Cruising-season closures outside CRT's winter programme, filed this way: 16 in June to August 2026 against 6 a year earlier, within what chance produces; tested on its own, not among the trends page's findings. How a change is tested.

On record
61 notices since May 2025: 58 closures and 3 restrictions

In force today

2 closures filed this way are in force today, longest shut first. Filter the explorer to them.

Shut today, counted to today.
CanalWhereSinceDays shut
Springs Branch (L&L Canal)Springs Branch - Visitor Moorings to Bridge 2, Mill Bridge8 January 20163,914
Ripon CanalLock 3, Oxclose Lock6 July 202643

By canal

27 canals have had a closure filed this way. A closure naming two canals counts on both.

Closures filed this way on each canal since May 2025, most first.
CanalClosures
River Severn Navigation11
Kennet & Avon Canal8
Leeds & Liverpool Canal7
Gloucester & Sharpness Canal4
New Junction Canal3
Sheffield & South Yorkshire Nav3
Stainforth & Keadby Canal3
Bridgwater & Taunton Canal2
Huddersfield Broad Canal2
Lancaster Canal2
Lee Navigation2
Leicester Line (Grand Union Canal)2
Show 15 moreShow fewer
CanalClosures
Regent's Canal2
Sheffield & Tinsley Canal2
Calder & Hebble Navigation1
Dukes Cut (Oxford Canal)1
Erewash Canal1
Hertford Union Canal1
Montgomery Canal1
Old River Lea1
Oxford Canal1
Peak Forest Canal1
Ripon Canal1
River Trent1
Springs Branch (L&L Canal)1
Trent & Mersey Canal1
Wakefield Branch (Aire & Calder)1

Every closure on record

Showing 58 closures and 3 restrictions CRT filed as “Information”.

Period

Rank by

Population

18 closures are in neither group: 18 unplanned with no day in the cruising season since May 2025.

Status

Duration

Cause

Asset affected

Lock part

Unplanned lock failures naming a part

Water problem

Unplanned failures naming one

CRT reason

Region

58
closures
903
closure-days since May 2025
644
in cruising season
2
no reopening date
What these figures mean
Population
Which closures a figure counts. All closures is everything; Unplanned closure drops the works CRT flags as its winter programme and any day outside the cruising season (the Friday nearest 15 March to the Sunday before the first Monday in November). Scheduled work CRT does not flag as winter works still counts here. CRT Planned closure is the flagged winter programme alone.
Defensible duration
The days between a closure's start and its reopening date, counted only where the dates allow it. A cancelled notice, or one whose reopening precedes its start, has no defensible duration and is in no total.
Closure-days
One day on which one closure was in force. Two closures on the same day are two closure-days; where the question is how long a canal was actually disrupted, overlapping notices are unioned into single intervals. They are counted from 1 May 2025, when this archive begins: a closure that started earlier adds only its days since then, though its own row shows its whole length. Every figure and chart counts only the days inside the Period chosen above them.
In force
A closure is in a Period, and a day is one a closure affected, if it was in force at any time that day, including the morning it reopened. Closure-days measure how long, so they count whole days and not the reopening day: a closure can be in a Period and add no closure-day to it.

Closures in force each month

closures active during the month
5
4
5
3
5
1
9
5
4
3
5
3
6
4
10
7
3
May 25Jun 25Jul 25Aug 25Sep 25Oct 25Nov 25Dec 25Jan 26Feb 26Mar 26Apr 26May 26Jun 26Jul 26Aug 26Sep 26

Canals ranked by the season's closures

share of the period's cruising-season days up to today — a closure somewhere on a long canal is likelier, and does not mean the canal was impassableclosures in force on the period's cruising-season days — a longer canal has more to go wrong on

Where

closure-days by regionclosures by region

A region with more canal has more to go wrong on, so these totals partly measure its size. Regions compared by length of canal are on the Reliability page.

What causes them

closure-days by causeclosures by cause

What fails

closure-days by assetclosures by asset

What fails on a lock

closure-days by part — unplanned lock failures naming a partclosures by part — unplanned lock failures naming a part

How long they last

closures by full length, including any days before May 2025 — the bands are not equal in width
25
21
8
2
1
1
<=1d2-7d8-30d31-90d91-365d>365d
61 results · every closure CRT filed as “Information”Jump to list

Closures

  1. Springs Branch of the Leeds & Liverpool Canal - From Springs Branch Moorings L1 to Bridge 2, Mill Bridge

    Springs Branch (L&L Canal)Yorkshire and North East

    3,914 days

    From 8 January 2016

    No reopening date

    Still shut

    513 of them since this archive began on 1 May 2025

    Where
    Springs Branch - Visitor Moorings to Bridge 2, Mill Bridge
    CRT reason
    Information
    Cause
    Ground moved
    Asset
    Canal or river

    This section of navigation remains closed and we are continuing to liaise with relevant parties to work towards a resolution. The restricted width means that powered boats will not get passed the obstruction, therefore such crafts should not proceed past the moorings. This…

    Latest of 2 CRT updates, 1 May 2025. 513 days without another.

  2. Dukes Cut Lock 44A

    Dukes Cut (Oxford Canal)London and South East

    133 days

    Fully shut 133 of CRT's 386 days

    From 21 August 2024

    Reopened 11 September 2025

    Where
    Lock 44A, Dukes Cut Lock
    CRT reason
    Information
    Cause
    Broke, cause not given
    Asset
    Lock

    Repairs to the paddle gearing completed Lock now open to navigation

    Latest of 4 CRT updates, 11 September 2025.

  3. Closed - Oxclose Lock

    Ripon CanalYorkshire and North East

    43 days

    Fully shut 43 of CRT's 82 days

    From 6 July 2026

    No reopening date

    Still shut

    Where
    Lock 3, Oxclose Lock
    CRT reason
    Information
    Cause
    Weather
    Asset
    Canal or river

    Oxclose Lock remains closed while additional investigations are carried out to identify and assess areas of water loss through the lock chamber. Specialist engineers will undertake microgravity surveys and detailed inspections, from Monday 14th September 2026, to determine the…

    Latest of 8 CRT updates, 3 September 2026. 23 days without another.

  4. Hertford Union Locks 1 to 3 closed due to boat strike

    Hertford Union CanalLondon and South East

    38 days

    From 8 December 2025

    Reopened 15 January 2026

    Where
    Lock 1, Top Lock to Lock 3, Bottom Lock
    CRT reason
    Information
    Cause
    Struck by boat or vehicle
    Asset
    Lock

    Work are scheduled for the week commending 12.01.2026 to complete a repair. We will update this notice by 16.01.2026 once we have more information from our regional team and contractors. Thank you for your ongoing patience and cooperation.

    Latest of 4 CRT updates, 9 January 2026.

  5. Lock 2 Gloucester Lock to Lock 4 Upper Lode Lock.

    River Severn NavigationWales and South West

    27 days

    From 1 December 2025

    Reopened 28 December 2025

    Where
    Lock 2 Gloucester Lock to Upper Lode Lock
    CRT reason
    Information
    Cause
    Weather
    Asset
    Canal or river

    UPDATE Please be advised that the section between Lock 2 Gloucester Lock and Lock 4 Upper Lode Lock is now open and safe to proceed. You are welcome to contact us at enquiries.walessouthwest@canalrivertrust.org.uk or 03030 404040 if you would like to discuss this information…

    Latest of 3 CRT updates, 28 December 2025.

  6. Bridge 30, Bathpool Swing Bridge, and Bridge 28, Hyde Bridge.

    Bridgwater & Taunton CanalWales and South West

    15 days

    From 9 July 2026

    Reopened 24 July 2026

    Where
    Bridge 28, Hyde to Bridge 30, Bathpool Swingbridge
    CRT reason
    Information
    Cause
    Other cause
    Asset
    Canal or river

    Please be advised that, due to a sunken craft, navigation is currently closed between Bridge 30, Bathpool Swing Bridge, and Bridge 28, Hyde Bridge. This notice will be updated when further information becomes available. In the meantime, please accept our apologies for any…

    CRT's only update, 9 July 2026.

  7. Bridge 47

    Lancaster CanalNorth West

    12 days

    From 14 November 2025

    Reopened 26 November 2025

    Where
    Bridge 47, Green Man Bridge
    CRT reason
    Information
    Cause
    Weather
    Asset
    Canal or river

    Navigation remains closed at Bridge 47 on the Lancaster Canal, following the large trees that have fallen. Unfortunately due to the contractors high volume of work from the recent Storm Claudia, we are currently still awaiting confirmation of their attendance. We will provide a…

    Latest of 3 CRT updates, 21 November 2025.

  8. Bridge 1 Victoria Rd & Lock 2 Newtown Lock.

    Bridgwater & Taunton CanalWales and South West

    12 days

    From 22 January 2026

    Reopened 3 February 2026

    Where
    Bridge 1, Victoria Rd to Lock 2, Newtown Lock
    CRT reason
    Information
    Cause
    Weather
    Asset
    Canal or river

    Please be advised that a tree is blocking navigation between Bridge 1 Victoria Road and Lock 2 Newtown Lock. Contractors are aware and we will update this notice with more information as soon as possible. We apologise for any inconvenience & invite customers to contact the…

    CRT's only update, 22 January 2026.

  9. Navigation Closure - Lee Navigation, Lock 1a, Carpenter's Road Lock

    Old River LeaLondon and South East

    11 days

    From 16 May 2025

    Reopened 27 May 2025

    Where
    Lock 1a, Carpenter's Road Lock
    CRT reason
    Information
    Cause
    Broke, cause not given
    Asset
    Lock

    Carpenters Road Lock is currently due to a technical fault. Engineers are aware and will repair the fault as soon as possible.

    CRT's only update, 16 May 2025.

  10. Frankton Locks

    Montgomery CanalWest Midlands

    10 days

    From 5 January 2026

    Reopened 15 January 2026

    Where
    Lock 1, Frankton Locks to Lock 4, Frankton Locks
    CRT reason
    Information
    Cause
    Weather
    Asset
    Canal or river

    Due to current weather conditions and a forecast of continued cold temperatures, Frankton Locks on the Montgomery Canal are temporarily closed to navigation. We apologise for any inconvenience this may cause and thank boaters for their understanding. Further updates will be…

    CRT's only update, 5 January 2026.

  11. Lock 60 Crofton Lock to Lock 61 Crossing Lock.

    Kennet & Avon CanalWales and South West

    9 days

    From 14 April 2026

    Reopened 23 April 2026

    Where
    Lock 61, Crossing Lock to Lock 60, Crofton Lock
    CRT reason
    Information
    Cause
    Weather
    Asset
    Canal or river

    Please be advised that both the navigation and towpath are currently closed between Lock 60 and Lock 61. This is due to overhead power lines arcing onto a fallen tree limb, creating a significant safety hazard. The Fire Brigade is on site and the area will remain closed until…

    CRT's only update, 14 April 2026.

  12. River Severn Navigation- Diglis Large Lock 6

    River Severn NavigationWales and South West

    8 days

    From 27 May 2026

    Reopened 4 June 2026

    Where
    Lock 6 Diglis (Large)
    CRT reason
    Information
    Cause
    Broke, cause not given
    Asset
    Lock

    Further to the notice below, we are pleased to confirm the works at Diglis Lock 6 have now been completed and the navigation is now open. You are welcome to contact us at enquiries.walessouthwest@canalrivertrust.org.uk or 03030 404040 if you would like to discuss this…

    Latest of 3 CRT updates, 4 June 2026.

  13. Maida Hill Tunnel Closed

    Regent's CanalLondon and South East

    7 days

    From 29 April 2025

    Reopened 6 May 2025

    5 of them since this archive began on 1 May 2025

    Where
    Bridge 1, Warwick Avenue to Lock 3, Bypass Weir Kentish Town Lock
    CRT reason
    Information
    Cause
    Pollution
    Asset
    Tunnel

    Further Update: Specialist contractors have started to empty the generator tanks and will continue overnight. Clean up of the canal is underway and the western portal has been skimmed today and booms still in place. We plan to start to draw the water through the tunnel tomorrow…

    Latest of 3 CRT updates, 2 May 2025.

  14. Lock 12 – Pulteney Gardens Lock.

    Kennet & Avon CanalWales and South West

    5 days

    From 12 March 2026

    Reopened 17 March 2026

    Where
    Lock 12, Pulteney Gardens Lock
    CRT reason
    Information
    Cause
    Broke, cause not given
    Asset
    Lock

    Please be advised that Lock 12, Pulteney Gardens Lock is currently closed due to an issue with the gate. Our colleagues are scheduled to attend site tomorrow to undertake further investigation. This notice will be updated with additional information as soon as it becomes…

    CRT's only update, 12 March 2026.

  15. Lock 65 Stanton Lock to Lock 66 Hallam Fields Lock.

    Erewash CanalEast Midlands

    5 days

    From 24 June 2026

    Reopened 29 June 2026

    Where
    Lock 66 - Hallam Fields Lock to Lock 65 - Stanton
    CRT reason
    Information
    Cause
    Weather
    Asset
    Canal or river

    Please be advised that due to low water levels between Lock 65 Stanton Lock and Lock 66 Hallam Fields Lock, the navigation is currently closed. A further update is due on or before Friday 26th June. In the meantime we apologise for any inconvenience & invite customers to contact…

    CRT's only update, 24 June 2026.

  16. Keadby Rail Bridge

    Stainforth & Keadby CanalYorkshire and North East

    4 days

    From 13 November 2025

    Reopened 17 November 2025

    Where
    Bridge 83, Keadby Rail Drawbridge
    CRT reason
    Information
    Cause
    Broke, cause not given
    Asset
    Swing bridge

    Network Rail has advised us that Keadby Canal Swing Bridge cannot be opened for boats to pass until further notice due to ongoing signalling issues. The Signalling Team is due to attend site today. This notice will be updated as soon as we receive confirmation from Network Rail…

    CRT's only update, 13 November 2025.

  17. Between Bridge 92 - 94

    Lancaster CanalNorth West

    4 days

    From 17 November 2025

    Reopened 21 November 2025

    Where
    Bridge 92, Burrow Beck Bridge to Bridge 94, Ashton Lane Bridge
    CRT reason
    Information
    Cause
    Weather
    Asset
    Canal or river

    Navigation and towpath remains closed between Bridge 92 and 94 on the Lancaster Canal, following a large tree that has fallen. Due to the recent Storm Claudia our contractors are experiencing a high volume of work and we are currently awaiting confirmation of their attendance.…

    Latest of 2 CRT updates, 19 November 2025.

  18. Gloucester Lock 2 to Lock 6 Diglis.

    River Severn NavigationWales and South West

    4 days

    From 21 November 2025

    Reopened 25 November 2025

    Where
    Lock 2 Gloucester Lock to Lock 6 Diglis (Large)
    CRT reason
    Information
    Cause
    Weather
    Asset
    Canal or river

    Please be advised that due to the recent rain, the section between Gloucester Lock 2 and Diglis Lock 6 is currently designated: Red - Do not proceed. CAUTION STRONG STREAM We advise all customers not to navigate because the strong flows make it difficult and dangerous (Locks may…

    CRT's only update, 21 November 2025.

  19. Gloucester Lock 2 to Diglis Lock 6.

    River Severn NavigationWales and South West

    3 days

    From 6 November 2025

    Reopened 9 November 2025

    Where
    Lock 2 Gloucester Lock to Lock 6 Diglis (Large)
    CRT reason
    Information
    Cause
    Weather
    Asset
    Canal or river

    Please be advised that due to the recent rain, the section of river between Gloucester Lock 2 and Diglis Lock 6 is currently closed due to high water levels. We advise all customers not to navigate because the strong flows make it difficult and dangerous. The river above this…

    CRT's only update, 6 November 2025.

  20. Between Bridge 23 and 24

    Peak Forest CanalNorth West

    3 days

    From 14 November 2025

    Reopened 17 November 2025

    Where
    Bridge 23, Stanley Hall Bridge to Bridge 24, Wood End Lift Bridge
    CRT reason
    Information
    Cause
    Weather
    Asset
    Canal or river

    A large tree has fallen and is blocking the navigation and towpath, between Bridges 23 Stanley Hall Bridge and Bridge 24, Wood End Lift Bridge on the Peak Forest Canal. We have instructed specialist contractors to assist with the removal, however due to adverse weather…

    CRT's only update, 14 November 2025.

  21. Navigation Closure - Huddersfield Broad Canal, Between Falls Lock, Lock 8 and Red Doles Lock, Lock 9, Huddersfield - OPEN

    Huddersfield Broad CanalYorkshire and North East

    3 days

    From 6 March 2026

    Reopened 9 March 2026

    Where
    Lock 9, Red Doles Lock to Lock 8, Falls Lock
    CRT reason
    Information
    Cause
    Ground moved
    Asset
    Canal or river

    The water levels have recovered over the weekend and the section of navigation is now open.

    Latest of 2 CRT updates, 9 March 2026.

  22. Maida Hill Tunnel Closure

    Regent's CanalLondon and South East

    2 days

    From 12 May 2025

    Reopened 14 May 2025

    Where
    Bridge 1, Warwick Avenue to Lock 3, Bypass Weir Kentish Town Lock
    CRT reason
    Information
    Cause
    Pollution
    Asset
    Tunnel

    Our team have confirmed that we've reopened the Maida Hill Tunnel. Thank you for your patience around this situation.

    Latest of 5 CRT updates, 14 May 2025.

  23. Long Sandall Lock

    Sheffield & South Yorkshire NavYorkshire and North East

    2 days

    From 6 July 2025

    Reopened 8 July 2025

    Where
    Long Sandall Lock
    CRT reason
    Information
    Cause
    Broke, cause not given
    Asset
    Lock

    Due to an issue with the user pedestals at Long Sandall, the lock is out of operation. Our engineers will be attending site in the morning (07/07) to carry out a repair.

    CRT's only update, 6 July 2025.

  24. The pound between Lock 71 Picketsfield Lock to Lock 72 Cobblers Lock.

    Kennet & Avon CanalWales and South West

    2 days

    From 3 November 2025

    Reopened 5 November 2025

    Where
    Lock 72, Cobblers Lock to Lock 71, Picketsfield
    CRT reason
    Information
    Cause
    Other cause
    Asset
    Canal or river

    Please be advised that due to the paddles being left open at Picketsfield Lock, the pound between Lock 71 and Lock 72 has been drained of water. We are currently working to refill the pound, which is expected to take several days. As a result, navigation in this section is…

    CRT's only update, 3 November 2025.

  25. Diglis Lock to Gloucester Lock 2.

    River Severn NavigationWales and South West

    2 days

    From 3 March 2026

    Reopened 5 March 2026

    Where
    Lock 2 Gloucester Lock to Lock 6 Diglis (Large)
    CRT reason
    Information
    Cause
    Weather
    Asset
    Canal or river

    Please be advised that due to a period of persistent rain, the section between Diglis Lock and Gloucester Lock 2 is designated: Red - Do not proceed. CAUTION STRONG STREAM - We advise users of all boats not to navigate because the strong flows make it difficult and dangerous…

    CRT's only update, 3 March 2026.

  26. The section between Upper Lode Lock and Gloucester Lock 2.

    River Severn NavigationWales and South West

    2 days

    Fully shut 2 of CRT's 6 days

    From 5 March 2026

    Reopened 11 March 2026

    Where
    Lock 2 Gloucester Lock to Upper Lode Lock
    CRT reason
    Information
    Cause
    Weather
    Asset
    Canal or river

    Please be advised that the section between Upper Lode Lock and Gloucester Lock 2 is designated: AMBER - PROCEED WITH CAUTION

    Latest of 2 CRT updates, 7 March 2026.

  27. Gloucester Lock 2.

    River Severn Navigation, Gloucester & Sharpness CanalWales and South West

    2 days

    From 28 April 2026

    Reopened 30 April 2026

    Where
    Lock 2 Gloucester Lock
    CRT reason
    Information
    Cause
    Broke, cause not given
    Asset
    Lock

    Please be advised that the downstream gates at Gloucester Lock are currently inoperable, and the lock is closed to navigation at this time. Our maintenance team are working to resolve the issue as quickly as possible. Further updates will be provided once progress is made.…

    CRT's only update, 28 April 2026.

  28. CLOSED - Bridge 199, Micklethwaite Swing Bridge, Leeds & Liverpool

    Leeds & Liverpool CanalYorkshire and North East

    2 days

    From 25 May 2026

    Reopened 27 May 2026

    Where
    Bridge 199, Micklethwaite Swing Bridge
    CRT reason
    Information
    Cause
    Weather
    Asset
    Swing bridge

    Now that temperatures have dropped the issue has been resolved and the swing bridge is back open for use as normal.

    Latest of 3 CRT updates, 27 May 2026.

  29. Upper Lode Lock.

    River Severn NavigationWales and South West

    2 days

    Fully shut 2 of CRT's 6 days

    From 24 June 2026

    Reopened 30 June 2026

    Where
    Upper Lode Lock
    CRT reason
    Information
    Cause
    Weather
    Asset
    Lock

    Further to the notice below, please be advised that from tomorrow (Saturday 27th June), Upper Lode Lock will be fully open and operating as normal. All repairs to the lock are scheduled to be carried out during the week commencing 29th June by our maintenance team. You are…

    Latest of 3 CRT updates, 26 June 2026.

  30. Lock 67 , Little Bedwyn Lock and Lock 68 Oakhill Down Lock.

    Kennet & Avon CanalWales and South West

    2 days

    From 17 July 2026

    Reopened 19 July 2026

    Where
    Lock 68, Oakhill Down Lock to Lock 67, Little Bedwyn Lock
    CRT reason
    Information
    Cause
    Vandalism
    Asset
    Canal or river

    Please be advised that due to low water levels, the pound between lock 67 and 68 is closed to navigation to allow water levels to recover. It has been identified that there has been deliberate misuse of the lock, which has contributed to the current situation and has…

    CRT's only update, 17 July 2026.

  31. CLOSED - Kirkstall, Forge and Newlay Locks

    Leeds & Liverpool CanalYorkshire and North East

    2 days

    From 23 July 2026

    Reopened 25 July 2026

    Where
    Lock 13, Newlay Top Lock to Lock 7, Kirkstall Little Lock
    CRT reason
    Information
    Cause
    Vandalism
    Asset
    Canal or river

    Our local team has attended site and assessed the water levels along this section of the canal. While levels have improved since the temporary closure was put in place, they have not yet recovered sufficiently to allow navigation to reopen safely. To ensure there is enough water…

    Latest of 2 CRT updates, 24 July 2026.

  32. Tinsley flight - CLOSED 29th-30th August

    Sheffield & Tinsley Canal, Sheffield & South Yorkshire NavYorkshire and North East

    2 days

    Fully shut 2 of CRT's 2 days

    From 29 August 2026

    Reopened 31 August 2026

    Where
    Lock 1 Tinsley to Tinsley No.12 Lock
    CRT reason
    Information
    Cause
    Nothing failed
    Asset
    Lock

    The Tinsley Lock flight will be closed on the 29th and 30th of August due to staff sickness. It will be open as normal for boaters from the 31st of August.

    CRT's only update, 26 August 2026.

  33. Tinsley Flight - closed 12th and 13th of September

    Sheffield & Tinsley Canal, Sheffield & South Yorkshire NavYorkshire and North East

    2 days

    Fully shut 2 of CRT's 4 days

    From 10 September 2026

    Reopened 14 September 2026

    Where
    Lock 1 Tinsley to Tinsley No.12 Lock
    CRT reason
    Information
    Cause
    Nothing failed
    Asset
    Lock

    The Tinsley Flight will be closed on the 12th and 13th of September due to staff sickness. It will be back open as normal for assisted passage from Monday the 14th of September onwards.

    CRT's only update, 10 September 2026.

  34. Lock 8 Aqueduct Lock Closed due to damaged paddle

    Lee NavigationLondon and South East

    1 day

    From 11 June 2025

    Reopened 12 June 2025

    Where
    Lock 8, Aqueduct Lock
    CRT reason
    Information
    Cause
    Broke, cause not given
    Asset
    Lock

    Our engineers have confirmed that this has been repaired and the lock is back in operation.

    Latest of 2 CRT updates, 12 June 2025.

  35. Between Bridge 205 & Bridge 206

    Trent & Mersey CanalNorth West

    1 day

    From 16 June 2025

    Reopened 17 June 2025

    Where
    Bridge 206, Bradley Meadow Bridge to Aqueduct, Bridge 205 Little Leigh
    CRT reason
    Information
    Cause
    Weather
    Asset
    Canal or river

    Navigation is closed between Bridge 205 and Bridge 206, Bradley Meadow Bridge, on the Trent & Mersey Canal due to a windblown tree. Our contractors have been informed, and we await their attendance. An update will be provided by Wednesday 18 June.

    CRT's only update, 16 June 2025.

  36. Victoria Bridge.

    Gloucester & Sharpness CanalWales and South West

    1 day

    From 1 July 2025

    Reopened 2 July 2025

    Where
    Victoria Basin Swing Bridge
    CRT reason
    Information
    Cause
    Weather
    Asset
    Swing bridge

    Due to the current hot weather, Victoria Swing Bridge will be closed today. We apologise for any inconvenience this may cause and appreciate your understanding. The bridge will reopen once temperatures have dropped to a safe level. You are welcome to contact us at…

    CRT's only update, 1 July 2025.

  37. Thornes Lock - Failed Paddle

    Calder & Hebble NavigationYorkshire and North East

    1 day

    From 24 July 2025

    Reopened 25 July 2025

    Where
    Lock 27, Thornes
    CRT reason
    Information
    Cause
    Broke, cause not given
    Asset
    Lock

    The team have attended site to attend the paddle at Thornes Lock. The paddle has been swapped but the repair was not sufficient enough to create a seal, making it unsafe to operate. The Lock has been closed as a result. We will update this notice by 3pm on Friday, 25th July.

    CRT's only update, 24 July 2025.

  38. Navigation Closure, Lock 46, Isis Lock

    Oxford CanalLondon and South East

    1 day

    From 21 September 2025

    Reopened 22 September 2025

    Where
    Lock 46, Isis Lock
    CRT reason
    Information
    Cause
    Broke, cause not given
    Asset
    Lock

    Our team are assessing the damage and an update will be posted once they've reported back the results.

    Latest of 2 CRT updates, 22 September 2025.

  39. From Bridge 22 Hempsted Road Swing Bridge to Lock 2 Gloucester Lock.

    Gloucester & Sharpness Canal, River Severn NavigationWales and South West

    1 day

    From 20 November 2025

    Reopened 21 November 2025

    Where
    Lock 2 Gloucester Lock
    CRT reason
    Information
    Cause
    Nothing failed
    Asset
    Canal or river

    Please be advised that due to a police incident the navigation is temporarily closed. We kindly ask boating customers not to navigate during this on going incident. We will update this notice when we have further information. You are welcome to contact us at…

    CRT's only update, 20 November 2025.

  40. Foxton Lock Flight

    Leicester Line (Grand Union Canal)East Midlands

    1 day

    From 25 December 2025

    Reopened 26 December 2025

    Where
    Lock 8 to Lock 17
    CRT reason
    Information
    Cause
    Nothing failed
    Asset
    Lock

    Foxton Lock Flight will be closed on 25th and 26th December. Due to limited resources, we are unable to safely open the locks for operation. Normal winter hours will resume on 27th December, and will be open from 9:30am, last boat in at 2:30pm. More information on opening times…

    CRT's only update, 9 December 2025.

  41. Loco Bridge - unoperable due to a key stuck in the lock. - Fixed and operational

    Huddersfield Broad CanalYorkshire and North East

    1 day

    From 2 July 2026

    Reopened 3 July 2026

    CRT's title says reopened

    Where
    Bridge 17, Quay Street Loco Liftbridge
    CRT reason
    Information
    Cause
    Other cause
    Asset
    Lift bridge

    M&E attended early this morning and the issue has been resolved. The Loco lift bridge is operational.

    Latest of 2 CRT updates, 3 July 2026.

  42. Bingley 3 & 5 Rise - Closed

    Leeds & Liverpool CanalYorkshire and North East

    1 day

    From 10 July 2026

    Reopened 11 July 2026

    Where
    Lock 29, Bingley 5 Rise Top Lock to Lock 22, Bingley 3 Rise Bottom Lock
    CRT reason
    Information
    Cause
    Nothing failed
    Asset
    Lock

    Due to todays high temperatures and forecasted extreme heat later today we will be closing Bingley Five and Three Rise locks at 12.30pm. These will re-open as normal tomorrow. We will continue to exercise operational flexibility to best manage the welfare of our colleagues and…

    CRT's only update, 10 July 2026.

  43. Bank Newton to Gargrave

    Leeds & Liverpool CanalYorkshire and North East

    1 day

    From 11 July 2026

    Reopened 12 July 2026

    Where
    Leeds & Liverpool Canal - 047 to Leeds & Liverpool Canal - 051
    CRT reason
    Information
    Cause
    Nothing failed
    Asset
    Canal or river

    | To protect the health, safety and wellbeing of our staff and volunteers during the forecast high temperatures this afternoon, the Leeds & Liverpool Canal between Bank Newton and Gargrave will be temporarily closed to navigation from this afternoon. The canal is scheduled to…

    CRT's only update, 11 July 2026.

  44. Kings Road Lock - Closure

    Wakefield Branch (Aire & Calder)Yorkshire and North East

    1 day

    From 13 July 2026

    Reopened 14 July 2026

    Where
    Lock 3, Kings Road Lock
    CRT reason
    Information
    Cause
    Planned works
    Asset
    Lock

    Due to divers being on site at Birkwood Lock today, Kings Road Lock will be closed until tomorrow morning, Tuesday 14th July. This is to maintain water levels in the short pound between Kings Road and Birkwood Locks. The lock will reopen at 08:00 tomorrow.

    CRT's only update, 13 July 2026.

  45. Keadby Lock - closure

    Stainforth & Keadby CanalYorkshire and North East

    1 day

    Fully shut 1 of CRT's 17 days

    From 28 July 2026

    Reopened 14 August 2026

    Where
    Keadby Lock
    CRT reason
    Information
    Cause
    Nothing failed
    Asset
    Lock

    Keadby Lock will now be open on the 22nd - 23rd of August. The closure on the 14th of August will still be taking place.

    Latest of 2 CRT updates, 3 August 2026.

  46. Wykewell Lift Bridge & Moors Swing Bridge - Planned power outage

    Stainforth & Keadby CanalYorkshire and North East

    same day

    From 13 August 2025

    Reopened 13 August 2025

    Where
    Wykewell Lift Bridge to Moores Swing Bridge
    CRT reason
    Information
    Cause
    Someone else's works
    Asset
    Swing bridge

    We have been informed by Northern Powergrid that there will be a planned power outage in the Thorne area on Wednesday, 13th August between 0800 - 1700. Please note that Wykewell Lift and Moores Swing bridges will not be operational during the power outage.

    CRT's only update, 6 August 2025.

  47. Upper Lode Lock.

    River Severn NavigationWales and South West

    same day

    From 24 September 2025

    Reopened 24 September 2025

    Where
    Upper Lode Lock
    CRT reason
    Information
    Cause
    Someone else's works
    Asset
    Lock

    Please be advised that Upper Lode Lock will be closed on Wednesday 24th September from 8:00am until 6:00pm due to a loss of electrical supply. We apologise for any inconvenience this may cause and appreciate your understanding. You are welcome to contact us at…

    CRT's only update, 18 September 2025.

  48. Lock 60 Crofton Lock - Lock 54 Cadley Lock.

    Kennet & Avon CanalWales and South West

    same day

    From 19 September 2025

    Reopened 19 September 2025

    Where
    Lock 60, Crofton Lock to Lock 54, Cadley Lock
    CRT reason
    Information
    Cause
    Other cause
    Asset
    Canal or river

    We would like to inform you that Crofton Flight was closed at 1:30pm today due to the pound being drained, as a result of the gate being left open. Our Operations Team are aware and will be on site to assess the situation. We apologise for any inconvenience this may cause and…

    CRT's only update, 19 September 2025.

  49. Watford Lock Flight

    Leicester Line (Grand Union Canal)East Midlands

    same day

    From 25 December 2025

    Reopened 25 December 2025

    Where
    Lock 1 to Lock 7
    CRT reason
    Information
    Cause
    Nothing failed
    Asset
    Lock

    Watford Lock Flight will be closed on 25th December. Due to limited resources, we are unable to safely open the locks for operation. Normal winter hours will resume on 26th December, and will be open from 9:30am, last boat in at 2:30pm. More information on opening times can be…

    CRT's only update, 9 December 2025.

  50. Tottenham Lock

    Lee NavigationLondon and South East

    same day

    From 15 February 2026

    Reopened 15 February 2026

    Where
    Lock 17, Tottenham Lock, Eastern Side
    CRT reason
    Information
    Cause
    Other cause
    Asset
    Lock

    A swan has become trapped within the lock gate. The Swan Sanctuary are attending to try to rescue it. The lock will be out of operation until the swan can be rescued.

    CRT's only update, 15 February 2026.

  51. Lock 101 Sheffield Lock to Lock 102 Garston Lock.

    Kennet & Avon CanalWales and South West

    9 days

    From 1 June 2026

    Ended 10 June 2026

    Restriction, not a full closure

    Where
    Lock 102, Garston Lock to Lock 101, Sheffield Lock
    CRT reason
    Information
    Cause
    Broke, cause not given
    Asset
    Lock

    Further to the notice below, we would like to advise customers that Garston Lock is open, however please note that it currently takes 15 minutes to refill. Further repair works are scheduled to begin during the W/C 8th June. We will provide additional details and timings later…

    Latest of 2 CRT updates, 1 June 2026.

  52. Gloucester Lock 2.

    River Severn Navigation, Gloucester & Sharpness CanalWales and South West

    18 days

    From 29 June 2026

    Ended 17 July 2026

    Restriction, not a full closure

    Where
    Lock 2 Gloucester Lock
    CRT reason
    Information
    Cause
    Planned works
    Asset
    Lock

    Please be advised that the essential maintenance works currently taking place at Gloucester Lock 2 are taking longer than originally planned to complete. During the installation of the refurbished stop plank channels, several unforeseen issues were encountered which have delayed…

    Latest of 2 CRT updates, 10 July 2026.

  53. Ufton Swingbridge.

    Kennet & Avon CanalWales and South West

    same day

    From 26 May 2026

    Reopened 26 May 2026

    Where
    Bridge 25A, Ufton Swingbridge
    CRT reason
    Information
    Cause
    Someone else's works
    Asset
    Swing bridge

    Please be aware that Scottish & Southern Electricity will be carrying out a planned power outage which will affect Ufton Swingbridge on Tuesday 26th May between 9am to 4pm. You are welcome to contact us at enquiries.walessouthwest@canalrivertrust.org.uk if you would like to…

    CRT's only update, 26 May 2026.

  54. Tyle Mill Swingbridge.

    Kennet & Avon CanalWales and South West

    same day

    From 26 May 2026

    Reopened 26 May 2026

    Where
    Bridge 23, Tyle Mill Swingbridge
    CRT reason
    Information
    Cause
    Someone else's works
    Asset
    Swing bridge

    Please be aware that Scottish & Southern Electricity will be carrying out a planned power outage which will affect Tyle Mill Swingbridge on Tuesday 26th May between 9am to 4pm. You are welcome to contact us at enquiries.walessouthwest@canalrivertrust.org.uk if you would like to…

    CRT's only update, 26 May 2026.

  55. CLOSED - Bridge 199, Micklethwaite Swing Bridge, Leeds & Liverpool

    Leeds & Liverpool CanalYorkshire and North East

    same day

    From 27 May 2026

    Reopened 27 May 2026

    Where
    Bridge 199, Micklethwaite Swing Bridge
    CRT reason
    Information
    Cause
    Weather
    Asset
    Swing bridge

    M&E have attended site and resolved the issue with the swing bridge. The bridge is now back open for navigation.

    Latest of 2 CRT updates, 27 May 2026.

  56. Bingley Five and Three Rise Locks to Remain Closed on Saturday, 11th July

    Leeds & Liverpool CanalYorkshire and North East

    same day

    From 11 July 2026

    Reopened 11 July 2026

    Where
    Lock 29, Bingley 5 Rise Top Lock to Lock 22, Bingley 3 Rise Bottom Lock
    CRT reason
    Information
    Cause
    Nothing failed
    Asset
    Lock

    Due to continued high temperatures and forecasted extreme heat for Saturday, Bingley Five and Three Rise locks will remain closed for the day. We will continue to monitor the temperatures and provide an update for Sunday, tomorrow.

    CRT's only update, 10 July 2026.

  57. Kirkstall, Forge and Newlay Locks to remain closed, Saturday 11th July

    Leeds & Liverpool CanalYorkshire and North East

    same day

    From 11 July 2026

    Reopened 11 July 2026

    Where
    Lock 13, Newlay Top Lock to Lock 7, Kirkstall Little Lock
    CRT reason
    Information
    Cause
    Nothing failed
    Asset
    Lock

    Due to continued high temperatures and forecasted extreme heat for Saturday, Kirkstall, Forge and Newlay locks will remain closed for the day. We will continue to monitor the temperatures and provide an update for Sunday, tomorrow.

    CRT's only update, 10 July 2026.

  58. Northern Powergrid planned outage at Kirkhouse Green Bridge on the Wednesday 19th August from 08:30hrs to 16:30hrs

    New Junction CanalYorkshire and North East

    same day

    From 19 August 2026

    Reopened 19 August 2026

    Where
    Kirkhouse Green Lift Bridge 4
    CRT reason
    Information
    Cause
    Someone else's works
    Asset
    Bridge

    Northern Powergrid have got a planned outage to carry out works. Kirkhouse Green Bridge will not be able to operate on the Wednesday 19th August from 08:30hrs to 16:30hrs.

    CRT's only update, 6 August 2026.

  59. Northern Powergrid Planned outage at Low Lane Bridge on Wed 19th August from 08:30 - 16:30hrs

    New Junction CanalYorkshire and North East

    same day

    From 19 August 2026

    Reopened 19 August 2026

    Where
    Low Lane Swing Bridge 2
    CRT reason
    Information
    Cause
    Someone else's works
    Asset
    Bridge

    Northern Powergrid have got a planned outage to carry out works. Low Lane Bridge will not be able to operate on the Wednesday 19th August from 08:30hrs to 16:30hrs.

    CRT's only update, 6 August 2026.

  60. Northern Powergrid planned outage to Top Lane Bridge on the Wednesday 19th August from 08:30hrs - 16:30hrs

    New Junction CanalYorkshire and North East

    same day

    From 19 August 2026

    Reopened 19 August 2026

    Where
    Top Lane Lift Bridge 3
    CRT reason
    Information
    Cause
    Someone else's works
    Asset
    Bridge

    Northern Powergrid have got a planned outage to carry out works. Top Lane Bridge will not be able to operate on the Wednesday 19th August from 08:30hrs to 16:30hrs.

    CRT's only update, 6 August 2026.

  61. Lock 12, Hazelford Lock

    River TrentEast Midlands

    same day

    From 12 September 2026

    Ended 12 September 2026

    Restriction, not a full closure

    Where
    Lock 12, Hazelford Lock
    CRT reason
    Information
    Cause
    Broke, cause not given
    Asset
    Lock

    Due to an issue with the self-operational pedestals, Hazelford lock will be closed to boating traffic overnight. The lock will be open to traffic with the assistance of our on duty lock keepers between the hours of 0900-1630hrs.

    CRT's only update, 12 September 2026.