

    Llangollen CanalNorth West

    1 day

    From 18 November 2025

    Reopened 19 November 2025

    Where
    Bridge 20, Wrenbury Bridge
    CRT reason
    Vehicle Incident
    Cause
    Struck by boat or vehicle
    Asset
    Swing bridge

    Navigation is currently closed at Wrenbury Swing Bridge, Bridge 20 on the Llangollen Canal due to a vehicle strike causing damage to the barriers. Our local team have been informed and are in attendance. An update will be provided tomorrow, Wednesday, 19 November.

    CRT's only update, 18 November 2025.

  29. Bridge 49, Royal Oak Swing Bridge

    Macclesfield CanalNorth West

    1 day

    From 2 December 2025

    Reopened 3 December 2025

    Where
    Bridge 49, Royal Oak Swingbridge
    CRT reason
    Suspected Vandalism
    Cause
    Vandalism
    Asset
    Swing bridge

    Due to suspected vandalism on the lock mechanism at Bridge 49, Royal Oak Swing bridge on the Macclesfield Canal, we've had to temporarily close navigation. Contractors have been instructed to attend. A further update will be provided Wednesday 3 December.

    CRT's only update, 2 December 2025.

  30. Bridge 4, Foxton swing bridge

    Market Harborough Arm (GU Cnl)East Midlands

    1 day

    From 28 December 2025

    Reopened 29 December 2025

    Where
    Bridge 4, Foxton Swingbridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    The fault has now been repaired and the swing bridge is operational once again. The navigation is open to traffic.

    Latest of 2 CRT updates, 29 December 2025.

  31. Bridge 31, New Lane Swing Bridge

    Leeds & Liverpool CanalNorth West

    1 day

    From 15 January 2026

    Reopened 16 January 2026

    Where
    Bridge 31, New Lane Swing Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Navigation is currently closed at Bridge 31, New Lane Swing Bridge on the Leeds & Liverpool Canal due to an electrical fault. Our specialist team have been instructed to attend. An update will be provided tomorrow, Friday 16 January.

    CRT's only update, 15 January 2026.

  32. Foxton Swingbridge 4

    Market Harborough Arm (GU Cnl)East Midlands

    1 day

    From 21 January 2026

    Reopened 22 January 2026

    Where
    Bridge 4, Foxton Swingbridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Foxton Swingbridge on the Market Harborough Arm of the Grand Union Canal is currently closed due to a mechanical issue. We are working to repair this as soon as possible and will update this notice once we have further information.

    CRT's only update, 21 January 2026.

  33. Bridge 9, Handcocks Swing Bridge

    Leeds & Liverpool CanalNorth West

    1 day

    From 26 January 2026

    Reopened 27 January 2026

    Where
    Bridge 9, Handcocks Swing Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Navigation is currently closed at Bridge 9, Handcocks Swing Bridge on the Leeds & Liverpool Canal due to a fault with the hydraulic hose that operates the swing bridge. Our contractors have been informed and will be attending site tomorrow to assess the issue and plan a method…

    CRT's only update, 26 January 2026.

  34. Bridge 49, Royal Oak Swing Bridge on the Macclesfield Canal

    Macclesfield CanalNorth West

    1 day

    From 18 February 2026

    Reopened 19 February 2026

    Where
    Bridge 49, Royal Oak Swingbridge
    CRT reason
    Vehicle Incident
    Cause
    Struck by boat or vehicle
    Asset
    Swing bridge

    Navigation is currently closed at Bridge 49, Royal Oak Swing Bridge, Macclesfield Canal due to a technical fault caused from recent vehicle strike. Specialist contractors will be in attendance tomorrow to assess and repair. An update will be provided on Thursday 19 February.

    CRT's only update, 18 February 2026.

  35. Winkwell Swing Bridge

    Grand Union CanalLondon and South East

    1 day

    From 23 February 2026

    Reopened 24 February 2026

    Where
    Bridge 147, W'Well Swingbridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Due to damage to the barrier boats will not be able to get through until a repair has been completed. Thank you for your patience.

    CRT's only update, 23 February 2026.

  36. Wrenbury Bridge, Bridge 20

    Llangollen CanalNorth West

    1 day

    From 1 June 2026

    Reopened 2 June 2026

    Where
    Bridge 20, Wrenbury Bridge
    CRT reason
    Vehicle Incident
    Cause
    Struck by boat or vehicle
    Asset
    Swing bridge

    Navigation is currently closed at Wrenbury Swing Bridge, Bridge 20 on the Llangollen Canal due to a vehicle strike. Our local team have been informed and are in attendance. An update will be provided on or before Wednesday, 3 June.

    CRT's only update, 1 June 2026.

  37. Closed - Bridge 209, Dock Swing Bridge Leeds & Liverpool Canal

    Leeds & Liverpool CanalYorkshire and North East

    1 day

    From 26 June 2026

    Reopened 27 June 2026

    Where
    Bridge 209, Dock Swing Bridge
    CRT reason
    Maintenance
    Cause
    Weather
    Asset
    Swing bridge

    Due to the high temperatures causing a malfunction, Bridge 209 – Dock Swing Bridge is currently closed and will be inspected tomorrow, Saturday 27th June. Our team will attend the site in the morning to carry out the necessary checks and ensure the bridge is safe to reopen. We…

    CRT's only update, 26 June 2026.

  38. Sykehouse Lock

    New Junction CanalYorkshire and North East

    1 day

    From 19 July 2026

    Reopened 20 July 2026

    Where
    Sykehouse Lock
    CRT reason
    Maintenance
    Cause
    Planned works
    Asset
    Swing bridge

    Sykhouse Lock Closure Notice Date: Sunday, 19 July 2026 From 3:00 pm on Sunday, 19 July 2026, Sykhouse Lock will be temporarily closed to allow essential maintenance to be carried out on the swing bridge crossing the lock. A member of the Canal & River Trust will be on site from…

    CRT's only update, 19 July 2026.

  39. Godnow Swingbridge - barriers are not working

    Stainforth & Keadby CanalYorkshire and North East

    1 day

    From 25 September 2026

    No reopening date

    Still shut

    Where
    Godnow Swing Bridge
    CRT reason
    Repair
    Cause
    Not read yet
    Asset
    Swing bridge

    Godnow Swing Bridge is currently closed as the barriers are not functionally correctly. The barriers have been isolated and the power switched off to them to close it to boat traffic. We have our Mechanical & Electrics Team attending to site on Monday of which we will be able to…

    CRT's only update, 25 September 2026. 1 day without another.

  40. Wykewell Lift Bridge & Moors Swing Bridge - Planned power outage

    Stainforth & Keadby CanalYorkshire and North East

    same day

    From 13 August 2025

    Reopened 13 August 2025

    Where
    Wykewell Lift Bridge to Moores Swing Bridge
    CRT reason
    Information
    Cause
    Someone else's works
    Asset
    Swing bridge

    We have been informed by Northern Powergrid that there will be a planned power outage in the Thorne area on Wednesday, 13th August between 0800 - 1700. Please note that Wykewell Lift and Moores Swing bridges will not be operational during the power outage.

    CRT's only update, 6 August 2025.

  41. Bridge20, Wrenbury Bridge

    Llangollen CanalNorth West

    same day

    From 9 October 2025

    Reopened 9 October 2025

    Where
    Bridge 20, Wrenbury Bridge
    CRT reason
    Repair
    Cause
    Struck by boat or vehicle
    Asset
    Swing bridge

    The navigation is currently closed at Wrenbury Swing Bridge, Bridge 20 on the Llangollen Canal due to a vehicle strike. Our local team are aware and we are in the process of carrying out a repair. An update will be provided Friday 10 October.

    CRT's only update, 9 October 2025.

  42. Hungerford Marsh Swing Bridge 86.

    Kennet & Avon CanalWales and South West

    same day

    From 17 March 2026

    Reopened 17 March 2026

    Where
    Bridge 86, Marsh Swing Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Please be advised that Hungerford Marsh Swing Bridge will be undergoing emergency repair works from Tuesday 17th March to Friday 20th March. We appreciate your patience and understanding while these essential repairs are carried out. You are welcome to contact us at…

    CRT's only update, 16 March 2026.

  43. CLOSED - Bridge 187 Warehouse Swing Bridge

    Leeds & Liverpool CanalYorkshire and North East

    same day

    From 29 April 2026

    Reopened 29 April 2026

    Where
    Bridge 187, Warehouse Swing Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Warehouse Swing Bridge, Bridge 187 is currently not operational and has no electric power. Contractors are to attend to site to investigate and to undertake the repairs needed to the asset. We will update the notice once the bridge is operational.

    CRT's only update, 29 April 2026.

  44. Little Clegg Swing Bridge

    Rochdale CanalNorth West

    43 days

    From 7 May 2026

    Ended 19 June 2026

    Restriction, not a full closure

    Where
    Bridge 54A, Little Clegg Swing Bridge
    CRT reason
    Repair
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Navigation remains closed at Little Clegg Swing Bridge on the Rochdale Canal due to a fault with the lock mechanism and the hydraulic hose that operates the swing bridge. Our contractors have received the additional parts required to complete the repairs and have scheduled to…

    Latest of 7 CRT updates, 10 June 2026.

  45. Ufton Swingbridge.

    Kennet & Avon CanalWales and South West

    same day

    From 26 May 2026

    Reopened 26 May 2026

    Where
    Bridge 25A, Ufton Swingbridge
    CRT reason
    Information
    Cause
    Someone else's works
    Asset
    Swing bridge

    Please be aware that Scottish & Southern Electricity will be carrying out a planned power outage which will affect Ufton Swingbridge on Tuesday 26th May between 9am to 4pm. You are welcome to contact us at enquiries.walessouthwest@canalrivertrust.org.uk if you would like to…

    CRT's only update, 26 May 2026.

  46. Tyle Mill Swingbridge.

    Kennet & Avon CanalWales and South West

    same day

    From 26 May 2026

    Reopened 26 May 2026

    Where
    Bridge 23, Tyle Mill Swingbridge
    CRT reason
    Information
    Cause
    Someone else's works
    Asset
    Swing bridge

    Please be aware that Scottish & Southern Electricity will be carrying out a planned power outage which will affect Tyle Mill Swingbridge on Tuesday 26th May between 9am to 4pm. You are welcome to contact us at enquiries.walessouthwest@canalrivertrust.org.uk if you would like to…

    CRT's only update, 26 May 2026.

  47. CLOSED - Bridge 199, Micklethwaite Swing Bridge, Leeds & Liverpool

    Leeds & Liverpool CanalYorkshire and North East

    same day

    From 27 May 2026

    Reopened 27 May 2026

    Where
    Bridge 199, Micklethwaite Swing Bridge
    CRT reason
    Information
    Cause
    Weather
    Asset
    Swing bridge

    M&E have attended site and resolved the issue with the swing bridge. The bridge is now back open for navigation.

    Latest of 2 CRT updates, 27 May 2026.

  48. Bridge 187, Warehouse Swing Bridge - no power

    Leeds & Liverpool CanalYorkshire and North East

    same day

    From 24 July 2026

    Reopened 24 July 2026

    Where
    Bridge 187, Warehouse Swing Bridge
    CRT reason
    Maintenance
    Cause
    Other cause
    Asset
    Swing bridge

    We have been advised by National Grid that there is currently a power outage in the Kildwick area that is expected to continue for the rest of the evening and into the night. Due to this, Bridge 187 Warehouse Swing Bridge cannot be operated by boaters. The issue should be sorted…

    CRT's only update, 24 July 2026.

Coming up

Scheduled but not yet started, so in no figure above.

1 scheduled.
ClosureFromPlanned
Crabtree Swing Bridge 32, New Lane
Leeds & Liverpool Canal · Repair
4 January 202767 days

What fails · Canals · Reliability · Trends · Download data